As a Software Engineer at High Speed Two, you are at the intersection of large-scale civil infrastructure and complex digital systems. This role is not merely about writing code; it is about building the robust, reliable, and intelligent software platforms that will underpin the United Kingdom’s high-speed rail network. You will be instrumental in developing systems that manage traffic, monitor mechanical and electrical assets, and ensure the safety and efficiency of one of Europe’s most ambitious engineering projects.

Seniority moves the scope further than the words in the title do. An earlier-career loop mostly checks that you implement something correctly and can reason about its cost, while a senior loop checks that you can pick between two defensible designs and say what you gave up.

Focus areas

  • Evolve APIs without breaking pinned SDK clients
  • Make every write idempotent under client retries
  • Scope every query and cache key by tenant

Overview

The work is defined by its scale and the critical nature of the outcomes. Whether you are working on Traffic Management Systems (TMS) or PRAM (Performance, Reliability, Availability, and Maintainability) engineering, your contributions directly impact how thousands of people interact with the rail network daily. You will navigate high-stakes environments where software reliability is paramount, collaborating with multidisciplinary teams of engineers to solve problems that have real-world, long-term consequences.

The role of a Software Engineer here often requires a blend of traditional software engineering practices and domain-specific knowledge related to rail infrastructure and asset management.

The High Speed Two interview process

High Speed Two candidates report 4 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.

Initial Technical Screening

Input bounds are the part of the prompt most often skimmed, and they usually contain the answer. They tell you which complexity class is admissible, which narrows the search before you have thought about the problem itself. As a rough planning figure, a compiled language does on the order of 10^8 simple operations per second and an interpreted one roughly an order of magnitude less. So n up to about twenty admits enumerating subsets, a few thousand admits a quadratic pass, and a million admits neither: you need near-linear, or linear with a log factor. If the bounds are missing, ask for them.

What to demonstrate

  • Whether the approach is justified by the stated input size rather than by whichever pattern you recognised first
  • Whether you ask about the properties that change the algorithm: whether the input arrives sorted, whether duplicates occur, whether values are bounded integers, whether it all fits in memory
  • Whether you can name the bottleneck in your own solution and what would remove it, even when you deliberately leave it in place
  • Whether a claimed speedup is real, since memoising a recursion only helps when subproblems genuinely overlap and the state can be keyed cheaply

How to prepare

  • For each algorithm you rely on, write down the largest n it handles in roughly a second, then check two of those figures by timing them in the language you will actually type in
  • For two weeks, write one line naming your target complexity and the bound that justifies it before you write any code, then compare that line with what you ended up submitting
  • Practise the conversion backwards: given a required O(n log n), list the mechanisms that get you there (sorting, a heap, an ordered map, divide and conquer) and choose by what the problem needs to query, not by what you used last

Experience Dive

You cannot drill a format you do not know, so put the preparation into material that travels. Three pieces of your own work, each rehearsed until you can take a follow-up you did not anticipate, will carry a conversation or a code walkthrough equally well. Specificity is what separates that from filler. A number needs its definition before it means anything: a p99 is over some window and measured at some hop, and a server-side figure excludes the queueing and network time a client would see. The number you cannot qualify is the one to leave out.

What to demonstrate

  • Whether your examples carry detail only someone who did the work would hold, such as what the binding constraint actually was, which alternative you rejected and why it was worse, and what you measured on each side of the change
  • Whether a number survives one follow-up, meaning you can say what it was measured over and whether it moved because of your change or merely alongside it
  • Whether a failure is described with the specific change that followed it, rather than a lesson stated in general terms
  • Whether your part in a team effort is stated accurately, including what other people did

How to prepare

  • Write a page on each of three projects covering the constraint, the option you rejected, the measurement before and after, and what went wrong. Cut any line you cannot take a follow-up on, since you are writing the parts you will be pressed on rather than a summary.
  • Recover the real figures while you still have access: request volume, data size, latency with its percentile and window, team size, timeline. Note where each came from, whether a dashboard, a design document or memory, and mark the estimates so you can say which they are out loud.
  • Take your weakest project story to someone who works in a different area and have them ask why four times in succession. The point where you run out of answer is the part to go and re-read before the round.

Interaction with Stakeholders

When a round has no standard shape, it is often there because something is still open: an area no earlier conversation reached, a round where the signal came out mixed, or a decision someone is not ready to make alone. Work out which by going back over what each earlier round actually covered rather than how it felt, and arrive able to give evidence on that point without being asked twice. Weak answers replay the loop's earlier material at the same depth. Strong ones go a level deeper and stay consistent with what you already said.

What to demonstrate

  • Whether your account of a project matches the one you gave earlier in the loop, since what you said before may be available to whoever runs this round
  • Whether you can go a level deeper on something already covered, reaching the decision and its alternatives rather than repeating the summary
  • Whether you state your own uncertainty accurately, including parts of a system you did not build and decisions you inherited, instead of claiming even ownership across all of it
  • Whether you can answer a question you handled poorly earlier by naming what you missed, rather than delivering a polished second version as if the first had not happened

How to prepare

  • Reconstruct the loop on one page: for each round, the questions you were asked and the answer you actually gave, not the better one you thought of afterwards. The gaps on that page are your best available guess at why this round exists.
  • Take the two claims you made earlier that carry the most weight and assemble the backing for each: the measurement, the date, what broke, the decision you would make differently now.
  • Write down the three facts about your work that must not drift between tellings, such as team size, timeline and your own role, and check your stories against that list rather than trusting recall under pressure

Final Decision

Coding rounds mostly set a floor. They decide whether you clear the bar, not where you land on the ladder. Level tends to come out of the design discussion and the ownership stories, so the question worth auditing beforehand is whether the scope you describe matches the scope of the job. Work that stops at your own service, or a story whose hard part was writing the code rather than getting several people to agree on an interface, reads a level below where you think you are interviewing, and that gap is usually resolved downwards.

What to demonstrate

  • Whether the largest thing you describe owning ran end to end — the decision, the migration path, the rollout, and what you did when it went wrong — or stopped at the change you merged
  • Whether design answers include what you would not build, what you would defer, and what you would measure before committing, rather than only what the boxes are
  • Whether a disagreement in a story was settled with something checkable — a benchmark, a prototype, a written proposal — instead of by seniority or by waiting it out
  • Whether you can say which calls you made alone and which you escalated, and why the line sat where it did

How to prepare

  • Write your largest piece of owned work as a timeline of decisions — who decided what, when, and what you did when the plan broke — then delete every sentence whose subject is "we" and see how much survives
  • Take one system you know well and drill the migration answer: how old and new paths run side by side under live traffic, how you compare their outputs, what the rollback is once writes are going to both, and which step you would not automate
  • Map each line of the ladder in the job posting to a specific thing you have done, find the line you cannot support, and prepare the closest evidence you have plus an honest account of the gap

Where candidates lose points

Serialising a tenant's writes through select ... for update on a single counter row

It is the first change that makes a counter correct, and it caps that tenant's write throughput at roughly one divided by the lock hold time. A transaction that takes the lock, makes a network call and then commits holds it for the entire round trip: at 2 ms that is about 500 writes per second for the whole tenant, and the largest tenants are exactly the ones that exceed it. The damage then spreads, because every waiter holds a database connection while it queues, so one hot tenant drains the shared pool and the symptom presents as a site-wide latency incident rather than as a lock problem. The repairs are to shrink the critical section to a single statement, to shard the counter into per-(tenant, hour) or per-(tenant, bucket) rows and sum on read, or to batch in memory and flush periodically while accepting the bounded loss that batching implies.

Checking a quota with a select and then writing

Under read-committed isolation, two concurrent transactions both observe a count below the limit and both insert, so the limit is exceeded by exactly the concurrency. Repeatable read does not rescue it either: it provides a stable snapshot, and this is write skew, which snapshot isolation permits by design. The options are serialisable isolation, which detects the conflict and aborts one transaction with a serialisation failure and therefore obliges the caller to retry; a single statement with the predicate inside the write; or a constraint that makes the surplus insert fail outright. The reason this pattern survives review is that it is correct in every test that runs one request at a time.

Choosing a schema before the access patterns are known

Write the queries first, with their filters, sort orders, cardinalities and which ones sit on the latency-critical path, then design tables and indexes to serve them. An index nothing queries still costs write throughput and storage, and a hot query with no supporting index becomes a full scan that only hurts once the table is big.

Sorting when the problem never required a total order

Match the algorithm to the guarantee actually needed: the top k comes from a size-k heap in O(n log k) time and O(k) space, distinctness needs a set rather than an ordering, and a small bounded integer key range admits a linear counting pass. A full O(n log n) sort is the right default only when you genuinely need everything in order.

Questions & practice

Fold a deduplicated usage stream into hourly rollups

Easy · aggregation · deduplication · watermarks · exact-arithmetic

You are given one day of usage_event rows, up to 250 million, each carrying event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at and ingested_at. Produce usage_rollup_hourly cells keyed (tenant_id, workspace_id, sku, hour_start) with quantity_sum, event_count and source_max_ingested_at. An event counts once per (tenant_id, idempotency_key). The rollup grain has no environment column, so state your filter. One pass. Give your time and space bounds, and say what the deduplication actually costs in memory.

Approach

  1. Bucket on occurred_at, never ingested_at: hour_start = date_trunc('hour', occurred_at at time zone 'UTC'). The two columns answer different questions. occurred_at says which hour the customer is billed for; ingested_at says how current the fold is. Using the second for the first makes late data invisible instead of correctable.
  2. The fold is trivial and the deduplication is the entire cost, so price it before designing anything clever. An exact set over (tenant_id, idempotency_key) at 250M entries, stored as a 16-byte 128-bit hash in an open-addressed table at 0.7 load factor, needs about 357M slots at 16 bytes each, roughly 5.7 GB. The fix is partitioning by hash(tenant_id) % P so each shard holds 1/P of the set and no tenant's keys straddle shards.
  3. Rule out a Bloom filter as a replacement, in the right direction: a false positive reports 'already seen' for an event never seen, so you drop a real event and lose revenue with no error raised. It is usable only as a negative pre-filter in front of the exact set, where a miss is conclusive and a hit must fall through to the real lookup.
  4. Accumulate in scaled integers, not binary floating point. numeric(20,6) admits values below 10^14, so one event scaled to micro-units can reach 10^20, past int64's 9.22 x 10^18; use a 128-bit or arbitrary-precision accumulator unless you first bound the per-event maximum. binary64 represents integers exactly only to 2^53, about 9.01 x 10^15, and cannot represent 0.1 at all, so two runs that sum in different orders disagree.
  5. Carry source_max_ingested_at = max(ingested_at) over the events folded into each cell, and count event_count over accepted, post-dedup events. Without that watermark there is no way to prove later what a number did and did not include, which is the first question any reconciliation asks.
  6. State the environment filter explicitly, because the rollup grain cannot record it. A fold that quietly includes staging bills non-production traffic; one that quietly excludes it loses a cost signal. Production-only is the billing answer, and either way it belongs in the job name and the output metadata. Complexity: O(n) time, O(distinct dedup keys) space, dominated by the dedup set rather than by the cells.

Follow-up

  • A producer retries at 23:59:59 and the retry lands at 00:00:01. The unique index on the daily-partitioned table must include the partition key. What gets double-counted, and what is the smallest change that fixes it?
  • The consumer acknowledges its batch before committing the fold. Which failure loses revenue now, and which arrangement duplicates instead?
  • What makes a re-run over the same day produce byte-identical rollups?

Locate a billing reconciliation gap without rescanning ninety million events

Hard · reconciliation · dimensional-bisection · watermarks · hypothesis-testing

A tenant's sealed invoice total is 0.4% below the sum of its raw usage_event rows for the period. That tenant has 90 million events over 30 days in a table partitioned daily on ingested_at, and its rollups carry source_max_ingested_at, revision and sealed_at. Recomputing all 30 days from raw is correct, and you are not going to do it. Give the procedure that locates the divergent (workspace, sku, hour) cell, the cost of each probe, and the one query you run before any of it.

Approach

  1. Run the free query first. Sum raw quantity for the period restricted to ingested_at <= source_max_ingested_at of the sealed rollups, and compare that against the unrestricted sum. The rollup stores the watermark precisely so this can be answered without a scan. If the whole 0.4% sits above the watermark, nothing is broken: it is late data, it becomes an adjustment line, and the investigation ends in one query.
  2. Only if the gap survives that test do you bisect, and you bisect by dimension rather than by rows. Compare 30 per-day totals, then inside the offending day compare the 6 SKUs, then the workspaces, then the 24 hours. That is roughly 30 + 6 + W + 24 grouped probes, each an indexed range scan over one daily partition for one tenant, against O(N) per attempt for the naive re-fold.
  3. Quantify why naive is not merely slow but unusable mid-incident: at a generous 200,000 rows/second sequential, 90 million rows is about 7.5 minutes per attempt, you will want ten attempts, and every one competes for I/O on the same partitions live ingest is writing. The diagnostic worsens the backlog it is diagnosing.
  4. Before fetching each comparison, state what it would look like under each hypothesis. Two adjacent hours off by equal and opposite amounts is occurred_at versus ingested_at bucketing. A whole day offset by exactly N hours is a timezone applied at the wrong layer. A gap confined to one SKU in one workspace is an environment filter. The same (tenant_id, idempotency_key) present in two ingested_day partitions is the dedup horizon losing a retry that crossed midnight.
  5. Make the next bisection cheap by storing the aggregate you keep recomputing. A per-(tenant_id, ingested_day) count and quantity checksum turns step two from thirty probes into one read, and it is the same number the reconciliation job already produces.
  6. Whatever you find, the sealed period does not change value. The correction is an adjustment line pointing at the line it reverses, carrying its own source_rollup_watermark, because the original invoice is the evidence of what the customer was charged.

Worked solution (35 min)

  1. Reproduce the shape locally: generate 2 million events for one synthetic tenant over 5 days, fold them, then inject three defects, namely 0.2% of events bucketed by ingested_at, a handful of duplicate idempotency_key values whose retries cross midnight, and a block of events ingested after the seal.
  2. Write the watermark-bounded query first and record how much of the gap it explains on its own.
  3. Bisect by day, then SKU, then hour, recording the probe count and the rows each probe touches.
  4. For each located cell, write down the predicted signature before querying it, then check whether the data matches the prediction.
  5. Time a full re-fold of the 2 million rows and extrapolate to 90 million.

Expected result: The watermark-bounded query accounts for the post-seal block entirely and removes it from the investigation. The ingested_at bucketing appears as adjacent hours off by equal and opposite amounts. The midnight-crossing duplicates appear as one (tenant_id, idempotency_key) present in two ingested_day partitions. Bisection reaches each cell in fewer than 70 probes.

Verify it yourself

  • The three injected defects sum to the original gap with no unexplained remainder.
  • Each probe's row count is bounded by one day-partition for one tenant, not by the period.
  • Removing the source_max_ingested_at bound from the first query makes a gap appear, and grow, while ingest runs, even after every defect is removed.

Follow-up

  • The gap is 0.4% in one direction on one day and 0.4% the other way the next day. What does that shape rule in, and what does it rule out?
  • How do you distinguish a duplicate from a restatement, given revision and recomputed_at on the rollup?
  • Ingest is still running while you investigate. What makes your two numbers comparable at all?

Order a job dependency graph and find its critical path

Medium · topological-sort · dag-longest-path · cycle-detection · critical-path

A workspace defines up to 50,000 jobs with up to 200,000 dependency edges and an estimated duration_seconds per job. Given the edge list, reject the graph if it contains a cycle and name one cycle's nodes; otherwise return a valid execution order, the earliest possible completion time with unlimited workers, and the set of jobs whose slack is zero. Then say which single job to shorten in order to cut the completion time, and by exactly how much. State the complexity of each part.

Approach

  1. Kahn's algorithm for the order: compute indegrees, seed a queue with zero-indegree nodes, emit and decrement. O(V + E), which at 50,000 and 200,000 is milliseconds. If fewer than V nodes are emitted, the graph contains a cycle.
  2. Kahn detects a cycle but cannot name one. The nodes left with indegree above zero contain every cycle, so run one DFS restricted to that residual subgraph with three-colour marking and report the stack slice from the grey node the back edge points at. That is the difference between a usable error message and 'dependency cycle detected'.
  3. Earliest completion with unlimited workers is the longest path, which is NP-hard on a general graph and linear on a DAG. State the precondition, then relax in topological order: earliest_finish[v] = duration[v] + max(earliest_finish[u] for u in preds(v)), taking the max over an empty predecessor set as zero. The makespan T is the maximum over all nodes. O(V + E).
  4. Second pass in reverse topological order for latest_finish, then slack[v] = latest_finish[v] - earliest_finish[v]. Zero-slack nodes form the critical path, and there can be several disjoint critical paths, so return the set rather than one chain. slack[v] = 0 is exactly the statement that some longest path runs through v; equivalently, the longest path through v has length T - slack[v].
  5. The speed-up bound is the point of the question, and the obvious form of it is wrong. Shortening a zero-slack job v by d, with 0 <= d <= duration[v], cuts the makespan by min(d, T - L_avoid(v)), where L_avoid(v) is the longest path in the graph with v deleted: the longest path that avoids v, not the second-longest path overall. The two coincide only when the runner-up path misses v. Counterexample: A of 10 s feeds both B of 5 s and C of 4 s, so T = 15 s and the second-longest path is 14 s, yet shortening A by 10 s leaves a makespan of 5 s. The realised gain is the full 10 s, because both paths ran through A and shrank together, while min(10, 15 - 14) predicts 1 s. The reason is structural: shortening v reduces every path through v by d and leaves every other path alone, so the new makespan is max(T - d, L_avoid(v)).
  6. Compute L_avoid(v) the direct way: delete v and re-run the same forward relaxation, O(V + E) per candidate. The cheaper equivalent skips the deletion, since L_avoid(v) only ever matters through that max: set duration[v] := 0, recompute the makespan as T0(v) = max(T - duration[v], L_avoid(v)), and the gain is min(d, T - T0(v)), which is identical for every d <= duration[v]. Only zero-slack jobs are candidates, because shortening a job with positive slack changes the completion time not at all. One relaxation is milliseconds at this size, so ranking a critical set in the hundreds costs O(k(V + E)) and is worth doing exactly; a critical set in the tens of thousands is not, and there you evaluate a shortlist, longest jobs first, and say that the answer is the best of that shortlist rather than the optimum.

Follow-up

  • Only m workers are available. What happens to your answer, and what can you still promise about the schedule you produce?
  • Edges arrive incrementally as the customer edits the pipeline. How do you detect a cycle at insert time without re-running Kahn over 250,000 elements?
  • Durations are estimates. How would you express completion time as a distribution, and what breaks about the critical path once you do?

Rebuild an hourly rollup with deduplication and late-arrival accounting

Hard · window functions · deduplication · event time vs ingest time · watermarks

From usage_event (event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at, ingested_at), produce the values usage_rollup_hourly should hold for one tenant over one day: per (workspace_id, sku, hour_start) the deduplicated quantity_sum, event_count and source_max_ingested_at, bucketed by occurred_at. Duplicates share (tenant_id, idempotency_key). Also report, per hour, the running total across the day and the share of quantity that arrived more than two hours after the hour began. Write the query, and state which duplicates a daily unique index cannot catch.

Approach

  1. Deduplicate in its own CTE before any aggregation, because a SUM cannot be un-summed: row_number() over (partition by tenant_id, idempotency_key order by ingested_at, event_id) = 1. Include the tiebreaker. Without it the surviving row is non-deterministic when two duplicates share an ingested_at, and a rollup described as deterministically recomputable then disagrees with itself between runs.
  2. Bucket on occurred_at and nothing else, and pin the timezone explicitly. date_trunc('hour', timestamptz) truncates in the session's TimeZone setting, so the same query run by a session set to a non-UTC zone buckets differently; use the three-argument date_trunc('hour', occurred_at, 'UTC') on PostgreSQL 16 or later, or date_trunc('hour', occurred_at at time zone 'UTC') at time zone 'UTC' before that. Filter environment = 'production' explicitly, since metering covers three environments and billing covers one.
  3. Aggregate to the grain with sum(quantity), count(*) and max(ingested_at). The last is not decoration: it is the watermark the row consumed up to, and without it there is no way to prove afterwards what a number did and did not include.
  4. Compute the late share inside the dedup-and-aggregate step as a conditional aggregate, sum(quantity) filter (where ingested_at > hour_start + interval '2 hours'), then divide by the hour's total. Compute the running total as a window over the already aggregated rows: sum(quantity_sum) over (partition by workspace_id, sku order by hour_start rows between unbounded preceding and current row). Running either over raw rows puts the duplicates back.
  5. Answer the index question exactly. The unique constraint is on (ingested_day, tenant_id, idempotency_key), because a unique index on a partitioned table must contain the partition key. It therefore deduplicates only within one ingest day and admits a duplicate whose retry crosses midnight or whose replay runs a week later. That is why this CTE dedups across the whole window being recomputed, and why the dedup horizon is a correctness parameter rather than a retention cost.
  6. Keep the numeric type all the way through. quantity is numeric so the sums are exact; a cast to double precision anywhere in this pipeline reintroduces drift that surfaces only as a few unreconcilable cents per tenant per month, long after the query is out of anyone's mind.

Follow-up

  • A dispute forces the same recompute over 40 days for one tenant. What changes about the dedup CTE's memory use and the chosen plan, and what would you do about it?
  • Two runs a minute apart return different quantity_sum values for an hour that is already closed. Give two mechanisms that produce that, and the single query that distinguishes them.
  • Express the same rollup incrementally so it does not re-scan the day each time the watermark advances. What does the incremental version stop being able to answer?

Enforce a concurrent-run quota that survives simultaneous requests

Medium · isolation levels · write skew · quotas · lock contention

A plan allows at most 20 concurrently running rows in job_run per tenant. The table holds run_id, tenant_id, workspace_id, status (queued, leased, running, succeeded, failed, timed_out, cancelled, lost), lease_token, leased_until, started_at and finished_at. Today the service runs select count(*) from job_run where tenant_id = $1 and status = 'running', compares the result to 20, then inserts. Under load a tenant exceeds the cap by exactly the number of concurrent requests. Name the anomaly, say which isolation levels do and do not prevent it, and give a version that holds, as SQL.

Approach

  1. Name it: write skew. Each transaction reads a predicate (the count of running rows), neither modifies what the other read, and both then insert rows that jointly violate an invariant no single row expresses. Read committed permits it. So does repeatable read, because snapshot isolation's first-updater-wins check fires only on conflicting row updates, and these are inserts touching disjoint rows.
  2. Enumerate the fixes with their real costs. SERIALIZABLE works: PostgreSQL's SSI tracks the predicate read and aborts one transaction with SQLSTATE 40001, which obliges the caller to retry and makes the abort rate rise with contention on a hot tenant. Folding the predicate into the write as insert ... select ... where (select count(*) ...) < 20 narrows the race to the statement's snapshot but does not close it under read committed.
  3. Give the version that holds at read committed: serialise on a row both transactions must touch. update tenant_concurrency set running = running + 1 where tenant_id = $1 and running < 20 returning running updates zero rows when the cap is reached, and zero rows is the rejection. This works because at read committed a blocked UPDATE re-evaluates its WHERE clause against the newly committed row; at repeatable read the same statement raises a serialisation error instead, so the isolation level changes the calling contract.
  4. State the cost you just bought. That row is now a per-tenant serialisation point, so admission throughput for the tenant is bounded by one divided by the lock hold time; at a 2 ms hold that is roughly 500 admissions/second. Keep the critical section to the single UPDATE, with no network call or scheduling decision inside the transaction, and decrement in the same transaction that writes the terminal status.
  5. Close the leak the status enum implies: a run can end as lost, so a crashed worker otherwise consumes a slot forever. Reconcile on a schedule against status = 'running' and leased_until < now(), and treat the counter as a fast path over job_run, which stays the system of record.

Worked solution (25 min)

  1. Seed a tenant with 19 running rows, then fire 8 concurrent sessions each running the select-then-insert, and count the resulting running rows.
  2. Repeat at REPEATABLE READ and confirm the count still exceeds 20.
  3. Repeat at SERIALIZABLE, count the 40001 aborts, and note that without a retry loop those requests fail rather than queue.
  4. Implement the atomic counter UPDATE, re-run the 8-way test, and confirm exactly 20 running rows with zero over-admissions.
  5. Kill a worker mid-run, let the lease expire, and check whether the slot comes back without intervention.

Expected result: Write skew identified; read committed and repeatable read both permit it; serialisable prevents it at the price of 40001 retries; the working read-committed version is update tenant_concurrency set running = running + 1 where tenant_id = $1 and running < 20 returning running, whose zero-row result is the rejection, plus a reconciliation path for runs that terminate as 'lost'.

Verify it yourself

  • At 8x concurrency against a cap of 20, running rows never exceed 20.
  • The rejection returns zero rows rather than raising, so it is distinguishable from an error in the caller.
  • Killing a worker does not permanently consume a slot.
  • The counter and select count(*) from job_run where status = 'running' agree after reconciliation.

Follow-up

  • Write the retry loop for the SERIALIZABLE version. What does the caller see when it keeps aborting, and what bounds the retries?
  • Two regions each keep a counter. What is the effective cap, and what does admission do when the counter store is unreachable?
  • The cap changes mid-flight on a plan upgrade. Do running jobs get killed, and what does the counter row look like during the change?

How do you balance the need for rapid deployment with the necessity for long-term system stability?

Medium

Approach

  1. Say what you would check first and why it is the highest-information step.
  2. State your assumptions explicitly before working the problem.
  3. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

How do you ensure that your code meets strict performance and safety standards?

Medium

Approach

  1. State your assumptions explicitly before working the problem.
  2. Clarify what is being asked and what a complete answer contains.
  3. Say what you would check first and why it is the highest-information step.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

Can you explain your process for troubleshooting a critical failure in a live production environment?

Medium

Approach

  1. Say what you would check first and why it is the highest-information step.
  2. State your assumptions explicitly before working the problem.
  3. Work from the requirement backwards to the design.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

Leasing sandboxed job runs without double execution

Medium · leases · fencing · state machines · metering

job-runner leases work from a queue and executes customer workloads in sandboxes with CPU, memory, wall-clock and egress limits. Run durations span 200 ms to 30 minutes, thousands are concurrent, and job_run.status must reach exactly one terminal state among succeeded, failed, timed_out, cancelled and lost. A worker can pause 45 seconds for garbage collection, or be briefly partitioned, after its sandbox has exited but before it writes the outcome. Design the lease duration, the fencing, and timeout ownership, and state how billable_seconds is computed for a run whose worker never returns.

Approach

  1. Resolve the lease-duration conflict rather than picking a compromise. A lease shorter than the longest legitimate run re-dispatches work that is still executing; a lease long enough for a 30-minute run leaves a crashed 200 ms run undetected for half an hour. Use a short lease - about 30 seconds - renewed by a heartbeat every 10 seconds while the supervisor is alive, each renewal pushing leased_until to now() + 30 s. Detection latency is then one lease, not one heartbeat: a dead worker's last successful heartbeat landed at most 10 s before it died, so leased_until expires 20 to 30 s after the death, plus whatever interval the reaper scans on. What the 3:1 ratio of lease to heartbeat buys is headroom - one or two missed heartbeats change nothing, and a stall only becomes a re-dispatch once it outlives the lease remaining when it began, between 20 and 30 s here. Both costs follow from those two numbers: heartbeat write load proportional to concurrent runs (3,000 runs at a 10-second interval is about 300 updates/second), and any pause longer than the lease - the 45-second GC - re-dispatching a run that is perfectly healthy.
  2. Fence the outcome write so the store, not the worker's memory, arbitrates: UPDATE job_run SET status = $1, finished_at = $2, exit_code = $3 WHERE run_id = $4 AND status = 'running' AND lease_token = $5, and require exactly one row affected. Zero rows means this worker was fenced while it was paused, and its correct behaviour is to discard the result, not to retry - the retry is how a resumed worker overwrites a newer attempt.
  3. Make the status machine monotone with a check constraint or a trigger so no terminal row can move, and model a retry as a new row with parent_run_id set and attempt incremented rather than a reset of the old one. That is what keeps how many times did this actually execute answerable afterwards and keeps each attempt's resource usage attributable to itself.
  4. Put the wall-clock timeout in the supervisor, never in the workload: a customer-supplied program asked to time itself out will not. Distinguish timed_out, which the supervisor observed and caused, from lost, which nobody observed at all, and leave exit_code null unless the supervisor actually saw the process exit. Recording lost as failed asserts an outcome no one witnessed and then bills and retries on that assertion.
  5. Decide billable_seconds for the unobserved case explicitly, because it cannot be derived. It is not now() - started_at, which bills queue and pause time the customer never consumed. The two defensible policies are leaving it null while status = 'lost' and billing nothing, or flooring it at the last heartbeat's observed running time as a stated lower bound; pick one and write it down. Add a per-tenant concurrency cap on sandbox slots so one tenant cannot occupy the whole fleet while these questions are being answered.

Worked solution (30 min)

  1. Draw the timeline: last successful heartbeat at t, sandbox exits at t, worker pauses from t to t+45 s, so leased_until = t+30 s and the lease expires there. Mark where the second worker starts and where the first worker's write arrives, then say how short the pause would have had to be to change nothing.
  2. Write the fenced terminal update and state the expected rows-affected in both the healthy case and the fenced case.
  3. Size the heartbeat: 3,000 concurrent runs at a 10-second interval is about 300 row updates/second on job_run - decide whether that lands on the same table and what it contends with.
  4. Write the billable_seconds rule for each terminal status and say which status leaves it null.

Expected result: A short lease of roughly 30 seconds renewed by a 10-second heartbeat, so detection latency is one lease - 20 to 30 seconds after a worker dies, plus the reaper's scan interval - independent of the 200 ms to 30 minute run spread, with one or two missed heartbeats tolerated rather than fatal; a terminal write fenced by AND status = 'running' AND lease_token = $x where zero rows affected means discard; retries as new rows with parent_run_id; a supervisor-owned wall-clock kill that separates timed_out from lost; billable_seconds left null while status = 'lost', or floored at the last heartbeat as a stated policy, never inferred from wall-clock.

Verify it yourself

  • In your timeline the fenced write must affect zero rows. If it affects one, the lease alone was doing the work and the token adds nothing.
  • At 3,000 concurrent runs and a 10-second heartbeat, check 300 updates/second against the other write load on that table before accepting the interval; if it is the dominant writer, the heartbeat belongs somewhere else. Check the ratio too: at lease = 3 x interval a lost heartbeat is survivable, whereas at lease = interval every scheduling hiccup is a double execution.
  • State whether a duplicate execution is billed, then confirm that summing billable_seconds across a parent and its retry matches that stated policy rather than matching it by accident.

Follow-up

  • A worker returns from a 45-second GC pause and writes succeeded. Walk through what the database does statement by statement.
  • Heartbeats are now a few hundred writes a second against job_run. How do you keep that off the path that matters, and what do you lose by moving it?
  • The re-dispatched workload has an external side effect the first attempt already performed. What does your design owe the customer, and what can it not fix?

Metering partition crash-loops and the sealing watermark freezes

Medium · poison message · at-least-once · dead-letter queue

One metering-ingest partition has stopped advancing. Lag grows linearly, the consumer restarts about every 40 seconds, and the same offset appears in every startup log while other partitions stay healthy. Events are committed in batches of a few thousand and the acknowledgement follows the commit. Sealing is six hours away and source_max_ingested_at for that partition's tenants is frozen. Give an ordered checklist, a containment action available within minutes, and the durable fix, saying what each does to exactly-once accounting.

Approach

  1. Distinguish a poison record from a capacity problem in one measurement: compare the offset and the exception across restarts. An identical pair every time is deterministic failure on one record, whereas a throughput problem still advances the offset between crashes.
  2. Read the record from a separate consumer group so the bytes can be inspected without perturbing the stuck consumer, then classify the defect: schema violation, a quantity failing the non-negative check, a null workspace, an unmappable SKU enum, or a payload past a size limit. That classification decides whether this is a producer bug or a missing consumer guard.
  3. Account for batch granularity before acting. With commits of a few thousand, one bad record fails thousands of good ones, so the blast radius is the batch. Halve the batch around the offset to isolate the record, or move to per-record error isolation so the radius becomes the record.
  4. Contain by diverting that record to a dead-letter store with its raw bytes and offset, then resume. This is safe here precisely because the acknowledgement follows the commit: the good records from the failed batch are re-consumed and absorbed by the uniqueness check on (tenant_id, idempotency_key) rather than counted twice.
  5. Make the fix durable with per-record error isolation, a bounded poison counter, and an alert on dead-letter rate rather than on lag alone, since lag only reveals this after the sealing margin has already been eaten.
  6. Check the horizon before replaying anything. The unique index lives on a daily-partitioned table and therefore includes the partition key, so it deduplicates within a day only; a replay landing on a later ingest day needs the separate dedup store or it double-counts into a tenant's bill.

Follow-up

  • Move the acknowledgement before the commit and describe exactly what is lost and what is duplicated in each of the two crash windows.
  • Sealing is in six hours and the partition will not drain in time. What do you seal on, and what does the invoice have to record so the difference is explainable later?
  • A producer replays two weeks of events next month. Which part of your fix stops holding, and what is the dedup horizon you would actually configure?

Suggested practice checklist

Roughly ninety minutes on weeknights with one longer weekend block. The plan cuts scope rather than compressing everything, on the assumption that one thing finished per night beats four half-started.

Day 1 — Fix the scope and take a cold baseline

  • Read the role description and write the three things the loop will almost certainly test, then write an explicit not-doing list and keep it visible all week.
  • Take one twenty-five-minute coding problem and one fifteen-minute design prompt cold, and write the single sentence naming what blocked each, because those two sentences decide where the remaining evenings go.
  • Set the week's rule: one thing finished every night, including the night you only have forty minutes.

Deliverable: A one-page scope with a not-doing list and two cold attempts, each carrying one sentence on what blocked it.

Day 2 — One pattern, written three times from blank

  • Choose the single pattern most likely to appear in your loop and write it three times from an empty file rather than editing the previous attempt.
  • On the third pass, write the invariant as a comment before the loop body and the complexity before the first line of code.
  • Stop at ninety minutes even if the third version is imperfect, and write the one thing you would fix given another hour.

Deliverable: Three independent implementations of the same pattern plus a note on what changed between them.

Day 3 — One design, only to the depth you can defend

  • Take one system shape and go only as far as requirements, interface and data model, refusing to draw a box you could not survive a follow-up about.
  • Attach one number to each non-functional requirement, deriving it rather than asserting it, and write the assumption the number rests on.
  • Write the one tradeoff you are choosing against and the observation that would make you reverse it.

Deliverable: One design at interface-and-schema depth with derived numbers and one written reversible tradeoff.

Day 4 — Only the fundamentals you will have to defend

  • Write, in under two hundred words each, the answers to the two questions that follow almost any implementation: why this structure and not the obvious alternative, and what happens to this code at a hundred times the input.
  • Write what an index actually costs: faster lookups on the indexed columns against a write that now maintains a second structure, plus the cases where the planner declines to use it anyway, low selectivity, or a predicate wrapping the column in a function.
  • Delete any answer you cannot deliver aloud in under a minute, since an answer that needs reading is not an answer you have.

Deliverable: Three written answers, each under two hundred words and each timed aloud.

Day 5 — Your own work, timed

  • Write a ninety-second and a four-minute version of your main project and time both aloud rather than reading them.
  • Prepare the two follow-ups that always come: what you would do differently, and how you knew it worked.
  • Put one number in the first sentence and be ready to say exactly where it came from and what it excludes.

Deliverable: Two timed narratives with one defensible number in the opening line.

Day 6 — The one full rehearsal, in the weekend block

  • Run a sixty-minute mock covering a coding round and a design round in one sitting with no break, because sustained attention is the thing evenings have not trained.
  • Immediately afterwards, and before hearing any feedback, write the three moments you lost the thread.
  • Spend the rest of the block only on those three moments, and on nothing you merely feel shaky about.

Deliverable: Mock notes naming three failure moments with a specific fix written under each.

Day 7 — Taper

  • Write the twenty-minute warm-up you will actually do on the morning: one problem you can already solve from a blank file, one design you can narrate, and nothing you have never seen.
  • Re-read only your own notes from this week and open no new material.
  • Write the logistics down: the editor or shared document you will be working in, whether execution and lookups are permitted, and the sentence you will use when you do not know something.

Deliverable: A one-page card holding the design structure, the project numbers, and the logistics.

Risky changes and the reversal path

For anything that touched live traffic, be ready to say how you would have undone it: a flag, a staged rollout, dual writes with the old path still authoritative. Once the old column is dropped or the source rows are overwritten there is no reverse, so name what you kept a copy of and for how long.

What is your experience with integrating software solutions with hardware or mechanical systems?

Medium · behavioural and engineering judgement

Approach

  1. Give the blast radius: what could have broken, and what you measured.
  2. Pick a story where you made the decision, not one where you watched it.
  3. State the situation in two sentences and spend the rest on the reasoning.

Follow-up

  • How did you know your change caused the improvement?
  • What would you do differently if you ran that again?

Describe a time you had to optimize a system to handle high-volume data inputs.

Medium · behavioural and engineering judgement

Approach

  1. Give the blast radius: what could have broken, and what you measured.
  2. Pick a story where you made the decision, not one where you watched it.
  3. Close with what you would do differently, concretely.

Follow-up

  • How did you know your change caused the improvement?
  • What would you do differently if you ran that again?

Describe a situation where you had to reconcile conflicting technical requirements from different stakeholders.

Medium · behavioural and engineering judgement

Approach

  1. Give the blast radius: what could have broken, and what you measured.
  2. Name the disagreement and how you resolved it with evidence.
  3. State the situation in two sentences and spend the rest on the reasoning.

Follow-up

  • What did you decide not to do, and why?
  • How did you know your change caused the improvement?