Interview guides · InMobi
InMobi Data Scientist Interview Questions & Guide 2026
InMobi Data Scientist interview guide: reported rounds, practice questions with worked solutions and a 7-day prep plan.
The 60-second brief
This guide covers what a Data Scientist at InMobi is expected to do and how to prepare for the interview.
SQL is seldom the hardest round and is often the one that eliminates people. The working bar is usually window functions, correct deduplication, and joins that do not silently fan out rows, rather than obscure syntax.
Focus areas
- Set fraud thresholds by expected cost
- Separate authorization, settlement and dispute outcomes cleanly
- Read vintage curves, not blended portfolio averages
The InMobi interview process
InMobi candidates report 4 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.
Initial Screening
A screening call is a matching exercise run by someone who will not evaluate your statistics. They are checking that the work described on your resume is work you personally did, and that its scope matches the level the role is written for. Logistics get settled in the same half hour so nobody spends an interviewer's afternoon on a mismatch. The answer that fails is the one narrated in the plural. If every sentence is 'we built' and 'the team decided', there is nothing specific to write down about you. Name the piece that was yours, the decision you made inside it, and what changed after.
What to demonstrate
- Whether the ownership implied by your resume survives one round of follow-up about who actually did which part
- Whether your described scope (data size, stakeholders, what shipped) matches the seniority the role is written at
- Whether timeline, location and compensation expectations make the rest of the loop worth scheduling
How to prepare
- Rewrite your top three resume bullets in the first person singular, each with the decision you made and what moved afterwards, then say them out loud once so the 'we' does not return under pressure
- Attach one number to each project: the baseline, the change, and the window it was measured over. Where impact was never measured, say that plainly rather than inventing a figure
- Settle your compensation range before the call and give it as a range with a reason behind it, such as current total comp or a competing timeline, instead of deflecting the question twice
Technical Deep Dives
This round decides whether someone can hand you a schema and a question and trust the number that comes back. Correctness under a clock is the bar, not clever syntax. The habit that separates strong from weak answers is checking the grain: after every join, know how many rows you expect and whether the count moved. Most wrong answers in this format are not wrong logic, they are a fan-out from a key that turned out not to be unique, or a filter applied before an aggregate when it belonged after. Say what you expect before you run it.
What to demonstrate
- Whether your row counts survive each join, and whether you notice on your own when they do not
- Deliberate handling of rows that fail to match, including whether the question needs an inner join or a left join with the non-matches kept and counted
- Whether NULLs are treated on purpose, given that a NULL compares equal to nothing and that COUNT of a column skips it
- Reaching a defensible answer inside the window instead of a refined one after it
How to prepare
- Take a two-table schema, write a join that fans out on purpose, then fix it by collapsing the many-side to one row per key before joining. Repeat until the fix is reflex rather than recall.
- Write a funnel as one query and print the distinct user count at each stage, then confirm each stage is a subset of the one above it rather than assuming it
- Do a few timed runs in a plain text box with no autocomplete and no formatter, since assessment editors often have neither
Collaborative Discussions
An extra round usually exists because something is still open after the standard loop: a skill the earlier interviews did not sample, a level decision, or two interviewers who disagreed. It is rarely a rerun of what you already did well. Ask the recruiter who you are meeting, what function they sit in, and how long the session runs. That is an ordinary scheduling question, and the answer changes what you should prepare. What separates a strong candidate here is treating the round as a fresh evaluation with its own bar, rather than assuming earlier performance carries you through or sinks you.
What to demonstrate
- Whether you can answer well on ground the earlier rounds did not cover, without leaning on what you already said to someone else
- Consistency of the facts in your stories: the same sample size, timeframe, team size and scope of your own role as in earlier conversations
- How you handle an unfamiliar format live, including whether you ask what kind of answer is wanted before producing one
How to prepare
- Ask the recruiter for the interviewer's function, the length, and whether to expect a coding surface, a discussion, or a presentation. Preparing for a 30 minute conversation with a partner team is not the same work as preparing for a 60 minute technical block.
- Write out what each earlier round actually covered, then list the two or three areas nobody probed. That gap is the most likely subject of the extra round.
- Re-read the numbers in the project stories you have already told, so a second telling does not quietly contradict the first.
Scenario-Based Problem Solving
An added round often puts you in front of someone outside the core hiring team: a partner engineer, a product owner, a domain expert, sometimes a more senior manager. The question they are really asking is not whether you can do the work but whether they would trust a number that came from you. That changes what a good answer looks like. Lead with what the decision cost and what it changed, keep the method available but not central, and be plain about the limits of your evidence. Overstating a result is the fastest way to lose this round.
What to demonstrate
- Whether you can explain a technical choice to someone who will never read your code, without either flattening it into nothing or hiding inside jargon
- Honesty about evidence strength: what the analysis establishes, what it only suggests, and what it cannot say at all
- How you take disagreement, specifically whether you update on a good objection, hold your position with reasons, or fold on contact
How to prepare
- Write the two-sentence version of your most technical project for a non-specialist, then check that neither sentence needs a method name to make sense.
- For one result you are proud of, write the strongest objection someone could raise and a response that concedes the part of it that is correct.
- Prepare one decision that turned out to be wrong: how you found out, what it cost, and what you changed afterwards. A senior cross-functional interviewer asks for this more often than a technical one does.
Where candidates lose points
Recalibrating an underwriting cutoff on approved and funded applicants only
Rejected applicants have no repayment outcome, and they were rejected because the incumbent model scored them badly, so the missingness depends directly on the outcome being modelled. Reject inference by augmentation or parcelling fills the gap using the incumbent model's own assumptions, which means it can confirm those assumptions but cannot test them. The only genuinely new information about the reject region comes from bureau performance on rejects who borrowed elsewhere, or from a deliberately randomised approval band around the cutoff.
Using written premium as the denominator of a loss ratio
Premium is written at inception and earned pro rata across the exposure period, so in a growing book written premium runs ahead of earned premium and the loss ratio comes out too low, with the error reversing when the book shrinks. The numerator has the mirror-image problem if it omits incurred-but-not-reported reserves, since recent accident periods then look profitable twice over. Both sides must refer to the same exposure period, which is what an accident-period view at a fixed development age enforces.
Explaining an aggregate move without decomposing the mix shift
Split the change in the aggregate into within-segment movement and movement in segment weights before you explain it. Every segment's rate can fall while the overall rate rises, purely because volume shifted toward segments that already had higher rates.
Answering a product-sense question with a list of features
Answer with a decision and the measurement that would settle it: the hypothesis, the primary metric, the guardrails, and the result that would make you not ship. A feature brainstorm cannot be wrong, which is exactly why it earns no points.
Questions & practice
Explain how you would design an A/B test for a new ad-ranking algorithm.
Medium · machine learning and modelling
Approach
- Check what information would not exist at prediction time, and exclude it.
- Say how the offline result would be validated online before it is trusted.
- Pick an evaluation metric that matches the cost of each error type, not a default.
Follow-up
- Where could label leakage enter this setup?
- What would you monitor after launch to know the model is still valid?
Estimate a delinquency roll-rate matrix and project twelve months
Hard · roll rates · markov chain · survivorship
fct_loan_performance_monthly gives loan_id, as_of_month_end, months_on_book, delinquency_bucket, charge_off_flag, prepaid_in_full_flag and restructured_flag. Build a month-to-month transition matrix over the five delinquency buckets plus absorbing charged_off and prepaid states. Loans that stop appearing must be routed to an absorbing state rather than dropped. Project the current book forward 12 months by repeated matrix multiplication and report the projected share reaching charge-off. Handle restructured_flag explicitly, and name one place the Markov assumption fails on this data.
Approach
- Build consecutive month pairs per loan by shifting as_of_month_end within loan_id, then verify the shifted value is exactly one month later. A gap is not a transition, it is an exit you have not resolved yet.
- Resolve exits before counting anything. A loan whose last row carries charge_off_flag moves to charged_off, one carrying prepaid_in_full_flag moves to prepaid, and one that disappears with neither is a data question to raise rather than silently discard, because discarding it is survivorship that inflates every cure rate.
- Count pairs into a 7 by 7 matrix and row-normalise. Assert every row sums to one and the two absorbing rows are the identity; a row that does not sum to one means exits were dropped.
- Decide and state the restructure rule. Restructuring resets days_past_due, so a dpd_60_89 to current move on a restructured loan is not a cure. Either give restructured loans their own state or carry the pre-restructure bucket, but do not let that move land in the cure cell.
- Project by taking the current bucket distribution as a row vector and multiplying by the matrix twelve times. Report the charged_off entry, and report it again from an all-current starting vector so the reader can see how much of the projection comes from loans that are already delinquent today.
- State the homogeneity failure plainly: transition rates depend strongly on months_on_book, so one pooled matrix applied to a book with a young mix understates early-life delinquency. If the mix is moving, estimate separate matrices by seasoning band.
Worked solution (45 min)
- Sort by loan_id and as_of_month_end, shift to form (from_state, to_state) pairs, and flag pairs whose month gap is not exactly one.
- For each loan's final row, assign the absorbing destination from charge_off_flag or prepaid_in_full_flag, and list loans that vanish with neither as an exception count to report.
- Apply the restructure rule, then build the 7 by 7 count matrix with a cross-tabulation over ordered state categories and row-normalise it.
- Assert row sums equal one and absorbing rows are the identity, then take the current month's bucket distribution as a row vector.
- Multiply twelve times, report the charged_off component, and repeat from an all-current vector for comparison.
Expected result: A 7 by 7 row-stochastic matrix with identity rows for charged_off and prepaid, a current-to-current diagonal typically above 0.95, roll rates rising with bucket depth, and a 12-month projected charge-off share of a few percentage points from an all-current start and materially higher from the actual book.
Verify it yourself
- Every row sums to one within floating-point tolerance, and both absorbing rows are exactly the identity.
- No mass sits in cells that skip a bucket upward, such as dpd_1_29 to dpd_60_89 in one month; if there is, the pairs are not actually consecutive months.
- The projection from an all-current start is strictly below the projection from the real book distribution.
- Backtest by estimating on months up to t minus 12 and comparing the projected distribution with the realised one at t; a systematic optimistic gap points at dropped exits or at seasoning, not at noise.
Follow-up
- How would you validate the projection against what actually happened, and over what window?
- The cure rate out of dpd_30_59 rose five points last quarter. What are the candidate explanations and how would you separate them?
- When would you prefer a vintage curve to a roll-rate projection, and why?
Build a vintage delinquency table without pivot or unstack
Easy · vintage analysis · cohorts · groupby · cumulative max
fct_loan_performance_monthly gives loan_id, origination_month, months_on_book, days_past_due, charge_off_flag and restructured_flag. Produce a DataFrame with one row per origination_month and columns for months_on_book 0 through 12, each cell holding the share of that vintage's funded loans that had ever reached 90 or more days past due, or charge-off, by that age. You may not use pivot, pivot_table, crosstab or unstack. Cells for ages a cohort has not yet reached must be NaN rather than zero.
Approach
- Define the per-row indicator as days_past_due >= 90 or charge_off_flag, then take a cumulative maximum of it per loan ordered by months_on_book, because the metric is reached-by-age-m, not in-that-state-at-age-m.
- Deal with restructuring before the cumulative max. Restructuring resets days_past_due, so a restructured loan re-enters at current and, without the cumulative maximum carrying its pre-restructure worst state, reads as a cure.
- Fix the denominator once as the count of distinct loan_id per origination_month across the whole cohort. Prepaid and charged-off loans stop producing rows, so a denominator recomputed at each age silently shrinks exactly where losses land.
- Aggregate with groupby(['origination_month','months_on_book'])['ever_90'].sum(), then pre-build the output frame indexed by sorted origination months with integer columns 0 to 12 and assign from the grouped Series by .loc on its index.
- Mask cells beyond each cohort's maximum observed months_on_book so an immature cell reads NaN instead of an artificially low rate.
Follow-up
- Two adjacent vintages diverge at months_on_book 6. How would you separate seasoning, mix shift and a genuine credit-quality change?
- The three most recent vintages look best on this table. What do you check before saying so?
- How does the table change if charge-off policy moved from 180 to 120 days past due partway through the series?
Can you walk me through your approach to using SQL window functions to calculate rolling averages or churn rates?
Medium · sql and data manipulation
Approach
- Handle the rows that do not match: a LEFT JOIN with a NULL check is usually the question.
- Compute rates by summing numerator and denominator separately, never by averaging rates.
- Say which table is the grain you start from, and join outward from it.
Follow-up
- How would you verify this result without re-running the same query?
- What breaks if events arrive late or out of order?
Monthly delinquency roll rates with honest exiting-account denominators
Hard · roll rates · window functions · self joins
From fct_loan_performance_monthly, compute month-over-month roll rates: for each as_of_month_end and delinquency_bucket, the share of loans in that bucket that are in a worse state at the following month end. Use this disposition convention and apply it without exception: charge-off is the terminal state one rank past dpd_90_plus, so a loan that charges off has rolled forward, not exited; loans that leave the book any other way — prepaid in full, sold, matured, or simply absent at the next month end — are exited. Bucket order is current, dpd_1_29, dpd_30_59, dpd_60_89, dpd_90_plus, then charged_off. Return from_month, from_bucket, accounts, rolled_forward, cured, stayed, exited and roll_rate, and show that the four dispositions sum to accounts on every row.
Approach
- Map the five delinquency_bucket values to ranks 0 through 4 in a small inline VALUES list, and reserve rank 5 for charged_off, because 'worse' is an ordering statement and enum text does not sort that way reliably. Read charge-off from charge_off_flag on the next month's row rather than from delinquency_bucket, which keeps carrying whatever delinquency value the loan held when it was written off.
- Use LEAD(as_of_month_end), LEAD(bucket_rank) and LEAD(charge_off_flag) OVER (PARTITION BY loan_id ORDER BY as_of_month_end), then verify the leading month end is exactly one month after the current one, since a loan missing a month would otherwise appear to cure or roll across a gap it never traversed.
- Classify each loan-month into exactly one of four labels off the adjacent next row, whose rank is 5 when its charge_off_flag is true and its mapped bucket rank otherwise. rolled_forward: the next rank is strictly greater. cured: strictly lower. stayed: equal. exited: there is no adjacent next row at all, which is where prepayment, sale, maturity and a gap in the monthly history land.
- Define rolled_forward as 'any strictly worse rank', not 'rank plus one'. Under normal monthly aging the only reachable worse state is the next bucket, so the two definitions coincide — except at charge-off, where a loan can go from dpd_60_89 straight to rank 5. A strict plus-one test leaves those loan-months matching no branch and breaks the exhaustiveness invariant.
- Be explicit about why charge-off is a roll rather than an exit: routed to exited, dpd_90_plus has no worse state left, so its roll_rate is identically zero by construction — arithmetic, not a credit finding. At rank 5 the dpd_90_plus row reports roll-to-loss, which is the number a loss forecast actually consumes.
- Aggregate by from_month and from_bucket and require that rolled_forward + cured + stayed + exited equals accounts on every row, which is the invariant that proves the classification is exhaustive and mutually exclusive.
Worked solution (45 min)
- CTE ranks: an inline VALUES mapping of the five delinquency_bucket values to ranks 0 through 4, joined onto the monthly rows. Rank 5 is not in the map; it is assigned during classification.
- CTE leads: add LEAD(as_of_month_end), LEAD(bucket_rank) and LEAD(charge_off_flag) partitioned by loan_id ordered by as_of_month_end.
- CTE classified: derive next_rank as CASE WHEN next_charge_off_flag THEN 5 ELSE next_bucket_rank END, then a CASE expression producing exactly one label per loan-month — exited when the next month end is null or is not the current month end plus one month, otherwise rolled_forward / cured / stayed by comparing next_rank to bucket_rank.
- Aggregate to from_month and from_bucket with COUNT(*) and four FILTER counts, then compute roll_rate as rolled_forward over accounts with a numeric cast.
- Assert the exhaustiveness invariant in a final HAVING or a separate verification query before trusting any number.
Expected result: One row per month and originating bucket, with the four disposition counts summing to accounts on every row and roll_rate between 0 and 1. Roll rates climb across current, dpd_1_29, dpd_30_59 and dpd_60_89, because each successive bucket holds loans that have already failed to cure. Do not expect that climb to continue into dpd_90_plus: that bucket is a catch-all holding several monthly cohorts at once until the charge-off policy retires them, so its roll-to-loss rate is set by the policy horizon — under a 180-day policy roughly a third of the bucket rolls in a given month — and usually sits below the dpd_60_89 rate. Cure out of dpd_90_plus is well under ten percent.
Verify it yourself
- rolled_forward + cured + stayed + exited equals accounts for every row, with no exceptions.
- SUM(accounts) for a given from_month equals the count of loan rows at that month end, so no loan-month was dropped or counted twice.
- Removing the adjacency test changes the cure and roll counts, and the size of that change is exactly the number of loans with a gap in their monthly history.
- The rolled_forward count for from_bucket dpd_90_plus in month M is at least the number of loans whose first charge_off_flag = true row falls at month end M+1. If it is materially lower, charge-off is being routed into exited.
- roll_rate for dpd_90_plus is strictly greater than zero in any month with charge-offs. A flat zero on that bucket across every month is the signature of charge-off classified as an exit, not of an unusually stable book.
- No loan-month is counted as both rolled_forward and exited: a loan with a charged-off row at M+1 has an adjacent next row, so it can never reach the exited branch.
Follow-up
- Project the next three months of dpd_90_plus inflow from these roll rates. What assumption does that projection make, and when does it break?
- A restructure resets days_past_due to zero. What does that do to the cure rate out of dpd_60_89, and how would you separate a real cure from a reset?
- Argue the other convention: prepayment in exited but charge-off also in exited, with roll rates reported only for the four non-terminal buckets. What does that series answer better, and what does it lose?
- The charge-off policy changed from 180 to 120 days. Show where that appears in this table and what it does to the dpd_90_plus roll rate specifically.
Describe a scenario where you had to perform a metric drop diagnosis; what was your systematic approach to identifying the root cause?
Medium · product sense and metrics
Approach
- State what result would change your recommendation, so the answer is falsifiable.
- Name one primary metric, then the guardrail that stops it being gamed.
- Fix the population and the time window before naming any metric.
Follow-up
- What would you do if the primary metric and the guardrail moved in opposite directions?
- Which segment would you cut first, and what would that rule out?
Which metrics would you prioritize to balance user experience against ad revenue?
Medium · product sense and metrics
Approach
- Name one primary metric, then the guardrail that stops it being gamed.
- Decompose the metric into the rates that drive it, and say which one you would check first.
- Fix the population and the time window before naming any metric.
Follow-up
- What would you do if the primary metric and the guardrail moved in opposite directions?
- Which segment would you cut first, and what would that rule out?
How do you approach product metric design for a new feature?
Medium · product sense and metrics
Approach
- Decompose the metric into the rates that drive it, and say which one you would check first.
- Name one primary metric, then the guardrail that stops it being gamed.
- Restate the decision this analysis has to support, and who acts on the answer.
Follow-up
- Which segment would you cut first, and what would that rule out?
- What would you do if the primary metric and the guardrail moved in opposite directions?
What are the most common experimentation pitfalls you have encountered in your previous projects?
Medium · a/b testing and experimentation
Approach
- Name the randomisation unit first; it decides the variance and what the test can detect.
- Decide the analysis before seeing data, including how long it runs and when you look.
- Say whether units interfere with each other, and switch design if they do.
Follow-up
- What would you do if you could not randomise at all?
- What would you conclude if the result is positive but the test is underpowered?
How do you determine statistical significance when dealing with highly skewed ad-click data?
Medium · a/b testing and experimentation
Approach
- Decide the analysis before seeing data, including how long it runs and when you look.
- Say whether units interfere with each other, and switch design if they do.
- State the primary metric and the minimum effect worth shipping, then size the test.
Follow-up
- What would you do if you could not randomise at all?
- How would you handle interference between treated and control units?
If we observe a sudden dip in daily active users on the Glance platform, how would you investigate?
Medium
Approach
- Clarify what is being asked and what a complete answer would contain.
- Say what you would check first and why it is the highest-information step.
- Work from the decision backwards to the evidence you would need.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
Diagnose a sample ratio mismatch before reading the result
Easy · sample ratio mismatch · instrumentation · chi-square
A two-week test of a new risk rule logged 512,340 exposures in treatment and 508,110 in control against an intended 50/50 split. The dashboard reports a 1.8 percent relative lift in the count-weighted authorization approval rate, p equals 0.004. Exposures are written by the events pipeline at the point the rule is evaluated. Before anyone reads the lift, test whether the split is consistent with 50/50, state your verdict, rank the mechanisms that would produce this imbalance, and say what you do with the two weeks of data.
Approach
- Run the test rather than eyeballing the ratio: a chi-square goodness-of-fit on one degree of freedom against the expected 50/50, or equivalently a binomial test on the treatment share. A 0.42 percent imbalance looks trivial and is not, because at a million exposures the null distribution is extremely tight.
- Declare the result uninterpretable rather than adjusting it. An SRM means units are missing from one arm conditional on something, and the something is usually correlated with the outcome, so reweighting or trimming does not restore exchangeability; it just hides the selection.
- Localise the mismatch before hypothesising about it: recompute the split by day, by channel, by issuer_country and by whether the rule actually fired. An SRM confined to one slice points straight at the code path that produced it.
- Rank mechanisms by how often they are the cause here. First, exposure logged downstream of a step the treatment changes, so any arm-specific drop-off before the log line silently deletes units. Second, assignment keyed on something mutable or nullable, such as card_token_id across a reissue or a null customer_id on guest traffic. Third, bot or fraud filtering applied after assignment and hitting arms unequally. Fourth, retry rows deduplicated after assignment rather than before. Fifth, a ramp or a rollback that moved mid-test.
- Close the loop with an A/A run on the fixed pipeline before rerunning the A/B, and add a continuous SRM check with an alert threshold so the next occurrence is caught on day one instead of at readout.
Worked solution (15 min)
- Total exposures N = 1,020,450, so expected per arm E = 510,225 and the absolute deviation is 2,115 in each direction.
- Chi-square = 2 * 2115^2 / 510225 = 2 * 4,473,225 / 510,225 = 2 * 8.767 = 17.53 on one degree of freedom.
- Convert: sqrt(17.53) = 4.19 standard deviations, so p is about 3e-5. The observed treatment share is 0.50208 against a null standard error of 0.000495, which is the same statement in another form.
- Declare SRM, withhold the 1.8 percent lift from any decision, and produce the per-day and per-channel split table that localises the cause.
Expected result: Chi-square is about 17.5 on one degree of freedom, p is about 3e-5. This is a sample ratio mismatch. The correct output is a defect report with a localisation table, not a treatment effect; the 1.8 percent lift is not reported as a result even with a caveat.
Verify it yourself
- The binomial standard error of the treatment share is sqrt(0.25 / 1020450) = 4.95e-4; the observed share 0.50208 sits 4.19 standard errors from 0.5, matching the chi-square.
- Re-running the same test on the assignment log rather than the exposure log should show a clean 50/50 if the randomiser is sound and the loss is downstream, which immediately narrows the search.
- Summing the per-day chi-square contributions should reproduce the total; a single day dominating the sum is a deploy, not a design flaw.
Follow-up
- Suppose the mismatch is entirely in one issuer_country and the treatment adds a 3-D Secure step there. What is the most likely code path, and what does that imply about the sign of the observed lift?
- What SRM alert threshold would you set for a daily check, and how do you keep it from firing constantly across many concurrent tests?
- If the split is exactly 50/50 but the two arms have different distributions of mcc and channel, is that an SRM? What is it, and what do you do about it?
Approval rate rose in every band yet fell overall
Medium · mix shift · simpsons paradox · segmentation
Monthly application approval rate on fct_loan_application fell from 62 to 57 percent. Cut by bureau_score band, the rate rose in every band, including the null-bureau band. Columns: application_id, channel, submitted_at, requested_amount_minor, declared_annual_income_minor, bureau_score, model_pd_12m, model_version, policy_rule_hits, decision, decided_by, decision_at. The denominator is decision in ('approve','decline'). Explain the arithmetic, quantify how much of the five-point fall is mix versus within-band movement, and say what you would tell the team that owns acquisition.
Approach
- Confirm the paradox is real rather than a banding artefact. Rebuild the bands on fixed cutpoints taken from the earlier period, because quantile bands re-cut each month move with the population and can manufacture this pattern on their own.
- Compute the exact decomposition rather than describing it: within = sum of w_i0 * (r_i1 - r_i0), mix = sum of r_i0 * (w_i1 - w_i0), interaction = sum of (w_i1 - w_i0) * (r_i1 - r_i0). The three terms sum identically to the change in the blended rate, so the report can state the split.
- Attribute the weight change by cutting the same fixed bands by channel. Keep null bureau_score as its own band; a thin file is a population signal, not missing data to be imputed away.
- Check whether the new arrivals also changed the population inside a band, by comparing requested_amount_minor and declared_annual_income_minor distributions within one band across the two months.
- Deliver two numbers rather than one story: policy is looser in every band, and the funnel is being fed a different population. Those have different owners and different fixes.
Follow-up
- If the new channel is profitable at its own approval rate, is the blended fall a problem at all?
- How would you present this so that nobody reads the blended series unaccompanied again?
- What breaks if you fix the mix by reweighting to a frozen band distribution every month?
Suggested practice checklist
Instead of guessing where the week should go, day one measures it under a fixed rubric and allocates the remaining hours in proportion to the gaps. The method is deliberately rigid: the allocation is written down before any studying starts and is not renegotiated when a topic turns out to be unpleasant.
Day 1 — Diagnostic, scored before you study anything
- Sit a 100-minute timed diagnostic in four blocks: 30 minutes of SQL across three prompts, 25 minutes of short-answer statistics, 25 minutes on one modelling or case prompt, and 20 minutes delivering one behavioural story aloud.
- Score each block from 0 to 3 on a fixed rubric where 3 is correct and fluent, 2 is correct but slow or prompted, 1 is partially correct, and 0 is stuck, grading the output rather than how the attempt felt.
- Allocate the hours for days two to five roughly in proportion to 3 minus the score in each block, write the allocation down, and commit to not revising it midweek.
Deliverable: A scored rubric and a fixed hour allocation for the rest of the week.
Day 2 — Largest gap: find the boundary rather than the subject
- Break the weakest area into five named sub-skills (for query work: grain control, window frames, date arithmetic, set logic with NULLs, and reading a query plan) and rate each one, so the rest of the week targets a sub-skill instead of a subject.
- Solve three problems chosen to sit just above where the rating drops off, and for each write the first move you failed to make.
- Re-solve one of them from memory four hours later, on paper, with nothing open.
Deliverable: A five-item sub-skill map with the two blocking sub-skills circled.
Day 3 — Largest gap: drill the blocking sub-skill
- Do eight short repetitions of the same shape rather than eight different problems, so what you practise is the pattern and not the puzzle.
- Write the rule you now hold in one sentence, then test it against a case built to break it: a ranking function over a column with ties, or a two-sample test on observations that are obviously dependent.
- Have someone else read your one-sentence rule and find the precondition you left out.
Deliverable: One rule statement with its preconditions attached and one counterexample that would have caught the incomplete version.
Day 4 — Second gap, plus maintenance on your strongest area
- Run the same sub-skill map and boundary protocol on the second-largest gap, compressed into half the day.
- Spend 25 timed minutes on your strongest area to stop it decaying, choosing the hardest problem you can still finish rather than an easy warm-up.
- Compare how the two areas fail: whether you lose time on recall, on setup, or on arithmetic, because the fix differs for each.
Deliverable: A second sub-skill map plus a one-line diagnosis of how each area fails you.
Day 5 — The gap that is not a skill
- Record yourself answering one technical and one behavioural prompt, then count two things in the playback: how many seconds before your first clarifying question, and how many sentences you started without knowing where they ended.
- Rewrite your three most-used stock phrases into shorter versions, and practise saying "I do not know, here is how I would find out" without softening it into a guess.
- Deliver one answer again with a hard 90-second limit to force structure before detail.
Deliverable: Two recordings with a counted improvement in time-to-first-question.
Day 6 — Retest under day-one conditions
- Sit the same 100-minute diagnostic structure with new prompts of comparable difficulty and score it on the identical rubric.
- Compare block by block, and for any block that did not move, change the method rather than adding hours: a block stuck at 1 usually means the practice was too varied, not too short.
- Write which single block you would still lose the offer on.
Deliverable: A second scored rubric placed next to the first, with one named remaining risk.
Day 7 — Full loop under interview conditions
- Run a 60-minute mock covering the two blocks that moved least, with an interviewer instructed to interrupt and change direction.
- Write your recovery script for the moment you go blank: restate the question, state your assumption, name the first thing you would check.
- Reduce the week to the rule statements you wrote, each with its preconditions attached, then say every one of them out loud without reading it and cut any you cannot state in a single sentence, since a rule you have to reconstruct mid-answer will not survive being interrupted.
Deliverable: A one-page card holding the recovery script and only the rules you could state from memory.
Being wrong in public
A number you shipped turned out to be wrong, and someone had already acted on it. That is one of the most useful stories a data person can carry. What is being scored is how fast you noticed, who you told first, and what you changed in the process so the same class of error could not repeat quietly.
Describe a situation where your data findings contradicted a product manager's intuition. How did you handle it?
Medium · behavioural and stakeholder questions
Approach
- Quantify the outcome, including what you would not claim credit for.
- Name the disagreement or constraint, and how you resolved it with evidence.
- Pick a story where you drove the decision, not one where you observed it.
Follow-up
- What did you decide not to do, and why?
- How did you know the outcome was caused by your change?
Retract a published number after finding a currency bug
Medium · error disclosure · minor units · process repair
Two weeks ago you published an interchange and fraud analysis that summed amount_minor across fct_payment_authorization without converting currencies. Minor units are not two decimals everywhere: some currencies carry none and some carry three, so the sum has no interpretation. A pricing decision is already in flight on the back of it. You now have corrected figures. Produce the retraction: what you send, to whom, in what order, and what you change in the process so this class of error is caught next time rather than trusted next time.
Approach
- Size the error before announcing it, because saying the number is wrong without a magnitude and a direction forces every reader to assume the worst case.
- Check whether the conclusion actually flips: if the ranking that drove the pricing decision is unchanged, that belongs in the first sentence beside the correction rather than buried at the end.
- Tell the person acting on it first and directly, then the wider distribution, using the same text, so nobody learns about it secondhand.
- Write the correction as four parts: the old number, the cause in one clause, the effect on the pending decision, and the new number. Leave out self-flagellation, which makes the reader do emotional work instead of acting.
- Fix the class rather than the instance: a rule that a sum over amount_minor either groups by transaction_currency or passes through both conversion steps, exponent scaling and then a dated rate into one named reporting currency, plus a standing reconciliation of the settled subset to the settlement ledger inside each settlement_currency.
Follow-up
- The corrected figures do not change the decision. Do you still send the correction, and what does that choice signal?
- What automated check would have caught this, where would it live, and what would it cost in false alarms?
Explain an incomplete dispute chart to a non-technical executive
Easy · dispute maturity · stakeholder communication · right-censoring
A finance lead is looking at first-chargeback rate by transaction month, built from fct_card_dispute joined to fct_payment_authorization on auth_id and attributed to requested_at. The last three months slope sharply down and the lead wants to announce a fraud improvement at tomorrow's review. Consumer dispute rights commonly run around 120 days from the transaction or expected delivery date, so those months are not complete. In five minutes, with no statistics vocabulary, explain why the decline is not yet evidence and say exactly what you would put on the slide instead.
Approach
- Lead with the mechanism in the listener's own terms, not with the statistical name for it: a dispute is attributed to the month the transaction happened, but it can be filed up to roughly 120 days later, so recent months contain only the disputes filed so far.
- Show completeness rather than arguing about the rate: for each transaction month, plot the share of its eventual disputes already filed, estimated from months that are fully matured. The last three months will sit visibly below 100 percent.
- Replace the chart with two artefacts: a matured series that stops 120 days back and is labelled final, and a development-factor estimate for the immature months drawn as a dashed range and labelled an estimate.
- Hand over one sentence the executive can repeat without you in the room: the recent months look better because the disputes have not arrived yet, not because fewer will arrive.
- Offer a weekly signal they can watch instead, such as the risk-score mix of approved volume or the decline-rule hit rate, and state up front what it does and does not predict.
Follow-up
- The deck ships tomorrow regardless. What exactly goes on the slide, and what wording do you insist on?
- How would you estimate the development factors, and how would you notice if they had shifted?