cswork / libraryOpen practice workspace

Interview guides · Illinois Tool Works

Illinois Tool Works Software Engineer Interview Guide

Illinois Tool Works Software Engineer interview guide: reported rounds, questions and how candidates describe the process.

The 60-second brief

At Illinois Tool Works (ITW), a Software Engineer occupies a critical position at the intersection of industrial innovation and digital transformation. You are not just writing code; you are building the software intelligence that powers diverse, high-value industrial products across segments like automotive, food equipment, and test & measurement. Your work directly impacts how our systems perform, ensuring reliability in environments where precision is non-negotiable. This role requires a unique blend of technical agility and practical engineering intuition. Because ITW operates through a decentralized, entrepreneurial business model, you will often find yourself working in small, high-impact teams where your technical decisions have immediate, visible consequences.

This guide is scoped to a Software Engineer candidate at Illinois Tool Works.

Focus areas

  • Resume & Project Portfolio Presentation
  • Behavioral Interviewing
  • Catia V5

The Illinois Tool Works interview process

Illinois Tool Works candidates report 3 rounds over 3-5 weeks. The stages below are what candidates describe, not a published process.

Initial Screening

A high-level assessment to evaluate your overall fit for the role.

What to demonstrate

  • A high-level assessment to evaluate your overall fit for the role
  • Depth in Resume & Project Portfolio Presentation

How to prepare

  • Be able to walk your CV end to end in two minutes, and say why this company specifically.
  • Have your salary expectations, notice period and location constraints ready, and ask for the rest of the loop in writing.

Team-Specific Evaluations

More detailed technical evaluations tailored to the specific team and its challenges.

What to demonstrate

  • More detailed technical evaluations tailored to the specific team and its challenges
  • Depth in Resume & Project Portfolio Presentation

How to prepare

  • Answer aloud and timed: We utilize C++ and Docker; how have you applied these tools to solve a specific development challenge?
  • Answer aloud and timed: How do you manage part tolerances or hardware-software integration in your design process?

Onsite or Panel Interviews

Final rounds that may include multiple interviewers assessing both technical and behavioral aspects.

What to demonstrate

  • Final rounds that may include multiple interviewers assessing both technical and behavioral aspects
  • Depth in Resume & Project Portfolio Presentation

How to prepare

  • Answer aloud and timed: What is your process for keeping your technical skills up to date with evolving industry standards?
  • Answer aloud and timed: Describe a time you had to explain a complex technical issue to a non-technical stakeholder.

Where candidates lose points

Prepare for the "Why

Be ready to explain why you chose specific languages or architectures in your past projects.

Professionalism Matters

Treat every interaction, from the first HR screening to the final manager call, with high professionalism.

Know the Division

Research the specific ITW division you are interviewing with; knowing their product line demonstrates serious interest.

Clarify Expectations

If an interviewer asks a vague question, ask for clarification. It shows you are deliberate in your problem-solving.

Questions & practice

Archive a resource graph without breaking live references or recursing

Medium · graph traversal · topological order · tenant isolation

Resources reference other resources within a tenant; for the largest tenant the reference table holds up to 2,000,000 nodes and 8,000,000 edges. Archiving a resource must archive everything reachable from it that nothing outside the set still references, refuse when a live external referrer exists, and terminate when references form cycles, which they legitimately do. Produce the archive order and the refusal list, targeting O(V+E). Say what stops the traversal crossing a tenant boundary, and why recursion is the wrong control structure at this size.

Approach

  1. Load the subgraph with the tenant predicate on both endpoints of the edge, not only on the side you started from. Scoping the left table alone is the classic cross-tenant leak: one mis-entered edge then pulls another tenant's resources into the traversal and, worse, into the archive.
  2. Traverse iteratively with an explicit stack. A 2,000,000-node graph can hold a chain deep enough to exhaust a native stack in the low tens of thousands of frames, and that failure is a process crash rather than an error you can return.
  3. Treat cycles as data rather than corruption: compute strongly connected components with Tarjan in O(V+E) using its own explicit stack, then condense. The condensation is a DAG, so a topological order over it gives the archive order, and every member of a component archives in one transaction because no order within a cycle is valid.
  4. Decide refusals with reverse edges. A candidate is archivable only if every in-edge originates inside the candidate set, so build the transpose or count in-degrees restricted to the visited set, and emit each blocked resource with the id of the external referrer, which is the only part of the answer an operator can act on.

Follow-up

  • The graph is read in one query and the archive writes a minute later. What can change in between, and how do you make the write safe?
  • The candidate set is 400,000 resources. Is that one transaction, and if not, what does a half-finished archive look like to a reader?

Merge partitioned event streams into one ordered feed with bounded lateness

Hard · k-way merge · watermarks · out-of-order streams

The read-model service consumes 64 log partitions carrying about 4,000 events per second in total. Each partition is ordered within itself, but partitions drift by up to 30 seconds, and the activity feed must present a tenant's events in occurred_at order. Produce the merge. State its complexity, the buffer it requires in events and in bytes, what happens when one partition is idle, and what you do with an event that arrives after you have already emitted its position. Payloads average 1 KB.

Approach

  1. Merge with a min-heap over the 64 partition heads keyed on (occurred_at, event_id): O(log P) per event and O(n log P) overall. The tie-break on event_id is what makes the output deterministic when two partitions carry the same millisecond, which matters because the feed is paginated and a non-deterministic order reorders pages under the reader.
  2. Emitting the heap head is only correct once every partition has produced everything up to that timestamp, so the emit condition is a watermark: the minimum across partitions of the highest occurred_at seen, less the allowed lateness. Events are held until the watermark passes them, which is what turns individually ordered streams into a jointly ordered one.
  3. Size the buffer from the lateness rather than guessing: 4,000 events per second times 30 seconds is 120,000 buffered events, and at 1 KB each about 120 MB of heap. That number is the real price of the ordering guarantee and belongs in front of whoever asked for it.
  4. Handle the idle partition explicitly, because it fails the feed rather than corrupting it: a partition with no traffic never advances its own maximum, so the watermark freezes and output stops entirely. Either every partition emits a periodic idle marker carrying the broker's current time, or the watermark falls back to wall clock for a partition silent beyond a threshold.

Follow-up

  • The lateness budget is raised to five minutes. What is the new buffer, and what besides memory changes?
  • The consumer restarts. Where does it resume from, and what does the feed look like for the first 30 seconds?

Find overlapping job attempts and peak concurrency from lease records

Medium · sweep line · intervals · leases

A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.

Approach

  1. Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
  2. For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
  3. For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
  4. Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.

Follow-up

  • A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
  • Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?

Explain why the owner filter ignores the listing index

Medium · composite index · query plans · sort elimination

The only index on resource is (tenant_id, status, updated_at DESC, resource_id DESC). A new endpoint returns one user's resources across all statuses, newest created first: WHERE tenant_id = $1 AND owner_user_id = $2 ORDER BY created_at DESC LIMIT 20. On a tenant with 2M rows it takes 900 ms and EXPLAIN shows a sort above a large scan. Explain precisely why the existing index cannot serve it, give the index that can, and state which of these the new index still will not help: owner_user_id alone across tenants; the same query ordered by updated_at. PostgreSQL 16.

Approach

  1. Separate the two jobs an index does. For filtering, a composite btree is seekable only on a left prefix, so with no predicate on status the scan can at best range over tenant_id and test owner_user_id per row; PostgreSQL 16 has no btree skip scan to jump the unconstrained column.
  2. For ordering, the index is sorted by (status, updated_at) within a tenant and not by created_at, so the LIMIT cannot stop early: every matching row is read and then sorted. That is the 'Sort Method: top-N heapsort' line, and it is why the plan reads 2M rows to answer with 20.
  3. Derive the replacement from the access path — equality, equality, then the ordering column: CREATE INDEX CONCURRENTLY ON resource (tenant_id, owner_user_id, created_at DESC). The scan seeks to the (tenant, owner) range and walks 20 entries in order, so the Sort node disappears along with the row-read.
  4. Treat INCLUDE (title, status) as conditional, not free. An index-only scan still visits the heap for any row whose page is not marked all-visible, so on a table taking 1.2k writes/second the win depends on autovacuum keeping the visibility map current, and the wider index costs more on every insert.

Follow-up

  • 90% of rows are status='active'. Would a partial index WHERE status = 'active' change your answer, and for which of the three queries?
  • A dashboard runs this for 40 owners in one page load. What changes about the design?

Find version gaps and relay lag with window functions

Medium · window functions · event tables · frame semantics

outbox_event holds event_id, aggregate_type, aggregate_id, aggregate_version, event_type, payload, status ('pending','published','dead'), attempts, created_at, published_at. A projection is missing rows and you must decide whether the relay skipped events or the consumer dropped them. Write three queries over the last seven days: one listing every aggregate_id whose published aggregate_version sequence has a hole, one giving per-day counts with a running total, and one returning the newest published event per aggregate. For each, say where the window function is evaluated relative to WHERE and LIMIT. PostgreSQL 16.

Approach

  1. Gaps: compute lead(aggregate_version) OVER (PARTITION BY aggregate_id ORDER BY aggregate_version) in a subquery, then filter next_version <> aggregate_version + 1 in the outer query. Window functions are evaluated after WHERE, GROUP BY and HAVING and before the outer ORDER BY and LIMIT, so the predicate cannot sit in the same WHERE clause and PostgreSQL 16 has no QUALIFY.
  2. Say what the seven-day filter does to the answer: it truncates every partition, so the first row per aggregate has no predecessor inside the window and a hole spanning the boundary is invisible. Widen the window, or join to resource.version as the authority for the true maximum.
  3. Running total: SELECT date_trunc('day', created_at) AS d, count() AS n, sum(count()) OVER (ORDER BY date_trunc('day', created_at) ROWS UNBOUNDED PRECEDING). An aggregate inside a window call is legal because grouping runs before windowing. The grouping key is unique per row here so ROWS and RANGE agree, but write the frame anyway — over ungrouped rows with tied timestamps the default RANGE frame pulls in every peer row and the total jumps.
  4. Newest per aggregate: DISTINCT ON (aggregate_id) ... ORDER BY aggregate_id, aggregate_version DESC is the cheap PostgreSQL-only form when an index matches that order; row_number() OVER (PARTITION BY aggregate_id ORDER BY aggregate_version DESC) = 1 is the portable form and needs a subquery for the same evaluation-order reason as the gap query.

Follow-up

  • Relay failover redelivers events. Does a duplicate break the gap query, and how would you detect one from this table alone?
  • Turn the gap check into a continuous monitor rather than a query someone runs after an incident. What does it watch?

Can you walk me through a complex technical project you led and the specific technologies involved?

Medium · Technical and Domain Proficiency

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

We utilize C++ and Docker; how have you applied these tools to solve a specific development challenge?

Medium · Technical and Domain Proficiency

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

How do you manage part tolerances or hardware-software integration in your design process?

Medium · Technical and Domain Proficiency

Approach

  1. Say who the caller is and what they do when the call fails halfway.
  2. Define the identity of a request so a retry cannot double-apply it.
  3. Separate accepted, pending, failed and confirmed; they are different facts.
  4. Design the error taxonomy before the success shape; callers branch on it.

Follow-up

  • What happens if the caller retries after a timeout?
  • How does a client discover it is on an old version of this contract?

What is your process for keeping your technical skills up to date with evolving industry standards?

Medium · Technical and Domain Proficiency

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

How do you approach debugging a system when the issue is not immediately reproducible?

Medium · Technical and Domain Proficiency

Approach

  1. Establish what changed and when, before forming any theory.
  2. Pick a bisection that eliminates candidates whichever way it turns out.
  3. Check the instrumentation before believing the symptom.
  4. Separate the trigger from the cause; the deploy is rarely the bug.

Follow-up

  • What would you look at first, and what would it rule out?
  • How would you tell a cause from a coincidence here?

Suggested practice checklist

Built from the rounds and topics Illinois Tool Works candidates report.

Day 1 — Map the Illinois Tool Works loop

  • Write out the reported sequence: Initial Screening, Team-Specific Evaluations, Onsite or Panel Interviews.
  • For each round, write one sentence on what it is judging, from the description above, and mark the one you are least ready for.

Deliverable: A one-page map of the 3 reported rounds, with the weakest marked.

Day 2 — Work Resume & Project Portfolio Presentation

  • Spend the session on Resume & Project Portfolio Presentation, which Illinois Tool Works candidates report being tested on.
  • Write one worked example in Resume & Project Portfolio Presentation and time yourself on it.

Deliverable: One timed worked example in Resume & Project Portfolio Presentation.

Day 3 — Work Behavioral Interviewing

  • Spend the session on Behavioral Interviewing, which Illinois Tool Works candidates report being tested on.
  • Write one worked example in Behavioral Interviewing and time yourself on it.

Deliverable: One timed worked example in Behavioral Interviewing.

Day 4 — Work Catia V5

  • Spend the session on Catia V5, which Illinois Tool Works candidates report being tested on.
  • Write one worked example in Catia V5 and time yourself on it.

Deliverable: One timed worked example in Catia V5.

Day 5 — Answer out loud: Technical and Domain Proficiency

  • Answer aloud, timed: Can you walk me through a complex technical project you led and the specific technologies involved?
  • Answer aloud, timed: How do you approach debugging a system when the issue is not immediately reproducible?

Deliverable: Spoken answers to 2 reported Technical and Domain Proficiency question(s), under time.

Day 6 — Answer out loud: Behavioral and Leadership

  • Answer aloud, timed: Describe a time you had to explain a complex technical issue to a non-technical stakeholder.
  • Answer aloud, timed: How do you handle situations where you and a colleague have a fundamental disagreement on a technical approach?

Deliverable: Spoken answers to 2 reported Behavioral and Leadership question(s), under time.

Day 7 — Dry run for Illinois Tool Works

  • Run one full mock under time, then write down the two questions you most want to ask your interviewers.

Deliverable: A completed timed mock and two questions to ask.

Behavioural preparation

Behavioural rounds judge the decision you made and what it cost.

Describe a time you had to explain a complex technical issue to a non-technical stakeholder.

Medium · Behavioral and Leadership

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

How do you handle situations where you and a colleague have a fundamental disagreement on a technical approach

Medium · Behavioral and Leadership

How do you handle situations where you and a colleague have a fundamental disagreement on a technical approach?

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

Tell me about a time you missed a deadline or failed to meet a project requirement; how did you handle it?

Medium · Behavioral and Leadership

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

Why are you interested in working for ITW specifically, rather than a pure software company?

Medium · Behavioral and Leadership

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

How do you prioritize your tasks when managing multiple competing project requirements?

Medium · Behavioral and Leadership

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?