cswork / libraryOpen practice workspace

Interview guides · HiSolutions AG

HiSolutions AG Software Engineer Interview Guide

HiSolutions AG Software Engineer interview guide: reported rounds, questions and how candidates describe the process.

The 60-second brief

A Software Engineer (or Consultant in Software and License Management) at HiSolutions AG plays a pivotal role in bridging the gap between complex software ecosystems and strategic business value. You are not just writing code; you are architecting solutions for high-stakes environments where security, compliance, and efficiency are paramount. By joining this team, you contribute to the core mission of enabling organizations to navigate digital transformations with confidence and precision. This role is critical because it demands a dual focus: deep technical proficiency and the ability to consult effectively with clients. You will be tasked with managing software assets, optimizing licensing structures, and implementing robust IT project management frameworks.

This guide is scoped to a Software Engineer candidate at HiSolutions AG.

Focus areas

  • License Management
  • Software Asset Management (SAM)
  • IT Project Management

The HiSolutions AG interview process

HiSolutions AG candidates report 3 rounds over 3-5 weeks. The stages below are what candidates describe, not a published process.

Application Review

Initial assessment of your background and professional experience.

What to demonstrate

  • Initial assessment of your background and professional experience
  • Depth in License Management

How to prepare

  • Be able to walk your CV end to end in two minutes, and say why this company specifically.
  • Have your salary expectations, notice period and location constraints ready, and ask for the rest of the loop in writing.

Technical Assessment

Discussions regarding your problem-solving capabilities.

What to demonstrate

  • Discussions regarding your problem-solving capabilities
  • Depth in License Management

How to prepare

  • Answer aloud and timed: How do you approach the initial discovery phase of a new IT project?
  • Answer aloud and timed: What steps do you take to ensure a project remains within budget and scope?

Behavioral Assessment

Evaluation of your consulting style and soft skills.

What to demonstrate

  • Evaluation of your consulting style and soft skills
  • Depth in License Management

How to prepare

  • Prepare three examples from your own work, each with a decision you made and an outcome you can quantify.
  • Re-read the description of the behavioral assessment above and write down what you would ask to confirm before it.

Where candidates lose points

Structure your answers

Always lead with the conclusion before providing the supporting details.

Be specific

When discussing past projects, cite specific tools, methodologies, and quantitative results whenever possible.

Understand the firm

Research HiSolutions AG’s focus on security and IT consulting to tailor your answers to their specific market position.

Frame your answers around the value you provide to the client

The interviewer is assessing if they would feel comfortable putting you in front of one of their key accounts.

Questions & practice

Track a rolling failure rate per destination for circuit decisions

Easy · sliding window · ring buffer · circuit breaker

The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.

Approach

  1. Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
  2. Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
  3. State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
  4. Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.

Follow-up

  • The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
  • A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?

Collapse a redelivered event batch into per-aggregate high-water marks

Easy · hashing · at-least-once · aggregation

You drain a batch of up to 5,000,000 events, each (aggregate_id BIGINT, aggregate_version INT, event_type, payload). The log guarantees order within one aggregate only; the batch merges 64 partitions, and a relay failover has redelivered a range, so an older version for an aggregate can appear after a newer one. Given a map of last_applied_version per aggregate, produce the events worth applying, at most one per (aggregate_id, version), plus the count discarded. Target O(n) time. State the memory for 2,000,000 distinct aggregates and what you do when it does not fit.

Approach

  1. One pass, one hash map from aggregate_id to the highest version kept, and a discard counter. An event whose version is at or below last_applied_version for its aggregate is dropped without further work, which is the whole reason the event carries its version rather than a delta. O(n) expected time, O(d) space in distinct aggregates.
  2. Keep the maximum, never the last occurrence. The redelivered range means the final appearance of an aggregate in the batch can be an older version than one seen earlier in the same batch, so last-wins applies stale state over newer state and the projection regresses with no error anywhere.
  3. Cost the memory instead of calling it large: an 8-byte key plus a 4-byte version is 12 bytes of payload, and an open-addressed table held at a 0.7 load factor costs roughly 17 bytes per entry before per-slot metadata, so 2,000,000 aggregates is tens of megabytes in a native layout and several times that in a runtime that boxes both key and value.
  4. If the distinct set exceeds memory, partition on hash(aggregate_id) mod P and reduce each partition independently. Every event for one aggregate hashes to the same partition, so the per-partition result is exact and the merge is concatenation rather than a second reduction.

Follow-up

  • The payload is a patch rather than a snapshot, so applying only the highest version loses the intermediate changes. What changes in your reduction?
  • How do you detect that version 7 arrived while version 6 was never delivered, and what should the consumer do about the gap?

Merge partitioned event streams into one ordered feed with bounded lateness

Hard · k-way merge · watermarks · out-of-order streams

The read-model service consumes 64 log partitions carrying about 4,000 events per second in total. Each partition is ordered within itself, but partitions drift by up to 30 seconds, and the activity feed must present a tenant's events in occurred_at order. Produce the merge. State its complexity, the buffer it requires in events and in bytes, what happens when one partition is idle, and what you do with an event that arrives after you have already emitted its position. Payloads average 1 KB.

Approach

  1. Merge with a min-heap over the 64 partition heads keyed on (occurred_at, event_id): O(log P) per event and O(n log P) overall. The tie-break on event_id is what makes the output deterministic when two partitions carry the same millisecond, which matters because the feed is paginated and a non-deterministic order reorders pages under the reader.
  2. Emitting the heap head is only correct once every partition has produced everything up to that timestamp, so the emit condition is a watermark: the minimum across partitions of the highest occurred_at seen, less the allowed lateness. Events are held until the watermark passes them, which is what turns individually ordered streams into a jointly ordered one.
  3. Size the buffer from the lateness rather than guessing: 4,000 events per second times 30 seconds is 120,000 buffered events, and at 1 KB each about 120 MB of heap. That number is the real price of the ordering guarantee and belongs in front of whoever asked for it.
  4. Handle the idle partition explicitly, because it fails the feed rather than corrupting it: a partition with no traffic never advances its own maximum, so the watermark freezes and output stops entirely. Either every partition emits a periodic idle marker carrying the broker's current time, or the watermark falls back to wall clock for a partition silent beyond a threshold.

Follow-up

  • The lateness budget is raised to five minutes. What is the new buffer, and what besides memory changes?
  • The consumer restarts. Where does it resume from, and what does the feed look like for the first 30 seconds?

Write the update path that detects a concurrent edit

Medium · optimistic concurrency · transactional outbox · audit history

resource carries version INT NOT NULL DEFAULT 1. resource_revision holds revision_id, resource_id, version, actor_user_id, change_kind, patch JSONB, request_id, created_at with UNIQUE (resource_id, version). outbox_event holds aggregate_type, aggregate_id, aggregate_version, event_type, payload, status. A PUT carries the version the client read. Write the exact statements for the single transaction that applies the edit, records the revision and enqueues 'resource.updated', and give the handler's branch on zero affected rows. Then say what PostgreSQL 16 does under READ COMMITTED when two of these updates hit one row at once.

Approach

  1. One transaction, three writes, no network call inside it: UPDATE resource SET title = $3, version = version + 1, updated_at = now() WHERE resource_id = $1 AND tenant_id = $4 AND version = $2; then INSERT the resource_revision row at version $2 + 1; then INSERT the outbox_event row at the same aggregate_version. The event goes to a table rather than a broker because no transaction spans both.
  2. Branch on the affected-row count before doing anything else. Zero has three causes — stale version, wrong tenant, row gone — so re-read once and map to 409 carrying the current version, or 404 for an id outside the caller's tenant, which also stops the endpoint confirming that another tenant's id exists.
  3. State the engine behaviour instead of assuming it. Under READ COMMITTED the second UPDATE blocks on the row lock, and when the first commits PostgreSQL re-evaluates the WHERE clause against the newly committed row, so the version predicate now fails and the statement reports zero rows. Under REPEATABLE READ the identical collision raises SQLSTATE 40001 instead, so the handler must fold both shapes into one conflict response.
  4. Keep UNIQUE (resource_id, version) even though the predicate already serialises writers. It is what makes a lost update unwritable if any other path ever reaches the revision table, and it converts a logic bug into 23505 rather than into a silently missing history row.

Follow-up

  • A client sends the version it read ten minutes ago and the resource has moved three versions. What is in your 409 so it can resolve the conflict without a full re-fetch?
  • Two editors, two disjoint fields, no overlap. Does your answer still refuse the second write, and should it?

Hold a per-tenant active cap against concurrent creates

Hard · write skew · isolation levels · constraints

A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.

Approach

  1. Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
  2. Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
  3. Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
  4. State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.

Follow-up

  • A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
  • The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?

How do you manage competing priorities when working on multiple client projects simultaneously?

Medium · Consulting & Project Management

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

How do you approach the initial discovery phase of a new IT project?

Medium · Consulting & Project Management

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

What steps do you take to ensure a project remains within budget and scope?

Medium · Consulting & Project Management

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

How do you assess whether a client’s current software landscape is optimized for cost and compliance?

Medium · Software & License Management

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

What are the most common risks you identify when auditing a large enterprise’s software portfolio?

Medium · Software & License Management

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Explain your process for evaluating a new software tool for a client’s specific needs.

Medium · Software & License Management

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

How do you stay updated on changes in licensing models and software market trends?

Medium · Software & License Management

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Exports duplicate a row range about once a week

Hard · leases · clock skew · idempotency

Roughly once a week an export writes a file containing a duplicated range of rows. The affected job_run rows show attempt = 1, status = succeeded, one started_at, and a lease_owner naming a different host from the one whose logs show the job starting. Leases last 30 seconds and are heartbeated every 10 from inside the handler; lease_expires_at is computed on the worker and compared against the database's now(). Find the mechanism, and give a fix that holds even if you cannot fix the clocks.

Approach

  1. Start from the fact that eliminates the obvious answer. attempt = 1 means no retry was recorded, so this is not a re-run after failure; two workers ran the same row concurrently and the takeover path never touched the counter. lease_owner naming a host other than the one that started the job is the same statement from the other side.
  2. Enumerate the mechanisms that cause a premature takeover, then find the signal that separates them. Either the lease genuinely expired because the heartbeat did not fire, which is what happens when the heartbeat runs on the handler's own thread and the handler makes a long blocking call, or it only appeared expired because two clocks disagree, since lease_expires_at is written from the worker's clock and evaluated against the database's. The discriminator is the distribution: incidents clustered on the longest exports indict the heartbeat, incidents clustered on one host indict skew. Measure both, and measure each host's offset against the database directly.
  3. Read the reclaim query precisely. In PostgreSQL now() is transaction start time, not statement time, so a reclaimer holding a long transaction compares against an older timestamp than expected; clock_timestamp() is the statement-time function. This is worth ruling in or out before you redesign anything, because it changes which rows look expired.
  4. Remove the second clock rather than trying to synchronise it. Issue and extend the lease in the database, with lease_expires_at = now() + interval '30 seconds' in both the claim and the heartbeat, so exactly one clock is ever compared and worker skew stops mattering to this predicate.

Follow-up

  • The displaced worker has already streamed half the file to object storage. What makes that side effect safe to repeat?
  • You now count takeovers. What alert fires on that counter, and at what threshold?

Suggested practice checklist

Built from the rounds and topics HiSolutions AG candidates report.

Day 1 — Map the HiSolutions AG loop

  • Write out the reported sequence: Application Review, Technical Assessment, Behavioral Assessment.
  • For each round, write one sentence on what it is judging, from the description above, and mark the one you are least ready for.

Deliverable: A one-page map of the 3 reported rounds, with the weakest marked.

Day 2 — Work License Management

  • Spend the session on License Management, which HiSolutions AG candidates report being tested on.
  • Write one worked example in License Management and time yourself on it.

Deliverable: One timed worked example in License Management.

Day 3 — Work Software Asset Management (SAM)

  • Spend the session on Software Asset Management (SAM), which HiSolutions AG candidates report being tested on.
  • Write one worked example in Software Asset Management (SAM) and time yourself on it.

Deliverable: One timed worked example in Software Asset Management (SAM).

Day 4 — Work IT Project Management

  • Spend the session on IT Project Management, which HiSolutions AG candidates report being tested on.
  • Write one worked example in IT Project Management and time yourself on it.

Deliverable: One timed worked example in IT Project Management.

Day 5 — Answer out loud: Consulting & Project Management

  • Answer aloud, timed: How do you manage competing priorities when working on multiple client projects simultaneously?
  • Answer aloud, timed: Describe a time you had to explain a complex software licensing issue to a client who had little technical knowledge.

Deliverable: Spoken answers to 2 reported Consulting & Project Management question(s), under time.

Day 6 — Answer out loud: Software & License Management

  • Answer aloud, timed: How do you assess whether a client’s current software landscape is optimized for cost and compliance?
  • Answer aloud, timed: What are the most common risks you identify when auditing a large enterprise’s software portfolio?

Deliverable: Spoken answers to 2 reported Software & License Management question(s), under time.

Day 7 — Dry run for HiSolutions AG

  • Run one full mock under time, then write down the two questions you most want to ask your interviewers.

Deliverable: A completed timed mock and two questions to ask.

Behavioural preparation

Behavioural rounds judge the decision you made and what it cost.

Describe a time you had to explain a complex software licensing issue to a client who had little technical kno

Medium · Consulting & Project Management

Describe a time you had to explain a complex software licensing issue to a client who had little technical knowledge.

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

How do you handle conflict or disagreement within a project team?

Medium · Consulting & Project Management

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
  4. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

Ship under a deadline and bound the debt you chose

Medium · pagination · technical debt · tradeoffs

You have four days to ship a tenant-facing listing endpoint. The version you would defend uses keyset pagination over (tenant_id, status, updated_at DESC, resource_id DESC); the version you can finish uses LIMIT/OFFSET with no matching index. Describe a deadline call you actually made of this shape: what you shipped, what you knowingly deferred, how you bounded the damage with a mechanism rather than an intention, and the specific numeric condition that would force the follow-up. Name who you told and where you wrote it down.

Approach

  1. Name the deferred failure precisely instead of calling it slow. OFFSET n makes the database produce and discard n rows, so cost grows with page depth; without an index matching the sort, every matching row is read and sorted before the limit applies; and rows inserted between two page fetches shift across the boundary so items are skipped or repeated with nothing in the response to signal it.
  2. Bound the blast radius with something mechanical rather than a promise: cap maximum page depth, cap page size, restrict the endpoint to one internal caller, or keep it behind a flag. State which failure each cap removes and which it leaves standing.
  3. Attach a number to the trigger and wire it to an alarm: the first tenant crossing N resources, or the endpoint's p99 crossing its share of the 400 ms budget, so the debt announces itself instead of waiting to be remembered.
  4. Write it where the next engineer looks, which is the code and the ticket, not a chat message: what was deferred, why, the cap, and the trigger.

Follow-up

  • At what page depth does the offset version breach your latency budget, given your page size and row counts?
  • What breaks first when you switch to keyset pagination later, and what does a client holding an old page token see?