Interview guides · Tucson Electric Power
Tucson Electric Power Software Engineer Interview Guide
Tucson Electric Power Software Engineer interview guide: reported rounds, questions and how candidates describe the process.
The 60-second brief
As a Software Engineer at Tucson Electric Power (TEP), you are at the intersection of critical infrastructure and modern technology. You will play a vital role in maintaining the digital systems that support the reliable delivery of electricity to the Tucson community. Your work directly impacts the operational efficiency of power plants, grid management systems, and the internal tools that keep the organization running effectively. This position requires a high degree of technical reliability and a strong sense of ownership. You will be expected to bridge the gap between complex engineering requirements and functional software solutions. Whether you are working on legacy system integration or developing new tools for plant operations, your contributions are essential to the stability and modernization of Tucson Electric Power.
This guide is scoped to a Software Engineer candidate at Tucson Electric Power.
Focus areas
- Questioning Skills (Asking Clarifying Questions)
- Communication
- Power Systems / Power Plant Domain Knowledge
Where to focus your preparation
No round sequence has been reported for Tucson Electric Power. Confirm the format with your recruiter.
Preparation focus
No round sequence has been reported for this company, so confirm the format with your recruiter and work the reported questions below.
What to demonstrate
- Breadth across the topics this company reports testing
- Whether you confirm the format before preparing for it
How to prepare
- Ask the recruiter for the sequence, the duration of each stage and whether you will be writing code
- Work the reported questions below and time yourself
Where candidates lose points
Showcase your reliability
In the utility sector, reliability is everything. Use your answers to highlight times you have been dependable and thorough.
Prepare for the "Why TEP?" question
Have a compelling, research-backed answer for why you want to work for a utility provider specifically.
Be ready for behavioral questions
Don't neglect your "soft skills." How you interact with your team is often as important as the code you write.
Practice your technical explanations
You will likely need to explain your work to non-technical stakeholders, so practice simplifying your technical explanations.
Questions & practice
Identify the heaviest tenants in a five-minute window under memory pressure
Medium · top-k · heavy hitters · streaming
The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.
Approach
- Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
- Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
- State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
- Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.
Follow-up
- The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
- Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?
Canonicalise a request body into a stable idempotency fingerprint
Medium · parsing · canonicalisation · hashing
idempotency_key.request_fingerprint is a SHA-256 over the method, path and canonicalised body, and a retry whose fingerprint differs must be rejected with 422 rather than served the stored response. Write the canonicaliser. Bodies are JSON up to 256 KB nested at most 32 levels; clients vary key order, whitespace and unicode escaping, and some send 64-bit ids as JSON numbers. Produce a deterministic byte string such that semantically identical bodies match and any semantic difference does not. State your complexity and name two normalisations you refuse to perform.
Approach
- Parse once into a tree, then re-serialise under fixed rules: object keys sorted, array order preserved, one escaping convention, no insignificant whitespace. Parsing is O(n) and sorting keys is O(k log k) per object, so O(n log n) overall with O(depth) stack, and the 32-level cap is enforced during parsing because hostile nesting is how a canonicaliser becomes a stack overflow.
- Sort keys by their UTF-8 bytes and say why the obvious implementation is wrong in some runtimes: a default string comparison that orders by UTF-16 code units places surrogate pairs, meaning code points from U+10000 up, below U+E000 to U+FFFF, which is not UTF-8 byte order, so two services written in different languages disagree on the same document.
- Do not re-encode numbers through a double. IEEE-754 binary64 represents integers exactly only up to 2^53, so normalising a 19-digit id through a float changes it, and 1 against 1.0 cannot be reconciled without deciding whether they are the same value. Preserve the literal token, and require ids as strings at the API boundary if you want them comparable.
- Reject duplicate keys rather than picking one. JSON permits them and parsers disagree, most keeping the last, so any choice you make ties the fingerprint to a parser detail that the code handling the request does not necessarily share.
Follow-up
- A client sends the same logical request with an extra field your API ignores. Same key, different fingerprint, so you return 422. Is that the right answer?
- Where does the fingerprint get computed relative to request decompression and the body-size limit?
Collapse a redelivered event batch into per-aggregate high-water marks
Easy · hashing · at-least-once · aggregation
You drain a batch of up to 5,000,000 events, each (aggregate_id BIGINT, aggregate_version INT, event_type, payload). The log guarantees order within one aggregate only; the batch merges 64 partitions, and a relay failover has redelivered a range, so an older version for an aggregate can appear after a newer one. Given a map of last_applied_version per aggregate, produce the events worth applying, at most one per (aggregate_id, version), plus the count discarded. Target O(n) time. State the memory for 2,000,000 distinct aggregates and what you do when it does not fit.
Approach
- One pass, one hash map from aggregate_id to the highest version kept, and a discard counter. An event whose version is at or below last_applied_version for its aggregate is dropped without further work, which is the whole reason the event carries its version rather than a delta. O(n) expected time, O(d) space in distinct aggregates.
- Keep the maximum, never the last occurrence. The redelivered range means the final appearance of an aggregate in the batch can be an older version than one seen earlier in the same batch, so last-wins applies stale state over newer state and the projection regresses with no error anywhere.
- Cost the memory instead of calling it large: an 8-byte key plus a 4-byte version is 12 bytes of payload, and an open-addressed table held at a 0.7 load factor costs roughly 17 bytes per entry before per-slot metadata, so 2,000,000 aggregates is tens of megabytes in a native layout and several times that in a runtime that boxes both key and value.
- If the distinct set exceeds memory, partition on hash(aggregate_id) mod P and reduce each partition independently. Every event for one aggregate hashes to the same partition, so the per-partition result is exact and the merge is concatenation rather than a second reduction.
Follow-up
- The payload is a patch rather than a snapshot, so applying only the highest version loses the intermediate changes. What changes in your reduction?
- How do you detect that version 7 arrived while version 6 was never delivered, and what should the consumer do about the gap?
Denormalise tenant onto revisions and backfill it live
Hard · denormalisation · online migration · backfill
resource_revision (revision_id, resource_id, version, actor_user_id, change_kind, patch, request_id, created_at) has 400M rows and no tenant column; tenant_id lives only on resource. Two reads need it: a tenant-scoped audit feed ordered by created_at DESC, and an offboarding purge. Both join back to resource today. Justify adding tenant_id to resource_revision against those two reads, name the anomaly the copy introduces and the constraint that prevents it, then give the ordered migration for a live table taking 1.2k writes/second — the lock each step takes, how the backfill is batched, and where each step stops being reversible. PostgreSQL 16.
Approach
- Justify from the access path rather than from taste. Without the column, the audit feed either scans resource_revision by created_at and discards other tenants' rows, or resolves the tenant's resource_ids first and probes with them — both proportional to the tenant's whole history rather than to one page. With (tenant_id, created_at DESC, revision_id DESC) it is a seek that stops at 50 rows, and the purge becomes a ranged delete instead of a join.
- Name the cost exactly: a second copy of a fact can disagree with the first. Make the disagreement unwritable rather than documented — add UNIQUE (resource_id, tenant_id) on resource so it can serve as a foreign-key target, then FOREIGN KEY (resource_id, tenant_id) REFERENCES resource (resource_id, tenant_id) on the revision table. A revision can then only ever carry its parent's tenant.
- Step one, expand: ALTER TABLE resource_revision ADD COLUMN tenant_id BIGINT NULL, with no default, so it is a catalogue change and no rewrite. It still needs ACCESS EXCLUSIVE for an instant, and that instant queues behind the longest open transaction on the table while every later query queues behind it — set lock_timeout to 2s and retry rather than wait.
- Step two, dual-write: deploy the writer that populates tenant_id on every new revision while reads still use the join. Reversible by redeploying the previous build, because nothing reads the column yet.
Follow-up
- The backfill is half finished and a rollback is required. What state is the table in, and what does the previous build do with a half-populated column?
- How do you verify the backfill actually finished, given rows are still being inserted while it runs?
Find version gaps and relay lag with window functions
Medium · window functions · event tables · frame semantics
outbox_event holds event_id, aggregate_type, aggregate_id, aggregate_version, event_type, payload, status ('pending','published','dead'), attempts, created_at, published_at. A projection is missing rows and you must decide whether the relay skipped events or the consumer dropped them. Write three queries over the last seven days: one listing every aggregate_id whose published aggregate_version sequence has a hole, one giving per-day counts with a running total, and one returning the newest published event per aggregate. For each, say where the window function is evaluated relative to WHERE and LIMIT. PostgreSQL 16.
Approach
- Gaps: compute lead(aggregate_version) OVER (PARTITION BY aggregate_id ORDER BY aggregate_version) in a subquery, then filter next_version <> aggregate_version + 1 in the outer query. Window functions are evaluated after WHERE, GROUP BY and HAVING and before the outer ORDER BY and LIMIT, so the predicate cannot sit in the same WHERE clause and PostgreSQL 16 has no QUALIFY.
- Say what the seven-day filter does to the answer: it truncates every partition, so the first row per aggregate has no predecessor inside the window and a hole spanning the boundary is invisible. Widen the window, or join to resource.version as the authority for the true maximum.
- Running total: SELECT date_trunc('day', created_at) AS d, count() AS n, sum(count()) OVER (ORDER BY date_trunc('day', created_at) ROWS UNBOUNDED PRECEDING). An aggregate inside a window call is legal because grouping runs before windowing. The grouping key is unique per row here so ROWS and RANGE agree, but write the frame anyway — over ungrouped rows with tied timestamps the default RANGE frame pulls in every peer row and the total jumps.
- Newest per aggregate: DISTINCT ON (aggregate_id) ... ORDER BY aggregate_id, aggregate_version DESC is the cheap PostgreSQL-only form when an index matches that order; row_number() OVER (PARTITION BY aggregate_id ORDER BY aggregate_version DESC) = 1 is the portable form and needs a subquery for the same evaluation-order reason as the gap query.
Follow-up
- Relay failover redelivers events. Does a duplicate break the gap query, and how would you detect one from this table alone?
- Turn the gap check into a continuous monitor rather than a query someone runs after an incident. What does it watch?
How do you ensure that your code is maintainable and scalable for long-term use?
Medium · Technical & Role-Specific Knowledge
Approach
- Fix the scope first: who calls this, how often, and what they do when it fails.
- Name the read and write paths separately; they rarely have the same bottleneck.
- Choose a partition key and say what query it makes expensive.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- What breaks first when traffic grows ten times?
- How does this behave when that dependency is down for an hour?
What is your process for gathering requirements when you are tasked with building a new internal tool?
Medium · Technical & Role-Specific Knowledge
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Can you explain a time you had to troubleshoot a complex technical issue and the steps you took to resolve it?
Medium · Technical & Role-Specific Knowledge
Approach
- Establish what changed and when, before forming any theory.
- Pick a bisection that eliminates candidates whichever way it turns out.
- Check the instrumentation before believing the symptom.
- Separate the trigger from the cause; the deploy is rarely the bug.
Follow-up
- What would you look at first, and what would it rule out?
- How would you tell a cause from a coincidence here?
Suggested practice checklist
Built from the topics and questions Tucson Electric Power candidates report; no round sequence has been reported.
Day 1 — Establish the Tucson Electric Power format
- No round sequence has been reported, so ask your recruiter for the sequence, the duration of each stage and whether you will write code.
Deliverable: A written reply from your recruiter confirming the format.
Day 2 — Work Questioning Skills (Asking Clarifying Questions)
- Spend the session on Questioning Skills (Asking Clarifying Questions), which Tucson Electric Power candidates report being tested on.
- Write one worked example in Questioning Skills (Asking Clarifying Questions) and time yourself on it.
Deliverable: One timed worked example in Questioning Skills (Asking Clarifying Questions).
Day 3 — Work Communication
- Spend the session on Communication, which Tucson Electric Power candidates report being tested on.
- Write one worked example in Communication and time yourself on it.
Deliverable: One timed worked example in Communication.
Day 4 — Work Power Systems / Power Plant Domain Knowledge
- Spend the session on Power Systems / Power Plant Domain Knowledge, which Tucson Electric Power candidates report being tested on.
- Write one worked example in Power Systems / Power Plant Domain Knowledge and time yourself on it.
Deliverable: One timed worked example in Power Systems / Power Plant Domain Knowledge.
Day 5 — Answer out loud: Technical & Role-Specific Knowledge
- Answer aloud, timed: Describe your experience with system integration and what challenges you have faced in the past.
- Answer aloud, timed: How do you ensure that your code is maintainable and scalable for long-term use?
Deliverable: Spoken answers to 2 reported Technical & Role-Specific Knowledge question(s), under time.
Day 6 — Rehearse your own examples
- Prepare three examples from your own work where you made the decision, each with the outcome you can quantify.
Deliverable: Three examples written out, each with a number attached.
Day 7 — Dry run for Tucson Electric Power
- Run one full mock under time, then write down the two questions you most want to ask your interviewers.
Deliverable: A completed timed mock and two questions to ask.
Behavioural preparation
Behavioural rounds judge the decision you made and what it cost.
Describe your experience with system integration and what challenges you have faced in the past.
Medium · Technical & Role-Specific Knowledge
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
How do you handle technical documentation to ensure your team can support your work after you finish a project
Medium · Technical & Role-Specific Knowledge
How do you handle technical documentation to ensure your team can support your work after you finish a project?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Narrate an outage you owned from page to postmortem
Hard · incident response · blast radius · postmortems
Pick an incident you personally drove, ideally one where writes were affected rather than reads. In six to eight minutes: state the symptom as it first appeared on a dashboard, the blast radius you established before you knew the cause, the mitigation you applied and when, the mechanism you eventually proved, and the follow-up that would prevent a repeat. Bring numbers: error rate, tenants affected, minutes to mitigate, minutes to resolve. If you cannot name what you measured, choose a different incident.
Approach
- Open on the signal rather than the cause: which metric at which percentile moved, on which service, at what time, so the listener follows the same evidence you had rather than a conclusion you already reached.
- Separate mitigation from diagnosis out loud. State what you did to stop the bleeding (flag off, shed traffic, drain a lease, roll back a deploy) and say plainly that you did it before the mechanism was known, because those are two jobs with different deadlines.
- Establish blast radius in countable terms: how many tenants, how many writes, and crucially whether the effect was loss or only delay. An append-only revision table or a pending outbox row means the change survived and the projection was merely behind, which is a repair rather than a data-loss incident.
- Prove the mechanism instead of asserting it. Name the trace span that grew, the plan that flipped to a sequential scan, the lease that expired, plus one alternative you ruled out and the signal that stayed flat while you ruled it out.
Follow-up
- What would you do differently in the first five minutes, given the same dashboard and no more information?
- Which follow-up action did you deliberately not take, and why was dropping it the right call?