Interview guides · Space Information
Space Information Software Engineer Interview Guide
Space Information Software Engineer interview guide: reported rounds, questions and how candidates describe the process.
The 60-second brief
A Software Engineer at Space Information plays a pivotal role in bridging the gap between complex aerospace requirements and robust, scalable software solutions. You are not just writing code; you are building the digital infrastructure that supports mission-critical systems. Your work directly impacts how data is processed, analyzed, and delivered within high-stakes environments where precision and reliability are paramount. This role is inherently cross-functional, requiring you to collaborate with electrical, power systems, and systems engineers to ensure that software and hardware operate in perfect harmony. Whether you are optimizing power distribution algorithms or developing diagnostic tools for aerospace hardware, your contributions are fundamental to the operational success of the company’s products.
This guide is scoped to a Software Engineer candidate at Space Information.
Focus areas
- Aerospace Power Distribution
- Power Systems
- Power Distribution Architecture
The Space Information interview process
Space Information candidates report 4 rounds over 3-5 weeks. The stages below are what candidates describe, not a published process.
Engagement
Candidates often begin through engagement at career fairs or direct applications.
What to demonstrate
- Candidates often begin through engagement at career fairs or direct applications
- Depth in Aerospace Power Distribution
How to prepare
- Answer aloud and timed: Tell us about a situation that put you outside of your comfort zone and how did you overcome it?
- Answer aloud and timed: Describe a time you had to resolve a technical disagreement with a team member.
Screening Phase
Initial screening to assess candidate qualifications and fit.
What to demonstrate
- Initial screening to assess candidate qualifications and fit
- Depth in Aerospace Power Distribution
How to prepare
- Answer aloud and timed: How do you prioritize tasks when faced with conflicting project deadlines?
- Work Aerospace Power Distribution until you can explain it without notes
Rigorous Assessments
Candidates undergo assessments that test hands-on engineering capabilities.
What to demonstrate
- Candidates undergo assessments that test hands-on engineering capabilities
- Depth in Aerospace Power Distribution
How to prepare
- Work Aerospace Power Distribution until you can explain it without notes
- Work Power Systems until you can explain it without notes
Final Evaluation
Final assessment to evaluate technical rigor and long-term interest in the field.
What to demonstrate
- Final assessment to evaluate technical rigor and long-term interest in the field
- Depth in Aerospace Power Distribution
How to prepare
- Work Aerospace Power Distribution until you can explain it without notes
- Work Power Systems until you can explain it without notes
Where candidates lose points
Structure your answers
Use the STAR method (Situation, Task, Action, Result) for behavioral questions to keep your responses concise and impactful.
Show your work
Even if you are solving a whiteboard problem, vocalize your thought process so the interviewer can follow your logic.
Connect to the mission
Research the specific projects or products Space Information is currently working on and be ready to discuss how your skills contribute to those goals.
Ask meaningful questions
Use your time with interviewers to ask about their development lifecycle and how teams cross-collaborate.
Questions & practice
Archive a resource graph without breaking live references or recursing
Medium · graph traversal · topological order · tenant isolation
Resources reference other resources within a tenant; for the largest tenant the reference table holds up to 2,000,000 nodes and 8,000,000 edges. Archiving a resource must archive everything reachable from it that nothing outside the set still references, refuse when a live external referrer exists, and terminate when references form cycles, which they legitimately do. Produce the archive order and the refusal list, targeting O(V+E). Say what stops the traversal crossing a tenant boundary, and why recursion is the wrong control structure at this size.
Approach
- Load the subgraph with the tenant predicate on both endpoints of the edge, not only on the side you started from. Scoping the left table alone is the classic cross-tenant leak: one mis-entered edge then pulls another tenant's resources into the traversal and, worse, into the archive.
- Traverse iteratively with an explicit stack. A 2,000,000-node graph can hold a chain deep enough to exhaust a native stack in the low tens of thousands of frames, and that failure is a process crash rather than an error you can return.
- Treat cycles as data rather than corruption: compute strongly connected components with Tarjan in O(V+E) using its own explicit stack, then condense. The condensation is a DAG, so a topological order over it gives the archive order, and every member of a component archives in one transaction because no order within a cycle is valid.
- Decide refusals with reverse edges. A candidate is archivable only if every in-edge originates inside the candidate set, so build the transpose or count in-degrees restricted to the visited set, and emit each blocked resource with the id of the external referrer, which is the only part of the answer an operator can act on.
Follow-up
- The graph is read in one query and the archive writes a minute later. What can change in between, and how do you make the write safe?
- The candidate set is 400,000 resources. Is that one transaction, and if not, what does a half-finished archive look like to a reader?
Diff a projection against the primary without per-row point reads
Hard · reconciliation · range hashing · throttling
The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.
Approach
- Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
- Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
- For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
- Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.
Follow-up
- The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
- Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?
Collapse a redelivered event batch into per-aggregate high-water marks
Easy · hashing · at-least-once · aggregation
You drain a batch of up to 5,000,000 events, each (aggregate_id BIGINT, aggregate_version INT, event_type, payload). The log guarantees order within one aggregate only; the batch merges 64 partitions, and a relay failover has redelivered a range, so an older version for an aggregate can appear after a newer one. Given a map of last_applied_version per aggregate, produce the events worth applying, at most one per (aggregate_id, version), plus the count discarded. Target O(n) time. State the memory for 2,000,000 distinct aggregates and what you do when it does not fit.
Approach
- One pass, one hash map from aggregate_id to the highest version kept, and a discard counter. An event whose version is at or below last_applied_version for its aggregate is dropped without further work, which is the whole reason the event carries its version rather than a delta. O(n) expected time, O(d) space in distinct aggregates.
- Keep the maximum, never the last occurrence. The redelivered range means the final appearance of an aggregate in the batch can be an older version than one seen earlier in the same batch, so last-wins applies stale state over newer state and the projection regresses with no error anywhere.
- Cost the memory instead of calling it large: an 8-byte key plus a 4-byte version is 12 bytes of payload, and an open-addressed table held at a 0.7 load factor costs roughly 17 bytes per entry before per-slot metadata, so 2,000,000 aggregates is tens of megabytes in a native layout and several times that in a runtime that boxes both key and value.
- If the distinct set exceeds memory, partition on hash(aggregate_id) mod P and reduce each partition independently. Every event for one aggregate hashes to the same partition, so the per-partition result is exact and the merge is concatenation rather than a second reduction.
Follow-up
- The payload is a patch rather than a snapshot, so applying only the highest version loses the intermediate changes. What changes in your reduction?
- How do you detect that version 7 arrived while version 6 was never delivered, and what should the consumer do about the gap?
Replace offset paging on the resource feed with keyset
Easy · keyset pagination · composite index · sort order
resource holds resource_id, tenant_id, owner_user_id, title, body_ref, version, status ('draft','active','archived','deleted'), created_at, updated_at, deleted_at, with an index on (tenant_id, status, updated_at DESC, resource_id DESC). The listing endpoint returns active resources for one tenant, newest update first, 50 per page, today with LIMIT 50 OFFSET n. Tenants reach page 400 and rows are created while they read. Write the keyset query, define what the cursor carries and how it is encoded, and say which part of the index each predicate uses. Assume PostgreSQL 16.
Approach
- Name the two failures separately. OFFSET 20000 makes the server produce and discard 20,000 rows, so page cost grows with depth rather than with page size. Independently, any write that changes how many rows sort above the offset moves the window between two fetches, and the direction decides which anomaly you get: an insert lands at the head of updated_at DESC and pushes already-returned rows down past the boundary, so they are returned a second time; a delete above the offset, or a row whose updated_at is bumped above the cursor, pulls rows up and one is never returned at all. Nothing in the response reveals either.
- Write the seek: WHERE tenant_id = $1 AND status = 'active' AND (updated_at, resource_id) < ($2, $3) ORDER BY updated_at DESC, resource_id DESC LIMIT 50. The row-value comparison is one index range rather than a disjunction, and both columns are NOT NULL, which is what makes that comparison well defined.
- Map each predicate onto the index: tenant_id and status are equality on the leading columns, (updated_at, resource_id) is the range, and the ORDER BY matches the index order so no Sort node appears and the scan stops after 50 rows. The DESC in the definition only matters for mixed directions — a plain ascending btree on the same columns is read backwards for this query.
- Put both sort columns in the cursor and nothing the client can tamper with into another tenant: base64 of (updated_at, resource_id), validated server-side, with tenant_id taken from the principal.
Follow-up
- The client asks for 'jump to page 400'. What do you offer instead, and what does the honest version cost?
- Sort order becomes user-selectable across four columns. How many indexes is that, and which would you refuse to add?
Explain why the owner filter ignores the listing index
Medium · composite index · query plans · sort elimination
The only index on resource is (tenant_id, status, updated_at DESC, resource_id DESC). A new endpoint returns one user's resources across all statuses, newest created first: WHERE tenant_id = $1 AND owner_user_id = $2 ORDER BY created_at DESC LIMIT 20. On a tenant with 2M rows it takes 900 ms and EXPLAIN shows a sort above a large scan. Explain precisely why the existing index cannot serve it, give the index that can, and state which of these the new index still will not help: owner_user_id alone across tenants; the same query ordered by updated_at. PostgreSQL 16.
Approach
- Separate the two jobs an index does. For filtering, a composite btree is seekable only on a left prefix, so with no predicate on status the scan can at best range over tenant_id and test owner_user_id per row; PostgreSQL 16 has no btree skip scan to jump the unconstrained column.
- For ordering, the index is sorted by (status, updated_at) within a tenant and not by created_at, so the LIMIT cannot stop early: every matching row is read and then sorted. That is the 'Sort Method: top-N heapsort' line, and it is why the plan reads 2M rows to answer with 20.
- Derive the replacement from the access path — equality, equality, then the ordering column: CREATE INDEX CONCURRENTLY ON resource (tenant_id, owner_user_id, created_at DESC). The scan seeks to the (tenant, owner) range and walks 20 entries in order, so the Sort node disappears along with the row-read.
- Treat INCLUDE (title, status) as conditional, not free. An index-only scan still visits the heap for any row whose page is not marked all-visible, so on a table taking 1.2k writes/second the win depends on autovacuum keeping the visibility map current, and the wider index costs more on every insert.
Follow-up
- 90% of rows are status='active'. Would a partial index WHERE status = 'active' change your answer, and for which of the three queries?
- A dashboard runs this for 40 owners in one page load. What changes about the design?
Publish rate-limit and deadline semantics the edge actually enforces
Easy · rate limiting · backpressure · retries
The edge API serves about 3k requests/second steady and 9k at peak against a 400 ms p99 budget, with an explicit bounded concurrency limit per instance. Limits exist per principal and per tenant. Callers are a partner integration running nightly bulk loads and a browser app. Specify the counting algorithm and window, which limit a request is charged against, the headers a well-behaved client reads, the status and body when a limit is hit, how that differs from the response when an instance is shedding load, and what each caller does with each.
Approach
- Choose the counter and name its failure mode. Fixed windows admit nearly twice the limit across a boundary - a full burst at the end of one window and another at the start of the next. A token bucket states sustained rate and burst separately, which is exactly what a nightly bulk load needs. A sliding-window counter is more faithful and costs more state per key. State the choice and the burst it permits.
- Charge each request against both keys and reject on the stricter. The tenant limit protects the shared primary, which absorbs roughly 1.2k writes/second in total; the per-principal limit stops one credential inside a tenant from consuming that tenant's whole allowance. The tenant is the fairness unit for the same reason it is the leading column of every index.
- Advertise limit, remaining and reset for the binding key on every response, not only on rejections, so a client can pace before it is refused. Pick one naming scheme - the RateLimit-* draft fields or an X-prefixed set - document the units, and never change them afterwards.
- Separate two rejections that look identical to a naive client. 429 means this caller exceeded its own share and Retry-After is a real schedule it should obey. 503 means the instance is at its concurrency bound and shedding, which is a statement about the server; a fleet-wide 503 retried on a fixed delay resynchronises every client into one stampede, so full jitter is mandatory there and the delay is the client's guess, not ours.
Follow-up
- One tenant stays under its limit and still degrades everyone else during a backfill. What changes - the limiter, the worker concurrency caps, or both?
- How are counters kept correct across 20 to 40 stateless instances, and what does your answer cost per request?
Make the resource write endpoint safe for retrying clients
Easy · idempotency · unique constraints · retries
The edge API accepts POST /v1/resources at 1.2k writes/second peak under a 400 ms p99 budget, and clients retry on timeout. idempotency_key has PRIMARY KEY (tenant_id, idempotency_key) plus request_fingerprint CHAR(64), state in ('in_flight','succeeded','failed'), response_status, response_body, resource_id, locked_until and expires_at. Specify the exact sequence the handler runs: what the second request does when it arrives while the first is still executing, what a retry carrying a different body receives, what happens when a process dies mid-request, and how the table is kept from growing without bound.
Approach
- Start from the race rather than the happy path. Insert the key row first, in its own short transaction, with state 'in_flight' and locked_until set to now() plus the request deadline. The unique constraint on (tenant_id, idempotency_key) is the arbitration mechanism: exactly one caller commits the insert, and every other caller takes a unique violation (SQLSTATE 23505) and becomes a follower. Reading the table and then inserting is a check-then-act race that both callers pass, and they pass it most often under the load that generates the retries.
- Give the follower a branch for every state it can observe, with no fall-through to doing the work: fingerprint mismatch means the key is being reused for a different request, so reject with 422 and never replay the stored response; 'succeeded' replays response_status and response_body verbatim; 'failed' allows a fresh attempt; 'in_flight' with locked_until in the future is answered with 409 and a retry hint, or a short bounded wait, because the only alternative is executing the effect twice.
- Commit the effect and the record of the effect together. The resource insert, its resource_revision row, its outbox_event row and the transition of the key row to 'succeeded' all happen in one transaction, so no crash can leave the work done and the key still 'in_flight'. The earlier insert is deliberately a separate transaction: it has to be visible to a concurrent caller before the work starts, which an uncommitted row is not.
- Close the wedged-key path. A process that dies after the insert leaves a row that would otherwise block that key forever, which is what locked_until exists for. Reclaim with a single conditional statement, UPDATE ... SET state='in_flight', locked_until=now()+interval WHERE ... AND state='in_flight' AND locked_until < now(), and treat a zero rowcount as losing the reclaim. Two statements that read and then update reintroduce the original race one layer down.
Follow-up
- The stored response body averages 200 KB and this table is now the largest in the database. What do you store instead, and what does a replay return once the body has been pruned?
- A client library generates a fresh idempotency key on every attempt. What breaks, which layer should have caught it, and does the server have any defence?
One customer endpoint stalls deliveries to every other destination
Medium · bulkhead · timeouts · saturation
The egress service delivers about 1.5k webhooks/second across 40,000 destinations, with a per-destination concurrency cap of 4 and a 10-second connect-plus-read timeout. Throughput falls to 300/second, queue depth climbs, and p99 delivery latency for unaffected destinations goes from 200 ms to minutes, while the error rate barely moves. One tenant holds 900 destination rows whose URLs share a hostname that now answers in 9.5 seconds. Explain the mechanism with the arithmetic, then give the containment in the order you would apply it.
Approach
- Look at saturation before errors. A flat error rate with collapsing throughput says nothing is failing, things are waiting, so the first signal to pull is in-flight request count or pool wait time rather than the error counter. This is the distinction that decides the whole investigation.
- Group in-flight work by resolved host, not by destination id. The cap is keyed per destination row, so 900 rows sharing one hostname buy 3,600 concurrent slots against a single host, each held for 9.5 seconds. The bulkhead was never a bulkhead for that host, and grouping by the wrong dimension is why the dashboard looked healthy.
- Do the arithmetic in both directions. Required concurrency is arrival rate times latency, so 1.5k/second at 200 ms needs about 300 in flight, which is entirely consumed by 3,600 slow slots; conversely whatever concurrency is left sustains rate equals concurrency divided by 9.5 seconds, which is the 300/second you are seeing. Matching both numbers is what promotes this from a plausible story to the mechanism.
- Explain why the circuit breaker never helped. It opens on consecutive failures, and a 9.5-second response inside a 10-second timeout is a success. Slow is not failing, so an error-rate breaker cannot see this; you need a slow-call ratio, a deadline propagated from the caller's remaining budget, or a concurrency limiter.
Follow-up
- The host recovers to 80 ms. How long does the queue take to drain, and what does the drain do to the recovered host?
- Where should the 10-second timeout number actually come from?
Suggested practice checklist
Built from the rounds and topics Space Information candidates report.
Day 1 — Map the Space Information loop
- Write out the reported sequence: Engagement, Screening Phase, Rigorous Assessments, Final Evaluation.
- For each round, write one sentence on what it is judging, from the description above, and mark the one you are least ready for.
Deliverable: A one-page map of the 4 reported rounds, with the weakest marked.
Day 2 — Work Aerospace Power Distribution
- Spend the session on Aerospace Power Distribution, which Space Information candidates report being tested on.
- Write one worked example in Aerospace Power Distribution and time yourself on it.
Deliverable: One timed worked example in Aerospace Power Distribution.
Day 3 — Work Power Systems
- Spend the session on Power Systems, which Space Information candidates report being tested on.
- Write one worked example in Power Systems and time yourself on it.
Deliverable: One timed worked example in Power Systems.
Day 4 — Work Power Distribution Architecture
- Spend the session on Power Distribution Architecture, which Space Information candidates report being tested on.
- Write one worked example in Power Distribution Architecture and time yourself on it.
Deliverable: One timed worked example in Power Distribution Architecture.
Day 5 — Answer out loud: Behavioral and Situational Challenges
- Answer aloud, timed: Tell us about a situation that put you outside of your comfort zone and how did you overcome it?
- Answer aloud, timed: Describe a time you had to resolve a technical disagreement with a team member.
Deliverable: Spoken answers to 2 reported Behavioral and Situational Challenges question(s), under time.
Day 6 — Rehearse your own examples
- Prepare three examples from your own work where you made the decision, each with the outcome you can quantify.
Deliverable: Three examples written out, each with a number attached.
Day 7 — Dry run for Space Information
- Run one full mock under time, then write down the two questions you most want to ask your interviewers.
Deliverable: A completed timed mock and two questions to ask.
Behavioural preparation
Behavioural rounds judge the decision you made and what it cost.
Tell us about a situation that put you outside of your comfort zone and how did you overcome it?
Medium · Behavioral and Situational Challenges
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Describe a time you had to resolve a technical disagreement with a team member.
Medium · Behavioral and Situational Challenges
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
How do you prioritize tasks when faced with conflicting project deadlines?
Medium · Behavioral and Situational Challenges
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?