cswork / OAOpen practice workspace

MicrosoftOA #36

Maximize Number of Produced Cars

Estimated HardJudge-ready

Topics (AI-labelled)KnapsackGreedy

Each car can be assigned to either assembly line, cannot switch lines once started, and is built at most once. The two lines have time budgets X and Y respectively; maximize the number of cars built.

Input

The first line contains N X Y (1≤N≤1000, 1≤X,Y≤500), and the second line contains N durations (1..1000).

Output

Output a single integer, the answer.

Example 1

Input:

3 1 1
1 1 3

Output:

2

Example 2

Input:

5 8 9
6 5 5 4 3

Output:

4

Example 3

Input:

4 8 8
5 5 4 6

Output:

2

Example notes

Example 1: each line builds one car of duration 1, for 2 in total.

Example 2: split the cars as 3+5 and 4+5, for 4 cars in total.

Example 3: any two cars take at least 9, so each line builds at most one car, for 2 in total.

Editorial

Loading solution…