cswork / libraryOpen practice workspace

Interview guides · JMD Technologies

JMD Technologies Software Engineer Interview Guide

JMD Technologies Software Engineer interview guide: reported rounds, questions and how candidates describe the process.

The 60-second brief

As a Software Engineer at JMD Technologies, you are at the intersection of complex systems engineering and cutting-edge software development. Your work is fundamental to the stability and innovation of the rail industry, where precision and reliability are not just goals—they are safety requirements. You will be responsible for designing, developing, and maintaining software solutions that power mission-critical infrastructure, ensuring that high-stakes environments operate with maximum efficiency. This role offers a unique opportunity to apply your technical expertise to real-world, high-scale engineering challenges. Whether you are working on signal design or broader project engineering initiatives, your contributions directly impact the safety and functionality of large-scale transportation networks.

This guide is scoped to a Software Engineer candidate at JMD Technologies.

Focus areas

  • Signal Design Engineering
  • Rail Engineering
  • Signaling Systems (Rail/Industrial)

The JMD Technologies interview process

JMD Technologies candidates report 3 rounds over 3-5 weeks. The stages below are what candidates describe, not a published process.

Initial Screening

The first step involves a review of applications to assess candidate qualifications.

What to demonstrate

  • The first step involves a review of applications to assess candidate qualifications
  • Depth in Signal Design Engineering

How to prepare

  • Be able to walk your CV end to end in two minutes, and say why this company specifically.
  • Have your salary expectations, notice period and location constraints ready, and ask for the rest of the loop in writing.

Technical Assessments

Candidates will undergo technical evaluations to demonstrate their software proficiency.

What to demonstrate

  • Candidates will undergo technical evaluations to demonstrate their software proficiency
  • Depth in Signal Design Engineering

How to prepare

  • Answer aloud and timed: How do you handle hardware-software integration challenges?
  • Answer aloud and timed: What is your approach to signal processing within a software-defined system?

Behavioral Assessments

Discussions will focus on the candidate's fit within the team-oriented culture.

What to demonstrate

  • Discussions will focus on the candidate's fit within the team-oriented culture
  • Depth in Signal Design Engineering

How to prepare

  • Prepare three examples from your own work, each with a decision you made and an outcome you can quantify.
  • Re-read the description of the behavioral assessments above and write down what you would ask to confirm before it.

Where candidates lose points

Prepare for the 'Why'

Be ready to explain why you chose a specific approach or technology. We value intentionality in engineering.

Stay Humble

Our culture values team members who are willing to admit when they don't know something and are eager to learn.

Practice Clarity

When answering technical questions, start with your high-level approach before diving into the granular code or math.

Review Fundamentals

Even if you have years of experience, a quick refresher on core engineering and basic algorithm principles will serve you well.

Questions & practice

Archive a resource graph without breaking live references or recursing

Medium · graph traversal · topological order · tenant isolation

Resources reference other resources within a tenant; for the largest tenant the reference table holds up to 2,000,000 nodes and 8,000,000 edges. Archiving a resource must archive everything reachable from it that nothing outside the set still references, refuse when a live external referrer exists, and terminate when references form cycles, which they legitimately do. Produce the archive order and the refusal list, targeting O(V+E). Say what stops the traversal crossing a tenant boundary, and why recursion is the wrong control structure at this size.

Approach

  1. Load the subgraph with the tenant predicate on both endpoints of the edge, not only on the side you started from. Scoping the left table alone is the classic cross-tenant leak: one mis-entered edge then pulls another tenant's resources into the traversal and, worse, into the archive.
  2. Traverse iteratively with an explicit stack. A 2,000,000-node graph can hold a chain deep enough to exhaust a native stack in the low tens of thousands of frames, and that failure is a process crash rather than an error you can return.
  3. Treat cycles as data rather than corruption: compute strongly connected components with Tarjan in O(V+E) using its own explicit stack, then condense. The condensation is a DAG, so a topological order over it gives the archive order, and every member of a component archives in one transaction because no order within a cycle is valid.
  4. Decide refusals with reverse edges. A candidate is archivable only if every in-edge originates inside the candidate set, so build the transpose or count in-degrees restricted to the visited set, and emit each blocked resource with the id of the external referrer, which is the only part of the answer an operator can act on.

Follow-up

  • The graph is read in one query and the archive writes a minute later. What can change in between, and how do you make the write safe?
  • The candidate set is 400,000 resources. Is that one transaction, and if not, what does a half-finished archive look like to a reader?

Identify the heaviest tenants in a five-minute window under memory pressure

Medium · top-k · heavy hitters · streaming

The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.

Approach

  1. Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
  2. Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
  3. State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
  4. Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.

Follow-up

  • The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
  • Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?

Find overlapping job attempts and peak concurrency from lease records

Medium · sweep line · intervals · leases

A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.

Approach

  1. Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
  2. For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
  3. For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
  4. Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.

Follow-up

  • A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
  • Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?

Explain why the owner filter ignores the listing index

Medium · composite index · query plans · sort elimination

The only index on resource is (tenant_id, status, updated_at DESC, resource_id DESC). A new endpoint returns one user's resources across all statuses, newest created first: WHERE tenant_id = $1 AND owner_user_id = $2 ORDER BY created_at DESC LIMIT 20. On a tenant with 2M rows it takes 900 ms and EXPLAIN shows a sort above a large scan. Explain precisely why the existing index cannot serve it, give the index that can, and state which of these the new index still will not help: owner_user_id alone across tenants; the same query ordered by updated_at. PostgreSQL 16.

Approach

  1. Separate the two jobs an index does. For filtering, a composite btree is seekable only on a left prefix, so with no predicate on status the scan can at best range over tenant_id and test owner_user_id per row; PostgreSQL 16 has no btree skip scan to jump the unconstrained column.
  2. For ordering, the index is sorted by (status, updated_at) within a tenant and not by created_at, so the LIMIT cannot stop early: every matching row is read and then sorted. That is the 'Sort Method: top-N heapsort' line, and it is why the plan reads 2M rows to answer with 20.
  3. Derive the replacement from the access path — equality, equality, then the ordering column: CREATE INDEX CONCURRENTLY ON resource (tenant_id, owner_user_id, created_at DESC). The scan seeks to the (tenant, owner) range and walks 20 entries in order, so the Sort node disappears along with the row-read.
  4. Treat INCLUDE (title, status) as conditional, not free. An index-only scan still visits the heap for any row whose page is not marked all-visible, so on a table taking 1.2k writes/second the win depends on autovacuum keeping the visibility map current, and the wider index costs more on every insert.

Follow-up

  • 90% of rows are status='active'. Would a partial index WHERE status = 'active' change your answer, and for which of the three queries?
  • A dashboard runs this for 40 owners in one page load. What changes about the design?

Find version gaps and relay lag with window functions

Medium · window functions · event tables · frame semantics

outbox_event holds event_id, aggregate_type, aggregate_id, aggregate_version, event_type, payload, status ('pending','published','dead'), attempts, created_at, published_at. A projection is missing rows and you must decide whether the relay skipped events or the consumer dropped them. Write three queries over the last seven days: one listing every aggregate_id whose published aggregate_version sequence has a hole, one giving per-day counts with a running total, and one returning the newest published event per aggregate. For each, say where the window function is evaluated relative to WHERE and LIMIT. PostgreSQL 16.

Approach

  1. Gaps: compute lead(aggregate_version) OVER (PARTITION BY aggregate_id ORDER BY aggregate_version) in a subquery, then filter next_version <> aggregate_version + 1 in the outer query. Window functions are evaluated after WHERE, GROUP BY and HAVING and before the outer ORDER BY and LIMIT, so the predicate cannot sit in the same WHERE clause and PostgreSQL 16 has no QUALIFY.
  2. Say what the seven-day filter does to the answer: it truncates every partition, so the first row per aggregate has no predecessor inside the window and a hole spanning the boundary is invisible. Widen the window, or join to resource.version as the authority for the true maximum.
  3. Running total: SELECT date_trunc('day', created_at) AS d, count() AS n, sum(count()) OVER (ORDER BY date_trunc('day', created_at) ROWS UNBOUNDED PRECEDING). An aggregate inside a window call is legal because grouping runs before windowing. The grouping key is unique per row here so ROWS and RANGE agree, but write the frame anyway — over ungrouped rows with tied timestamps the default RANGE frame pulls in every peer row and the total jumps.
  4. Newest per aggregate: DISTINCT ON (aggregate_id) ... ORDER BY aggregate_id, aggregate_version DESC is the cheap PostgreSQL-only form when an index matches that order; row_number() OVER (PARTITION BY aggregate_id ORDER BY aggregate_version DESC) = 1 is the portable form and needs a subquery for the same evaluation-order reason as the gap query.

Follow-up

  • Relay failover redelivers events. Does a duplicate break the gap query, and how would you detect one from this table alone?
  • Turn the gap check into a continuous monitor rather than a query someone runs after an incident. What does it watch?

Explain how you ensure software reliability in a safety-critical environment.

Medium · Technical and Domain Knowledge

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

What is your approach to signal processing within a software-defined system?

Medium · Technical and Domain Knowledge

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Explain the importance of latency in real-time systems and how you optimize for it.

Medium · Technical and Domain Knowledge

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Describe your process for debugging complex, multi-layered system architectures.

Medium · Technical and Domain Knowledge

Approach

  1. Establish what changed and when, before forming any theory.
  2. Pick a bisection that eliminates candidates whichever way it turns out.
  3. Check the instrumentation before believing the symptom.
  4. Separate the trigger from the cause; the deploy is rarely the bug.

Follow-up

  • What would you look at first, and what would it rule out?
  • How would you tell a cause from a coincidence here?

Suggested practice checklist

Built from the rounds and topics JMD Technologies candidates report.

Day 1 — Map the JMD Technologies loop

  • Write out the reported sequence: Initial Screening, Technical Assessments, Behavioral Assessments.
  • For each round, write one sentence on what it is judging, from the description above, and mark the one you are least ready for.

Deliverable: A one-page map of the 3 reported rounds, with the weakest marked.

Day 2 — Work Signal Design Engineering

  • Spend the session on Signal Design Engineering, which JMD Technologies candidates report being tested on.
  • Write one worked example in Signal Design Engineering and time yourself on it.

Deliverable: One timed worked example in Signal Design Engineering.

Day 3 — Work Rail Engineering

  • Spend the session on Rail Engineering, which JMD Technologies candidates report being tested on.
  • Write one worked example in Rail Engineering and time yourself on it.

Deliverable: One timed worked example in Rail Engineering.

Day 4 — Work Signaling Systems (Rail/Industrial)

  • Spend the session on Signaling Systems (Rail/Industrial), which JMD Technologies candidates report being tested on.
  • Write one worked example in Signaling Systems (Rail/Industrial) and time yourself on it.

Deliverable: One timed worked example in Signaling Systems (Rail/Industrial).

Day 5 — Answer out loud: Technical and Domain Knowledge

  • Answer aloud, timed: Explain how you ensure software reliability in a safety-critical environment.
  • Answer aloud, timed: Describe your process for debugging complex, multi-layered system architectures.

Deliverable: Spoken answers to 2 reported Technical and Domain Knowledge question(s), under time.

Day 6 — Answer out loud: Behavioral and Professional Alignment

  • Answer aloud, timed: Describe a time you had to explain a complex technical issue to a non-technical stakeholder.
  • Answer aloud, timed: How do you manage your time when working under tight project deadlines?

Deliverable: Spoken answers to 2 reported Behavioral and Professional Alignment question(s), under time.

Day 7 — Dry run for JMD Technologies

  • Run one full mock under time, then write down the two questions you most want to ask your interviewers.

Deliverable: A completed timed mock and two questions to ask.

Behavioural preparation

Behavioural rounds judge the decision you made and what it cost.

How do you handle hardware-software integration challenges?

Medium · Technical and Domain Knowledge

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

Describe a time you had to explain a complex technical issue to a non-technical stakeholder.

Medium · Behavioral and Professional Alignment

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

How do you manage your time when working under tight project deadlines?

Medium · Behavioral and Professional Alignment

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

Tell us about a mistake you made in a project and how you addressed it.

Medium · Behavioral and Professional Alignment

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

How do you maintain a positive attitude when faced with unexpected project delays?

Medium · Behavioral and Professional Alignment

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?