cswork / libraryOpen practice workspace

Interview guides · Miltec UV

Miltec UV Software Engineer Interview Guide

Miltec UV Software Engineer interview guide: reported rounds, questions and how candidates describe the process.

The 60-second brief

A Software Engineer at Miltec UV plays a vital role in supporting the innovative technology behind the company’s industry-leading ultraviolet curing systems. You will be responsible for developing and maintaining the software infrastructure that ensures precision, reliability, and efficiency in Miltec UV products. Your work directly impacts how these systems perform in critical manufacturing environments, requiring a blend of technical acumen and practical problem-solving. This role is not just about writing code; it is about understanding the intersection of software and hardware performance. You will collaborate closely with the engineering department to translate technical requirements into functional solutions.

This guide is scoped to a Software Engineer candidate at Miltec UV.

Focus areas

  • Problem Solving
  • Structured Troubleshooting
  • Analytical Reasoning

The Miltec UV interview process

Miltec UV candidates report 2 rounds over 2-4 weeks. The stages below are what candidates describe, not a published process.

Initial Screening Call

A high-level introduction to your background and interest in the company, focusing on attitude and general fit.

What to demonstrate

  • A high-level introduction to your background and interest in the company
  • Focusing on attitude and general fit

How to prepare

  • Be able to walk your CV end to end in two minutes, and say why this company specifically.
  • Have your salary expectations, notice period and location constraints ready, and ask for the rest of the loop in writing.

Secondary Meeting

A more technical discussion with HR team and Engineering head, focusing on potential contributions and specific processes.

What to demonstrate

  • A more technical discussion with HR team and Engineering head
  • Focusing on potential contributions and specific processes

How to prepare

  • Answer aloud and timed: How do you approach isolating a bug in a system that involves both hardware and software components?
  • Answer aloud and timed: Can you walk us through your past employment and relevant project experience?

Where candidates lose points

Own your narrative

Be prepared to explain your resume in detail. The interviewers will be listening to how you describe your past projects and the specific role you played in them.

Be ready for the "mower" question

This is a classic behavioral-technical hybrid question used here. Do not look for a trick; simply explain your logical process for troubleshooting.

Ask meaningful questions

Use the time with the head of the Engineering department to ask about the team’s current priorities and the biggest technical challenges they are facing.

Stay engaged

Since the interviews are highly conversational, ensure you are actively participating in the dialogue rather than waiting to be prompted.

Questions & practice

Diff a projection against the primary without per-row point reads

Hard · reconciliation · range hashing · throttling

The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.

Approach

  1. Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
  2. Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
  3. For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
  4. Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.

Follow-up

  • The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
  • Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?

Find overlapping job attempts and peak concurrency from lease records

Medium · sweep line · intervals · leases

A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.

Approach

  1. Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
  2. For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
  3. For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
  4. Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.

Follow-up

  • A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
  • Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?

Track a rolling failure rate per destination for circuit decisions

Easy · sliding window · ring buffer · circuit breaker

The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.

Approach

  1. Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
  2. Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
  3. State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
  4. Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.

Follow-up

  • The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
  • A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?

Find version gaps and relay lag with window functions

Medium · window functions · event tables · frame semantics

outbox_event holds event_id, aggregate_type, aggregate_id, aggregate_version, event_type, payload, status ('pending','published','dead'), attempts, created_at, published_at. A projection is missing rows and you must decide whether the relay skipped events or the consumer dropped them. Write three queries over the last seven days: one listing every aggregate_id whose published aggregate_version sequence has a hole, one giving per-day counts with a running total, and one returning the newest published event per aggregate. For each, say where the window function is evaluated relative to WHERE and LIMIT. PostgreSQL 16.

Approach

  1. Gaps: compute lead(aggregate_version) OVER (PARTITION BY aggregate_id ORDER BY aggregate_version) in a subquery, then filter next_version <> aggregate_version + 1 in the outer query. Window functions are evaluated after WHERE, GROUP BY and HAVING and before the outer ORDER BY and LIMIT, so the predicate cannot sit in the same WHERE clause and PostgreSQL 16 has no QUALIFY.
  2. Say what the seven-day filter does to the answer: it truncates every partition, so the first row per aggregate has no predecessor inside the window and a hole spanning the boundary is invisible. Widen the window, or join to resource.version as the authority for the true maximum.
  3. Running total: SELECT date_trunc('day', created_at) AS d, count() AS n, sum(count()) OVER (ORDER BY date_trunc('day', created_at) ROWS UNBOUNDED PRECEDING). An aggregate inside a window call is legal because grouping runs before windowing. The grouping key is unique per row here so ROWS and RANGE agree, but write the frame anyway — over ungrouped rows with tied timestamps the default RANGE frame pulls in every peer row and the total jumps.
  4. Newest per aggregate: DISTINCT ON (aggregate_id) ... ORDER BY aggregate_id, aggregate_version DESC is the cheap PostgreSQL-only form when an index matches that order; row_number() OVER (PARTITION BY aggregate_id ORDER BY aggregate_version DESC) = 1 is the portable form and needs a subquery for the same evaluation-order reason as the gap query.

Follow-up

  • Relay failover redelivers events. Does a duplicate break the gap query, and how would you detect one from this table alone?
  • Turn the gap check into a continuous monitor rather than a query someone runs after an incident. What does it watch?

Replace offset paging on the resource feed with keyset

Easy · keyset pagination · composite index · sort order

resource holds resource_id, tenant_id, owner_user_id, title, body_ref, version, status ('draft','active','archived','deleted'), created_at, updated_at, deleted_at, with an index on (tenant_id, status, updated_at DESC, resource_id DESC). The listing endpoint returns active resources for one tenant, newest update first, 50 per page, today with LIMIT 50 OFFSET n. Tenants reach page 400 and rows are created while they read. Write the keyset query, define what the cursor carries and how it is encoded, and say which part of the index each predicate uses. Assume PostgreSQL 16.

Approach

  1. Name the two failures separately. OFFSET 20000 makes the server produce and discard 20,000 rows, so page cost grows with depth rather than with page size. Independently, any write that changes how many rows sort above the offset moves the window between two fetches, and the direction decides which anomaly you get: an insert lands at the head of updated_at DESC and pushes already-returned rows down past the boundary, so they are returned a second time; a delete above the offset, or a row whose updated_at is bumped above the cursor, pulls rows up and one is never returned at all. Nothing in the response reveals either.
  2. Write the seek: WHERE tenant_id = $1 AND status = 'active' AND (updated_at, resource_id) < ($2, $3) ORDER BY updated_at DESC, resource_id DESC LIMIT 50. The row-value comparison is one index range rather than a disjunction, and both columns are NOT NULL, which is what makes that comparison well defined.
  3. Map each predicate onto the index: tenant_id and status are equality on the leading columns, (updated_at, resource_id) is the range, and the ORDER BY matches the index order so no Sort node appears and the scan stops after 50 rows. The DESC in the definition only matters for mixed directions — a plain ascending btree on the same columns is read backwards for this query.
  4. Put both sort columns in the cursor and nothing the client can tamper with into another tenant: base64 of (updated_at, resource_id), validated server-side, with tenant_id taken from the principal.

Follow-up

  • The client asks for 'jump to page 400'. What do you offer instead, and what does the honest version cost?
  • Sort order becomes user-selectable across four columns. How many indexes is that, and which would you refuse to add?

Can you walk us through your past employment and relevant project experience?

Medium · Experience and Background

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

What specific technical processes or software development areas are you most interested in working on at our c

Medium · Experience and Background

What specific technical processes or software development areas are you most interested in working on at our company?

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

What are you looking to gain from this position, and how does it align with your long-term career goals?

Medium · Experience and Background

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

If you were mowing your lawn and the mower stopped working, what is the first thing you would do to solve the

Medium · Problem-Solving and Troubleshooting

If you were mowing your lawn and the mower stopped working, what is the first thing you would do to solve the problem?

Approach

  1. Establish what changed and when, before forming any theory.
  2. Pick a bisection that eliminates candidates whichever way it turns out.
  3. Check the instrumentation before believing the symptom.
  4. Separate the trigger from the cause; the deploy is rarely the bug.

Follow-up

  • What would you look at first, and what would it rule out?
  • How would you tell a cause from a coincidence here?

How do you approach isolating a bug in a system that involves both hardware and software components?

Medium · Problem-Solving and Troubleshooting

Approach

  1. Establish what changed and when, before forming any theory.
  2. Pick a bisection that eliminates candidates whichever way it turns out.
  3. Check the instrumentation before believing the symptom.
  4. Separate the trigger from the cause; the deploy is rarely the bug.

Follow-up

  • What would you look at first, and what would it rule out?
  • How would you tell a cause from a coincidence here?

Suggested practice checklist

Built from the rounds and topics Miltec UV candidates report.

Day 1 — Map the Miltec UV loop

  • Write out the reported sequence: Initial Screening Call, Secondary Meeting.
  • For each round, write one sentence on what it is judging, from the description above, and mark the one you are least ready for.

Deliverable: A one-page map of the 2 reported rounds, with the weakest marked.

Day 2 — Work Problem Solving

  • Spend the session on Problem Solving, which Miltec UV candidates report being tested on.
  • Write one worked example in Problem Solving and time yourself on it.

Deliverable: One timed worked example in Problem Solving.

Day 3 — Work Structured Troubleshooting

  • Spend the session on Structured Troubleshooting, which Miltec UV candidates report being tested on.
  • Write one worked example in Structured Troubleshooting and time yourself on it.

Deliverable: One timed worked example in Structured Troubleshooting.

Day 4 — Work Analytical Reasoning

  • Spend the session on Analytical Reasoning, which Miltec UV candidates report being tested on.
  • Write one worked example in Analytical Reasoning and time yourself on it.

Deliverable: One timed worked example in Analytical Reasoning.

Day 5 — Answer out loud: Problem-Solving and Troubleshooting

  • Answer aloud, timed: If you were mowing your lawn and the mower stopped working, what is the first thing you would do to solve the problem?
  • Answer aloud, timed: Describe a time you encountered a technical issue you couldn't immediately fix; how did you proceed?

Deliverable: Spoken answers to 2 reported Problem-Solving and Troubleshooting question(s), under time.

Day 6 — Answer out loud: Experience and Background

  • Answer aloud, timed: Can you walk us through your past employment and relevant project experience?
  • Answer aloud, timed: What specific technical processes or software development areas are you most interested in working on at our company?

Deliverable: Spoken answers to 2 reported Experience and Background question(s), under time.

Day 7 — Dry run for Miltec UV

  • Run one full mock under time, then write down the two questions you most want to ask your interviewers.

Deliverable: A completed timed mock and two questions to ask.

Behavioural preparation

Behavioural rounds judge the decision you made and what it cost.

Describe a time you encountered a technical issue you couldn't immediately fix; how did you proceed?

Medium · Problem-Solving and Troubleshooting

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

Narrate an outage you owned from page to postmortem

Hard · incident response · blast radius · postmortems

Pick an incident you personally drove, ideally one where writes were affected rather than reads. In six to eight minutes: state the symptom as it first appeared on a dashboard, the blast radius you established before you knew the cause, the mitigation you applied and when, the mechanism you eventually proved, and the follow-up that would prevent a repeat. Bring numbers: error rate, tenants affected, minutes to mitigate, minutes to resolve. If you cannot name what you measured, choose a different incident.

Approach

  1. Open on the signal rather than the cause: which metric at which percentile moved, on which service, at what time, so the listener follows the same evidence you had rather than a conclusion you already reached.
  2. Separate mitigation from diagnosis out loud. State what you did to stop the bleeding (flag off, shed traffic, drain a lease, roll back a deploy) and say plainly that you did it before the mechanism was known, because those are two jobs with different deadlines.
  3. Establish blast radius in countable terms: how many tenants, how many writes, and crucially whether the effect was loss or only delay. An append-only revision table or a pending outbox row means the change survived and the projection was merely behind, which is a repair rather than a data-loss incident.
  4. Prove the mechanism instead of asserting it. Name the trace span that grew, the plan that flipped to a sequential scan, the lease that expired, plus one alternative you ruled out and the signal that stayed flat while you ruled it out.

Follow-up

  • What would you do differently in the first five minutes, given the same dashboard and no more information?
  • Which follow-up action did you deliberately not take, and why was dropping it the right call?

Estimate work you have never done and defend the range

Hard · estimation · backfills · expand-contract

You are asked to estimate a change you have never attempted: add a column to a 100-million-row table, populate it, move reads across, and drop the old shape. Give a range with the assumptions that generate it, including batch size, the signal your backfill throttles on, and wall-clock hours, and name the three unknowns that would move the number most. Then describe a real estimate you gave under comparable ignorance: how you expressed its uncertainty, what you committed to, and how wrong you turned out to be.

Approach

  1. Decompose into independently deployable steps before estimating anything: add the column nullable, write both shapes, backfill in batches, verify, move reads, stop writing the old shape, drop it. That is four deploys spread over days, and the calendar estimate is dominated by them rather than by the loop's runtime.
  2. Do the arithmetic aloud for the part that has arithmetic in it: batch size times number of batches times per-batch duration, at a write rate the primary can absorb alongside roughly 1.2k writes per second of production traffic. The loop is throttled by replication lag and lock waits, not by how fast it can issue statements.
  3. Price the schema step by its lock rather than its statement duration. In PostgreSQL an ALTER TABLE taking ACCESS EXCLUSIVE waits for every open transaction on that table while later queries queue behind it, so a millisecond change issued during a thirty-second analytics query stalls that table for thirty seconds. Adding a nullable column with a non-volatile default avoids a rewrite from version 11; a new index wants CREATE INDEX CONCURRENTLY, which cannot run inside a transaction block and leaves an invalid index behind if it fails.
  4. Express the answer as a range whose endpoints each trace to a stated assumption, then name the cheapest experiment that collapses it, which is almost always running one real batch against the real table and multiplying.

Follow-up

  • How do you verify the backfill genuinely finished, given rows written by production traffic while it ran?
  • Where does the backfill resume from after a worker is killed mid-batch, and what makes that resume point trustworthy?