cswork / libraryOpen practice workspace

Interview guides · Gravitee

Gravitee Software Engineer Interview Questions & Guide 2026

Caching practice for Gravitee software engineer prep: settle the staleness budget before choosing an invalidation strategy.

The 60-second brief

As a Software Engineer at Gravitee, you are not just writing code; you are building the connective tissue for the next generation of digital intelligence. Gravitee is a Gartner® Magic Quadrant™ Leader focused on governing APIs, events, and AI agents. Your work directly impacts how global organizations secure their digital infrastructure, making this role critical to the company’s mission of governing the world’s intelligence.

If the loop includes an asynchronous take-home, treat it as a code review of you rather than as a puzzle: structure, what you chose to test, and what you wrote down about the constraint you were working under. Hold the stated time box and say what you would have done with more of it.

Focus areas

  • Scope every query and cache key by tenant
  • Bound blast radius with per-tenant concurrency limits
  • Evolve APIs without breaking pinned SDK clients

Overview

In this position, you will operate within high-velocity engineering pods, balancing technical rigor with product-centric thinking. You will be expected to move seamlessly between backend and frontend systems, leveraging AI-accelerated workflows to prototype, validate, and ship production-ready features. The role is designed for builders who want to own a vertical slice of the product and see the tangible, measurable impact of their contributions on a global scale.

The Gravitee interview process

Gravitee candidates report 6 rounds · ≈ 4-6 weeks. The stages below are what candidates describe, not a published process.

Application Review

The person on this call usually cannot evaluate your code and does not need to. They write a short paragraph, and that paragraph is what a hiring manager skims when deciding who to put on your loop. So the test is not whether your work was hard, it is whether a non-engineer can repeat it correctly. Name systems by what they did rather than by their internal codename, give each project a shape (what was breaking, what you changed, what happened after), and keep the whole walkthrough near ninety seconds. Depth that cannot survive a paraphrase reads as vagueness.

What to demonstrate

  • Whether a non-engineer can restate your projects without distorting them, since their paraphrase is what travels to the hiring manager, not your sentences
  • Whether each project has a shape rather than a stack list: the failure or constraint, the change you made, the result and how it was measured
  • Whether you can say what was yours inside a team project without either inflating it or disappearing into the plural

How to prepare

  • Rewrite each headline project as two sentences with no internal system names and no acronyms outside your company, then say them to someone outside engineering and have them repeat them back. Fix whatever came back wrong
  • Attach one measured number to each project: the baseline, the change, and the window it was measured over. Where nothing was ever measured, say that plainly rather than reaching for a plausible percentage
  • Time the background walkthrough against a clock. If it runs past two minutes, compress the earliest role to a single clause and spend the recovered time on the most recent one

Phone Screen

Half of this call is the part candidates treat as small talk: start date, notice period, work authorisation and its timing, location and time zone, on-call, and the number. Those are what kill offers late, after several engineers have each spent a day. Surfacing a hard constraint now costs you nothing and occasionally buys you something, since a loop compressed to fit a competing deadline can usually only be arranged if it is asked for early. The common failure is deflecting the compensation question twice, then discovering at offer stage that the band never reached your number.

What to demonstrate

  • Whether your hard constraints are compatible with the role before a loop gets booked: earliest start, notice period, what authorisation you hold and when it needs action, days on site, willingness to carry a pager
  • Whether you give a compensation range with something behind it, such as current total compensation or a competing timeline, rather than leaving the band untested
  • Whether your stated timeline is real, since a competing deadline raised now is something scheduling can sometimes work around and the same deadline raised at offer stage usually is not

How to prepare

  • Write each constraint down in one line before the call and state them as facts rather than negotiating them live under a question you were not expecting
  • Set your range from two or three current data points for that level and location, and name the structure you are quoting in, so the number is comparable to the one they are holding
  • If another process is running, say where it stands and by when, and ask directly whether this loop can be scheduled inside that window

Technical Deep-Dive

The same problem is scored by two different mechanisms depending on the format, and preparing for one does not cover the other. With a person watching, partial progress is visible and a hint is a correction you can absorb; silence is the expensive failure, because nobody can read a half-written function. With an automated grader there is no partial credit for what you were about to do, nobody to ask, and the worked examples in the prompt are the entire specification. Read them as a contract, down to whether an empty result should be an empty list or no output at all.

What to demonstrate

  • In a live session, whether your commentary tracks what your hands are doing, and whether a hint redirects you or gets defended against
  • In an automated one, whether you cover the cases the examples do not show, since the hidden cases are where the score moves
  • Whether you manage the clock on purpose: abandoning an approach that is not converging while there is still time to write something simpler that finishes

How to prepare

  • Have someone hand you a problem and feed you one deliberately wrong hint. Practise testing it against a concrete case instead of accepting or rejecting it on authority.
  • Do one timed run a week in a plain browser editor with autocomplete, linting and your own snippets switched off, which is closer to what these environments give you
  • For the automated format, write the harness before the solution: a main that feeds the worked examples plus an empty and a single-element case and prints expected against actual, so a wrong submission is caught by you first

Architectural Discussion

You cannot drill a format you do not know, so put the preparation into material that travels. Three pieces of your own work, each rehearsed until you can take a follow-up you did not anticipate, will carry a conversation or a code walkthrough equally well. Specificity is what separates that from filler. A number needs its definition before it means anything: a p99 is over some window and measured at some hop, and a server-side figure excludes the queueing and network time a client would see. The number you cannot qualify is the one to leave out.

What to demonstrate

  • Whether your examples carry detail only someone who did the work would hold, such as what the binding constraint actually was, which alternative you rejected and why it was worse, and what you measured on each side of the change
  • Whether a number survives one follow-up, meaning you can say what it was measured over and whether it moved because of your change or merely alongside it
  • Whether a failure is described with the specific change that followed it, rather than a lesson stated in general terms
  • Whether your part in a team effort is stated accurately, including what other people did

How to prepare

  • Write a page on each of three projects covering the constraint, the option you rejected, the measurement before and after, and what went wrong. Cut any line you cannot take a follow-up on, since you are writing the parts you will be pressed on rather than a summary.
  • Recover the real figures while you still have access: request volume, data size, latency with its percentile and window, team size, timeline. Note where each came from, whether a dashboard, a design document or memory, and mark the estimates so you can say which they are out loud.
  • Take your weakest project story to someone who works in a different area and have them ask why four times in succession. The point where you run out of answer is the part to go and re-read before the round.

Behavioral Assessment

Many of these questions are about something that went wrong, and the grading sits mostly in the hours after you knew. Who found out first, whether that was you or an alert or a user, how long it took you to say it out loud, and whether the people who needed the news got it while they could still act on it. Engineers under-tell this part because it feels like confessing. The pattern it is looking for is the opposite: the quiet fix, an incident absorbed without telling anyone, after which nothing changed and the same failure is still available.

What to demonstrate

  • How the problem was found, and whether that route was one you had built or one that happened to you, since a user reporting it first means your instrumentation did not cover that failure
  • Whether time-to-detect and time-to-tell are separate numbers in your account and whether you know both, because a fast fix that nobody heard about until the retro is a different answer from a slow one that was announced immediately
  • Whether the resolution left something durable behind, a check that fires or a default that changed, rather than depending on people remembering to be careful
  • Whether you can say what the failure cost without either inflating it or waving it away

How to prepare

  • Reconstruct one incident you were part of as a timeline with clock times: first bad request, first signal, first person who knew, first message outside the team, mitigation, permanent fix. The gaps between those entries are what gets asked about
  • Look up the configuration of the signal that caught it, including its evaluation window and threshold. An alert defined on a five-minute aggregate cannot fire until the condition holds across that window, which puts a floor under time-to-detect that has nothing to do with how severe the failure was. Be able to say what that floor was and whether anyone had chosen it deliberately
  • Prepare one story where you escalated early and the severity turned out to be smaller than you thought, including what it cost the people you pulled in. Without it, every answer you give about raising alarms is unfalsifiable

Final Round

Nobody in the room with you decides this. Interviewers typically write their rounds up separately, often before seeing anyone else's, and the outcome is settled later from those write-ups. A split panel gets resolved by whichever note carries specific evidence, so what you want out of each room is one concrete thing that person could write down: a bug you caught yourself, a trade-off you named, a decision you owned. The rest is arithmetic. The project you describe in a behavioural conversation is often the same system you sketched an hour earlier, and the two accounts have to agree.

What to demonstrate

  • Whether the scale, team size and timeline you attach to a project hold steady when that project resurfaces in a different round
  • Whether each interviewer leaves with a specific thing to cite rather than a general impression of competence
  • Whether a trade-off you defended in one round survives a challenge in another, instead of being quietly swapped for the answer the new interviewer seemed to want
  • Whether a question you have already answered earlier in the day gets the same answer at the same depth, without visible impatience

How to prepare

  • Write a one-page sheet per project fixing the figures you will quote — request volume, data size, team size, elapsed time, what broke — and say them aloud from the sheet until they come out identical every time
  • For each round on the schedule, decide in advance the one sentence you want in that person's notes, then check in a mock that you said it outright instead of leaving it to be inferred
  • Have someone ask you the same project question twice, an hour apart, and diff the two answers for numbers that moved or a trade-off that reversed

Where candidates lose points

One shared connection pool for every tenant and every query class

A single tenant with a large table and a missing index can occupy every connection with slow queries, and every other tenant then waits in connection acquisition -- a queue invisible in database metrics, because the database itself looks healthy while the application starves. Containment is bulkheads: separate pools or per-tenant concurrency caps for interactive requests, background jobs and exports, a statement timeout low enough that a pathological query dies before it accumulates, and an idle-in-transaction timeout so a stuck client cannot pin a connection and its locks indefinitely. One caveat worth knowing in advance: if a transaction-pooling proxy sits in front of the database, session-scoped behaviour changes, so session-level advisory locks and settings applied outside a transaction do not survive the way they do on a direct connection.

Treating a timed-out write as a failed write

A timeout says the response did not arrive, not that the work did not happen; the server may well have committed and then lost the connection. Retrying a non-idempotent create after a timeout is the standard way to end up with two of something, and those duplicates land precisely when the system is already degraded and least able to absorb them. The discipline is to treat a timeout as unknown: either the write carries an idempotency key so the retry is safe by construction, or the client re-reads authoritative state before deciding what to do, and the interface says unknown rather than showing a failure that invites a second click.

Starting work without saying what you are about to spend time on

State the plan before executing it: the approach, roughly how long it will take, and what you intend to leave hand-waved. That gives the interviewer a chance to redirect you in ten seconds rather than watching you spend fifteen minutes on the wrong sub-problem.

Writing code before the input contract is pinned down

Before the first line, state the types, the size bounds, whether duplicates, negatives or an empty input are possible, whether the input is sorted, whether you may mutate it, and what the function returns when nothing matches. Every one of those answers changes the code, and discovering one at minute twenty costs a rewrite you no longer have time for.

Questions & practice

Fold a deduplicated usage stream into hourly rollups

Easy · aggregation · deduplication · watermarks · exact-arithmetic

You are given one day of usage_event rows, up to 250 million, each carrying event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at and ingested_at. Produce usage_rollup_hourly cells keyed (tenant_id, workspace_id, sku, hour_start) with quantity_sum, event_count and source_max_ingested_at. An event counts once per (tenant_id, idempotency_key). The rollup grain has no environment column, so state your filter. One pass. Give your time and space bounds, and say what the deduplication actually costs in memory.

Approach

  1. Bucket on occurred_at, never ingested_at: hour_start = date_trunc('hour', occurred_at at time zone 'UTC'). The two columns answer different questions. occurred_at says which hour the customer is billed for; ingested_at says how current the fold is. Using the second for the first makes late data invisible instead of correctable.
  2. The fold is trivial and the deduplication is the entire cost, so price it before designing anything clever. An exact set over (tenant_id, idempotency_key) at 250M entries, stored as a 16-byte 128-bit hash in an open-addressed table at 0.7 load factor, needs about 357M slots at 16 bytes each, roughly 5.7 GB. The fix is partitioning by hash(tenant_id) % P so each shard holds 1/P of the set and no tenant's keys straddle shards.
  3. Rule out a Bloom filter as a replacement, in the right direction: a false positive reports 'already seen' for an event never seen, so you drop a real event and lose revenue with no error raised. It is usable only as a negative pre-filter in front of the exact set, where a miss is conclusive and a hit must fall through to the real lookup.
  4. Accumulate in scaled integers, not binary floating point. numeric(20,6) admits values below 10^14, so one event scaled to micro-units can reach 10^20, past int64's 9.22 x 10^18; use a 128-bit or arbitrary-precision accumulator unless you first bound the per-event maximum. binary64 represents integers exactly only to 2^53, about 9.01 x 10^15, and cannot represent 0.1 at all, so two runs that sum in different orders disagree.
  5. Carry source_max_ingested_at = max(ingested_at) over the events folded into each cell, and count event_count over accepted, post-dedup events. Without that watermark there is no way to prove later what a number did and did not include, which is the first question any reconciliation asks.
  6. State the environment filter explicitly, because the rollup grain cannot record it. A fold that quietly includes staging bills non-production traffic; one that quietly excludes it loses a cost signal. Production-only is the billing answer, and either way it belongs in the job name and the output metadata. Complexity: O(n) time, O(distinct dedup keys) space, dominated by the dedup set rather than by the cells.

Follow-up

  • A producer retries at 23:59:59 and the retry lands at 00:00:01. The unique index on the daily-partitioned table must include the partition key. What gets double-counted, and what is the smallest change that fixes it?
  • The consumer acknowledges its batch before committing the fold. Which failure loses revenue now, and which arrangement duplicates instead?
  • What makes a re-run over the same day produce byte-identical rollups?

Find peak concurrent sandbox usage from run intervals

Medium · sweep-line · intervals · concurrency-caps · null-semantics

Given up to 5 million job_run rows for one tenant over one day, with run_id, started_at, finished_at, status and wall_clock_limit_seconds, report the maximum number of sandboxes running at once, the earliest instant that maximum is reached, and the first run_id that would breach a per-tenant cap of C. started_at is null while a run is queued; finished_at is null both for runs still executing and for runs in status lost. Treat a run as occupying [started_at, finished_at). Give the complexity and state how you handle each null.

Approach

  1. Turn each run into two sweep events, (started_at, +1) and (end, -1), then sort the 2n events by timestamp with -1 ordered before +1 at equal timestamps. That tie-break is what makes the interval half-open, so a run finishing at 10:00:00 and one starting at 10:00:00 never overlap.
  2. Decide each null out loud before sweeping, because each choice moves the answer. A null started_at means queued and contributes nothing. A null finished_at with status running or leased is clipped to the window end. Status lost has no observed end at all, so clip it at started_at + wall_clock_limit_seconds on the grounds that the supervisor owns the timeout, and record that you did. The table's check (finished_at is null or started_at is not null) guarantees you never see an end without a start.
  3. Sweep once, maintaining a running counter, the maximum, and the timestamp at which the maximum was first attained (update peak_at only on a strict increase, or you will report the last such instant instead of the earliest). Capture the first run_id whose +1 takes the counter to C+1 during the same sweep rather than in a second pass.
  4. Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by started_at, a min-heap of end times gives O(n log k) time and O(k) space with k the peak concurrency, which is the better shape when the rows come from an index scan on (tenant_id, started_at).
  5. If second resolution is acceptable, counting-sort the endpoints into an 86,400-slot delta array and prefix-sum it: O(n + T) time and O(T) space, which beats the comparison sort at 5 million rows. It answers only at second granularity, so state which resolution the cap is defined in.

Follow-up

  • Now report peak concurrency per tenant for 10,000 tenants from one globally sorted stream. What changes about memory and about the sort?
  • The cap has to be enforced at dispatch rather than reported afterwards. What does the admission check look like, and where does it race?
  • How would you answer 'peak concurrency within any 5-minute window' without re-sorting?

Hold a tenant to a trailing sixty-second request limit

Medium · sliding-window · two-pointer · rate-limiting · tenant-skew

The gateway must hold each tenant to R requests in any trailing 60 seconds, in aggregate across three regions and every pod, within a budget of under 10 ms added p99. Peak is 30,000 requests/second across 200,000 active tenants, and traffic is heavily skewed toward a handful of them. Give an exact single-process algorithm with its amortised per-request cost and its memory per tenant, then a bounded-memory approximation and the worst-case overshoot it actually admits. Say what the distributed version does when the counter store is unreachable.

Approach

  1. Exact, single process: a per-tenant deque of request timestamps. On arrival, pop from the front while front <= now - 60s, then admit if the remaining length is below R and push. Each timestamp is pushed once and popped once, so the cost is O(1) amortised. The O(R) version is the one that re-filters the whole deque on every request.
  2. Quote the memory. R = 1,000 across 200,000 active tenants is up to 2 x 10^8 timestamps at 8 bytes, about 1.6 GB, and that is the worst case rather than the mean, because the long tail of small tenants holds almost nothing. Skew helps you here and hurts you in the sharding decision.
  3. Bounded alternative, with its real bound stated: a fixed 60-second counter is O(1) memory but admits close to 2R across a 60-second span straddling a boundary. The weighted two-bucket estimate, prev * (60 - elapsed)/60 + cur, is better on smooth traffic but assumes the previous window's arrivals were uniform; an adversary packing them at the end of that window is undercounted and can still approach 2R. Say that rather than calling it exact.
  4. Token bucket is the usual gateway answer and a different contract: O(1) state per tenant (tokens, last_refill), a sustained rate, and a deliberate burst allowance equal to the bucket size. Choose it when a burst is acceptable and the log when the limit is contractual.
  5. Distributed: the limit is per tenant in aggregate, so a local bucket of R/N per pod is wrong in both directions under skew. A tenant landing on one pod is throttled at R/N, and a tenant spread evenly across pods exceeds R. The shared check must be a single atomic round trip, one script or one increment-and-compare, never read-then-write, and it must fit inside the 10 ms p99 budget.
  6. Decide the unavailable case in advance and write it down. Failing open keeps the product up and lets a tenant exceed its limit for the duration; failing closed converts a counter-store outage into a full outage. Most gateways fail open on rate limits and closed on authorisation, and those are two separate decisions made separately.

Worked solution (25 min)

  1. Implement the deque version and instrument the per-request pop count, then confirm total pops equal total pushes over a run.
  2. Generate a burst that places R requests in the last 100 ms of one minute and R more in the first 100 ms of the next.
  3. Run that burst through the exact deque, a fixed 60-second counter, and the weighted two-bucket estimate, recording admissions in the trailing 60 seconds at every instant.
  4. Size the memory as R x active tenants x 8 bytes at R = 1,000 and 200,000 tenants, and compare it against what a token bucket would need.

Expected result: The exact deque never admits more than R in any trailing 60-second window. The fixed counter admits close to 2R across the boundary. The weighted estimate lands between the two on this burst and approaches 2R once the previous window's requests are packed at its end.

Verify it yourself

  • Total pops equal total pushes, which is what makes the amortised O(1) claim true rather than merely asserted.
  • Sliding the whole burst by 30 seconds changes the fixed counter's result and leaves the deque's unchanged.
  • Running two processes each limiting to R/2, against a tenant that sends everything to one of them, shows that tenant throttled at half its contractual limit.

Follow-up

  • One tenant sends 40% of all traffic. What does that do to a single counter key, and what do you shard on instead?
  • Quotas rather than rate limits: the check is select used; if used < limit then insert. Name the isolation level that still permits the overshoot, and the two fixes.
  • How do you return an accurate Retry-After from the exact algorithm without a second scan?

Migrate a live partitioned event table without blocking ingest

Hard · online migration · ddl locks · expand and contract · partitioning

usage_event is range-partitioned daily on ingested_at, holds roughly 250M rows per day across 400 live partitions, and is written at 10-40k rows/second. Two changes are required: quantity must move from double precision to numeric(20,6), and a new environment column must become NOT NULL with a default of 'production'. Ingest cannot stop. Give the ordered plan, naming for each step the lock it takes, what that lock blocks, and roughly how long it is held. Identify the one step that cannot be rolled back cleanly once traffic depends on it.

Approach

  1. Classify the two changes before planning anything. Adding a column with a non-volatile default has been metadata-only since PostgreSQL 11, so it is cheap. Changing double precision to numeric is not binary-coercible, so alter column ... type rewrites every partition under ACCESS EXCLUSIVE and rebuilds its indexes; on this volume that is hours of blocked ingest and is simply not an option, which is why the plan is expand-and-contract rather than one statement.
  2. Expand: add quantity_numeric numeric(20,6) and environment with its default on the parent. Both are catalogue-only but both take a brief ACCESS EXCLUSIVE that cascades to partitions, so run each with lock_timeout set to a second or two and retry on failure. A queued ACCESS EXCLUSIVE request blocks every reader behind it, which is how a metadata-only change turns into an outage.
  3. Dual-write: deploy producer code that populates both columns on every insert, and leave it running before anything reads the new column. This is the step that cannot be reverted cleanly. Once readers depend on quantity_numeric, reverting the writer leaves rows with a null there, and the gap is only discoverable by re-reading the old column, which the readers have stopped doing.
  4. Backfill older partitions in batches keyed on the primary key, oldest first, committing every few thousand rows with a pause between batches, and skipping the partition still receiving writes until it rotates. Each batch is an ordinary UPDATE taking row locks only. The cost is bloat and WAL rather than blocking, so watch dead tuples and let autovacuum keep pace instead of wrapping 400 partitions in one transaction.
  5. Make NOT NULL cheap with the three-step form: add constraint ... check (environment is not null) not valid (brief ACCESS EXCLUSIVE, no scan), then validate constraint (SHARE UPDATE EXCLUSIVE, scans while reads and writes continue), then set not null, which from PostgreSQL 12 uses the validated check and skips its own full scan. Do this per partition, then on the parent.
  6. Switch and contract: move reads to the new column behind a flag, verify over a full period that both columns agree on freshly written rows, drop the old column (metadata-only), and only then remove the dual-write. Any index on the new column goes on with CREATE INDEX CONCURRENTLY per partition, since CIC is not supported on a partitioned parent: create the parent index with ONLY, build each child concurrently, then ALTER INDEX ... ATTACH PARTITION until the parent index becomes valid.

Worked solution (45 min)

  1. On a scratch cluster, build 10 partitions of 2M rows each and run a writer at a few thousand inserts/second.
  2. Run the naive type change and measure how long writes stall and how far ingest lag grows before killing it.
  3. Run the expand step with lock_timeout = '2s' while the writer runs, and observe a clean lock timeout and retry instead of a pile-up of blocked readers.
  4. Backfill in 5k-row batches and chart dead tuples and WAL generated per batch.
  5. Run the not-valid, validate, set-not-null sequence and confirm from pg_stat_activity and timings that nothing held an exclusive lock through a full scan.
  6. Add an index with CIC per partition plus ATTACH PARTITION and confirm the parent index reports valid only after the last attach.

Expected result: An ordered expand, dual-write, backfill, switch, contract plan with the lock named per step: metadata-only ADD COLUMN under a brief ACCESS EXCLUSIVE taken with lock_timeout; batched UPDATE backfill under row locks; CHECK NOT VALID, then VALIDATE under SHARE UPDATE EXCLUSIVE, then SET NOT NULL; CREATE INDEX CONCURRENTLY per partition with ATTACH PARTITION; and the dual-write-to-read switch identified as the step that cannot be reverted cleanly.

Verify it yourself

  • No step in the plan holds ACCESS EXCLUSIVE for longer than the configured lock_timeout.
  • The writer's error rate stays at zero through the rehearsal apart from the deliberate lock timeout.
  • After VALIDATE, SET NOT NULL completes in milliseconds on a table where the naive form scanned every row.
  • Freshly written rows agree on both columns for a full verification period before the old column is dropped.

Follow-up

  • A CREATE INDEX CONCURRENTLY fails halfway through the partition list. What state is the table in, how do you detect it, and what do you run?
  • The producer computes quantity itself. What happens to a request already in flight when the dual-write deploy lands, and does it matter?
  • Give two queries that prove the backfill is complete: one cheap enough to run every minute, one authoritative.

Model credential revocation so history survives the delete

Easy · soft delete · partial indexes · check constraints · audit history

tenant_api_key stores key_id, tenant_id, workspace_id, name, key_prefix, secret_hash, scopes text[], status (active, revoked, expired, compromised), auth_version, created_at, expires_at, last_used_at, revoked_at, revoked_reason. Rotation inserts a new row and revocation never deletes, because an incident review asks which credential served a request last quarter. Write the constraints that enforce: a label is unique only among a tenant's live keys, revoked_at and status can never disagree, and scopes is never empty. Then write the authentication lookup predicate, and name one column in this table that must stay out of it.

Approach

  1. Reach for a partial unique index rather than a plain UNIQUE: create unique index on tenant_api_key (tenant_id, name) where revoked_at is null. Any number of revoked rows may share a label, the live namespace stays unique per tenant, and the revoked majority is not in the index at all, so it stays small on a table that only grows.
  2. Tie the nullable timestamp to the enum so the two cannot drift: check ((revoked_at is not null) = (status in ('revoked','compromised'))) and check ((revoked_at is null) = (revoked_reason is null)). A revocation that records no reason is the one an incident review cannot use.
  3. Write the emptiness check as check (cardinality(scopes) > 0), not array_length(scopes, 1) > 0. array_length returns NULL for an empty array, a CHECK constraint passes when its expression is NULL, so the array_length version accepts exactly the value it was written to reject.
  4. Make the lookup a single index probe with every liveness condition inside it: where secret_hash = $1 and revoked_at is null and (expires_at is null or expires_at > now()) and auth_version = $2, backed by a unique index on secret_hash. Nothing is filtered in application code, so there is no path that forgets a clause.
  5. Keep last_used_at out of that predicate. It is written asynchronously and is allowed to lag by a minute, so it is a usage signal; feeding it into an authorisation decision makes the decision depend on a write that may be late, batched away or lost.
  6. Flag the modelling smell while you are here: expired is derivable from expires_at < now(), so storing it as a status obliges a job to keep it true and guarantees the column is wrong between the expiry instant and that job's next run. Derive it in the predicate; keep the stored status for states that are decisions rather than clock readings.

Follow-up

  • Rotation issues a replacement while the old key stays live for a 30-day overlap. What does the uniqueness rule become, and what does the UI show to tell two same-named keys apart?
  • A password reset bumps the principal's auth_version. No row in this table changed. How does the next request fail, and what query counts how many keys that bump just killed?
  • A key turns up in a public repository. Which columns let you find it, and what do you write to the row?

How do you approach debugging a production issue in a distributed system?

Medium

Approach

  1. Work from the requirement backwards to the design.
  2. Say what you would check first and why it is the highest-information step.
  3. State your assumptions explicitly before working the problem.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

If you were tasked with building an AI-integrated feature, where would you start?

Medium

Approach

  1. State your assumptions explicitly before working the problem.
  2. Say what you would check first and why it is the highest-information step.
  3. Clarify what is being asked and what a complete answer contains.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

How do you ensure your code is maintainable and performant?

Medium

Approach

  1. State your assumptions explicitly before working the problem.
  2. Clarify what is being asked and what a complete answer contains.
  3. Say what you would check first and why it is the highest-information step.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Leasing sandboxed job runs without double execution

Medium · leases · fencing · state machines · metering

job-runner leases work from a queue and executes customer workloads in sandboxes with CPU, memory, wall-clock and egress limits. Run durations span 200 ms to 30 minutes, thousands are concurrent, and job_run.status must reach exactly one terminal state among succeeded, failed, timed_out, cancelled and lost. A worker can pause 45 seconds for garbage collection, or be briefly partitioned, after its sandbox has exited but before it writes the outcome. Design the lease duration, the fencing, and timeout ownership, and state how billable_seconds is computed for a run whose worker never returns.

Approach

  1. Resolve the lease-duration conflict rather than picking a compromise. A lease shorter than the longest legitimate run re-dispatches work that is still executing; a lease long enough for a 30-minute run leaves a crashed 200 ms run undetected for half an hour. Use a short lease - about 30 seconds - renewed by a heartbeat every 10 seconds while the supervisor is alive, each renewal pushing leased_until to now() + 30 s. Detection latency is then one lease, not one heartbeat: a dead worker's last successful heartbeat landed at most 10 s before it died, so leased_until expires 20 to 30 s after the death, plus whatever interval the reaper scans on. What the 3:1 ratio of lease to heartbeat buys is headroom - one or two missed heartbeats change nothing, and a stall only becomes a re-dispatch once it outlives the lease remaining when it began, between 20 and 30 s here. Both costs follow from those two numbers: heartbeat write load proportional to concurrent runs (3,000 runs at a 10-second interval is about 300 updates/second), and any pause longer than the lease - the 45-second GC - re-dispatching a run that is perfectly healthy.
  2. Fence the outcome write so the store, not the worker's memory, arbitrates: UPDATE job_run SET status = $1, finished_at = $2, exit_code = $3 WHERE run_id = $4 AND status = 'running' AND lease_token = $5, and require exactly one row affected. Zero rows means this worker was fenced while it was paused, and its correct behaviour is to discard the result, not to retry - the retry is how a resumed worker overwrites a newer attempt.
  3. Make the status machine monotone with a check constraint or a trigger so no terminal row can move, and model a retry as a new row with parent_run_id set and attempt incremented rather than a reset of the old one. That is what keeps how many times did this actually execute answerable afterwards and keeps each attempt's resource usage attributable to itself.
  4. Put the wall-clock timeout in the supervisor, never in the workload: a customer-supplied program asked to time itself out will not. Distinguish timed_out, which the supervisor observed and caused, from lost, which nobody observed at all, and leave exit_code null unless the supervisor actually saw the process exit. Recording lost as failed asserts an outcome no one witnessed and then bills and retries on that assertion.
  5. Decide billable_seconds for the unobserved case explicitly, because it cannot be derived. It is not now() - started_at, which bills queue and pause time the customer never consumed. The two defensible policies are leaving it null while status = 'lost' and billing nothing, or flooring it at the last heartbeat's observed running time as a stated lower bound; pick one and write it down. Add a per-tenant concurrency cap on sandbox slots so one tenant cannot occupy the whole fleet while these questions are being answered.

Worked solution (30 min)

  1. Draw the timeline: last successful heartbeat at t, sandbox exits at t, worker pauses from t to t+45 s, so leased_until = t+30 s and the lease expires there. Mark where the second worker starts and where the first worker's write arrives, then say how short the pause would have had to be to change nothing.
  2. Write the fenced terminal update and state the expected rows-affected in both the healthy case and the fenced case.
  3. Size the heartbeat: 3,000 concurrent runs at a 10-second interval is about 300 row updates/second on job_run - decide whether that lands on the same table and what it contends with.
  4. Write the billable_seconds rule for each terminal status and say which status leaves it null.

Expected result: A short lease of roughly 30 seconds renewed by a 10-second heartbeat, so detection latency is one lease - 20 to 30 seconds after a worker dies, plus the reaper's scan interval - independent of the 200 ms to 30 minute run spread, with one or two missed heartbeats tolerated rather than fatal; a terminal write fenced by AND status = 'running' AND lease_token = $x where zero rows affected means discard; retries as new rows with parent_run_id; a supervisor-owned wall-clock kill that separates timed_out from lost; billable_seconds left null while status = 'lost', or floored at the last heartbeat as a stated policy, never inferred from wall-clock.

Verify it yourself

  • In your timeline the fenced write must affect zero rows. If it affects one, the lease alone was doing the work and the token adds nothing.
  • At 3,000 concurrent runs and a 10-second heartbeat, check 300 updates/second against the other write load on that table before accepting the interval; if it is the dominant writer, the heartbeat belongs somewhere else. Check the ratio too: at lease = 3 x interval a lost heartbeat is survivable, whereas at lease = interval every scheduling hiccup is a double execution.
  • State whether a duplicate execution is billed, then confirm that summing billable_seconds across a parent and its retry matches that stated policy rather than matching it by accident.

Follow-up

  • A worker returns from a 45-second GC pause and writes succeeded. Walk through what the database does statement by statement.
  • Heartbeats are now a few hundred writes a second against job_run. How do you keep that off the path that matters, and what do you lose by moving it?
  • The re-dispatched workload has an external side effect the first attempt already performed. What does your design owe the customer, and what can it not fix?

A rare job-run overwrite that logging makes disappear

Hard · fencing tokens · leases · concurrency

About one job run in fifty thousand records billable_seconds matching no observed sandbox lifetime, and a few rows show worker_id changing after finished_at was already set. It does not reproduce: debug logging around the terminal write made it vanish for two weeks before it returned. Runs last from 200 ms to 30 minutes, the lease is 60 seconds and is renewed while a run executes. Give an ordered checklist, the mechanism, and a fix that makes the illegal write impossible rather than merely rarer.

Approach

  1. Mine the evidence instead of chasing a repro: select rows where updated_at is later than finished_at, or where a terminal status was written twice, and join them to attempt history to recover both writer identities. The defect has already happened tens of times and the rows are the recording.
  2. State the signature before measuring it. If the cause is a lease that expired while the original worker was stalled, affected runs should cluster where the gap between the last renewal and the terminal write exceeds the lease, and should correlate with worker pause metrics rather than with workload shape.
  3. Read the disappearance honestly. Logging inside the window changed the timing and lowered the probability; it is evidence about how narrow the window is, not a fix. Reproduce by widening the window on purpose, shortening the lease and injecting a pause between sandbox exit and the terminal write, rather than by adding more instrumentation.
  4. Name the mechanism precisely: the lease expires during a stall such as a long garbage-collection pause or a brief partition, the run is re-dispatched, and the original worker then wakes and writes its terminal state over the new attempt's row. A lease alone cannot stop this, because the check and the write are separated by the stall.
  5. Fix by fencing the write itself: UPDATE job_run SET status = $2, finished_at = $3, billable_seconds = $4 WHERE run_id = $1 AND status = 'running' AND lease_token = $5, with zero rows affected interpreted as having been fenced rather than as success. The token lives on the row so the store arbitrates, not the worker's memory.
  6. Keep the state machine honest: a retry inserts a new row pointing at parent_run_id rather than resetting the old one, and a run whose worker vanished terminates as lost with billable_seconds null, because recording failure asserts an outcome nobody observed and then bills and retries on that assertion.

Follow-up

  • The supervisor also emits a usage event on completion. What does the fenced worker do about the event it already emitted, and how does metering absorb it?
  • Lease renewal is itself a network call. What happens when a renewal times out, and how does the worker decide whether it still holds the lease?
  • Why is lengthening the lease past the longest legitimate run the wrong lever, and what breaks if you do it anyway?

Suggested practice checklist

For a candidate senior enough that the loop turns on design and judgement rather than on whether the coding round gets finished. Five days build one system properly and then stress it; coding gets a single maintenance day, on the assumption that the risk at this level is an unexamined tradeoff rather than a missed algorithm.

Day 1 — Numbers before diagrams

  • Build your own reference card of the figures you will re-derive all week: bytes for a realistic record, requests per second implied by a given daily active count, and the storage that a year at a given write rate produces. Derive each one rather than copying it, because the derivation is what survives a follow-up.
  • Turn one product statement into capacity requirements. From ten million daily users at four writes and forty reads each, state the peak-to-average factor you are assuming and why, then produce peak write QPS, peak read QPS and a year of storage.
  • Write the two numbers whose order of magnitude changes the design, the read-to-write ratio and the working-set size against memory per node, and state the threshold at which each one flips your answer.

Deliverable: A one-page numbers card and one worked capacity estimate with every assumption written down.

Day 2 — One system, from requirements to schema

  • Spend the first ten minutes producing only functional requirements, non-functional targets with numbers attached, a p99 latency, a durability expectation, a consistency requirement, and an explicit out-of-scope list.
  • Define the interface before the boxes: the three or four endpoints, their parameters, what each returns, and which of them are idempotent.
  • Write the data model, then write the single access pattern that justifies it, and state what the schema would have to become if the dominant access pattern were the other one.

Deliverable: One design carried to endpoint-and-schema depth, with non-functional targets expressed as numbers and a written out-of-scope list.

Day 3 — The consistency you are actually buying

  • Write out what a client sees under asynchronous replication when its write commits on the leader and its next read is served by a lagging follower, then write the two fixes, pinning that session's reads to the leader for a bounded window or carrying a version token the replica must reach, and the cost of each.
  • Work the quorum arithmetic on paper for N of three with W and R of two, and separate what R + W > N does guarantee, that any read set intersects any write set, from what it does not: on its own it is not linearizability, and a sloppy quorum that accepts writes on nodes outside the preference list breaks even the intersection.
  • Take two storage choices with different defaults, a single-leader relational store committing synchronously and a quorum-replicated store that converges eventually, and write the specific product behaviour that would be wrong under each, rather than a general statement about which is stronger.

Deliverable: A page separating what quorum overlap guarantees from what it does not, with one concrete product misbehaviour attached to each gap.

Day 4 — Failure is the design

  • For one write path, work through the case where the client times out after the server has already committed, then design the idempotency key: who generates it, how long it is retained, and what the duplicate request returns.
  • Express the retry policy as parameters rather than as a word: maximum attempts, base delay, backoff factor, jitter, and which error classes are retried at all. Then state why retrying a non-idempotent write without a key is a correctness bug and not merely waste.
  • Compute the fan-out effect on tail latency. If a request waits on ten backends and each independently exceeds its p99 one percent of the time, the chance at least one is slow is 1 - 0.99^10, about ten percent. Then write why independence is the optimistic assumption and what correlates them in practice.
  • Name the backpressure mechanism for one queue or one dependency in the design, a bounded queue with shedding or a concurrency limit, and write what the caller is told when it engages.

Deliverable: One write path with an idempotency design, a parameterised retry policy, and a written tail-latency calculation with its assumption named.

Day 5 — Scaling the hot path

  • Choose cache-aside or write-through for one read path and write the staleness window each produces, then name the invalidation event and what the system does when that event is lost.
  • Design against the stampede: either coalesce requests so only one recomputes a missing key, or refresh early with jittered expiry, and write why identical TTLs on keys populated in the same moment produce a synchronised expiry and a thundering herd.
  • Shard one table by a key you choose, then answer the two questions that break the choice: which queries now require a scatter-gather, and what happens to the distribution when one tenant is a hundred times larger than the median.
  • Write the cost of adding a node under plain modulo placement, where nearly every key moves, against consistent hashing, where roughly one key in n+1 moves, and state what virtual nodes are for.

Deliverable: A caching and sharding decision for one path, each with its failure mode and its rebalancing cost written beside it.

Day 6 — Keep the coding hand in, at the bar that applies to you

  • Solve one medium problem in thirty minutes, then spend twenty more making it production-shaped: named invariants, validation at the boundary, and errors that distinguish a caller mistake from an internal fault.
  • Write the tests you would require of a colleague's version of that function: one for empty input, one for the boundary, and one for the case the implementation is most likely to get wrong.
  • Read a piece of your own code from six months ago and write the change you would ask for, phrased as you would actually phrase it in review.

Deliverable: One problem hardened to review standard, with its test list and one written review comment.

Day 7 — Defend it while being interrupted

  • Run a forty-five-minute design mock with an interviewer briefed to change a requirement halfway, a tenfold traffic increase or a new strict consistency requirement, and to push on one number you estimated.
  • Rehearse the two sentences a senior loop is listening for: naming the tradeoff you are choosing against and why, and saying what you would measure to learn that the choice was wrong.
  • Prepare the design you regret: a real decision, the constraint that produced it, what it cost, and what you changed afterwards.

Deliverable: Mock notes recording how the design changed under the new requirement, plus a written account of one regretted decision.

Scope is read from what you decided

Team size, service count and tickets closed say very little. Seniority shows in the decision you owned: what you chose not to build, which constraint you traded away, whose objection you had to resolve before anything could move. A large project where you executed someone else's plan is a small story.

What is your experience with API management or cloud-native platforms?

Medium · behavioural and engineering judgement

Approach

  1. Close with what you would do differently, concretely.
  2. Pick a story where you made the decision, not one where you watched it.
  3. Give the blast radius: what could have broken, and what you measured.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

Tell me about a feature you built that had a measurable impact on the business.

Medium · behavioural and engineering judgement

Approach

  1. Give the blast radius: what could have broken, and what you measured.
  2. Pick a story where you made the decision, not one where you watched it.
  3. Close with what you would do differently, concretely.

Follow-up

  • How did you know your change caused the improvement?
  • What did you decide not to do, and why?

Resolve a review disagreement over a quota check

Easy · code review · isolation levels · write skew · disagreement

A colleague's pull request enforces a per-tenant quota by selecting the current count and then inserting when it is under the limit. You flag it as a race. They reply that the transaction already runs at repeatable read, so the snapshot makes it safe, and the tests pass. Walk through taking that disagreement to a resolution: what you write in the review, what you demonstrate rather than assert, which fix you propose and why, and what you do if they still disagree after all of it.

Approach

  1. Answer the claim precisely instead of restating your objection, because they have made a specific technical argument. In PostgreSQL, repeatable read is snapshot isolation; this is write skew, which snapshot isolation permits by design. Both transactions read a count that is stable within their own snapshot, insert disjoint rows that the other cannot see, and both commit, so the limit is exceeded by exactly the concurrency.
  2. Demonstrate rather than cite. Two psql sessions, both BEGIN ISOLATION LEVEL REPEATABLE READ, both select the count, both insert, both commit: it succeeds. Repeat at SERIALIZABLE and the second commit fails with serialization_failure, SQLSTATE 40001. That takes two minutes, ends the argument without anyone conceding a position, and leaves an artefact for the next reviewer.
  3. Offer the options with their costs rather than a verdict. Serialisable plus a retry loop on 40001 is correct but obliges every caller to retry and degrades under contention. An increment-and-compare on a counter row — update tenant_quota set used = used + 1 where tenant_id = $1 and used < limit returning used — is safe even at read committed, because a blocked updater re-evaluates the WHERE clause against the row version it finally locks, and zero rows returned means full. A unique or exclusion constraint that makes the surplus write fail is the third.
  4. Name the plausible non-fix explicitly, since it is what usually gets merged instead: folding the count into the insert as insert ... select ... where (select count(*) ...) < limit is still racy under read committed, because the subquery cannot see the other transaction's uncommitted rows. It looks atomic and is not.
  5. Say what you do if they still disagree: escalate the decision rather than the disagreement. Attach the reproduction, hand it to the service owner or a third reviewer, and state that you will not block the merge if the owner accepts the risk knowingly — and that you want that acceptance written down.
  6. Close with the general lesson worth leaving in the review thread: a passing suite is weak evidence for a concurrency claim because it runs one request at a time. Ask for a test that runs two.

Follow-up

  • Write the counter-row version. Does your answer change if the quota counts child rows rather than a column?
  • Under serialisable, who performs the retry, and what does the API client see if the retry also fails?
  • This is the third disagreement with the same reviewer this month. What changes in how you review?