cswork / libraryOpen practice workspace

Interview guides · Glennon Brothers

Glennon Brothers Software Engineer Interview Guide

Glennon Brothers Software Engineer interview guide: reported rounds, questions and how candidates describe the process.

The 60-second brief

As a Software Engineer at Glennon Brothers, you are at the intersection of traditional timber engineering and modern technical maintenance systems. This role is critical to the operational health of our manufacturing facilities, ensuring that our proprietary timber frame production technology functions with high precision and minimal downtime. You are not just writing code; you are building the digital backbone that supports our industry-leading timber processing capabilities. The impact of this position is felt directly on the factory floor. By developing, maintaining, and optimizing the software that controls our automated machinery and service infrastructure, you directly influence the efficiency and safety of our production lines.

This guide is scoped to a Software Engineer candidate at Glennon Brothers.

Focus areas

  • Software Engineering
  • Service Engineering
  • Maintenance Engineering

Where to focus your preparation

No round sequence has been reported for Glennon Brothers. Confirm the format with your recruiter.

Preparation focus

No round sequence has been reported for this company, so confirm the format with your recruiter and work the reported questions below.

What to demonstrate

  • Breadth across the topics this company reports testing
  • Whether you confirm the format before preparing for it

How to prepare

  • Ask the recruiter for the sequence, the duration of each stage and whether you will be writing code
  • Work the reported questions below and time yourself

Where candidates lose points

Focus on Safety

Always frame your technical solutions with an emphasis on operator safety and system integrity.

Be Practical

When faced with a coding challenge, prioritize maintainable, readable code over overly complex "clever" solutions.

Know the Business

Understand that Glennon Brothers is a leader in the timber industry; showing an interest in our products adds value to your application.

Do not attempt to memorize generic coding solutions

We prioritize candidates who explain their logic and can adapt to the unique constraints of our machinery.

Questions & practice

Identify the heaviest tenants in a five-minute window under memory pressure

Medium · top-k · heavy hitters · streaming

The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.

Approach

  1. Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
  2. Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
  3. State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
  4. Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.

Follow-up

  • The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
  • Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?

Find overlapping job attempts and peak concurrency from lease records

Medium · sweep line · intervals · leases

A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.

Approach

  1. Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
  2. For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
  3. For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
  4. Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.

Follow-up

  • A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
  • Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?

Archive a resource graph without breaking live references or recursing

Medium · graph traversal · topological order · tenant isolation

Resources reference other resources within a tenant; for the largest tenant the reference table holds up to 2,000,000 nodes and 8,000,000 edges. Archiving a resource must archive everything reachable from it that nothing outside the set still references, refuse when a live external referrer exists, and terminate when references form cycles, which they legitimately do. Produce the archive order and the refusal list, targeting O(V+E). Say what stops the traversal crossing a tenant boundary, and why recursion is the wrong control structure at this size.

Approach

  1. Load the subgraph with the tenant predicate on both endpoints of the edge, not only on the side you started from. Scoping the left table alone is the classic cross-tenant leak: one mis-entered edge then pulls another tenant's resources into the traversal and, worse, into the archive.
  2. Traverse iteratively with an explicit stack. A 2,000,000-node graph can hold a chain deep enough to exhaust a native stack in the low tens of thousands of frames, and that failure is a process crash rather than an error you can return.
  3. Treat cycles as data rather than corruption: compute strongly connected components with Tarjan in O(V+E) using its own explicit stack, then condense. The condensation is a DAG, so a topological order over it gives the archive order, and every member of a component archives in one transaction because no order within a cycle is valid.
  4. Decide refusals with reverse edges. A candidate is archivable only if every in-edge originates inside the candidate set, so build the transpose or count in-degrees restricted to the visited set, and emit each blocked resource with the id of the external referrer, which is the only part of the answer an operator can act on.

Follow-up

  • The graph is read in one query and the archive writes a minute later. What can change in between, and how do you make the write safe?
  • The candidate set is 400,000 resources. Is that one transaction, and if not, what does a half-finished archive look like to a reader?

Find version gaps and relay lag with window functions

Medium · window functions · event tables · frame semantics

outbox_event holds event_id, aggregate_type, aggregate_id, aggregate_version, event_type, payload, status ('pending','published','dead'), attempts, created_at, published_at. A projection is missing rows and you must decide whether the relay skipped events or the consumer dropped them. Write three queries over the last seven days: one listing every aggregate_id whose published aggregate_version sequence has a hole, one giving per-day counts with a running total, and one returning the newest published event per aggregate. For each, say where the window function is evaluated relative to WHERE and LIMIT. PostgreSQL 16.

Approach

  1. Gaps: compute lead(aggregate_version) OVER (PARTITION BY aggregate_id ORDER BY aggregate_version) in a subquery, then filter next_version <> aggregate_version + 1 in the outer query. Window functions are evaluated after WHERE, GROUP BY and HAVING and before the outer ORDER BY and LIMIT, so the predicate cannot sit in the same WHERE clause and PostgreSQL 16 has no QUALIFY.
  2. Say what the seven-day filter does to the answer: it truncates every partition, so the first row per aggregate has no predecessor inside the window and a hole spanning the boundary is invisible. Widen the window, or join to resource.version as the authority for the true maximum.
  3. Running total: SELECT date_trunc('day', created_at) AS d, count() AS n, sum(count()) OVER (ORDER BY date_trunc('day', created_at) ROWS UNBOUNDED PRECEDING). An aggregate inside a window call is legal because grouping runs before windowing. The grouping key is unique per row here so ROWS and RANGE agree, but write the frame anyway — over ungrouped rows with tied timestamps the default RANGE frame pulls in every peer row and the total jumps.
  4. Newest per aggregate: DISTINCT ON (aggregate_id) ... ORDER BY aggregate_id, aggregate_version DESC is the cheap PostgreSQL-only form when an index matches that order; row_number() OVER (PARTITION BY aggregate_id ORDER BY aggregate_version DESC) = 1 is the portable form and needs a subquery for the same evaluation-order reason as the gap query.

Follow-up

  • Relay failover redelivers events. Does a duplicate break the gap query, and how would you detect one from this table alone?
  • Turn the gap check into a continuous monitor rather than a query someone runs after an incident. What does it watch?

Hold a per-tenant active cap against concurrent creates

Hard · write skew · isolation levels · constraints

A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.

Approach

  1. Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
  2. Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
  3. Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
  4. State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.

Follow-up

  • A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
  • The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?

Describe your process for performing a root-cause analysis on a recurring software bug in an automated system.

Medium · Technical and Maintenance Engineering

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

What experience do you have with PLC (Programmable Logic Controller) programming or similar industrial control

Medium · Technical and Maintenance Engineering

What experience do you have with PLC (Programmable Logic Controller) programming or similar industrial control software?

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

How do you ensure that software updates are deployed to machinery without interrupting critical production sch

Medium · Technical and Maintenance Engineering

How do you ensure that software updates are deployed to machinery without interrupting critical production schedules?

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Can you explain a time you had to optimize code to improve the response time of a hardware interface?

Medium · Technical and Maintenance Engineering

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. State your assumptions explicitly before working the problem.
  3. Say what you would check first and why it is the highest-information step.
  4. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

How do you approach troubleshooting a software-controlled machine that has stopped responding mid-production?

Medium · Technical and Maintenance Engineering

Approach

  1. Establish what changed and when, before forming any theory.
  2. Pick a bisection that eliminates candidates whichever way it turns out.
  3. Check the instrumentation before believing the symptom.
  4. Separate the trigger from the cause; the deploy is rarely the bug.

Follow-up

  • What would you look at first, and what would it rule out?
  • How would you tell a cause from a coincidence here?

Suggested practice checklist

Built from the topics and questions Glennon Brothers candidates report; no round sequence has been reported.

Day 1 — Establish the Glennon Brothers format

  • No round sequence has been reported, so ask your recruiter for the sequence, the duration of each stage and whether you will write code.

Deliverable: A written reply from your recruiter confirming the format.

Day 2 — Work Software Engineering

  • Spend the session on Software Engineering, which Glennon Brothers candidates report being tested on.
  • Write one worked example in Software Engineering and time yourself on it.

Deliverable: One timed worked example in Software Engineering.

Day 3 — Work Service Engineering

  • Spend the session on Service Engineering, which Glennon Brothers candidates report being tested on.
  • Write one worked example in Service Engineering and time yourself on it.

Deliverable: One timed worked example in Service Engineering.

Day 4 — Work Maintenance Engineering

  • Spend the session on Maintenance Engineering, which Glennon Brothers candidates report being tested on.
  • Write one worked example in Maintenance Engineering and time yourself on it.

Deliverable: One timed worked example in Maintenance Engineering.

Day 5 — Answer out loud: Technical and Maintenance Engineering

  • Answer aloud, timed: How do you approach troubleshooting a software-controlled machine that has stopped responding mid-production?
  • Answer aloud, timed: Describe your process for performing a root-cause analysis on a recurring software bug in an automated system.

Deliverable: Spoken answers to 2 reported Technical and Maintenance Engineering question(s), under time.

Day 6 — Rehearse your own examples

  • Prepare three examples from your own work where you made the decision, each with the outcome you can quantify.

Deliverable: Three examples written out, each with a number attached.

Day 7 — Dry run for Glennon Brothers

  • Run one full mock under time, then write down the two questions you most want to ask your interviewers.

Deliverable: A completed timed mock and two questions to ask.

Behavioural preparation

Behavioural rounds judge the decision you made and what it cost.

Tell callers you do not own that their integration breaks

Medium · deprecation · compatibility · stakeholders

A field in a write endpoint's response must change shape. You own the endpoint; you do not own the four internal callers or the outbound webhook consumers who read it. Describe a deprecation you were responsible for: what you shipped first, how you established who was actually reading the field, the window you gave and what set its length, what you did about the consumer who never moved, and how you decided removal was safe. Name the signal you used, not the announcement you sent.

Approach

  1. Establish the reader set empirically rather than from a wiki of owners: per-field usage counters keyed by principal, or access logs attributed to a consumer. State the blind spot of whichever you pick, since a consumer that reads the field only on a monthly job will not appear in a week of logs.
  2. Ship additive first. Populate the new field alongside the old one so no reader is forced to move, which is also what keeps a rolling deploy safe, because old and new instances answer the same requests at the same time and a rollback must still find the old shape present.
  3. Set the window from the slowest legitimate consumer's release cadence, not from your calendar, and decide separately what to do for a consumer with no release process at all, such as an external webhook endpoint you can only email.
  4. Convert silence into evidence before you rely on it: a short, low-traffic removal window that makes a still-dependent consumer fail visibly and loudly while you are watching, rather than at three in the morning after you have moved on.

Follow-up

  • How would you detect a consumer that reads the field only during a monthly export?
  • One caller refuses to move and has a commercial relationship behind it. What changes in your plan and what does not?

Unblock an engineer without taking the keyboard

Easy · mentoring · leases · at-least-once

A teammate has spent two days on a job handler that occasionally writes duplicate rows. They are certain the queue is delivering twice by mistake. You suspect a lease expiring under a slow handler, so the job is running concurrently with itself. Describe how you have unblocked someone in this position: what you asked before offering a hypothesis, what you showed them rather than told them, and what you left them owning. Then say what you would do if their theory turned out to be the right one.

Approach

  1. Ask before diagnosing, and ask for things answerable from data they already have: the attempt count on the job rows that produced duplicates, the handler's observed duration against its lease expiry, and whether the duplicate rows share a natural key that a unique constraint could have caught.
  2. Teach the shape rather than the answer. A lease cannot distinguish a dead worker from a slow one, so a handler that outruns its lease is running twice by design, and deploys deliver the other half by killing handlers mid-run on every rollout. Both of their candidate theories produce identical duplicate rows, which is why the evidence has to come from timings rather than from argument.
  3. Hand over a checklist they execute: a natural key on every write the handler performs so the second copy collides rather than appends, the record of intent written before any external effect, a lease heartbeat while running, and the metric that shows it working.
  4. Keep ownership with them deliberately. Pair on the first write, then step back; if you finish it yourself you have closed one ticket and left the same person stuck on the next redelivery.

Follow-up

  • How would you distinguish a genuine double-delivery from a lease expiry using only the data already stored?
  • Their handler calls an external endpoint before recording that it did. What do you tell them to change first?

Argue against a design, lose, and commit anyway

Medium · disagreement · service boundaries · decision records

Describe a design you argued against and lost. State the failure you predicted as a named mechanism, not a feeling about complexity: two services that would need one transaction, a projection with no rebuild path, a write path with no idempotency key. Say what evidence you brought, what the decision maker weighed instead, and what you did after the decision was made: what you instrumented, what you wrote down, and whether the prediction came true. Five minutes.

Approach

  1. State the prediction in falsifiable form up front: the mechanism, the condition that triggers it, and the observable outcome. A prediction that cannot be checked also cannot be credited to you later.
  2. Show the evidence you had at the time and label each piece honestly as measured, analogous, or intuition. Keeping the intuition is fine; disguising it as data is the thing that erodes your standing in the next argument.
  3. Represent the opposing case at full strength, including the constraint you did not control: a fixed date, a team boundary, or the fact that the decision was cheap to reverse and yours was not.
  4. Make disagree-and-commit concrete. Name the artefact you left behind so the prediction could be settled without you: the alert and its threshold, the counter on the dashboard, the decision note that recorded the trade-off and the condition that would revisit it.

Follow-up

  • What threshold on that alert would have proved you right, and did anyone ever look at it?
  • If the same proposal arrived tomorrow with the same deadline, would you argue it the same way?