Interview guides · Hyperfine Research
Hyperfine Research Software Engineer Interview Questions & Guide 2026
Take-home style practice for Hyperfine Research software engineer candidates: a small service, a fixed budget, a written tradeoff.
The 60-second brief
As a Software Engineer at Hyperfine Research, you are at the intersection of cutting-edge medical technology and software engineering. Hyperfine Research is known for its pioneering work in portable magnetic resonance imaging (MRI), and the software team is responsible for bridging the gap between sophisticated hardware, data processing, and the clinical interfaces used by healthcare professionals.
Scope in the operational half of the job when the seat carries on-call. Rollout, rollback and what you would put on a dashboard belong inside a design answer rather than after it, and an answer that never reaches them reads as someone who has built systems but not run them.
Focus areas
- Bound blast radius with per-tenant concurrency limits
- Make every write idempotent under client retries
- Evolve APIs without breaking pinned SDK clients
Overview
Your work will directly impact the usability, speed, and accuracy of diagnostic imaging. You will be expected to handle both the high-level application logic and the complex backend systems required to process sensitive medical data. This role requires a unique balance of technical rigor and the ability to work within a highly regulated, mission-driven environment where precision is paramount.
The Hyperfine Research interview process
Hyperfine Research candidates report 3 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.
Initial Screening
Half of this call is the part candidates treat as small talk: start date, notice period, work authorisation and its timing, location and time zone, on-call, and the number. Those are what kill offers late, after several engineers have each spent a day. Surfacing a hard constraint now costs you nothing and occasionally buys you something, since a loop compressed to fit a competing deadline can usually only be arranged if it is asked for early. The common failure is deflecting the compensation question twice, then discovering at offer stage that the band never reached your number.
What to demonstrate
- Whether your hard constraints are compatible with the role before a loop gets booked: earliest start, notice period, what authorisation you hold and when it needs action, days on site, willingness to carry a pager
- Whether you give a compensation range with something behind it, such as current total compensation or a competing timeline, rather than leaving the band untested
- Whether your stated timeline is real, since a competing deadline raised now is something scheduling can sometimes work around and the same deadline raised at offer stage usually is not
How to prepare
- Write each constraint down in one line before the call and state them as facts rather than negotiating them live under a question you were not expecting
- Set your range from two or three current data points for that level and location, and name the structure you are quoting in, so the number is comparable to the one they are holding
- If another process is running, say where it stands and by when, and ask directly whether this loop can be scheduled inside that window
Technical Assessments
Most of the time lost in this format is not lost to thinking. It goes to a standard-library call you half-remember, an off-by-one in a loop bound, and a debugging loop that mutates code at random until something passes. When output is wrong, stop re-reading the whole function: take the smallest input that reproduces it and walk the state through by hand, printing intermediates if the environment allows. Guessing at a fix without a failing case you understand is how a five-minute bug becomes twenty, and the clock does not pause while you do it.
What to demonstrate
- Whether you reach the right structure without a detour, and can write it from memory rather than only recall that one exists
- Whether overflow is considered where the language has fixed-width integers, since a signed 32-bit value stops at 2,147,483,647 and then wraps in Java, is undefined behaviour in C++, and does not arise in Python, whose integers grow instead
- Whether recursion depth is treated as a constraint on large inputs, given that CPython's default limit is 1000 frames and a deep recursion can exhaust the stack in any language where an iterative version would not
- Whether a failing case is isolated and explained before any edit is made to the code
How to prepare
- From an empty file and with no references open, implement the pieces you lean on most: a heap push and pop, an iterative DFS with an explicit stack, and a binary search whose midpoint is written lo + (hi - lo) / 2, which avoids the overflow that (lo + hi) / 2 can hit in a fixed-width integer type
- Time yourself on the ten library calls you look up most, such as sorting with a custom comparator, splitting and joining strings, and finding the next key at or above a value in an ordered map, until the lookup is gone
- Take a solution you know is broken and, before touching it, write one sentence naming the input, the expected value and the actual value. Repeat until you do it without deciding to.
Presentation or Onsite Experience
Where the day includes a partner from product, design or data, that conversation is weighted like the technical ones and prepared for least. They are deciding one thing: whether having you in the room makes their decisions cheaper. That means options with costs attached, not implementation detail and not "it depends". An estimate someone can plan against — a range, the assumption that would push it to the high end, and what you would drop to hit the low one — is worth more than a confident single number, which everyone present already knows is wrong.
What to demonstrate
- Whether an estimate comes as a range with the assumption most likely to break it, and states what a specific scope cut would actually buy
- Whether a technical constraint is handed over as a choice with consequences on their side, rather than as a verdict they have no standing to argue with
- Whether you establish what decision is on the table before proposing anything
- Whether risk is raised while it can still change the plan, with the trigger that would confirm it, instead of reported afterwards as a slip
How to prepare
- Take a project that shipped late and write the two-sentence warning you could have given three weeks earlier, naming what you would have needed decided at that point
- Rehearse one estimate out loud until it arrives in three parts: the range, the single assumption that would blow it, and the smallest thing you would cut to protect the date
- Rewrite an objection you have actually made — the "we can't do that" version — as two options with their costs, so the choice ends up with the person who owns it
Where candidates lose points
Checking a quota with a select and then writing
Under read-committed isolation, two concurrent transactions both observe a count below the limit and both insert, so the limit is exceeded by exactly the concurrency. Repeatable read does not rescue it either: it provides a stable snapshot, and this is write skew, which snapshot isolation permits by design. The options are serialisable isolation, which detects the conflict and aborts one transaction with a serialisation failure and therefore obliges the caller to retry; a single statement with the predicate inside the write; or a constraint that makes the surplus insert fail outright. The reason this pattern survives review is that it is correct in every test that runs one request at a time.
Serialising a tenant's writes through select ... for update on a single counter row
It is the first change that makes a counter correct, and it caps that tenant's write throughput at roughly one divided by the lock hold time. A transaction that takes the lock, makes a network call and then commits holds it for the entire round trip: at 2 ms that is about 500 writes per second for the whole tenant, and the largest tenants are exactly the ones that exceed it. The damage then spreads, because every waiter holds a database connection while it queues, so one hot tenant drains the shared pool and the symptom presents as a site-wide latency incident rather than as a lock problem. The repairs are to shrink the critical section to a single statement, to shard the counter into per-(tenant, hour) or per-(tenant, bucket) rows and sum on read, or to batch in memory and flush periodically while accepting the bounded loss that batching implies.
Going silent while thinking
Narrate the candidates and why you are discarding them, even in fragments: sorting first would make this a two-pointer scan, but it destroys the original indices, which the output needs. From the other side of the table, a candidate thinking hard and a candidate stuck are indistinguishable until one of them speaks.
Assuming the input fits in memory
Ask how large the input is in bytes before committing to an in-memory algorithm; beyond that point the options are a single streaming pass, an external sort with bounded buffers, or a sketch that trades exactness for constant memory. An algorithm that assumes random access to the whole input is a different algorithm from one that sees each element once.
Questions & practice
Solve a string manipulation problem (typically at a LeetCode Easy level).
Medium · data structures and algorithms
Approach
- Name the brute-force solution and its complexity before improving on it.
- State the target complexity and say which constraint rules the naive version out.
- Restate the input: its shape, its size, and what is guaranteed about it.
Follow-up
- What is the worst case, and how likely is it on real data?
- Which test case would catch an off-by-one here?
Implement a basic data structure manipulation task.
Medium · data structures and algorithms
Approach
- Choose the data structure from the access pattern, not from familiarity.
- Restate the input: its shape, its size, and what is guaranteed about it.
- Name the brute-force solution and its complexity before improving on it.
Follow-up
- What is the worst case, and how likely is it on real data?
- How does this change if the input no longer fits in memory?
Find peak concurrent sandbox usage from run intervals
Medium · sweep-line · intervals · concurrency-caps · null-semantics
Given up to 5 million job_run rows for one tenant over one day, with run_id, started_at, finished_at, status and wall_clock_limit_seconds, report the maximum number of sandboxes running at once, the earliest instant that maximum is reached, and the first run_id that would breach a per-tenant cap of C. started_at is null while a run is queued; finished_at is null both for runs still executing and for runs in status lost. Treat a run as occupying [started_at, finished_at). Give the complexity and state how you handle each null.
Approach
- Turn each run into two sweep events,
(started_at, +1)and(end, -1), then sort the 2n events by timestamp with-1ordered before+1at equal timestamps. That tie-break is what makes the interval half-open, so a run finishing at 10:00:00 and one starting at 10:00:00 never overlap. - Decide each null out loud before sweeping, because each choice moves the answer. A null
started_atmeans queued and contributes nothing. A nullfinished_atwith statusrunningorleasedis clipped to the window end. Statuslosthas no observed end at all, so clip it atstarted_at + wall_clock_limit_secondson the grounds that the supervisor owns the timeout, and record that you did. The table'scheck (finished_at is null or started_at is not null)guarantees you never see an end without a start. - Sweep once, maintaining a running counter, the maximum, and the timestamp at which the maximum was first attained (update
peak_atonly on a strict increase, or you will report the last such instant instead of the earliest). Capture the firstrun_idwhose+1takes the counter to C+1 during the same sweep rather than in a second pass. - Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by
started_at, a min-heap of end times gives O(n log k) time and O(k) space with k the peak concurrency, which is the better shape when the rows come from an index scan on(tenant_id, started_at). - If second resolution is acceptable, counting-sort the endpoints into an 86,400-slot delta array and prefix-sum it: O(n + T) time and O(T) space, which beats the comparison sort at 5 million rows. It answers only at second granularity, so state which resolution the cap is defined in.
Worked solution (20 min)
- Write the null policy as three lines of prose first, one per case, and keep them beside the output.
- Emit 2n endpoint tuples
(timestamp, delta, run_id)and sort on the key(timestamp, delta)so-1precedes+1. - Sweep, tracking
cur,peak,peak_atupdated only on a strict increase, and the firstrun_idwhose+1takescurto C+1. - Build a fixture with two runs where one ends exactly when the next starts, three genuinely overlapping runs, one run with a null
finished_atand statusrunning, and one with statuslostand a 300-secondwall_clock_limit_seconds. - Re-run with every timestamp shifted by a constant and confirm the peak is unchanged while
peak_atshifts by the same constant.
Expected result: Peak is 3, from the overlapping trio. The exact-handoff pair yields a peak of 1, not 2. peak_at is the start instant of the third overlapping run. The lost run occupies exactly [started_at, started_at + 300s) under the stated policy.
Verify it yourself
- Setting
peak_aton>=rather than>moves the reported instant to the last time the peak was attained. Flip it and watch the fixture change. - Sorting by timestamp alone, without the delta tie-break, raises the reported peak on the handoff fixture.
- The deltas over the whole sweep sum to zero once every open-ended run has been clipped.
Follow-up
- Now report peak concurrency per tenant for 10,000 tenants from one globally sorted stream. What changes about memory and about the sort?
- The cap has to be enforced at dispatch rather than reported afterwards. What does the admission check look like, and where does it race?
- How would you answer 'peak concurrency within any 5-minute window' without re-sorting?
Rebuild an hourly rollup with deduplication and late-arrival accounting
Hard · window functions · deduplication · event time vs ingest time · watermarks
From usage_event (event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at, ingested_at), produce the values usage_rollup_hourly should hold for one tenant over one day: per (workspace_id, sku, hour_start) the deduplicated quantity_sum, event_count and source_max_ingested_at, bucketed by occurred_at. Duplicates share (tenant_id, idempotency_key). Also report, per hour, the running total across the day and the share of quantity that arrived more than two hours after the hour began. Write the query, and state which duplicates a daily unique index cannot catch.
Approach
- Deduplicate in its own CTE before any aggregation, because a SUM cannot be un-summed:
row_number() over (partition by tenant_id, idempotency_key order by ingested_at, event_id) = 1. Include the tiebreaker. Without it the surviving row is non-deterministic when two duplicates share an ingested_at, and a rollup described as deterministically recomputable then disagrees with itself between runs. - Bucket on occurred_at and nothing else, and pin the timezone explicitly.
date_trunc('hour', timestamptz)truncates in the session's TimeZone setting, so the same query run by a session set to a non-UTC zone buckets differently; use the three-argumentdate_trunc('hour', occurred_at, 'UTC')on PostgreSQL 16 or later, ordate_trunc('hour', occurred_at at time zone 'UTC') at time zone 'UTC'before that. Filterenvironment = 'production'explicitly, since metering covers three environments and billing covers one. - Aggregate to the grain with
sum(quantity),count(*)andmax(ingested_at). The last is not decoration: it is the watermark the row consumed up to, and without it there is no way to prove afterwards what a number did and did not include. - Compute the late share inside the dedup-and-aggregate step as a conditional aggregate,
sum(quantity) filter (where ingested_at > hour_start + interval '2 hours'), then divide by the hour's total. Compute the running total as a window over the already aggregated rows:sum(quantity_sum) over (partition by workspace_id, sku order by hour_start rows between unbounded preceding and current row). Running either over raw rows puts the duplicates back. - Answer the index question exactly. The unique constraint is on (ingested_day, tenant_id, idempotency_key), because a unique index on a partitioned table must contain the partition key. It therefore deduplicates only within one ingest day and admits a duplicate whose retry crosses midnight or whose replay runs a week later. That is why this CTE dedups across the whole window being recomputed, and why the dedup horizon is a correctness parameter rather than a retention cost.
- Keep the numeric type all the way through. quantity is numeric so the sums are exact; a cast to double precision anywhere in this pipeline reintroduces drift that surfaces only as a few unreconcilable cents per tenant per month, long after the query is out of anyone's mind.
Follow-up
- A dispute forces the same recompute over 40 days for one tenant. What changes about the dedup CTE's memory use and the chosen plan, and what would you do about it?
- Two runs a minute apart return different quantity_sum values for an hour that is already closed. Give two mechanisms that produce that, and the single query that distinguishes them.
- Express the same rollup incrementally so it does not re-scan the day each time the watermark advances. What does the incremental version stop being able to answer?
Enforce a concurrent-run quota that survives simultaneous requests
Medium · isolation levels · write skew · quotas · lock contention
A plan allows at most 20 concurrently running rows in job_run per tenant. The table holds run_id, tenant_id, workspace_id, status (queued, leased, running, succeeded, failed, timed_out, cancelled, lost), lease_token, leased_until, started_at and finished_at. Today the service runs select count(*) from job_run where tenant_id = $1 and status = 'running', compares the result to 20, then inserts. Under load a tenant exceeds the cap by exactly the number of concurrent requests. Name the anomaly, say which isolation levels do and do not prevent it, and give a version that holds, as SQL.
Approach
- Name it: write skew. Each transaction reads a predicate (the count of running rows), neither modifies what the other read, and both then insert rows that jointly violate an invariant no single row expresses. Read committed permits it. So does repeatable read, because snapshot isolation's first-updater-wins check fires only on conflicting row updates, and these are inserts touching disjoint rows.
- Enumerate the fixes with their real costs. SERIALIZABLE works: PostgreSQL's SSI tracks the predicate read and aborts one transaction with SQLSTATE 40001, which obliges the caller to retry and makes the abort rate rise with contention on a hot tenant. Folding the predicate into the write as
insert ... select ... where (select count(*) ...) < 20narrows the race to the statement's snapshot but does not close it under read committed. - Give the version that holds at read committed: serialise on a row both transactions must touch.
update tenant_concurrency set running = running + 1 where tenant_id = $1 and running < 20 returning runningupdates zero rows when the cap is reached, and zero rows is the rejection. This works because at read committed a blocked UPDATE re-evaluates its WHERE clause against the newly committed row; at repeatable read the same statement raises a serialisation error instead, so the isolation level changes the calling contract. - State the cost you just bought. That row is now a per-tenant serialisation point, so admission throughput for the tenant is bounded by one divided by the lock hold time; at a 2 ms hold that is roughly 500 admissions/second. Keep the critical section to the single UPDATE, with no network call or scheduling decision inside the transaction, and decrement in the same transaction that writes the terminal status.
- Close the leak the status enum implies: a run can end as
lost, so a crashed worker otherwise consumes a slot forever. Reconcile on a schedule againststatus = 'running' and leased_until < now(), and treat the counter as a fast path overjob_run, which stays the system of record.
Worked solution (25 min)
- Seed a tenant with 19 running rows, then fire 8 concurrent sessions each running the select-then-insert, and count the resulting running rows.
- Repeat at REPEATABLE READ and confirm the count still exceeds 20.
- Repeat at SERIALIZABLE, count the 40001 aborts, and note that without a retry loop those requests fail rather than queue.
- Implement the atomic counter UPDATE, re-run the 8-way test, and confirm exactly 20 running rows with zero over-admissions.
- Kill a worker mid-run, let the lease expire, and check whether the slot comes back without intervention.
Expected result: Write skew identified; read committed and repeatable read both permit it; serialisable prevents it at the price of 40001 retries; the working read-committed version is update tenant_concurrency set running = running + 1 where tenant_id = $1 and running < 20 returning running, whose zero-row result is the rejection, plus a reconciliation path for runs that terminate as 'lost'.
Verify it yourself
- At 8x concurrency against a cap of 20, running rows never exceed 20.
- The rejection returns zero rows rather than raising, so it is distinguishable from an error in the caller.
- Killing a worker does not permanently consume a slot.
- The counter and
select count(*) from job_run where status = 'running'agree after reconciliation.
Follow-up
- Write the retry loop for the SERIALIZABLE version. What does the caller see when it keeps aborting, and what bounds the retries?
- Two regions each keep a counter. What is the effective cap, and what does admission do when the counter store is unreachable?
- The cap changes mid-flight on a plan upgrade. Do running jobs get killed, and what does the counter row look like during the change?
Describe how you would structure a service to process and store high-volume diagnostic data.
Medium · system design and architecture
Approach
- Name the failure you are designing for, then the recovery path.
- Fix the scope first: who calls this, how often, and what they do when it fails.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- What would you drop to keep the system up under load?
- What breaks first when traffic grows ten times?
How do you ensure your system remains resilient during network latency or hardware connectivity issues?
Medium · system design and architecture
Approach
- Fix the scope first: who calls this, how often, and what they do when it fails.
- Name the failure you are designing for, then the recovery path.
- Choose a partition key and say what query it makes expensive.
Follow-up
- What breaks first when traffic grows ten times?
- What would you drop to keep the system up under load?
Design a system to handle data flow between the device and the cloud.
Medium · system design and architecture
Approach
- Choose a partition key and say what query it makes expensive.
- Fix the scope first: who calls this, how often, and what they do when it fails.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- How does this behave when that dependency is down for an hour?
- What breaks first when traffic grows ten times?
How do you manage cookies, encryption, and hashing to ensure data integrity and security?
Medium
Approach
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
- State your assumptions explicitly before working the problem.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Authorisation cache with a bounded revocation window
Hard · caching · invalidation · availability · authz
The edge gateway serves about 30k requests/second from roughly 120 pods across three regions and may add no more than 10 ms at p99. Each request presents an API key that must resolve to an authorisation context: tenant, workspace, scopes, entitlements and credential version. The control plane that owns those rows takes tens of writes/second. A revoked credential must stop authorising within a bound you state as a number. Design the cache - what is keyed, what invalidates it, how many tiers - and specify what the gateway does for the duration of a control-plane outage.
Approach
- Fix the entry shape before the topology: key on SHA-256 of the presented secret, value is the resolved context plus the principal's auth_version and a fetched_at. Cache negative lookups too, with a much shorter TTL and a bounded-size structure, because otherwise every sprayed invalid key is a control-plane round trip, and unbounded negative entries let a sprayer evict live ones.
- Compute the control-plane read load before choosing a TTL, and notice the multiplier is pods, not regions, when the cache is in-process: distinct_active_keys x pods / TTL. At 50,000 active credentials, 120 pods and a 60 s TTL that is 100,000 reads/second against a single-writer primary with read replicas, which is not serviceable - so the design needs two tiers, a per-region shared cache in front of the control plane with the in-process cache held to a few seconds.
- State the bound as the sum of the tiers, not as a hope: with a 10 s in-process TTL over a 60 s regional TTL, worst-case staleness absent any invalidation message is 70 s, because an in-process entry can be filled from a regional entry that was itself about to expire. Publish-subscribe invalidation on every credential and entitlement mutation makes the typical case sub-second, but it is lossy under partition, so the TTL is the only enforced bound and both tiers must subscribe.
- Make auth_version propagate through the same path: a password reset or sign-out-everywhere bumps the principal and revokes its keys with no hook of its own, so the invalidation publisher has to expand principal -> credentials and publish per key, or the cache keeps serving keys whose auth_version no longer matches.
- Decide the partition behaviour in advance and write it as two rules: on a cache hit past TTL, serve from the stale entry up to a grace ceiling (say 10 minutes); on a cache miss, refuse, because authorising something never seen converts a control-plane outage into an authorisation bypass. Worst-case revoked-key lifetime during an outage is then TTL + grace, about 11 minutes, and that number is the price of not turning a control-plane outage into a total data-plane outage.
- Protect the refill path: per-key single-flight so a mass invalidation or a cold pod does not stampede the control plane, TTL jitter so entries created together do not expire together, and a small separately replicated deny-list for compromised keys that is consulted on the hot path and survives control-plane loss.
Worked solution (35 min)
- Write the cache entry shape - key, value fields, and which of those fields a request actually reads on the hot path - and mark which field makes a password reset propagate.
- Compute control-plane reads/second for TTLs of 10 s, 60 s and 300 s using distinct_keys x cache_instances / TTL, once with cache_instances = 3 regions and once with cache_instances = 120 pods, and note which of the two the in-process design actually implies.
- Enumerate the four states a revocation can be in - published and received, published and dropped, control plane unreachable, pod started after the publish - and write which entry serves the next request in each.
- Write the outage policy as two rules (hit past TTL within grace: serve; miss: refuse) and compute worst-case revoked-key lifetime as the sum of both tier TTLs plus the grace.
Expected result: A two-tier design with a single stated number: roughly 10 s in-process over 60 s regional, so about 70 s worst-case staleness without invalidation and typically under a second with it, plus a 10-minute stale-serve grace giving about 11 minutes worst case during a control-plane outage; fail-open on a warm hit, fail-closed on a miss; a separately replicated deny-list for compromised keys; per-key single-flight and TTL jitter on the refill path.
Verify it yourself
- Recompute the read load with pods rather than regions as the multiplier. If the number exceeds what read replicas can serve, a single in-process tier is not a viable design and you need a shared tier, a longer TTL, or routing that gives each pod a slice of the key space.
- Trace a password reset end to end. If your invalidation publishes only on credential rows, the reset revokes nothing and the auth_version field in the cache entry is decorative.
- State the outage behaviour as a decision already made rather than as an alert. If the answer is a human paging someone, the availability target for the control plane has not actually been set.
Follow-up
- A key is found in a public repository and must stop working in seconds, not minutes. What changes, and what does it cost on the request path?
- One region is partitioned from the control plane while the control plane itself is healthy. What do that region's pods do, and how do you distinguish this from a control-plane outage?
- How would you measure the actual revocation bound in production rather than asserting it from the configuration?
Hourly rollups merge one hour and lose another
Easy · timezone · rollups · reconciliation
Reconciliation flags one tenant on one day. Summing usage_event.quantity by hour of occurred_at gives 24 non-empty hours, but usage_rollup_hourly holds 23 rows for that tenant, workspace and SKU, one of which carries roughly the sum of two adjacent hours. Other days reconcile exactly, and the affected date matches a civil-time transition. hour_start is documented as truncated to the hour in UTC. You have both tables, the rollup job source, and its runtime environment. Give an ordered checklist, the mechanism, and the correction path for a day that may already be sealed.
Approach
- Bisect by dimension until one cell explains the whole difference: tenant, then day, then SKU, then hour. A defect confined to a single transition date already rules out deduplication and late arrival, both of which are indifferent to which hour an event lands in.
- Read the truncation with its precondition stated: date_trunc on a timestamptz value is evaluated in the session TimeZone, not in UTC. If the job connects without pinning that setting, it inherits the server or container default.
- Follow that to the collision: in a zone that observes daylight saving, two distinct UTC hours map to the same local wall-clock label at the autumn transition, so both fold into one key under the unique constraint on (tenant_id, workspace_id, sku, hour_start) and their quantities sum into one row. At the spring transition a label never occurs and the row is simply absent.
- Confirm from data rather than from reading code: run the same aggregate twice, once with the session pinned to UTC and once with the job host zone, and check that the second reproduces the stored rollup exactly.
- Fix at the source by pinning the connection to UTC explicitly, or by truncating on occurred_at AT TIME ZONE 'UTC', rather than relying on a default that differs between a developer machine, CI and production.
- Correct according to status, not convenience: an open hour is recomputed with revision incremented, a sealed hour is frozen and the difference becomes an adjustment line on the next invoice with voided_by_line_id pointing at the line it reverses.
Follow-up
- The same job also emits a daily figure for a dashboard. Why can a correct hourly rollup still produce a wrong day, and what does the tenant's billing timezone have to do with it?
- How would you detect this class automatically rather than waiting for reconciliation, given that it only manifests twice a year per zone?
Suggested practice checklist
Roughly ninety minutes on weeknights with one longer weekend block. The plan cuts scope rather than compressing everything, on the assumption that one thing finished per night beats four half-started.
Day 1 — Fix the scope and take a cold baseline
- Read the role description and write the three things the loop will almost certainly test, then write an explicit not-doing list and keep it visible all week.
- Take one twenty-five-minute coding problem and one fifteen-minute design prompt cold, and write the single sentence naming what blocked each, because those two sentences decide where the remaining evenings go.
- Set the week's rule: one thing finished every night, including the night you only have forty minutes.
Deliverable: A one-page scope with a not-doing list and two cold attempts, each carrying one sentence on what blocked it.
Day 2 — One pattern, written three times from blank
- Choose the single pattern most likely to appear in your loop and write it three times from an empty file rather than editing the previous attempt.
- On the third pass, write the invariant as a comment before the loop body and the complexity before the first line of code.
- Stop at ninety minutes even if the third version is imperfect, and write the one thing you would fix given another hour.
Deliverable: Three independent implementations of the same pattern plus a note on what changed between them.
Day 3 — One design, only to the depth you can defend
- Take one system shape and go only as far as requirements, interface and data model, refusing to draw a box you could not survive a follow-up about.
- Attach one number to each non-functional requirement, deriving it rather than asserting it, and write the assumption the number rests on.
- Write the one tradeoff you are choosing against and the observation that would make you reverse it.
Deliverable: One design at interface-and-schema depth with derived numbers and one written reversible tradeoff.
Day 4 — Only the fundamentals you will have to defend
- Write, in under two hundred words each, the answers to the two questions that follow almost any implementation: why this structure and not the obvious alternative, and what happens to this code at a hundred times the input.
- Write what an index actually costs: faster lookups on the indexed columns against a write that now maintains a second structure, plus the cases where the planner declines to use it anyway, low selectivity, or a predicate wrapping the column in a function.
- Delete any answer you cannot deliver aloud in under a minute, since an answer that needs reading is not an answer you have.
Deliverable: Three written answers, each under two hundred words and each timed aloud.
Day 5 — Your own work, timed
- Write a ninety-second and a four-minute version of your main project and time both aloud rather than reading them.
- Prepare the two follow-ups that always come: what you would do differently, and how you knew it worked.
- Put one number in the first sentence and be ready to say exactly where it came from and what it excludes.
Deliverable: Two timed narratives with one defensible number in the opening line.
Day 6 — The one full rehearsal, in the weekend block
- Run a sixty-minute mock covering a coding round and a design round in one sitting with no break, because sustained attention is the thing evenings have not trained.
- Immediately afterwards, and before hearing any feedback, write the three moments you lost the thread.
- Spend the rest of the block only on those three moments, and on nothing you merely feel shaky about.
Deliverable: Mock notes naming three failure moments with a specific fix written under each.
Day 7 — Taper
- Write the twenty-minute warm-up you will actually do on the morning: one problem you can already solve from a blank file, one design you can narrate, and nothing you have never seen.
- Re-read only your own notes from this week and open no new material.
- Write the logistics down: the editor or shared document you will be working in, whether execution and lookups are permitted, and the sentence you will use when you do not know something.
Deliverable: A one-page card holding the design structure, the project numbers, and the logistics.
Outage answers are graded on instruments
Nobody is scoring your stamina at three in the morning. What carries weight is which signal told you something was wrong, what you measured before touching anything, what you rolled back versus what you fixed forward, and why you picked one. 'We restarted it and it went away' is a story about not knowing.
How do your specific technical skills relate to the core requirements of this role?
Medium · behavioural and engineering judgement
Approach
- Close with what you would do differently, concretely.
- Name the disagreement and how you resolved it with evidence.
- State the situation in two sentences and spend the rest on the reasoning.
Follow-up
- How did you know your change caused the improvement?
- What would you do differently if you ran that again?
Why do you want to work at Hyperfine Research?
Medium · behavioural and engineering judgement
Approach
- Name the disagreement and how you resolved it with evidence.
- Pick a story where you made the decision, not one where you watched it.
- Close with what you would do differently, concretely.
Follow-up
- How did you know your change caused the improvement?
- What would you do differently if you ran that again?
Unblock an engineer on a job run that finished twice
Easy · mentoring · fencing tokens · lease expiry · debugging method
An engineer two weeks into the team brings you a job_run row showing status succeeded with an exit_code written by a worker declared dead ten minutes earlier; the retry attempt also shows succeeded. They have spent a day adding logging and are no closer. You have twenty minutes and you do not want to take the keyboard. Describe how you unblock someone: the question you ask first, what you let them find themselves, the concept you name and when, and how you check the next day that they own the fix rather than having watched you produce it.
Approach
- Ask what they expect rather than what they see: which statement set status to succeeded, and what did it check before writing? That question points directly at the update's WHERE clause, which is where the answer lives, and it costs them nothing to answer, so it does not read as a test.
- Let them build the timeline themselves from the row: queued_at, started_at, leased_until, finished_at and worker_id, on both the original run and the retry. Two different worker_ids with a lease expiry between them tells the whole story, and they will see it before you say it.
- Name the concept once the evidence has earned it. A lease bounds time; it does not prevent a write. The store has to reject a stale writer, which means the update carries a fencing token the row compares — update job_run set status = 'succeeded' where run_id = $1 and lease_token = $2 and status = 'running' — and a long garbage-collection pause or a brief partition is enough to produce what they are looking at.
- Point at the second, less obvious half and let them decide it: 'lost' exists in the status enum precisely so a run whose worker vanished is not recorded as failed, because failed asserts an outcome nobody observed and the system then bills and retries on that assertion. Ask them what these two rows should have said.
- Leave them with the next step rather than the patch — a test that kills the first worker after the sandbox exits and before the row is written — and say when you are available again, so the offer is real rather than polite.
- Check ownership the next day by what they produced, not by asking if it went well: a test that reproduces the window proves they understood it; a test that only asserts the new WHERE clause proves they copied it. Ask them to explain it to a third person and listen for whether the explanation is theirs.
Follow-up
- They propose a longer lease instead of a token. What do you say, and what breaks when legitimate runs last thirty minutes?
- How can you tell whether your explanation landed or they simply deferred to you?
- The same engineer hits a variant of this next month. What did you fail to teach the first time?