cswork / libraryOpen practice workspace

Interview guides · Kiewit Corporation

Kiewit Corporation Software Engineer Interview Questions & Guide 2026

Debugging practice for Kiewit Corporation software engineer candidates: reproduce it, narrow it, then change one thing per run.

The 60-second brief

At Kiewit, a Software Engineer plays a unique and pivotal role that bridges the gap between cutting-edge technology and heavy industrial construction. Unlike traditional tech companies where software exists in a purely digital ecosystem, software at Kiewit directly powers massive, real-world infrastructure projects—ranging from bridges and highways to tunnels and power plants. The applications you build, optimize, and maintain are used by field engineers, project managers, and estimators to ensure multi-million-dollar operations run safely, on time, and within budget.

Treat capacity estimation as a conversion skill rather than a table to memorise: turn a user count and an action rate into requests per second and bytes per day, then name the component that number breaks first. The figure only matters if it changes the design.

Focus areas

  • Scope every query and cache key by tenant
  • Evolve APIs without breaking pinned SDK clients
  • Build at-least-once pipelines with explicit deduplication horizons

Overview

The impact of this position is felt across the entire lifecycle of Kiewit’s projects. You will contribute to proprietary estimating software, complex logistics and scheduling platforms, real-time safety monitoring tools, and field-data collection systems. Because Kiewit's construction crews operate in diverse and sometimes remote environments, the software must be highly reliable, performant, and intuitive.

Entering this role means joining a team where technology has a tangible, physical footprint. It requires not only strong analytical and technical capabilities but also an appreciation for the scale and complexity of the construction industry. Successful candidates are those who are excited by the challenge of solving complex logistical problems and are eager to build software that has a lasting impact on the physical world.

The Kiewit Corporation interview process

Kiewit Corporation candidates report 3 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.

Initial Screen

Before anything technical happens, someone has to decide which rung of the ladder your loop is calibrated to, and that decision sets the bar for every round after it. It comes from how you describe scope, not from your title, because titles do not convert cleanly between companies. The weak version of the answer is team size and years. The strong version names the largest change you shipped where nobody reviewed the design, what would have broken if you had been wrong, and what you were paged for. Get the level said out loud on this call, because the range and the loop both follow from it.

What to demonstrate

  • Whether the scope in your own account maps onto a level the team actually has an opening at, so a mismatch ends the process cheaply rather than after four interviewers have spent a day
  • Whether your title needs re-mapping: the same word describes very different amounts of independent decision-making at a twenty-person company and a ten-thousand-person one
  • Whether your compensation expectation can be filled at that level in the structure the role pays in, which is why the number gets asked for before any engineer is scheduled

How to prepare

  • Write down two changes from the last two years: the largest one you designed with nobody reviewing the design, and the largest one where someone more senior did. Lead with the first when scope comes up, and be ready to say which parts of the second were yours
  • Ask which level the loop is calibrated to and what changes at the level above it, then plan your weeks from that answer rather than from the posting
  • Settle a total-compensation range beforehand with the split named, base against bonus against equity and its vesting period, so a question about numbers gets a number instead of the word market

Technical & Managerial Rounds

What this round decides is narrow: whether you can produce code that runs and is correct on inputs nobody showed you. An elegant solution that does not compile scores below a plain one that does, so write a correct brute force first, say out loud that you know its cost, and improve it with the working version still on screen. What separates strong answers is who finds the broken case. Trace your own code against an empty input, a single element, and duplicate keys before you say you are finished, because being told is far more expensive than noticing.

What to demonstrate

  • Whether degenerate inputs get checked without being asked for: an empty collection, one element, every element equal, and the extreme value the input type allows
  • Whether the complexity you state matches the code you actually wrote, including a sort or a copy sitting inside a loop
  • Whether the finished answer is verified against the worked examples before you call it done, rather than assumed correct because the code reads correctly

How to prepare

  • Take five problems you have already solved and, without running anything, write down what each returns for empty input, a single element, and all-duplicates. Then run them and count how many you predicted wrong.
  • Drill the brute force as its own skill: on ten problems, write only the obviously-correct slow version and time how long it takes to get it passing. If that is more than a few minutes, that is what to practise, not the optimal version.
  • Add a fixed last step before you submit anything, reading only the loop bounds and the initial value of each accumulator, which is where most off-by-one errors live

On-Site / Career Day

Where the day includes a partner from product, design or data, that conversation is weighted like the technical ones and prepared for least. They are deciding one thing: whether having you in the room makes their decisions cheaper. That means options with costs attached, not implementation detail and not "it depends". An estimate someone can plan against — a range, the assumption that would push it to the high end, and what you would drop to hit the low one — is worth more than a confident single number, which everyone present already knows is wrong.

What to demonstrate

  • Whether an estimate comes as a range with the assumption most likely to break it, and states what a specific scope cut would actually buy
  • Whether a technical constraint is handed over as a choice with consequences on their side, rather than as a verdict they have no standing to argue with
  • Whether you establish what decision is on the table before proposing anything
  • Whether risk is raised while it can still change the plan, with the trigger that would confirm it, instead of reported afterwards as a slip

How to prepare

  • Take a project that shipped late and write the two-sentence warning you could have given three weeks earlier, naming what you would have needed decided at that point
  • Rehearse one estimate out loud until it arrives in three parts: the range, the single assumption that would blow it, and the smallest thing you would cut to protect the date
  • Rewrite an objection you have actually made — the "we can't do that" version — as two options with their costs, so the choice ends up with the person who owns it

Where candidates lose points

Paginating a growing table with limit and offset

Two unrelated defects share the idiom. Correctness: rows inserted or deleted between page requests shift the window, so a consumer walking an export skips rows and sees others twice, which for a customer-facing sync is silent data loss rather than an error anyone notices. Cost: the database still produces and discards the skipped rows, so page N costs time proportional to N times the page size and a deep page on a large table degrades from milliseconds to seconds. Keyset pagination over a stable, unique, indexed ordering -- where (created_at, id) < ($1, $2) order by created_at desc, id desc limit $3 -- is constant-cost per page and immune to shifting, on the precondition that the cursor columns never change value for a row, which disqualifies updated_at as a cursor.

Checking a quota with a select and then writing

Under read-committed isolation, two concurrent transactions both observe a count below the limit and both insert, so the limit is exceeded by exactly the concurrency. Repeatable read does not rescue it either: it provides a stable snapshot, and this is write skew, which snapshot isolation permits by design. The options are serialisable isolation, which detects the conflict and aborts one transaction with a serialisation failure and therefore obliges the caller to retry; a single statement with the predicate inside the write; or a constraint that makes the surplus insert fail outright. The reason this pattern survives review is that it is correct in every test that runs one request at a time.

Designing for a scale nobody asked for

Ask for request rate, data size, read-to-write ratio and expected growth, then size the simplest option first; one relational instance on current hardware covers a large share of real workloads. Reaching for shards, queues and a cache tier before any number has been quoted reads as pattern-matching rather than judgement.

A cache with no invalidation story

Say how an entry goes stale, how long you can serve it stale, and what happens when many requests miss the same key at the same instant. One popular key expiring under load sends every concurrent request to the origin together; single-flight coalescing, jittered expiry, or serving stale while revalidating are the standard answers.

Questions & practice

Locate a billing reconciliation gap without rescanning ninety million events

Hard · reconciliation · dimensional-bisection · watermarks · hypothesis-testing

A tenant's sealed invoice total is 0.4% below the sum of its raw usage_event rows for the period. That tenant has 90 million events over 30 days in a table partitioned daily on ingested_at, and its rollups carry source_max_ingested_at, revision and sealed_at. Recomputing all 30 days from raw is correct, and you are not going to do it. Give the procedure that locates the divergent (workspace, sku, hour) cell, the cost of each probe, and the one query you run before any of it.

Approach

  1. Run the free query first. Sum raw quantity for the period restricted to ingested_at <= source_max_ingested_at of the sealed rollups, and compare that against the unrestricted sum. The rollup stores the watermark precisely so this can be answered without a scan. If the whole 0.4% sits above the watermark, nothing is broken: it is late data, it becomes an adjustment line, and the investigation ends in one query.
  2. Only if the gap survives that test do you bisect, and you bisect by dimension rather than by rows. Compare 30 per-day totals, then inside the offending day compare the 6 SKUs, then the workspaces, then the 24 hours. That is roughly 30 + 6 + W + 24 grouped probes, each an indexed range scan over one daily partition for one tenant, against O(N) per attempt for the naive re-fold.
  3. Quantify why naive is not merely slow but unusable mid-incident: at a generous 200,000 rows/second sequential, 90 million rows is about 7.5 minutes per attempt, you will want ten attempts, and every one competes for I/O on the same partitions live ingest is writing. The diagnostic worsens the backlog it is diagnosing.
  4. Before fetching each comparison, state what it would look like under each hypothesis. Two adjacent hours off by equal and opposite amounts is occurred_at versus ingested_at bucketing. A whole day offset by exactly N hours is a timezone applied at the wrong layer. A gap confined to one SKU in one workspace is an environment filter. The same (tenant_id, idempotency_key) present in two ingested_day partitions is the dedup horizon losing a retry that crossed midnight.
  5. Make the next bisection cheap by storing the aggregate you keep recomputing. A per-(tenant_id, ingested_day) count and quantity checksum turns step two from thirty probes into one read, and it is the same number the reconciliation job already produces.
  6. Whatever you find, the sealed period does not change value. The correction is an adjustment line pointing at the line it reverses, carrying its own source_rollup_watermark, because the original invoice is the evidence of what the customer was charged.

Follow-up

  • The gap is 0.4% in one direction on one day and 0.4% the other way the next day. What does that shape rule in, and what does it rule out?
  • How do you distinguish a duplicate from a restatement, given revision and recomputed_at on the rollup?
  • Ingest is still running while you investigate. What makes your two numbers comparable at all?

Seal an hour under late data with bounded memory

Hard · watermarks · late-data · quantile-sketch · conditional-write

Metering ingest reads 256 partitions at 10,000 to 40,000 events/second. Events carry occurred_at and ingested_at, and during a producer replay the gap between them is hours. Seal each UTC hour once no more than 50 parts per million of that hour's eventual quantity can still arrive, using memory that does not grow with the size of the replay. Define the watermark, the lateness parameter and how you measure it, the structure holding open hours, and the write that performs the seal. State what an idle partition does to your watermark.

Approach

  1. Two clocks, two jobs. Bucket by occurred_at, because that is the hour the customer is billed for, and advance the watermark on ingested_at, because that is what the fold has consumed and what source_max_ingested_at records. Conflating them is what makes late data invisible.
  2. The global watermark is the min over partitions of each partition's committed ingested_at, not the max: the fold is trustworthy only as far as the slowest partition. The consequence is that one idle partition pins the watermark forever and nothing seals, so an idle partition must promote its watermark to wall clock after a stated idle timeout, and that timeout becomes a correctness parameter, because a partition that is slow rather than idle gets sealed past.
  3. Choose the lateness L from the measured distribution of ingested_at - occurred_at, weighted by quantity rather than by event count. The target is 50 ppm of the hour's quantity, and a replay is rare in events while carrying disproportionate mass, so an event-weighted quantile picks an L that is comfortably wrong at exactly the moment it matters.
  4. Measure that quantile in bounded memory. A Greenwald-Khanna summary gives epsilon-approximate quantiles in O((1/epsilon) log(epsilon n)) space; a t-digest costs more per merge but has relative error that tightens at the tails, which is the half of the distribution you are reading at p99.99. Keep a separate summary per tenant class, because one tenant's batch importer is not the population.
  5. Hold open hours in a min-heap keyed by hour_start. When the watermark advances, pop every hour with hour_end + L < W and seal it: O(log H_open) per advance and O(1) amortised per event to touch its bucket. Memory is open hours multiplied by distinct (tenant, workspace, sku) keys, so cap the number of simultaneously open hours and spill the oldest into usage_rollup_hourly as status='open' with a revision bump. While an hour is open the row is upsertable, so the store is your overflow.
  6. The seal itself is a conditional write: update ... set status='sealed', sealed_at=now() where status='open' returning .... Two sealers race on every restart, and the loser must see zero rows and stop rather than write a second value. After the seal, an event for that hour is not an upsert but an adjustment, and source_max_ingested_at is what proves it arrived afterwards.

Worked solution (40 min)

  1. Replay a day of events with a synthetic lateness distribution: 99.9% under two minutes, plus a 0.05% tail at four to six hours that carries 3% of total quantity.
  2. Compute the p99.99 lateness two ways, event-weighted and quantity-weighted, and put the two numbers side by side.
  3. Implement the min-heap of open hours with the watermark as the min over 256 partitions, then stall one partition for 20 minutes and observe what seals.
  4. Set the idle-partition timeout to 60 seconds, repeat the stall, and measure how much quantity arrives after the seal.
  5. Attempt the seal from two workers at once and confirm the conditional update lets exactly one through.

Expected result: The quantity-weighted p99.99 is hours larger than the event-weighted one. Choosing L from the event-weighted number lets roughly the tail's 3% of quantity land after the seal, 600 times the 50 ppm target. With the min watermark and no idle timeout, the stalled partition blocks all sealing; with a 60-second timeout, the stall is sealed past and its events arrive late.

Verify it yourself

  • Post-seal quantity as a fraction of the hour's total is at or below 50 ppm at the chosen L, measured rather than assumed.
  • The second sealer's update reports zero rows affected and writes nothing.
  • Heap size equals the number of open hours and does not grow with the replay's event count.

Follow-up

  • A replay starts during the sealing window for a period you are about to close. What do you do, and what is the customer-visible consequence of each option?
  • Your measured quantity-weighted p99.99 lateness is six hours and the invoice must be issued at 02:00 UTC on the first. How do you reconcile those two numbers?
  • How would you detect that L has drifted before it costs you an hour's quantity?

Find peak concurrent sandbox usage from run intervals

Medium · sweep-line · intervals · concurrency-caps · null-semantics

Given up to 5 million job_run rows for one tenant over one day, with run_id, started_at, finished_at, status and wall_clock_limit_seconds, report the maximum number of sandboxes running at once, the earliest instant that maximum is reached, and the first run_id that would breach a per-tenant cap of C. started_at is null while a run is queued; finished_at is null both for runs still executing and for runs in status lost. Treat a run as occupying [started_at, finished_at). Give the complexity and state how you handle each null.

Approach

  1. Turn each run into two sweep events, (started_at, +1) and (end, -1), then sort the 2n events by timestamp with -1 ordered before +1 at equal timestamps. That tie-break is what makes the interval half-open, so a run finishing at 10:00:00 and one starting at 10:00:00 never overlap.
  2. Decide each null out loud before sweeping, because each choice moves the answer. A null started_at means queued and contributes nothing. A null finished_at with status running or leased is clipped to the window end. Status lost has no observed end at all, so clip it at started_at + wall_clock_limit_seconds on the grounds that the supervisor owns the timeout, and record that you did. The table's check (finished_at is null or started_at is not null) guarantees you never see an end without a start.
  3. Sweep once, maintaining a running counter, the maximum, and the timestamp at which the maximum was first attained (update peak_at only on a strict increase, or you will report the last such instant instead of the earliest). Capture the first run_id whose +1 takes the counter to C+1 during the same sweep rather than in a second pass.
  4. Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by started_at, a min-heap of end times gives O(n log k) time and O(k) space with k the peak concurrency, which is the better shape when the rows come from an index scan on (tenant_id, started_at).
  5. If second resolution is acceptable, counting-sort the endpoints into an 86,400-slot delta array and prefix-sum it: O(n + T) time and O(T) space, which beats the comparison sort at 5 million rows. It answers only at second granularity, so state which resolution the cap is defined in.

Follow-up

  • Now report peak concurrency per tenant for 10,000 tenants from one globally sorted stream. What changes about memory and about the sort?
  • The cap has to be enforced at dispatch rather than reported afterwards. What does the admission check look like, and where does it race?
  • How would you answer 'peak concurrency within any 5-minute window' without re-sorting?

Enforce a concurrent-run quota that survives simultaneous requests

Medium · isolation levels · write skew · quotas · lock contention

A plan allows at most 20 concurrently running rows in job_run per tenant. The table holds run_id, tenant_id, workspace_id, status (queued, leased, running, succeeded, failed, timed_out, cancelled, lost), lease_token, leased_until, started_at and finished_at. Today the service runs select count(*) from job_run where tenant_id = $1 and status = 'running', compares the result to 20, then inserts. Under load a tenant exceeds the cap by exactly the number of concurrent requests. Name the anomaly, say which isolation levels do and do not prevent it, and give a version that holds, as SQL.

Approach

  1. Name it: write skew. Each transaction reads a predicate (the count of running rows), neither modifies what the other read, and both then insert rows that jointly violate an invariant no single row expresses. Read committed permits it. So does repeatable read, because snapshot isolation's first-updater-wins check fires only on conflicting row updates, and these are inserts touching disjoint rows.
  2. Enumerate the fixes with their real costs. SERIALIZABLE works: PostgreSQL's SSI tracks the predicate read and aborts one transaction with SQLSTATE 40001, which obliges the caller to retry and makes the abort rate rise with contention on a hot tenant. Folding the predicate into the write as insert ... select ... where (select count(*) ...) < 20 narrows the race to the statement's snapshot but does not close it under read committed.
  3. Give the version that holds at read committed: serialise on a row both transactions must touch. update tenant_concurrency set running = running + 1 where tenant_id = $1 and running < 20 returning running updates zero rows when the cap is reached, and zero rows is the rejection. This works because at read committed a blocked UPDATE re-evaluates its WHERE clause against the newly committed row; at repeatable read the same statement raises a serialisation error instead, so the isolation level changes the calling contract.
  4. State the cost you just bought. That row is now a per-tenant serialisation point, so admission throughput for the tenant is bounded by one divided by the lock hold time; at a 2 ms hold that is roughly 500 admissions/second. Keep the critical section to the single UPDATE, with no network call or scheduling decision inside the transaction, and decrement in the same transaction that writes the terminal status.
  5. Close the leak the status enum implies: a run can end as lost, so a crashed worker otherwise consumes a slot forever. Reconcile on a schedule against status = 'running' and leased_until < now(), and treat the counter as a fast path over job_run, which stays the system of record.

Worked solution (25 min)

  1. Seed a tenant with 19 running rows, then fire 8 concurrent sessions each running the select-then-insert, and count the resulting running rows.
  2. Repeat at REPEATABLE READ and confirm the count still exceeds 20.
  3. Repeat at SERIALIZABLE, count the 40001 aborts, and note that without a retry loop those requests fail rather than queue.
  4. Implement the atomic counter UPDATE, re-run the 8-way test, and confirm exactly 20 running rows with zero over-admissions.
  5. Kill a worker mid-run, let the lease expire, and check whether the slot comes back without intervention.

Expected result: Write skew identified; read committed and repeatable read both permit it; serialisable prevents it at the price of 40001 retries; the working read-committed version is update tenant_concurrency set running = running + 1 where tenant_id = $1 and running < 20 returning running, whose zero-row result is the rejection, plus a reconciliation path for runs that terminate as 'lost'.

Verify it yourself

  • At 8x concurrency against a cap of 20, running rows never exceed 20.
  • The rejection returns zero rows rather than raising, so it is distinguishable from an error in the caller.
  • Killing a worker does not permanently consume a slot.
  • The counter and select count(*) from job_run where status = 'running' agree after reconciliation.

Follow-up

  • Write the retry loop for the SERIALIZABLE version. What does the caller see when it keeps aborting, and what bounds the retries?
  • Two regions each keep a counter. What is the effective cap, and what does admission do when the counter store is unreachable?
  • The cap changes mid-flight on a plan upgrade. Do running jobs get killed, and what does the counter row look like during the change?

Explain why the metering dashboard scans every daily partition

Medium · indexing · partition pruning · sargability · tenant skew

usage_event is range-partitioned daily on ingested_at and holds tenant_id, workspace_id, environment, sku, quantity numeric(20,6), occurred_at and ingested_at. The only relevant index is on (occurred_at). A dashboard runs select sku, sum(quantity) from usage_event where tenant_id = $1 and date_trunc('hour', occurred_at) >= $2 and environment = 'production' group by sku, and EXPLAIN shows a sequential scan of every partition. Give each distinct reason, rewrite the predicate so an index can serve it, propose the index, and state the write cost its column order adds.

Approach

  1. Separate the three causes rather than blaming one. First, date_trunc('hour', occurred_at) wraps the column, so the predicate is not sargable against a btree on the bare column. Second, pruning keys off ingested_at while the query constrains occurred_at, so no partition can be excluded. Third, even made sargable, (occurred_at) is not tenant-leading, so for one tenant among thousands the scan reads the whole time range and discards nearly all of it.
  2. Rewrite the bound carefully, because the obvious rewrite is only conditionally equivalent. date_trunc('hour', x) >= $2 equals x >= $2 only when $2 is already hour-aligned; for an arbitrary $2 it means x >= date_trunc('hour', $2) + interval '1 hour'. Normalise the parameter in the caller and leave the column bare.
  3. Restore pruning with a second, redundant predicate on the partition key: ingested_at >= $2 - interval '<late-data horizon>'. State both sides of it. It prunes to a handful of partitions, and it silently omits any event whose ingest lagged past that horizon, which is precisely what a producer replay produces. Either document the horizon as a stated bound, or partition on occurred_at and move the problem into the dedup window instead.
  4. Propose (tenant_id, occurred_at) include (sku, quantity) per partition. A partial index where environment = 'production' mostly saves size rather than selectivity, since production dominates the three environments; take it if non-production is a meaningful share and skip it otherwise.
  5. Price the write path honestly. At roughly 250M rows/day each extra index is another insert plus WAL per row, and a tenant-leading key scatters inserts across one hot leaf per active tenant instead of appending to a single rightmost leaf, so page dirtying and random I/O both rise. An INCLUDE payload widens every leaf entry and enlarges the index accordingly.
  6. Add the index-only-scan caveat before someone reports it as a regression: on a freshly appended table the visibility map is not yet set for recent pages, so the INCLUDE columns still cost heap fetches until autovacuum has been through, and the newest hour is exactly the data the dashboard reads.

Follow-up

  • CREATE INDEX CONCURRENTLY is not supported on a partitioned parent. Give the sequence that gets this index onto 400 existing partitions without blocking ingest.
  • One tenant holds 200 times the median row count and the dashboard still times out for them with the index in place. What changes?
  • Should this read hit usage_rollup_hourly instead? State what that costs in freshness and what the watermark lets you promise.

Describe a situation where you had to learn a new technology quickly to solve a problem.

Medium

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Explain the concept of a virtual function and when you would use one.

Medium

Approach

  1. Work from the requirement backwards to the design.
  2. State your assumptions explicitly before working the problem.
  3. Clarify what is being asked and what a complete answer contains.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Per-tenant rate limiting that holds across one hundred pods

Medium · rate limiting · hot keys · atomicity · write skew

The same gateway enforces each tenant's plan rate limit in requests/second and its monthly quota. Traffic is heavily skewed: a handful of tenants exceed all others combined, while a small tenant's requests may all land on one of the 120 pods. Both limits must hold in aggregate rather than per pod, per credential or per region, and the check may add at most 2 ms at p99. Specify the algorithm, where the state lives, the exact operation performed per request, and the behaviour when the counter store is unreachable - separately for the rate limit and the quota.

Approach

  1. Do the arithmetic on per-pod buckets before discarding them, and be precise about which half fails. Giving each pod rate/N keeps the sustained aggregate correct - 120 buckets of 5 rps sum to the 600 rps limit - but a tenant whose traffic all lands on one pod is throttled at 5 rps, a hundred and twentieth of what it pays for. The over-admission comes from burst depth, not sustained rate: if each pod carries a full bucket depth B, the aggregate burst is 120B against a limit that intended to allow B.
  2. Move the rate limit to a shared counter accessed in exactly one atomic round trip - a token bucket or GCRA as a single server-side script returning allow/deny plus a retry-after - never a read followed by a write. Keep the key tenant-scoped and region-local; a globally shared counter costs a cross-region round trip that alone exceeds the 2 ms budget, so shard the global limit per region in proportion to observed regional share and accept that a tenant whose traffic shifts regions is briefly throttled until the shards rebalance.
  3. Cut round trips for the largest tenants with leased tokens: a pod leases 50 at a time and spends them locally, reducing counter round trips by 50x at the cost of bounded over-admission of pods x lease_size, which is 6,000 requests in the worst case here. Shrink the lease for tenants with small limits, where that bound would swamp the limit itself.
  4. Treat the quota as a different problem, not a longer window. It is a count that other in-flight requests are changing, so select-the-usage-then-insert is write skew: read-committed permits it and repeatable read permits it too, because snapshot isolation is exactly what allows two transactions to read a consistent count and both write. Enforce it inside one statement - an atomic increment whose returned value is compared, or UPDATE ... SET used = used + $1 WHERE used + $1 <= limit RETURNING - or with a constraint that makes the surplus write fail.
  5. Write the unavailability policy per limit rather than one policy for both. The rate limit fails open to a conservative local bucket, because it protects capacity and failing closed turns a counter blip into a total outage. The quota fails open for tenants whose last known usage was well below the cap and closed for those at or above it, since that is the only decision with revenue attached, and reconciles from the usage ledger on recovery - which is why the monthly counter must be re-seedable from that ledger rather than being the only copy.

Worked solution (30 min)

  1. For a 600 rps limit across 120 pods, compute the sustained rate and the aggregate burst under local buckets of depth B, then the throughput of a tenant whose traffic all lands on one pod.
  2. Write the shared-counter operation as a single atomic script: its inputs, its return value, and the number of network round trips per request.
  3. Size a lease of 50 tokens: compute the worst-case over-admission as pods x lease_size and the reduction in round trips, then decide the smallest limit at which the lease is still acceptable.
  4. Write the two unavailability policies side by side and the reconciliation step that runs when the counter store returns.

Expected result: A per-region shared token bucket keyed (tenant, region, window) executed as one atomic script at roughly one sub-millisecond intra-region round trip; the monthly quota enforced by a single atomic increment-and-compare that is re-seedable from the usage ledger; leases only for high-limit tenants with over-admission bounded at 120 x 50 = 6,000 requests; the rate limit failing open to a conservative local bucket and the quota failing closed only above the last known cap.

Verify it yourself

  • Separate the two halves of the local-bucket claim: sustained aggregate is correct at rate/N per pod, burst is not. If your answer says local buckets let a tenant exceed its sustained rate, the arithmetic does not support it.
  • Re-read your quota check and confirm no branch reads the counter and then writes it. If the predicate is not inside the write or enforced by a constraint, the race is still there.
  • Compare worst-case lease over-admission against the smallest tenant limit you apply leases to. If 6,000 exceeds that tenant's per-minute allowance, the lease size is wrong for that tier.

Follow-up

  • One tenant is 40% of all traffic and its counter key lands on a single shard. What do you change, and what does that cost in accuracy?
  • Clients receive 429s and retry. What stops the well-behaved ones from synchronising into a herd?
  • A tenant reports being throttled below its limit. Which evidence do you produce, and does your design emit it today?

Hourly rollups merge one hour and lose another

Easy · timezone · rollups · reconciliation

Reconciliation flags one tenant on one day. Summing usage_event.quantity by hour of occurred_at gives 24 non-empty hours, but usage_rollup_hourly holds 23 rows for that tenant, workspace and SKU, one of which carries roughly the sum of two adjacent hours. Other days reconcile exactly, and the affected date matches a civil-time transition. hour_start is documented as truncated to the hour in UTC. You have both tables, the rollup job source, and its runtime environment. Give an ordered checklist, the mechanism, and the correction path for a day that may already be sealed.

Approach

  1. Bisect by dimension until one cell explains the whole difference: tenant, then day, then SKU, then hour. A defect confined to a single transition date already rules out deduplication and late arrival, both of which are indifferent to which hour an event lands in.
  2. Read the truncation with its precondition stated: date_trunc on a timestamptz value is evaluated in the session TimeZone, not in UTC. If the job connects without pinning that setting, it inherits the server or container default.
  3. Follow that to the collision: in a zone that observes daylight saving, two distinct UTC hours map to the same local wall-clock label at the autumn transition, so both fold into one key under the unique constraint on (tenant_id, workspace_id, sku, hour_start) and their quantities sum into one row. At the spring transition a label never occurs and the row is simply absent.
  4. Confirm from data rather than from reading code: run the same aggregate twice, once with the session pinned to UTC and once with the job host zone, and check that the second reproduces the stored rollup exactly.
  5. Fix at the source by pinning the connection to UTC explicitly, or by truncating on occurred_at AT TIME ZONE 'UTC', rather than relying on a default that differs between a developer machine, CI and production.
  6. Correct according to status, not convenience: an open hour is recomputed with revision incremented, a sealed hour is frozen and the difference becomes an adjustment line on the next invoice with voided_by_line_id pointing at the line it reverses.

Follow-up

  • The same job also emits a daily figure for a dashboard. Why can a correct hourly rollup still produce a wrong day, and what does the tenant's billing timezone have to do with it?
  • How would you detect this class automatically rather than waiting for reconciliation, given that it only manifests twice a year per zone?

Suggested practice checklist

For someone fluent in a dynamic language who has shipped real work but has never had to say what the runtime is doing underneath. The week is built on measuring and deliberately breaking things, because the questions that expose this background are the ones where the interviewer asks why a second time.

Day 1 — Measure before reasoning

  • Take a slow piece of your own code, write down in advance where you believe the time goes, then profile it and record how wrong the guess was. The cost is usually an allocation you did not notice or an accidental quadratic membership test.
  • Replace one list membership test inside a loop with a set and measure at a thousand, ten thousand and a hundred thousand elements, confirming the shape of the curve rather than only that it got faster.
  • Write down the three quantities you can now measure instead of assert: wall time, peak memory, and call count for the function you suspected.

Deliverable: A before-and-after profile of real code plus a written note on the size of the gap between the guess and the measurement.

Day 2 — References, copies, and the bugs they produce

  • Write the function with a mutable default argument, call it three times, and explain the accumulating result: the default is evaluated once when the function is defined, so every call shares one object.
  • Build a nested structure, take a shallow copy, mutate an inner element, and show that both views changed, because a shallow copy duplicates the container and not the elements. Then fix it with a deep copy and state the cost you just accepted.
  • Write two functions, one mutating its argument in place and one rebinding the local name, and predict the caller's view of each before running it. That single distinction produces most of the bugs that pass their tests.

Deliverable: Three small programs whose output you predicted correctly before running, each with a one-line statement of the rule underneath.

Day 3 — Types, once, in a language that checks them

  • Port one module you have already written, roughly a hundred lines, into a statically typed language, and record every place the compiler demanded an answer your original had left implicit: a value that can be absent, a numeric width, a case never handled.
  • Write the same signature in both languages and state what the static one guarantees before the program runs and what it does not, since it will not save you from a wrong algorithm or an index out of range.
  • Write the difference between an interface satisfied by declaration and one satisfied structurally, with one case each where the other approach would miss the mistake.

Deliverable: One module in two languages plus a list of the questions the type checker forced you to answer.

Day 4 — Concurrency, starting with what actually runs at the same time

  • Run the same CPU-bound function across four threads and four processes and measure both. Under the default CPython build the threaded version will not speed up, because only one thread executes bytecode at a time; the process version will. Check which build you are on first, since free-threaded builds remove that lock and change the result.
  • Then run a blocking I/O workload across four threads and measure it speeding up, because the interpreter releases that lock around blocking calls, which is why treating threads as useless is wrong as a general claim.
  • Build the lost update: two threads each incrementing a shared counter a hundred thousand times, and show a final value below the expected sum, because an increment is a load, an add and a store and the thread can be suspended between them. Fix it with a lock and then measure what the lock costs.

Deliverable: Three measurements, threads against processes on CPU work, threads on I/O work, and a demonstrated lost update, each with the mechanism written underneath.

Day 5 — Debugging as a procedure rather than an instinct

  • Work one real failure as a bisection: find a revision or an input size where it is good and one where it is bad, halve repeatedly, and state the two assumptions bisection needs, that the property changes exactly once across the range and that the test is reliable.
  • Minimise one failing input to the smallest version that still fails, and record how many rounds it took.
  • Keep a hypothesis log for one bug in three columns, what I believe, what would disprove it, what I observed, and stop yourself the first time you are about to change two things at once.

Deliverable: One bug worked to root cause with a written hypothesis log and a minimised reproducing input.

Day 6 — Tests that catch the bug you are about to write

  • Implement an LRU cache with a capacity bound, then write the three test cases that would catch an off-by-one in eviction: insert exactly capacity items and assert nothing was evicted, insert one more and assert the least recently used key is the one gone, and read an old key just before that insert so the eviction victim changes.
  • Add a property test comparing your implementation against a deliberately slow reference, an ordered list scanned linearly, over a few thousand random operation sequences, because a slow reference finds the cases you would not have thought to write.
  • Write one numeric test that fails under exact equality and passes with a tolerance, and state why the tolerance has to be relative rather than absolute once the magnitudes grow.

Deliverable: An LRU implementation with three boundary tests, one property test against a slow reference, and one tolerance-based numeric test.

Day 7 — Debug something broken, out loud

  • Have someone plant three defects in a two-hundred-line program, an off-by-one, a shared mutable state bug, and a wrong error-handling path, then find them while narrating, under a fixed rule: state the hypothesis before touching anything.
  • Time each one and record which tool found it, reading, a printed value, a debugger, or a test, because the question asked in interviews is how you would find it rather than what it was.
  • Write the sentence you will use when you do not yet know the cause, one that names the next measurement instead of offering a guess.

Deliverable: A recorded debugging session with time-to-find per defect and the method that found each.

The estimate and the day you knew

A slipped date is only a bad story if you sat on it. What matters is what you believed when you gave the number, the signal that told you it was wrong, how many days passed before you said so, and what you cut rather than asking for more time. Scope you defended counts as much as scope you dropped.

Describe your experience with database design and writing efficient queries.

Medium · behavioural and engineering judgement

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. Name the disagreement and how you resolved it with evidence.
  3. State the situation in two sentences and spend the rest on the reasoning.

Follow-up

  • How did you know your change caused the improvement?
  • What did you decide not to do, and why?

Are you willing to relocate to different project sites or offices across the country if required?

Medium · behavioural and engineering judgement

Approach

  1. Close with what you would do differently, concretely.
  2. Name the disagreement and how you resolved it with evidence.
  3. State the situation in two sentences and spend the rest on the reasoning.

Follow-up

  • What did you decide not to do, and why?
  • How did you know your change caused the improvement?

What does safety in the workplace mean to you, and how does it apply to a software engineering role?

Medium · behavioural and engineering judgement

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What did you decide not to do, and why?
  • What would you do differently if you ran that again?

Describe a time you had to work with a difficult team member. How did you handle it?

Medium · behavioural and engineering judgement

Approach

  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Pick a story where you made the decision, not one where you watched it.
  3. Give the blast radius: what could have broken, and what you measured.

Follow-up

  • What did you decide not to do, and why?
  • What would you do differently if you ran that again?