Interview guides · Electric Power Systems (AK)
Electric Power Systems (AK) Software Engineer Interview Guide
Electric Power Systems (AK) Software Engineer interview guide: reported rounds, questions and how candidates describe the process.
The 60-second brief
The Software Engineer role at Electric Power Systems (AK) is a highly specialized position that sits at the critical intersection of advanced software development and power systems engineering. You will be responsible for building, maintaining, and optimizing the digital infrastructure that supports complex power grid operations, protection schemes, and system-wide reliability. This role is vital to the company’s mission of ensuring safe and efficient energy delivery. You will work on software solutions that model, simulate, and control power systems, requiring a deep understanding of how code interacts with physical electrical infrastructure. It is a challenging, high-impact environment where your work directly influences the stability of regional power networks. Candidates who thrive here are those who enjoy solving complex, real-world engineering problems where the stakes are high.
This guide is scoped to a Software Engineer candidate at Electric Power Systems (AK).
Focus areas
- Power system studies
- Electrical power systems engineering
- Power system protection engineering
The Electric Power Systems (AK) interview process
Electric Power Systems (AK) candidates report 3 rounds over 3-5 weeks. The stages below are what candidates describe, not a published process.
Initial Screening
A preliminary assessment to gauge your technical background.
What to demonstrate
- A preliminary assessment to gauge your technical background
- Depth in Power system studies
How to prepare
- Be able to walk your CV end to end in two minutes, and say why this company specifically.
- Have your salary expectations, notice period and location constraints ready, and ask for the rest of the loop in writing.
Technical Deep-Dives
In-depth technical interviews to evaluate your problem-solving skills.
What to demonstrate
- In-depth technical interviews to evaluate your problem-solving skills
- Depth in Power system studies
How to prepare
- Answer aloud and timed: How do you ensure the precision and reliability of numerical models in your code?
- Answer aloud and timed: Describe a time you had to troubleshoot a software-driven issue in a power system environment.
Behavioral Assessments
Evaluations to determine cultural alignment and teamwork capabilities.
What to demonstrate
- Evaluations to determine cultural alignment and teamwork capabilities
- Depth in Power system studies
How to prepare
- Prepare three examples from your own work, each with a decision you made and an outcome you can quantify.
- Re-read the description of the behavioral assessments above and write down what you would ask to confirm before it.
Where candidates lose points
Focus on Trade-offs
In every technical answer, explain the trade-offs you considered. This demonstrates maturity and an understanding of the constraints inherent in real-world engineering.
Be Transparent About Gaps
If you are less experienced in a specific power systems domain, be honest about it, but pivot to how you would research and learn the necessary information.
Prioritize Reliability
Always emphasize how your code handles edge cases, data integrity, and system failures. Reliability is paramount in the power industry.
Questions & practice
How would you optimize a simulation algorithm for large-scale power system data?
Medium · Technical & Domain Proficiency
Approach
- Restate the input: its shape, its size, and what is guaranteed about it.
- Name the brute-force solution and its complexity before improving on it.
- Choose the data structure from the access pattern, not from familiarity.
- State the target complexity and say which constraint rules the naive version out.
Follow-up
- How does this change if the input no longer fits in memory?
- What is the worst case, and how likely is it on real data?
Archive a resource graph without breaking live references or recursing
Medium · graph traversal · topological order · tenant isolation
Resources reference other resources within a tenant; for the largest tenant the reference table holds up to 2,000,000 nodes and 8,000,000 edges. Archiving a resource must archive everything reachable from it that nothing outside the set still references, refuse when a live external referrer exists, and terminate when references form cycles, which they legitimately do. Produce the archive order and the refusal list, targeting O(V+E). Say what stops the traversal crossing a tenant boundary, and why recursion is the wrong control structure at this size.
Approach
- Load the subgraph with the tenant predicate on both endpoints of the edge, not only on the side you started from. Scoping the left table alone is the classic cross-tenant leak: one mis-entered edge then pulls another tenant's resources into the traversal and, worse, into the archive.
- Traverse iteratively with an explicit stack. A 2,000,000-node graph can hold a chain deep enough to exhaust a native stack in the low tens of thousands of frames, and that failure is a process crash rather than an error you can return.
- Treat cycles as data rather than corruption: compute strongly connected components with Tarjan in O(V+E) using its own explicit stack, then condense. The condensation is a DAG, so a topological order over it gives the archive order, and every member of a component archives in one transaction because no order within a cycle is valid.
- Decide refusals with reverse edges. A candidate is archivable only if every in-edge originates inside the candidate set, so build the transpose or count in-degrees restricted to the visited set, and emit each blocked resource with the id of the external referrer, which is the only part of the answer an operator can act on.
Follow-up
- The graph is read in one query and the archive writes a minute later. What can change in between, and how do you make the write safe?
- The candidate set is 400,000 resources. Is that one transaction, and if not, what does a half-finished archive look like to a reader?
Merge partitioned event streams into one ordered feed with bounded lateness
Hard · k-way merge · watermarks · out-of-order streams
The read-model service consumes 64 log partitions carrying about 4,000 events per second in total. Each partition is ordered within itself, but partitions drift by up to 30 seconds, and the activity feed must present a tenant's events in occurred_at order. Produce the merge. State its complexity, the buffer it requires in events and in bytes, what happens when one partition is idle, and what you do with an event that arrives after you have already emitted its position. Payloads average 1 KB.
Approach
- Merge with a min-heap over the 64 partition heads keyed on (occurred_at, event_id): O(log P) per event and O(n log P) overall. The tie-break on event_id is what makes the output deterministic when two partitions carry the same millisecond, which matters because the feed is paginated and a non-deterministic order reorders pages under the reader.
- Emitting the heap head is only correct once every partition has produced everything up to that timestamp, so the emit condition is a watermark: the minimum across partitions of the highest occurred_at seen, less the allowed lateness. Events are held until the watermark passes them, which is what turns individually ordered streams into a jointly ordered one.
- Size the buffer from the lateness rather than guessing: 4,000 events per second times 30 seconds is 120,000 buffered events, and at 1 KB each about 120 MB of heap. That number is the real price of the ordering guarantee and belongs in front of whoever asked for it.
- Handle the idle partition explicitly, because it fails the feed rather than corrupting it: a partition with no traffic never advances its own maximum, so the watermark freezes and output stops entirely. Either every partition emits a periodic idle marker carrying the broker's current time, or the watermark falls back to wall clock for a partition silent beyond a threshold.
Follow-up
- The lateness budget is raised to five minutes. What is the new buffer, and what besides memory changes?
- The consumer restarts. Where does it resume from, and what does the feed look like for the first 30 seconds?
Keep soft-deleted accounts from blocking re-registration
Easy · soft delete · unique constraints · engine differences
app_user holds user_id, tenant_id, email CITEXT, password_hash (NULL for SSO principals), email_verified_at, auth_version, status ('invited','active','suspended','deactivated'), created_at, updated_at, deleted_at. Two live accounts for one address inside a tenant must be impossible, but an address freed by a soft delete must be reusable, and the same tenant may delete and re-register it repeatedly. Write the uniqueness DDL for PostgreSQL 16, then the equivalent for MySQL 8 where partial indexes do not exist, and say what each permits once three deleted rows already hold that address.
Approach
- Start from what is actually unique: not (tenant_id, email), but (tenant_id, email) among live rows. PostgreSQL says that directly — CREATE UNIQUE INDEX app_user_live_email ON app_user (tenant_id, email) WHERE deleted_at IS NULL. A full constraint over the same two columns burns the address permanently the first time someone deletes an account.
- Keep case-insensitivity in the type or the index, never in the application: CITEXT as given, or UNIQUE (tenant_id, lower(email)) as an expression index where the extension is unavailable. A case-sensitive unique column is exactly how two accounts for one human appear.
- For MySQL 8 the predicate has to move inside the key: add a discriminator column that is a constant 0 while the row is live and is set to user_id on delete, with UNIQUE (tenant_id, email, deleted_marker). Live rows share the constant and still collide; deleted rows differ from each other and stop colliding.
- State the NULL variant and its dependency: leaving the marker NULL for deleted rows also works, because a unique index treats NULLs as distinct — true in MySQL, and true in PostgreSQL only under the default NULLS DISTINCT, which PostgreSQL 15 lets you reverse. Check the polarity against the three existing deleted rows: constant-on-live is what preserves the collision you want, and reversing it silently admits duplicate live accounts.
Follow-up
- A deleted account re-registers with the same address the next day. Do the old resource rows follow the new user_id, and how does the API keep the two principals apart?
- How do you honour an erasure request while resource_revision.actor_user_id still references this table?
Find version gaps and relay lag with window functions
Medium · window functions · event tables · frame semantics
outbox_event holds event_id, aggregate_type, aggregate_id, aggregate_version, event_type, payload, status ('pending','published','dead'), attempts, created_at, published_at. A projection is missing rows and you must decide whether the relay skipped events or the consumer dropped them. Write three queries over the last seven days: one listing every aggregate_id whose published aggregate_version sequence has a hole, one giving per-day counts with a running total, and one returning the newest published event per aggregate. For each, say where the window function is evaluated relative to WHERE and LIMIT. PostgreSQL 16.
Approach
- Gaps: compute lead(aggregate_version) OVER (PARTITION BY aggregate_id ORDER BY aggregate_version) in a subquery, then filter next_version <> aggregate_version + 1 in the outer query. Window functions are evaluated after WHERE, GROUP BY and HAVING and before the outer ORDER BY and LIMIT, so the predicate cannot sit in the same WHERE clause and PostgreSQL 16 has no QUALIFY.
- Say what the seven-day filter does to the answer: it truncates every partition, so the first row per aggregate has no predecessor inside the window and a hole spanning the boundary is invisible. Widen the window, or join to resource.version as the authority for the true maximum.
- Running total: SELECT date_trunc('day', created_at) AS d, count() AS n, sum(count()) OVER (ORDER BY date_trunc('day', created_at) ROWS UNBOUNDED PRECEDING). An aggregate inside a window call is legal because grouping runs before windowing. The grouping key is unique per row here so ROWS and RANGE agree, but write the frame anyway — over ungrouped rows with tied timestamps the default RANGE frame pulls in every peer row and the total jumps.
- Newest per aggregate: DISTINCT ON (aggregate_id) ... ORDER BY aggregate_id, aggregate_version DESC is the cheap PostgreSQL-only form when an index matches that order; row_number() OVER (PARTITION BY aggregate_id ORDER BY aggregate_version DESC) = 1 is the portable form and needs a subquery for the same evaluation-order reason as the gap query.
Follow-up
- Relay failover redelivers events. Does a duplicate break the gap query, and how would you detect one from this table alone?
- Turn the gap check into a continuous monitor rather than a query someone runs after an incident. What does it watch?
How do you ensure the precision and reliability of numerical models in your code?
Medium · Technical & Domain Proficiency
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
What methodologies do you use to validate software performance against physical power system requirements?
Medium · Technical & Domain Proficiency
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
One customer endpoint stalls deliveries to every other destination
Medium · bulkhead · timeouts · saturation
The egress service delivers about 1.5k webhooks/second across 40,000 destinations, with a per-destination concurrency cap of 4 and a 10-second connect-plus-read timeout. Throughput falls to 300/second, queue depth climbs, and p99 delivery latency for unaffected destinations goes from 200 ms to minutes, while the error rate barely moves. One tenant holds 900 destination rows whose URLs share a hostname that now answers in 9.5 seconds. Explain the mechanism with the arithmetic, then give the containment in the order you would apply it.
Approach
- Look at saturation before errors. A flat error rate with collapsing throughput says nothing is failing, things are waiting, so the first signal to pull is in-flight request count or pool wait time rather than the error counter. This is the distinction that decides the whole investigation.
- Group in-flight work by resolved host, not by destination id. The cap is keyed per destination row, so 900 rows sharing one hostname buy 3,600 concurrent slots against a single host, each held for 9.5 seconds. The bulkhead was never a bulkhead for that host, and grouping by the wrong dimension is why the dashboard looked healthy.
- Do the arithmetic in both directions. Required concurrency is arrival rate times latency, so 1.5k/second at 200 ms needs about 300 in flight, which is entirely consumed by 3,600 slow slots; conversely whatever concurrency is left sustains rate equals concurrency divided by 9.5 seconds, which is the 300/second you are seeing. Matching both numbers is what promotes this from a plausible story to the mechanism.
- Explain why the circuit breaker never helped. It opens on consecutive failures, and a 9.5-second response inside a 10-second timeout is a success. Slow is not failing, so an error-rate breaker cannot see this; you need a slow-call ratio, a deadline propagated from the caller's remaining budget, or a concurrency limiter.
Follow-up
- The host recovers to 80 ms. How long does the queue take to drain, and what does the drain do to the recovered host?
- Where should the 10-second timeout number actually come from?
Suggested practice checklist
Built from the rounds and topics Electric Power Systems (AK) candidates report.
Day 1 — Map the Electric Power Systems (AK) loop
- Write out the reported sequence: Initial Screening, Technical Deep-Dives, Behavioral Assessments.
- For each round, write one sentence on what it is judging, from the description above, and mark the one you are least ready for.
Deliverable: A one-page map of the 3 reported rounds, with the weakest marked.
Day 2 — Work Power system studies
- Spend the session on Power system studies, which Electric Power Systems (AK) candidates report being tested on.
- Write one worked example in Power system studies and time yourself on it.
Deliverable: One timed worked example in Power system studies.
Day 3 — Work Electrical power systems engineering
- Spend the session on Electrical power systems engineering, which Electric Power Systems (AK) candidates report being tested on.
- Write one worked example in Electrical power systems engineering and time yourself on it.
Deliverable: One timed worked example in Electrical power systems engineering.
Day 4 — Work Power system protection engineering
- Spend the session on Power system protection engineering, which Electric Power Systems (AK) candidates report being tested on.
- Write one worked example in Power system protection engineering and time yourself on it.
Deliverable: One timed worked example in Power system protection engineering.
Day 5 — Answer out loud: Technical & Domain Proficiency
- Answer aloud, timed: How would you optimize a simulation algorithm for large-scale power system data?
- Answer aloud, timed: Explain your experience with software that interfaces with electrical protection relays.
Deliverable: Spoken answers to 2 reported Technical & Domain Proficiency question(s), under time.
Day 6 — Answer out loud: Behavioral & Analytical Problem-Solving
- Answer aloud, timed: Describe a complex technical project you led from conception to deployment.
- Answer aloud, timed: How do you handle situations where software requirements conflict with physical system constraints?
Deliverable: Spoken answers to 2 reported Behavioral & Analytical Problem-Solving question(s), under time.
Day 7 — Dry run for Electric Power Systems (AK)
- Run one full mock under time, then write down the two questions you most want to ask your interviewers.
Deliverable: A completed timed mock and two questions to ask.
Behavioural preparation
Behavioural rounds judge the decision you made and what it cost.
Explain your experience with software that interfaces with electrical protection relays.
Medium · Technical & Domain Proficiency
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Describe a time you had to troubleshoot a software-driven issue in a power system environment.
Medium · Technical & Domain Proficiency
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Describe a complex technical project you led from conception to deployment.
Medium · Behavioral & Analytical Problem-Solving
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
How do you handle situations where software requirements conflict with physical system constraints?
Medium · Behavioral & Analytical Problem-Solving
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Tell me about a time you identified a critical flaw in a system design and how you addressed it.
Medium · Behavioral & Analytical Problem-Solving
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
How do you balance the need for rapid feature development with the requirement for high-reliability systems?
Medium · Behavioral & Analytical Problem-Solving
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Describe a situation where you had to communicate complex technical findings to non-technical stakeholders.
Medium · Behavioral & Analytical Problem-Solving
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?