Interview guides · Seek Thermal
Seek Thermal Software Engineer Interview Guide
Seek Thermal Software Engineer interview guide: reported rounds, questions and how candidates describe the process.
The 60-second brief
At Seek Thermal, a Software Engineer—often operating within the scope of Sr. Systems Engineering—is the bridge between cutting-edge thermal imaging hardware and the intuitive software experiences that define our products. You are not just writing code; you are enabling users to visualize the invisible, whether for industrial inspection, security, or outdoor recreation. Your work directly impacts how our high-precision sensors interact with mobile platforms, desktop applications, and embedded systems. This role is inherently cross-functional and highly technical. You will collaborate closely with electrical and mechanical engineers to optimize firmware performance, driver stability, and image processing algorithms.
This guide is scoped to a Software Engineer candidate at Seek Thermal.
Focus areas
- Systems Engineering
- Software Engineering
- Hardware/Systems Integration
Where to focus your preparation
No round sequence has been reported for Seek Thermal. Confirm the format with your recruiter.
Preparation focus
No round sequence has been reported for this company, so confirm the format with your recruiter and work the reported questions below.
What to demonstrate
- Breadth across the topics this company reports testing
- Whether you confirm the format before preparing for it
How to prepare
- Ask the recruiter for the sequence, the duration of each stage and whether you will be writing code
- Work the reported questions below and time yourself
Where candidates lose points
Think out loud
Our interviewers want to see your thought process. Even if you aren't sure of the answer, explaining your reasoning allows us to assess your problem-solving logic.
Focus on trade-offs
Whenever you propose a solution, immediately discuss the trade-offs (e.g., "This approach is faster, but it consumes more memory").
Know our products
Spend time researching our current thermal imaging lineup. Understanding the product helps you frame your technical answers in a relevant context.
Prepare a few questions about our current development challenges
It shows you are already thinking about how to add value to the team.
Questions & practice
How do you ensure thread safety when managing high-frequency data streams?
Medium · Technical & Systems Architecture
Approach
- Say what the runtime actually does before reasoning about the code.
- Name what is shared across threads and what owns each piece of state.
- Identify the window where an invariant is briefly untrue.
- Distinguish a value from a reference to it, and say which one you handed out.
Follow-up
- What happens if two callers reach this at the same time?
- Where could this allocate more than you expect?
Collapse a redelivered event batch into per-aggregate high-water marks
Easy · hashing · at-least-once · aggregation
You drain a batch of up to 5,000,000 events, each (aggregate_id BIGINT, aggregate_version INT, event_type, payload). The log guarantees order within one aggregate only; the batch merges 64 partitions, and a relay failover has redelivered a range, so an older version for an aggregate can appear after a newer one. Given a map of last_applied_version per aggregate, produce the events worth applying, at most one per (aggregate_id, version), plus the count discarded. Target O(n) time. State the memory for 2,000,000 distinct aggregates and what you do when it does not fit.
Approach
- One pass, one hash map from aggregate_id to the highest version kept, and a discard counter. An event whose version is at or below last_applied_version for its aggregate is dropped without further work, which is the whole reason the event carries its version rather than a delta. O(n) expected time, O(d) space in distinct aggregates.
- Keep the maximum, never the last occurrence. The redelivered range means the final appearance of an aggregate in the batch can be an older version than one seen earlier in the same batch, so last-wins applies stale state over newer state and the projection regresses with no error anywhere.
- Cost the memory instead of calling it large: an 8-byte key plus a 4-byte version is 12 bytes of payload, and an open-addressed table held at a 0.7 load factor costs roughly 17 bytes per entry before per-slot metadata, so 2,000,000 aggregates is tens of megabytes in a native layout and several times that in a runtime that boxes both key and value.
- If the distinct set exceeds memory, partition on hash(aggregate_id) mod P and reduce each partition independently. Every event for one aggregate hashes to the same partition, so the per-partition result is exact and the merge is concatenation rather than a second reduction.
Follow-up
- The payload is a patch rather than a snapshot, so applying only the highest version loses the intermediate changes. What changes in your reduction?
- How do you detect that version 7 arrived while version 6 was never delivered, and what should the consumer do about the gap?
Track a rolling failure rate per destination for circuit decisions
Easy · sliding window · ring buffer · circuit breaker
The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.
Approach
- Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
- Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
- State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
- Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
Follow-up
- The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
- A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?
Stop tag and share joins from fanning out a page
Medium · join fan-out · semi-joins · many-to-many
resource_tag is (resource_id, tag_id) with PK (resource_id, tag_id); resource_share is (resource_id, shared_with_user_id, permission). The tagged-and-shared listing inner-joins resource to both, filters tenant_id, tag_id = ANY($2) and shared_with_user_id = $3, orders by updated_at DESC and takes 50. Pages come back with fewer than 50 distinct resources and the total in the header is far too high. Explain the row multiplication, rewrite both the page query and the count query so each is correct, and name the index each one needs. PostgreSQL 16.
Approach
- Do the arithmetic against the predicates that are actually there. An inner join emits one row per matching child row, and both joins are filtered: tag_id = ANY($2) admits only the requested tags, shared_with_user_id = $3 admits one user's share rows. So a resource holding three of the requested tags and shared with $3 once yields three rows, not one — the multiplier is its count of matching tags times its share rows for that single user, and that second factor is 1 unless the table admits duplicate (resource_id, shared_with_user_id) pairs. LIMIT 50 then limits rows rather than resources, and COUNT(*) counts pairs — the header is the product, not the population.
- Reject DISTINCT as the fix. It deduplicates after the product has been built, so the planner must materialise and sort the fanned-out set before the LIMIT can apply, and it leaves any SUM or AVG in the same select list wrong.
- Rewrite both filters as semi-joins, keeping resource as the only row source: AND EXISTS (SELECT 1 FROM resource_tag rt WHERE rt.resource_id = r.resource_id AND rt.tag_id = ANY($2)) and the same shape against resource_share. A semi-join stops at the first match per resource and preserves the driving index order, so ORDER BY updated_at DESC, resource_id DESC LIMIT 50 still stops after 50 rows.
- Count with the same predicates and no join at all: SELECT count(*) FROM resource r WHERE r.tenant_id = $1 AND r.status = 'active' AND EXISTS (...) AND EXISTS (...). Nothing multiplies a resource, so the number is the population.
Follow-up
- The filter changes from 'any of these tags' to 'all of these tags'. Rewrite it and state what it costs relative to the ANY form.
- A resource can be shared with the same user twice under different permissions. Does your count change, and should it?
Explain why the owner filter ignores the listing index
Medium · composite index · query plans · sort elimination
The only index on resource is (tenant_id, status, updated_at DESC, resource_id DESC). A new endpoint returns one user's resources across all statuses, newest created first: WHERE tenant_id = $1 AND owner_user_id = $2 ORDER BY created_at DESC LIMIT 20. On a tenant with 2M rows it takes 900 ms and EXPLAIN shows a sort above a large scan. Explain precisely why the existing index cannot serve it, give the index that can, and state which of these the new index still will not help: owner_user_id alone across tenants; the same query ordered by updated_at. PostgreSQL 16.
Approach
- Separate the two jobs an index does. For filtering, a composite btree is seekable only on a left prefix, so with no predicate on status the scan can at best range over tenant_id and test owner_user_id per row; PostgreSQL 16 has no btree skip scan to jump the unconstrained column.
- For ordering, the index is sorted by (status, updated_at) within a tenant and not by created_at, so the LIMIT cannot stop early: every matching row is read and then sorted. That is the 'Sort Method: top-N heapsort' line, and it is why the plan reads 2M rows to answer with 20.
- Derive the replacement from the access path — equality, equality, then the ordering column: CREATE INDEX CONCURRENTLY ON resource (tenant_id, owner_user_id, created_at DESC). The scan seeks to the (tenant, owner) range and walks 20 entries in order, so the Sort node disappears along with the row-read.
- Treat INCLUDE (title, status) as conditional, not free. An index-only scan still visits the heap for any row whose page is not marked all-visible, so on a table taking 1.2k writes/second the win depends on autovacuum keeping the visibility map current, and the wider index costs more on every insert.
Follow-up
- 90% of rows are status='active'. Would a partial index WHERE status = 'active' change your answer, and for which of the three queries?
- A dashboard runs this for 40 owners in one page load. What changes about the design?
What are the trade-offs between using C++ and higher-level languages in a hardware-centric environment?
Medium · Technical & Systems Architecture
Approach
- Fix the scope first: who calls this, how often, and what they do when it fails.
- Name the read and write paths separately; they rarely have the same bottleneck.
- Choose a partition key and say what query it makes expensive.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- What breaks first when traffic grows ten times?
- How does this behave when that dependency is down for an hour?
Design the async export contract a client can resume safely
Hard · async operations · idempotency · leases
A tenant asks for a CSV of every resource. The work runs for minutes on the worker fleet through a job_run row carrying a lease, an attempt count and a dedupe_key, far past the edge's 400 ms budget. Callers are a browser that polls and a script that walks away and checks later. Specify what the submit call returns, the operation resource and its states, how a duplicate submit is handled, how a client learns about completion, what cancellation means given that a lease can expire mid-run, and how the result is fetched and when it expires.
Approach
- Split the API in two. Submit returns 202 with an operation id and a location to poll, and never blocks on the work. The operation is a real resource with its own lifecycle - queued, running, succeeded, failed, cancelled - plus attempt, a monotonic progress figure, and a terminal error drawn from the same code taxonomy the synchronous endpoints use, so a client needs one error vocabulary rather than two.
- Deduplicate at submit using job_run.dedupe_key, unique over (job_type, dedupe_key) while status is 'queued' or 'running': a repeat submit of the same logical export returns 200 with the existing operation instead of 202 with a new one, and the partial index deliberately permits a legitimate re-run once the first has finished. Pair it with the request's idempotency key so an HTTP-level retry of the submit is exact rather than merely similar.
- Tell the poller how to poll: Retry-After on the polling response, a minimum interval enforced at the edge, and a documented maximum lifetime after which an operation is reaped. Polling is the contract of record; the webhook is the fast path, and both must lead to the same terminal state, so a client that receives the completion event and then polls anyway sees no contradiction.
- Be exact about cancellation. A cancel request records intent; it cannot stop work already executing. The handler reads the flag at checkpoints, and because a lease expires on a clock that cannot distinguish a dead worker from a slow one, a second copy may start after the cancel was recorded - so the handler re-reads the flag immediately after claiming the lease. 'cancelled' becomes terminal only when no lease is outstanding; reporting it earlier shows a client a stopped job while a worker is still writing output.
Follow-up
- An operation has said 'running' for 40 minutes and the worker is gone. What does the client see, and which columns in job_run decide that?
- Two tenants each submit 50 exports at once. What in this contract stops one of them delaying the other?
Explain your approach to debugging a latency issue between the sensor hardware and the application layer.
Medium · Technical & Systems Architecture
Approach
- Establish what changed and when, before forming any theory.
- Pick a bisection that eliminates candidates whichever way it turns out.
- Check the instrumentation before believing the symptom.
- Separate the trigger from the cause; the deploy is rarely the bug.
Follow-up
- What would you look at first, and what would it rule out?
- How would you tell a cause from a coincidence here?
Suggested practice checklist
Built from the topics and questions Seek Thermal candidates report; no round sequence has been reported.
Day 1 — Establish the Seek Thermal format
- No round sequence has been reported, so ask your recruiter for the sequence, the duration of each stage and whether you will write code.
Deliverable: A written reply from your recruiter confirming the format.
Day 2 — Work Systems Engineering
- Spend the session on Systems Engineering, which Seek Thermal candidates report being tested on.
- Write one worked example in Systems Engineering and time yourself on it.
Deliverable: One timed worked example in Systems Engineering.
Day 3 — Work Software Engineering
- Spend the session on Software Engineering, which Seek Thermal candidates report being tested on.
- Write one worked example in Software Engineering and time yourself on it.
Deliverable: One timed worked example in Software Engineering.
Day 4 — Work Hardware/Systems Integration
- Spend the session on Hardware/Systems Integration, which Seek Thermal candidates report being tested on.
- Write one worked example in Hardware/Systems Integration and time yourself on it.
Deliverable: One timed worked example in Hardware/Systems Integration.
Day 5 — Answer out loud: Technical & Systems Architecture
- Answer aloud, timed: How do you handle resource constraints when developing for embedded or mobile thermal imaging platforms?
- Answer aloud, timed: Explain your approach to debugging a latency issue between the sensor hardware and the application layer.
Deliverable: Spoken answers to 2 reported Technical & Systems Architecture question(s), under time.
Day 6 — Rehearse your own examples
- Prepare three examples from your own work where you made the decision, each with the outcome you can quantify.
Deliverable: Three examples written out, each with a number attached.
Day 7 — Dry run for Seek Thermal
- Run one full mock under time, then write down the two questions you most want to ask your interviewers.
Deliverable: A completed timed mock and two questions to ask.
Behavioural preparation
Behavioural rounds judge the decision you made and what it cost.
How do you handle resource constraints when developing for embedded or mobile thermal imaging platforms?
Medium · Technical & Systems Architecture
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Describe a time you had to optimize an algorithm to improve real-time performance.
Medium · Technical & Systems Architecture
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Argue against a design, lose, and commit anyway
Medium · disagreement · service boundaries · decision records
Describe a design you argued against and lost. State the failure you predicted as a named mechanism, not a feeling about complexity: two services that would need one transaction, a projection with no rebuild path, a write path with no idempotency key. Say what evidence you brought, what the decision maker weighed instead, and what you did after the decision was made: what you instrumented, what you wrote down, and whether the prediction came true. Five minutes.
Approach
- State the prediction in falsifiable form up front: the mechanism, the condition that triggers it, and the observable outcome. A prediction that cannot be checked also cannot be credited to you later.
- Show the evidence you had at the time and label each piece honestly as measured, analogous, or intuition. Keeping the intuition is fine; disguising it as data is the thing that erodes your standing in the next argument.
- Represent the opposing case at full strength, including the constraint you did not control: a fixed date, a team boundary, or the fact that the decision was cheap to reverse and yours was not.
- Make disagree-and-commit concrete. Name the artefact you left behind so the prediction could be settled without you: the alert and its threshold, the counter on the dashboard, the decision note that recorded the trade-off and the condition that would revisit it.
Follow-up
- What threshold on that alert would have proved you right, and did anyone ever look at it?
- If the same proposal arrived tomorrow with the same deadline, would you argue it the same way?