Interview guides · Great Lakes Water Authority
Great Lakes Water Authority Software Engineer Interview Guide
Great Lakes Water Authority Software Engineer interview guide: reported rounds, questions and how candidates describe the process.
The 60-second brief
The role of a Software Engineer—often integrated with the responsibilities of an Infrastructure Administrator—at the Great Lakes Water Authority is critical to the daily lives of millions of Michigan residents. Unlike typical tech companies where software exists solely in the cloud, your work here directly bridges the gap between software systems and physical, real-world utility infrastructure. You will design, maintain, and optimize the software applications and databases that monitor, manage, and secure water treatment and distribution networks. In this position, your code and system configurations have a tangible impact on public health, environmental safety, and municipal efficiency. You will collaborate closely with field engineers, water treatment operators, and project managers to ensure that critical operational technologies remain highly available and secure.
This guide is scoped to a Software Engineer candidate at Great Lakes Water Authority.
Focus areas
- Problem Solving
- Infrastructure Administration
- Technical Knowledge (Water Treatment & Distribution)
The Great Lakes Water Authority interview process
Great Lakes Water Authority candidates report 3 rounds over 3-5 weeks. The stages below are what candidates describe, not a published process.
Recruiter Outreach
Initial contact from a recruiter to guide candidates through the scheduling steps.
What to demonstrate
- Initial contact from a recruiter to guide candidates through the scheduling steps
- Depth in Problem Solving
How to prepare
- Be able to walk your CV end to end in two minutes, and say why this company specifically.
- Have your salary expectations, notice period and location constraints ready, and ask for the rest of the loop in writing.
Panel Interview
A structured interview blending technical questions with situational problem-solving.
What to demonstrate
- A structured interview blending technical questions with situational problem-solving
- Depth in Problem Solving
How to prepare
- Answer aloud and timed: Describe your familiarity with SCADA systems or other industrial control software integrations.
- Answer aloud and timed: How do you approach securing software infrastructure against external vulnerabilities in a public utility setting?
Final Hiring Decision
The conclusion of the interview process where the final hiring decision is made.
What to demonstrate
- The conclusion of the interview process where the final hiring decision is made
- Depth in Problem Solving
How to prepare
- Answer aloud and timed: How would you approach a software integration challenge on an active construction site or physical utility plant?
- Answer aloud and timed: Describe a time you had to troubleshoot a system failure under tight pressure. What was your step-by-step process?
Where candidates lose points
Focus on Practical Integration
When discussing your past projects, emphasize how your software interacted with physical systems, databases, or third-party hardware. The hiring team values practical application over theoretical architecture.
Brush Up on Utility Concepts
Take some time to familiarize yourself with basic water treatment and distribution terminology. Understanding how water flows through a municipal system and the role of software in monitoring that flow will immediately stand out to your interviewers.
Comparing floating-point values for equality, or holding money in them
Binary floating point cannot represent 0.1 exactly, so repeated addition drifts and an equality check fails on values that are mathematically equal. Store currency as integer minor units or a decimal type, and compare floats against a tolerance you chose for a stated reason.
Questions & practice
Diff a projection against the primary without per-row point reads
Hard · reconciliation · range hashing · throttling
The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.
Approach
- Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
- Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
- For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
- Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.
Follow-up
- The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
- Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?
Find overlapping job attempts and peak concurrency from lease records
Medium · sweep line · intervals · leases
A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.
Approach
- Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
- For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
- For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
- Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
Follow-up
- A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
- Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
Collapse a redelivered event batch into per-aggregate high-water marks
Easy · hashing · at-least-once · aggregation
You drain a batch of up to 5,000,000 events, each (aggregate_id BIGINT, aggregate_version INT, event_type, payload). The log guarantees order within one aggregate only; the batch merges 64 partitions, and a relay failover has redelivered a range, so an older version for an aggregate can appear after a newer one. Given a map of last_applied_version per aggregate, produce the events worth applying, at most one per (aggregate_id, version), plus the count discarded. Target O(n) time. State the memory for 2,000,000 distinct aggregates and what you do when it does not fit.
Approach
- One pass, one hash map from aggregate_id to the highest version kept, and a discard counter. An event whose version is at or below last_applied_version for its aggregate is dropped without further work, which is the whole reason the event carries its version rather than a delta. O(n) expected time, O(d) space in distinct aggregates.
- Keep the maximum, never the last occurrence. The redelivered range means the final appearance of an aggregate in the batch can be an older version than one seen earlier in the same batch, so last-wins applies stale state over newer state and the projection regresses with no error anywhere.
- Cost the memory instead of calling it large: an 8-byte key plus a 4-byte version is 12 bytes of payload, and an open-addressed table held at a 0.7 load factor costs roughly 17 bytes per entry before per-slot metadata, so 2,000,000 aggregates is tens of megabytes in a native layout and several times that in a runtime that boxes both key and value.
- If the distinct set exceeds memory, partition on hash(aggregate_id) mod P and reduce each partition independently. Every event for one aggregate hashes to the same partition, so the per-partition result is exact and the merge is concatenation rather than a second reduction.
Follow-up
- The payload is a patch rather than a snapshot, so applying only the highest version loses the intermediate changes. What changes in your reduction?
- How do you detect that version 7 arrived while version 6 was never delivered, and what should the consumer do about the gap?
Hold a per-tenant active cap against concurrent creates
Hard · write skew · isolation levels · constraints
A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.
Approach
- Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
- Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
- Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
- State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.
Follow-up
- A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
- The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?
Replace offset paging on the resource feed with keyset
Easy · keyset pagination · composite index · sort order
resource holds resource_id, tenant_id, owner_user_id, title, body_ref, version, status ('draft','active','archived','deleted'), created_at, updated_at, deleted_at, with an index on (tenant_id, status, updated_at DESC, resource_id DESC). The listing endpoint returns active resources for one tenant, newest update first, 50 per page, today with LIMIT 50 OFFSET n. Tenants reach page 400 and rows are created while they read. Write the keyset query, define what the cursor carries and how it is encoded, and say which part of the index each predicate uses. Assume PostgreSQL 16.
Approach
- Name the two failures separately. OFFSET 20000 makes the server produce and discard 20,000 rows, so page cost grows with depth rather than with page size. Independently, any write that changes how many rows sort above the offset moves the window between two fetches, and the direction decides which anomaly you get: an insert lands at the head of updated_at DESC and pushes already-returned rows down past the boundary, so they are returned a second time; a delete above the offset, or a row whose updated_at is bumped above the cursor, pulls rows up and one is never returned at all. Nothing in the response reveals either.
- Write the seek: WHERE tenant_id = $1 AND status = 'active' AND (updated_at, resource_id) < ($2, $3) ORDER BY updated_at DESC, resource_id DESC LIMIT 50. The row-value comparison is one index range rather than a disjunction, and both columns are NOT NULL, which is what makes that comparison well defined.
- Map each predicate onto the index: tenant_id and status are equality on the leading columns, (updated_at, resource_id) is the range, and the ORDER BY matches the index order so no Sort node appears and the scan stops after 50 rows. The DESC in the definition only matters for mixed directions — a plain ascending btree on the same columns is read backwards for this query.
- Put both sort columns in the cursor and nothing the client can tamper with into another tenant: base64 of (updated_at, resource_id), validated server-side, with tenant_id taken from the principal.
Follow-up
- The client asks for 'jump to page 400'. What do you offer instead, and what does the honest version cost?
- Sort order becomes user-selectable across four columns. How many indexes is that, and which would you refuse to add?
How do you ensure high availability and data integrity when managing software databases for critical public ut
Medium · Technical & Domain Knowledge
How do you ensure high availability and data integrity when managing software databases for critical public utilities?
Approach
- Fix the scope first: who calls this, how often, and what they do when it fails.
- Name the read and write paths separately; they rarely have the same bottleneck.
- Choose a partition key and say what query it makes expensive.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- What breaks first when traffic grows ten times?
- How does this behave when that dependency is down for an hour?
Describe your familiarity with SCADA systems or other industrial control software integrations.
Medium · Technical & Domain Knowledge
Approach
- Say who the caller is and what they do when the call fails halfway.
- Define the identity of a request so a retry cannot double-apply it.
- Separate accepted, pending, failed and confirmed; they are different facts.
- Design the error taxonomy before the success shape; callers branch on it.
Follow-up
- What happens if the caller retries after a timeout?
- How does a client discover it is on an old version of this contract?
How do you approach securing software infrastructure against external vulnerabilities in a public utility sett
Medium · Technical & Domain Knowledge
How do you approach securing software infrastructure against external vulnerabilities in a public utility setting?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
How would you approach a software integration challenge on an active construction site or physical utility pla
Medium · Practical Problem-Solving & Field Operat
How would you approach a software integration challenge on an active construction site or physical utility plant?
Approach
- Say who the caller is and what they do when the call fails halfway.
- Define the identity of a request so a retry cannot double-apply it.
- Separate accepted, pending, failed and confirmed; they are different facts.
- Design the error taxonomy before the success shape; callers branch on it.
Follow-up
- What happens if the caller retries after a timeout?
- How does a client discover it is on an old version of this contract?
What safety and operational factors do you consider when deploying software updates to active, real-time physi
Medium · Practical Problem-Solving & Field Operat
What safety and operational factors do you consider when deploying software updates to active, real-time physical infrastructure?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
One customer endpoint stalls deliveries to every other destination
Medium · bulkhead · timeouts · saturation
The egress service delivers about 1.5k webhooks/second across 40,000 destinations, with a per-destination concurrency cap of 4 and a 10-second connect-plus-read timeout. Throughput falls to 300/second, queue depth climbs, and p99 delivery latency for unaffected destinations goes from 200 ms to minutes, while the error rate barely moves. One tenant holds 900 destination rows whose URLs share a hostname that now answers in 9.5 seconds. Explain the mechanism with the arithmetic, then give the containment in the order you would apply it.
Approach
- Look at saturation before errors. A flat error rate with collapsing throughput says nothing is failing, things are waiting, so the first signal to pull is in-flight request count or pool wait time rather than the error counter. This is the distinction that decides the whole investigation.
- Group in-flight work by resolved host, not by destination id. The cap is keyed per destination row, so 900 rows sharing one hostname buy 3,600 concurrent slots against a single host, each held for 9.5 seconds. The bulkhead was never a bulkhead for that host, and grouping by the wrong dimension is why the dashboard looked healthy.
- Do the arithmetic in both directions. Required concurrency is arrival rate times latency, so 1.5k/second at 200 ms needs about 300 in flight, which is entirely consumed by 3,600 slow slots; conversely whatever concurrency is left sustains rate equals concurrency divided by 9.5 seconds, which is the 300/second you are seeing. Matching both numbers is what promotes this from a plausible story to the mechanism.
- Explain why the circuit breaker never helped. It opens on consecutive failures, and a 9.5-second response inside a 10-second timeout is a success. Slow is not failing, so an error-rate breaker cannot see this; you need a slow-call ratio, a deadline propagated from the caller's remaining budget, or a concurrency limiter.
Follow-up
- The host recovers to 80 ms. How long does the queue take to drain, and what does the drain do to the recovered host?
- Where should the 10-second timeout number actually come from?
Suggested practice checklist
Built from the rounds and topics Great Lakes Water Authority candidates report.
Day 1 — Map the Great Lakes Water Authority loop
- Write out the reported sequence: Recruiter Outreach, Panel Interview, Final Hiring Decision.
- For each round, write one sentence on what it is judging, from the description above, and mark the one you are least ready for.
Deliverable: A one-page map of the 3 reported rounds, with the weakest marked.
Day 2 — Work Problem Solving
- Spend the session on Problem Solving, which Great Lakes Water Authority candidates report being tested on.
- Write one worked example in Problem Solving and time yourself on it.
Deliverable: One timed worked example in Problem Solving.
Day 3 — Work Infrastructure Administration
- Spend the session on Infrastructure Administration, which Great Lakes Water Authority candidates report being tested on.
- Write one worked example in Infrastructure Administration and time yourself on it.
Deliverable: One timed worked example in Infrastructure Administration.
Day 4 — Work Technical Knowledge (Water Treatment & Distribution)
- Spend the session on Technical Knowledge (Water Treatment & Distribution), which Great Lakes Water Authority candidates report being tested on.
- Write one worked example in Technical Knowledge (Water Treatment & Distribution) and time yourself on it.
Deliverable: One timed worked example in Technical Knowledge (Water Treatment & Distribution).
Day 5 — Answer out loud: Technical & Domain Knowledge
- Answer aloud, timed: What is your experience with software systems that interface with water treatment and distribution networks?
- Answer aloud, timed: How do you ensure high availability and data integrity when managing software databases for critical public utilities?
Deliverable: Spoken answers to 2 reported Technical & Domain Knowledge question(s), under time.
Day 6 — Answer out loud: Practical Problem-Solving & Field Operations
- Answer aloud, timed: How would you approach a software integration challenge on an active construction site or physical utility plant?
- Answer aloud, timed: Describe a time you had to troubleshoot a system failure under tight pressure. What was your step-by-step process?
Deliverable: Spoken answers to 2 reported Practical Problem-Solving & Field Operations question(s), under time.
Day 7 — Answer out loud: Behavioral & Team Collaboration
- Answer aloud, timed: Tell me about a time you had to explain a complex technical issue to a non-technical stakeholder, such as a water plant operator.
- Answer aloud, timed: How do you prioritize tasks when managing multiple infrastructure support requests simultaneously?
Deliverable: Spoken answers to 2 reported Behavioral & Team Collaboration question(s), under time.
Behavioural preparation
Behavioural rounds judge the decision you made and what it cost.
What is your experience with software systems that interface with water treatment and distribution networks?
Medium · Technical & Domain Knowledge
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Describe a time you had to troubleshoot a system failure under tight pressure. What was your step-by-step proc
Medium · Practical Problem-Solving & Field Operat
Describe a time you had to troubleshoot a system failure under tight pressure. What was your step-by-step process?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
How do you handle data synchronization issues when remote field sensors fail to communicate with central datab
Medium · Practical Problem-Solving & Field Operat
How do you handle data synchronization issues when remote field sensors fail to communicate with central databases?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Tell me about a time you had to explain a complex technical issue to a non-technical stakeholder, such as a wa
Medium · Behavioral & Team Collaboration
Tell me about a time you had to explain a complex technical issue to a non-technical stakeholder, such as a water plant operator.
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
How do you prioritize tasks when managing multiple infrastructure support requests simultaneously?
Medium · Behavioral & Team Collaboration
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Describe a situation where you had to collaborate with external contractors or engineers on a physical site. H
Medium · Behavioral & Team Collaboration
Describe a situation where you had to collaborate with external contractors or engineers on a physical site. How did you ensure project alignment?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?