Get Minimum Development Time

Estimated MediumJudge-ready

Topics (AI-labelled)GreedyPrefix & Ranges

Each feature is handled in exactly one of two ways: development takes developmentTime[i], and integration takes integrationTime[i]. Development is carried out simultaneously by as many members as needed, while integration is done sequentially by the team lead alone; the two kinds of work may overlap. Find the shortest time to finish everything. The parallel/serial conditions were recovered from the original HTML.

Input

The first line contains n, followed by two lines giving the development times and the integration times respectively. On this site 1≤n≤200000, and both kinds of times are in 1..10⁹.

Output

Output the shortest schedule length. The intermediate sum of integration times requires 64 bits.

Example 1

Input:

5
10 12 13 8 15
1 2 1 1 1

Output:

6

Example 2

Input:

2
2 100
100 3

Output:

3

Example 3

Input:

1
1
100

Output:

1

Example notes

The answers are 6, 3, and 1; in the second example, development and integration run in parallel, so 2 and 3 must not be added.