Interview guides · Costain
Costain Software Engineer Interview Questions & Guide 2026
Code reading practice for Costain software engineer prep: work out what unfamiliar code does before judging it.
The 60-second brief
As a Software Engineer at Costain, you sit at the intersection of traditional engineering excellence and modern digital transformation. Costain is a leader in smart infrastructure, and this role is critical to building the systems that power the United Kingdom’s transport, water, and energy networks. You are not just writing code; you are developing software solutions that improve operational efficiency, safety, and sustainability for complex infrastructure projects.
The behavioural round is a technical round in narrative form. Prepare it by collecting specifics you actually owned, such as a design you argued against, an incident you diagnosed, or a decision you later reversed, rather than by rehearsing phrasing.
Focus areas
- Bound every outbound call with a timeout
- Paginate large result sets with keyset cursors
- Make every write idempotent under retry
Overview
Your work directly impacts how Costain manages large-scale physical assets. Whether you are working on EICA (Electrical, Instrumentation, Control, and Automation) systems, geotechnical data analysis, or integrated control platforms, your software ensures that data flows seamlessly from the field to decision-makers. You will find this role uniquely rewarding because your technical output has tangible, real-world consequences in the physical environment.
This position demands a blend of rigorous engineering discipline and creative problem-solving. You will work alongside multidisciplinary teams, including mechanical and civil engineers, to integrate software into high-stakes infrastructure. Success in this role requires a candidate who is comfortable with high levels of responsibility and who thrives in an environment where precision and reliability are the primary objectives.
The Costain interview process
Costain candidates report 4 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.
Initial Screening
The person on this call usually cannot evaluate your code and does not need to. They write a short paragraph, and that paragraph is what a hiring manager skims when deciding who to put on your loop. So the test is not whether your work was hard, it is whether a non-engineer can repeat it correctly. Name systems by what they did rather than by their internal codename, give each project a shape (what was breaking, what you changed, what happened after), and keep the whole walkthrough near ninety seconds. Depth that cannot survive a paraphrase reads as vagueness.
What to demonstrate
- Whether a non-engineer can restate your projects without distorting them, since their paraphrase is what travels to the hiring manager, not your sentences
- Whether each project has a shape rather than a stack list: the failure or constraint, the change you made, the result and how it was measured
- Whether you can say what was yours inside a team project without either inflating it or disappearing into the plural
How to prepare
- Rewrite each headline project as two sentences with no internal system names and no acronyms outside your company, then say them to someone outside engineering and have them repeat them back. Fix whatever came back wrong
- Attach one measured number to each project: the baseline, the change, and the window it was measured over. Where nothing was ever measured, say that plainly rather than reaching for a plausible percentage
- Time the background walkthrough against a clock. If it runs past two minutes, compress the earliest role to a single clause and spend the recovered time on the most recent one
Technical Deep Dives
The same problem is scored by two different mechanisms depending on the format, and preparing for one does not cover the other. With a person watching, partial progress is visible and a hint is a correction you can absorb; silence is the expensive failure, because nobody can read a half-written function. With an automated grader there is no partial credit for what you were about to do, nobody to ask, and the worked examples in the prompt are the entire specification. Read them as a contract, down to whether an empty result should be an empty list or no output at all.
What to demonstrate
- In a live session, whether your commentary tracks what your hands are doing, and whether a hint redirects you or gets defended against
- In an automated one, whether you cover the cases the examples do not show, since the hidden cases are where the score moves
- Whether you manage the clock on purpose: abandoning an approach that is not converging while there is still time to write something simpler that finishes
How to prepare
- Have someone hand you a problem and feed you one deliberately wrong hint. Practise testing it against a concrete case instead of accepting or rejecting it on authority.
- Do one timed run a week in a plain browser editor with autocomplete, linting and your own snippets switched off, which is closer to what these environments give you
- For the automated format, write the harness before the solution: a main that feeds the worked examples plus an empty and a single-element case and prints expected against actual, so a wrong submission is caught by you first
Behavioral Discussion
Your first answer is not really what is scored. It buys the follow-up questions, and those decide the round. An interviewer with fifteen minutes takes one thread and pushes on it four or five times, so a story you can only tell at a single level of detail collapses under the third why. That is an argument for fewer stories known deeply rather than one prepared per prompt. Four or five pieces of work you can still explain down to the code you changed and the argument you had about it will cover nearly anything asked in this round.
What to demonstrate
- Whether a story holds as the questioning moves from what you did to why that instead of the alternative, and then to what you would change knowing what you know now
- Whether you can re-cut a project to answer the question actually asked rather than delivering a rehearsed block that answers an adjacent one
- Whether your level of detail is chosen rather than habitual: going down to the schema when the question is about the data model, staying out of it when the question is about the person who disagreed with you
How to prepare
- Pick four projects and write the chain out four levels deep for each: what you did, why that, why not the alternative, and what would have to be true for the alternative to have won. Where you cannot reach the fourth level, you have a placeholder rather than a story
- Have someone ask why three times in a row on a single thread with nothing else added, and mark the point where you start repeating a sentence you already said. That point is where the interviewer stops learning anything
- Build a one-page index instead of an answer bank: the common prompts in this round (disagreement, a failure that was yours, thin requirements, a deadline you missed, work you inherited) mapped to which of your four projects you would use for each, so the choosing is done now rather than while an interviewer waits
Final Hiring Decision
A day like this is several different games in a row, and the expensive mistake is carrying the previous one into the next room. Coding rewards narrow precision and finishing inside a timer. Design rewards breadth, stated assumptions and naming what you are deliberately not building. Behavioural rewards specificity about people and decisions. Candidates who over-engineer a coding problem they were supposed to finish, or who start sketching class hierarchies before anyone has agreed what the system has to do, are usually still playing the last round. Between rooms, name out loud which game the next one is.
What to demonstrate
- Whether the coding round ends with something that runs and has been traced against a degenerate input, rather than an extensible design that was never finished
- Whether a design discussion opens by agreeing on traffic shape, read-to-write ratio and what is allowed to be stale, instead of proceeding from an architecture you arrived with
- Whether a behavioural answer names a person, a disagreement and what you did about it, rather than describing the system the story happened inside
- Whether the opening habits still appear late in the day: restating the problem, asking for constraints, saying the plan before typing
How to prepare
- Book three mocks of different types back to back on one afternoon and ask each interviewer afterwards which round you answered in the wrong mode
- Write a three-line opening script per round type — coding: restate, name the approach and its cost, then type; design: ask for scale, read-write mix and what must not break; behavioural: name the person, the stakes and the decision — and run it off a card so the switch is mechanical rather than remembered
- Practise coding with a timer you do not extend, stopping when it stops, so the trained reflex is to finish a correct solution rather than to keep improving one
Where candidates lose points
Letting a slow dependency consume unbounded concurrency
The failure that takes a service down is usually not an error but a delay. A dependency answering in thirty seconds instead of fifty milliseconds holds each request's worker or connection six hundred times longer, and since required concurrency is arrival rate times latency, a fleet sized for sixty in-flight requests now needs thirty-six thousand to sustain the same rate - so it queues, and requests whose clients have already abandoned them still occupy resources. Retries make it precisely worse: a policy of three attempts triples the load on a dependency at the exact moment it is least able to serve, which is how one slow dependency becomes an outage of everything sharing that pool. Containment is four specific things - a timeout on every outbound call shorter than the caller's remaining budget, a bounded pool per dependency so one cannot starve the others, backoff with full jitter rather than a fixed delay so retries do not resynchronise, and a circuit that stops sending once the failure rate makes an attempt pointless.
Running a schema change as though the lock lasts as long as the statement
In PostgreSQL an ALTER TABLE that needs an ACCESS EXCLUSIVE lock must first wait for every open transaction touching that table, and while it waits, later queries needing a conflicting lock queue behind it rather than overtaking it. A DDL statement that would execute in milliseconds, issued while a thirty-second analytics query is open, therefore stalls all traffic on that table for thirty seconds: the outage length is set by the longest open transaction, not by the change. The defences are specific and worth knowing by name - set lock_timeout low and retry rather than queue, add columns without a volatile default so no table rewrite occurs (from version 11 a non-volatile default is a metadata-only change), build indexes with CREATE INDEX CONCURRENTLY while accepting that it cannot run inside a transaction block and leaves an invalid index behind if it fails, and add constraints as NOT VALID followed by a separate VALIDATE CONSTRAINT, which takes a weaker lock.
Listing technologies instead of trade-offs
Name the property the design needs first, such as ordered range scans, multi-entity transactions, cheap appends, or a predictable p99, then pick something that provides it and say what it gives up in exchange. Almost any component is defensible once you state the requirement it satisfies and the one it sacrifices.
Naming no test cases at all
State what you would test before being asked: empty input, a single element, all elements equal, the maximum permitted size, and the input that exercises the branch you just wrote. It costs thirty seconds and is much of what separates someone who has shipped code from someone who has only solved puzzles.
Questions & practice
Archive a resource graph without breaking live references or recursing
Medium · graph traversal · topological order · tenant isolation
Resources reference other resources within a tenant; for the largest tenant the reference table holds up to 2,000,000 nodes and 8,000,000 edges. Archiving a resource must archive everything reachable from it that nothing outside the set still references, refuse when a live external referrer exists, and terminate when references form cycles, which they legitimately do. Produce the archive order and the refusal list, targeting O(V+E). Say what stops the traversal crossing a tenant boundary, and why recursion is the wrong control structure at this size.
Approach
- Load the subgraph with the tenant predicate on both endpoints of the edge, not only on the side you started from. Scoping the left table alone is the classic cross-tenant leak: one mis-entered edge then pulls another tenant's resources into the traversal and, worse, into the archive.
- Traverse iteratively with an explicit stack. A 2,000,000-node graph can hold a chain deep enough to exhaust a native stack in the low tens of thousands of frames, and that failure is a process crash rather than an error you can return.
- Treat cycles as data rather than corruption: compute strongly connected components with Tarjan in O(V+E) using its own explicit stack, then condense. The condensation is a DAG, so a topological order over it gives the archive order, and every member of a component archives in one transaction because no order within a cycle is valid.
- Decide refusals with reverse edges. A candidate is archivable only if every in-edge originates inside the candidate set, so build the transpose or count in-degrees restricted to the visited set, and emit each blocked resource with the id of the external referrer, which is the only part of the answer an operator can act on.
- Store the graph as CSR rather than a map of lists: an offsets array of V+1 8-byte entries plus E 8-byte targets is about 80 MB at this size, where boxed adjacency lists cost several times that and lose cache locality on every hop.
- Run Kahn over the condensation for the order in O(V+E). If the emitted count is short of the component count the condensation step itself is wrong, since a condensation cannot contain a cycle, which makes the check free.
Follow-up
- The graph is read in one query and the archive writes a minute later. What can change in between, and how do you make the write safe?
- The candidate set is 400,000 resources. Is that one transaction, and if not, what does a half-finished archive look like to a reader?
- An edge points at a resource in another tenant. Is that a refusal, an error, or an alert?
Collapse a redelivered event batch into per-aggregate high-water marks
Easy · hashing · at-least-once · aggregation
You drain a batch of up to 5,000,000 events, each (aggregate_id BIGINT, aggregate_version INT, event_type, payload). The log guarantees order within one aggregate only; the batch merges 64 partitions, and a relay failover has redelivered a range, so an older version for an aggregate can appear after a newer one. Given a map of last_applied_version per aggregate, produce the events worth applying, at most one per (aggregate_id, version), plus the count discarded. Target O(n) time. State the memory for 2,000,000 distinct aggregates and what you do when it does not fit.
Approach
- One pass, one hash map from aggregate_id to the highest version kept, and a discard counter. An event whose version is at or below last_applied_version for its aggregate is dropped without further work, which is the whole reason the event carries its version rather than a delta. O(n) expected time, O(d) space in distinct aggregates.
- Keep the maximum, never the last occurrence. The redelivered range means the final appearance of an aggregate in the batch can be an older version than one seen earlier in the same batch, so last-wins applies stale state over newer state and the projection regresses with no error anywhere.
- Cost the memory instead of calling it large: an 8-byte key plus a 4-byte version is 12 bytes of payload, and an open-addressed table held at a 0.7 load factor costs roughly 17 bytes per entry before per-slot metadata, so 2,000,000 aggregates is tens of megabytes in a native layout and several times that in a runtime that boxes both key and value.
- If the distinct set exceeds memory, partition on hash(aggregate_id) mod P and reduce each partition independently. Every event for one aggregate hashes to the same partition, so the per-partition result is exact and the merge is concatenation rather than a second reduction.
- Reject sorting the batch by (aggregate_id, version) as the default. It is O(n log n) and buys nothing, because max is associative and commutative and needs no ordering; sorting earns its cost only when the downstream consumer must receive the events in order rather than a per-aggregate winner.
- Separate the two mechanisms out loud: in-batch deduplication does not make the consumer idempotent, because the same event redelivered tomorrow arrives in a different batch entirely. The projection write itself still has to be keyed on (aggregate_id, version).
Follow-up
- The payload is a patch rather than a snapshot, so applying only the highest version loses the intermediate changes. What changes in your reduction?
- How do you detect that version 7 arrived while version 6 was never delivered, and what should the consumer do about the gap?
- Two events for one aggregate carry the same version with different payloads. Which one is wrong, and how would you find out?
Merge partitioned event streams into one ordered feed with bounded lateness
Hard · k-way merge · watermarks · out-of-order streams
The read-model service consumes 64 log partitions carrying about 4,000 events per second in total. Each partition is ordered within itself, but partitions drift by up to 30 seconds, and the activity feed must present a tenant's events in occurred_at order. Produce the merge. State its complexity, the buffer it requires in events and in bytes, what happens when one partition is idle, and what you do with an event that arrives after you have already emitted its position. Payloads average 1 KB.
Approach
- Merge with a min-heap over the 64 partition heads keyed on (occurred_at, event_id): O(log P) per event and O(n log P) overall. The tie-break on event_id is what makes the output deterministic when two partitions carry the same millisecond, which matters because the feed is paginated and a non-deterministic order reorders pages under the reader.
- Emitting the heap head is only correct once every partition has produced everything up to that timestamp, so the emit condition is a watermark: the minimum across partitions of the highest occurred_at seen, less the allowed lateness. Events are held until the watermark passes them, which is what turns individually ordered streams into a jointly ordered one.
- Size the buffer from the lateness rather than guessing: 4,000 events per second times 30 seconds is 120,000 buffered events, and at 1 KB each about 120 MB of heap. That number is the real price of the ordering guarantee and belongs in front of whoever asked for it.
- Handle the idle partition explicitly, because it fails the feed rather than corrupting it: a partition with no traffic never advances its own maximum, so the watermark freezes and output stops entirely. Either every partition emits a periodic idle marker carrying the broker's current time, or the watermark falls back to wall clock for a partition silent beyond a threshold.
- Choose the late-event policy from what the projection is keyed on. The projection upserts on (aggregate_id, aggregate_version) and discards a version it has already applied, so a late event is safe to apply out of order and correctness never depended on the merge at all. Apply it, recompute the affected feed page, and count lateness so the 30-second budget can be re-derived from data rather than folklore.
- Say what the merge does not buy: ordering is guaranteed within one aggregate by the log's partitioning, and no watermark makes the cross-aggregate order authoritative. Two events from different aggregates in the same millisecond have no true order, so the feed's order is a presentation choice that must be stable rather than correct.
Worked solution (35 min)
- Write the heap comparator on (occurred_at, event_id) and the per-partition head refill.
- Write the watermark computation and the emit-loop condition, then list which buffered events are held at a chosen instant.
- Compute the buffer at 4,000 events per second, 30 seconds and 1 KB per event, and state what fraction of a worker's heap that represents.
- Add the idle-partition marker and trace the watermark with one silent partition, both with and without the marker.
- Write the late-event path and name the key that makes applying it safe.
Expected result: A 64-way min-heap merge at O(n log P) with a deterministic (occurred_at, event_id) comparator, a watermark of the per-partition minimum less 30 seconds gating emission, a stated buffer of 120,000 events and roughly 120 MB, idle markers so a silent partition cannot freeze the watermark, and a late-event policy justified by the projection's idempotency on (aggregate_id, aggregate_version).
Verify it yourself
- Feeding the partitions in an adversarial interleaving produces the same output sequence as feeding them in timestamp order.
- Silencing one partition stalls output without the idle marker and does not stall it with the marker.
- Applying a late event twice leaves the projection byte-identical, which is what permits the out-of-order path to exist.
Follow-up
- The lateness budget is raised to five minutes. What is the new buffer, and what besides memory changes?
- The consumer restarts. Where does it resume from, and what does the feed look like for the first 30 seconds?
- One partition is ten minutes behind because its producer is slow. Do you stall the feed or emit without it?
Denormalise tenant onto revisions and backfill it live
Hard · denormalisation · online migration · backfill
resource_revision (revision_id, resource_id, version, actor_user_id, change_kind, patch, request_id, created_at) has 400M rows and no tenant column; tenant_id lives only on resource. Two reads need it: a tenant-scoped audit feed ordered by created_at DESC, and an offboarding purge. Both join back to resource today. Justify adding tenant_id to resource_revision against those two reads, name the anomaly the copy introduces and the constraint that prevents it, then give the ordered migration for a live table taking 1.2k writes/second — the lock each step takes, how the backfill is batched, and where each step stops being reversible. PostgreSQL 16.
Approach
- Justify from the access path rather than from taste. Without the column, the audit feed either scans resource_revision by created_at and discards other tenants' rows, or resolves the tenant's resource_ids first and probes with them — both proportional to the tenant's whole history rather than to one page. With (tenant_id, created_at DESC, revision_id DESC) it is a seek that stops at 50 rows, and the purge becomes a ranged delete instead of a join.
- Name the cost exactly: a second copy of a fact can disagree with the first. Make the disagreement unwritable rather than documented — add UNIQUE (resource_id, tenant_id) on resource so it can serve as a foreign-key target, then FOREIGN KEY (resource_id, tenant_id) REFERENCES resource (resource_id, tenant_id) on the revision table. A revision can then only ever carry its parent's tenant.
- Step one, expand: ALTER TABLE resource_revision ADD COLUMN tenant_id BIGINT NULL, with no default, so it is a catalogue change and no rewrite. It still needs ACCESS EXCLUSIVE for an instant, and that instant queues behind the longest open transaction on the table while every later query queues behind it — set lock_timeout to 2s and retry rather than wait.
- Step two, dual-write: deploy the writer that populates tenant_id on every new revision while reads still use the join. Reversible by redeploying the previous build, because nothing reads the column yet.
- Step three, backfill: batch by primary key rather than by created_at so the cursor is dense and resumable — UPDATE resource_revision rr SET tenant_id = r.tenant_id FROM resource r WHERE r.resource_id = rr.resource_id AND rr.revision_id > $1 AND rr.revision_id <= $1 + 5000 AND rr.tenant_id IS NULL — committing per batch and persisting the cursor. Throttle on replica replay lag and on dead-tuple count, since each batch writes 5,000 new row versions. Run the backfill before the index exists so those updates can stay HOT.
- Step four, index then enforce then contract: CREATE INDEX CONCURRENTLY (cannot run inside a transaction block, scans the table twice, waits on open transactions, and leaves an INVALID index to drop concurrently if it fails); ADD CONSTRAINT ... CHECK (tenant_id IS NOT NULL) NOT VALID, then VALIDATE CONSTRAINT, which takes only SHARE UPDATE EXCLUSIVE, after which SET NOT NULL uses the validated check instead of re-scanning on PostgreSQL 12 and later. Only then move the audit reads onto the column and, in a later deploy, delete the join path.
Follow-up
- The backfill is half finished and a rollback is required. What state is the table in, and what does the previous build do with a half-populated column?
- How do you verify the backfill actually finished, given rows are still being inserted while it runs?
- A resource must now be movable between tenants. What does that do to the composite foreign key and to the revisions already written?
Hold a per-tenant active cap against concurrent creates
Hard · write skew · isolation levels · constraints
A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.
Approach
- Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
- Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
- Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
- State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.
- For the job case the invariant is expressible per row, so let the database hold it: a partial unique index on job_run (tenant_id, job_type) WHERE status IN ('queued','running') makes a second running export unwritable and the loser takes 23505, mapped to 409. That is strictly better than a counter — no drift, no reconciliation — and it is available only because the cap is one rather than fifty.
- Add the retry discipline each route demands: under SERIALIZABLE both 40001 and deadlock 40P01 are retryable and the retry must re-execute the read, while under READ COMMITTED with the counter nothing retries, because the conflict is reported to the caller rather than raised as an error.
Worked solution (35 min)
- Reproduce with two sessions that both count 49, both insert and both commit, at READ COMMITTED and then at REPEATABLE READ; record the final active count for each.
- Repeat both sessions at SERIALIZABLE and record which SQLSTATE the loser receives and at which statement it is raised.
- Implement the counter form and run a 20-way concurrent create against a tenant sitting at 45 active resources.
- Implement the partial unique index for the job case and race 20 enqueues of the same export.
Expected result: READ COMMITTED and REPEATABLE READ both finish at 51. SERIALIZABLE finishes at 50 with one transaction aborted at 40001 — usually at commit, though SSI may raise it at an earlier statement. The counter form finishes at exactly 50: of the twenty creates, the five that take the tenant from 45 to 50 return 201 and the remaining fifteen match zero rows and return 409, with no error raised. The job index admits one running export and rejects the rest with 23505.
Verify it yourself
- count(*) WHERE status='active' never exceeds the cap across 50 randomised concurrent runs.
- Remove the active_resource_count < 50 predicate and the same test must start failing; if it still passes, the race is not being exercised.
- At SERIALIZABLE, confirm every participating session is SERIALIZABLE — one session at a lower level and the guarantee is gone.
- After each run, the counter equals the real count of active rows.
Follow-up
- A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
- The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?
- How do you detect after the fact that the counter drifted, without locking the table?
How do you ensure that your code complies with industry safety and quality standards?
Medium
Approach
- Work from the requirement backwards to the design.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Describe a situation where you had to adapt your technical approach due to unexpected site conditions or hardware limitations.
Medium
Approach
- Work from the requirement backwards to the design.
- Say what you would check first and why it is the highest-information step.
- State your assumptions explicitly before working the problem.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
How do you approach the design of control systems to ensure reliability in high-stakes environments?
Medium
Approach
- Say what you would check first and why it is the highest-information step.
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Keep one tenant's bulk export from starving projection updates
Medium · backpressure · fair scheduling · head-of-line blocking · leases
The worker fleet runs about 600 jobs/second out of job_run, claimed under a lease and heartbeated while running. Most handlers finish under 200 ms; exports run for minutes. One tenant enqueues 50,000 exports. Design the scheduling so that tenant's exports slow down and nothing else does: the queue split, the concurrency caps and where they are enforced, the claim query, and the backpressure signal that stops accepting new work. State the in-flight worker count each class needs at its arrival rate, and what the cap costs the tenant that hits it.
Approach
- Do the concurrency arithmetic first, because it determines the pool shapes. Required in-flight work is arrival rate times service time: 600/second of 200 ms handlers needs about 120 workers, while one export per second at 180 seconds needs 180 on its own. The long tail dominates any pool it shares, so a single pool sized from the mean is consumed by exports while 50 ms projections queue behind them. That is head-of-line blocking, and adding capacity does not fix it because the ratio is what is wrong.
- Split by job class rather than by priority. Priority inside one pool still lets a running export hold its worker for the next four minutes - there is no preemption for a handler already executing. Separate queues and separate worker processes give each class a floor the other cannot take.
- Enforce the per-tenant cap inside the claim, not at enqueue. Claim with SELECT ... WHERE status='queued' AND run_after <= now() AND job_type=$1 ORDER BY run_after, job_run_id FOR UPDATE SKIP LOCKED LIMIT 1, restricted to tenants currently under their cap. Derive the running count from rows in status 'running' with a live lease rather than from a counter incremented at claim and decremented at completion: the derived count self-heals when a worker dies, and the counter leaks a slot every time one does.
- Make the ordering fair over tenants instead of over jobs. Strict FIFO with a cap still forces the claim to scan past 50,000 rows belonging to a capped tenant before it finds anyone else's work, so cost grows with backlog depth. Pick the tenant first from a small per-tenant queue-depth summary, then claim within that tenant, which makes the scan proportional to the number of active tenants instead.
- Close the loop with backpressure and deduplication. Reject or defer enqueues once a class's depth passes a bound, and rely on UNIQUE (job_type, dedupe_key) WHERE status IN ('queued','running') so a retrying producer collapses into one row instead of multiplying the backlog. Watch oldest-queued-age per class rather than depth: depth means nothing without a service rate, while age is the user-visible latency directly.
Worked solution (25 min)
- Compute required in-flight workers per class from arrival rate times service time, and show what one shared pool does when both classes contend.
- Write the claim statement with the per-tenant restriction, and state how the running count is derived so it survives a worker being killed.
- Trace what the claim scans when one tenant holds 50,000 queued rows, under FIFO and under tenant-first selection.
- Choose the backpressure threshold and the signal it watches, then state what the producer receives when it trips.
Expected result: Separate queues and worker pools per job class, sized from rate times service time (about 120 for 200 ms work, about 180 for exports). A per-(job_type, tenant) cap enforced inside the claim with FOR UPDATE SKIP LOCKED, with the running count derived from live leases so it self-heals. Tenant-first selection keeps claim cost proportional to active tenants rather than backlog depth. Enqueue is rejected on class depth, duplicates collapse on dedupe_key, and the alarm is oldest-queued-age per class.
Verify it yourself
- A tenant with 50,000 queued exports never occupies more than its cap's worth of workers.
- Claim cost does not grow as that tenant's backlog grows.
- Killing a worker mid-job returns its cap slot within the lease interval with no manual step.
- Projection p99 is unchanged while the export backlog drains.
Follow-up
- An export outruns its lease, so two copies run. What must the handler do to make the second copy harmless, and what does it write to guarantee that?
- With a cap of 4, the tenant's 50,000 exports now take hours. What do you tell them, and does the answer change if they are the largest tenant on the platform?
- Queue depth is flat but oldest-queued-age is climbing. Name the mechanisms that produce that exact pair of signals.
Edge instances grow 400 MB per hour until the nightly restart
Hard · memory leak · heap analysis · metric cardinality · gc
Edge API instances start at 700 MB resident and grow about 400 MB/hour; a nightly rolling restart has hidden it for weeks. Growth continues unchanged when request rate halves overnight, p99 degrades in the last hours before an instance is recycled, and heap used immediately after a forced full GC rises monotonically. The service holds no product state. Name the discriminating measurement that separates the plausible causes, give the most likely cause, and give the fix and how you would verify it.
Approach
- Separate resident memory from live heap first, because they fail differently. Resident size can grow from fragmentation, native buffers or thread stacks while the heap is flat; heap used after a full GC rising monotonically is the measurement that says objects are reachable and not being released. You already have it, so this is retention, not fragmentation, and that closes off half the candidate list.
- Use the rate's independence from traffic as the discriminator. Growth that continues at half the request rate rules out per-request objects that are merely slow to collect and points at a structure that grows with distinct values observed rather than with call volume. Write the candidates that have that property: a metrics registry keyed on a high-cardinality label, an unevicted cache, an interner, a per-key lock map.
- Take two heap snapshots an hour apart and diff by retained size, reading the dominator tree, not by allocation count or instance count. Expect one root holding a map with millions of entries, then follow the reference chain to the code that inserts and never removes. Allocation profilers point at churn, which is the wrong signal here.
- The candidate that fits this service is an observability label carrying an identifier, such as a request path recorded before templating so that /v1/resources/48213 becomes its own metric series. That grows with distinct ids seen, is independent of rate, and explains the late p99 degradation, since GC cost rises with the size of the live set.
- Fix by bounding cardinality at the source: template the path to /v1/resources/{id} before it becomes a label, move tenant id from a label to a log field or an exemplar, and cap the registry with a bounded map that evicts. Add a cardinality ceiling that fails loudly in a lower environment rather than growing quietly in production.
- Verify with a soak rather than a restart. Hold one instance out of the nightly recycle for 48 hours with the fix and compare post-GC heap and series count against an unfixed control taking the same traffic.
Follow-up
- Post-GC heap is now flat but resident size still creeps. What are you looking at, and does it matter?
- How would you have detected this before an OOM, given the nightly restart masked the trend?
- That label is what makes one dashboard useful. How do you keep the dashboard and lose the leak?
Suggested practice checklist
For someone who has spent the last few years shipping features and reading other people's code, and who has not solved a timed problem from a blank file in a long time. Five days rebuild the primitives and the patterns that sit on them, working from invariants rather than remembered solutions, and the last two attach that back to the rest of the loop.
Day 1 — Rebuild the primitives by implementing them
- Implement a dynamic array with doubling growth and an operation counter, then change the growth rule to add a fixed sixteen slots instead, and time both for n of ten thousand, a hundred thousand and a million. The fixed-increment version resizes n/16 times at O(n) each, so its total work is quadratic; doubling is what makes append amortised constant.
- Implement a hash map with separate chaining and a load-factor resize, then insert ten thousand keys engineered to land in one bucket and record what happens to lookup time, so that average-case O(1) becomes a claim with a stated precondition rather than a reflex.
- For dynamic-array append and hash-map insert, write down which cost is amortised rather than worst-case, which single operation pays the whole bill, and what a system with a hard per-operation deadline would have to do instead.
Deliverable: Two working implementations plus a timing table showing the input at which each structure's advertised complexity stops holding.
Day 2 — Arrays under an invariant: two pointers, sliding window, binary search
- Solve longest-subarray-with-sum-at-most-K using a sliding window, then run it on an input containing negative numbers and watch it return the wrong answer: extending the window only moves the sum monotonically when every element is non-negative, and that precondition is the whole reason the technique works.
- Write the binary search that finds the first index satisfying a predicate rather than an exact value, put the loop invariant above the loop in a comment, and verify termination on the two inputs that break careless versions: the empty range, and a range where every element satisfies the predicate.
- Compute the midpoint as lo + (hi - lo) / 2 and write one line on why the obvious (lo + hi) / 2 is a genuine defect in a fixed-width integer type and a non-issue in a language with arbitrary-precision integers.
Deliverable: Three solved problems, each with its invariant written above the loop, plus one recorded input on which the sliding window is provably wrong.
Day 3 — Sorting, heaps, and the greedy argument that has to be proved
- Solve one top-k problem three ways, by full sort, by a size-k heap, and by quickselect, then write the values of n and k at which each becomes the right choice, along with quickselect's quadratic worst case and why a randomised pivot makes that unlikely rather than impossible.
- Implement bottom-up heapify and count sift-down steps to confirm it does linear work rather than n log n, because most nodes sit near the bottom of the tree and therefore move only a short distance.
- Take interval scheduling by earliest finishing time and write the exchange argument out in full: given any optimal schedule, swapping in the earliest-finishing interval keeps it feasible and no smaller. Then construct the weighted variant where that same greedy fails and name what has to replace it.
Deliverable: A three-way top-k comparison with measured crossover points, one written exchange argument, and one counterexample to a greedy rule that looks almost identical.
Day 4 — Recursion, memoisation, and the step to a table
- Take one problem with overlapping subproblems, such as edit distance or coin change, instrument the plain recursion with a call counter to show the blow-up, then add memoisation and re-count.
- Convert the memoised version to a bottom-up table and state the two properties you relied on: each subproblem's result depends only on its arguments, and the dependencies form a DAG you can enumerate in order.
- Rewrite one deep recursion with an explicit stack, then find the input length at which the original hits the interpreter's frame limit, which defaults to about a thousand frames in CPython, so you know when the rewrite is required rather than decorative.
Deliverable: One problem in three forms, naive, memoised and tabulated, with call counts for each and the input length at which recursion depth becomes the binding constraint.
Day 5 — Graphs, where most of the work is choosing the traversal
- Implement BFS and DFS over one adjacency list, then answer for each which finds a shortest path in an unweighted graph and which you would use to detect a cycle in a directed graph, including why the in-progress versus finished distinction matters for the second.
- Implement topological sort by in-degree, feed it a graph containing a cycle, and confirm the failure signature is that fewer than V nodes come out rather than an exception, then note that the order it produces is one of several valid ones.
- Run a shortest-path search on a graph with a single negative edge weight and show the wrong answer, then write the precondition Dijkstra actually needs, non-negative weights, because it finalises a node's distance the first time that node is popped, and name the algorithm you would switch to and its own limit.
Deliverable: A small graph library with BFS, DFS and topological sort, plus two inputs that produce documented wrong answers under the wrong algorithm choice.
Day 6 — One day for everything that is not an algorithm
- Sketch one system only to the depth a coding-heavy loop tends to reach: the endpoints, what the service stores, and the single query pattern that decides the schema. Stop at twenty-five minutes.
- Prepare the project answer for an interviewer who codes, which means rehearsing the two levels they push to: the specific thing you built, and why you chose that approach over the alternative they will name. Open with a number and be ready to say what it excludes.
- Prepare the answer to what you would do differently, choosing a real technical mistake with a specific fix rather than a complaint about process or staffing.
Deliverable: One design sketch at endpoint-and-schema depth, plus a project answer rehearsed to two levels of follow-up.
Day 7 — Solve out loud, under time
- Do three timed problems at twenty-five minutes each in a plain editor with no autocomplete and no execution until the end, then tally separately the failures that were syntax and the ones that were approach, because those two numbers call for different fixes.
- Narrate one solution from the first sentence, stating the approach and its complexity before writing any code, and rehearse the sentence you will use when you realise mid-solution that the approach is wrong.
- Re-solve from blank the two problems you were slowest on this week and compare the times against the day they first appeared.
Deliverable: A recording of one fully narrated solution and a tally that separates syntax failures from approach failures.
The estimate and the day you knew
A slipped date is only a bad story if you sat on it. What matters is what you believed when you gave the number, the signal that told you it was wrong, how many days passed before you said so, and what you cut rather than asking for more time. Scope you defended counts as much as scope you dropped.
Describe your experience with EICA systems and how you have integrated software with physical hardware.
Medium · behavioural and engineering judgement
Approach
- Close with what you would do differently, concretely.
- State the situation in two sentences and spend the rest on the reasoning.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What did you decide not to do, and why?
- What would you do differently if you ran that again?
Tell me about a time you had to bridge the gap between software requirements and physical engineering constraints.
Medium · behavioural and engineering judgement
Approach
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
- Pick a story where you made the decision, not one where you watched it.
Follow-up
- What would you do differently if you ran that again?
- What did you decide not to do, and why?
Reverse your own decision and price the reversal
Medium · reversibility · measurement · migrations
Describe a technical decision you made and later reversed. Pick one that cost something: a service you split and merged back, a cache you added and removed, an index you created that pushed the planner onto a worse plan, a projection you rebuilt from scratch. State what you believed when you decided, the measurement that changed your mind, how long the wrong version ran in production, and what the reversal cost in migrations, dual writes, and a deprecation window for callers you did not own.
Approach
- State the original rationale without irony, in the version you would still defend given what was known then. If it is not defensible, the story is about carelessness rather than judgement, and a different example serves you better.
- Give the measurement that moved with a before and after: the p99 that did not improve, the cache hit rate that sat at 40%, the plan that flipped to a sequential scan once the table passed a size you can name.
- Cost the reversal in steps, not adjectives: expand-and-contract deploys, the dual-write window, the callers who had to be notified, the rows already written in the wrong shape that had to be backfilled or abandoned.
- Distinguish reversal from rewrite by naming what you kept. Most good reversals preserve the schema or the interface and undo one decision inside it, which is also why they were affordable.
- Finish on the process change: the smallest experiment that would have produced the same measurement in a day, and why you did not run it the first time.
Follow-up
- What in that decision was irreversible, and did you know it was irreversible when you made it?
- How did you tell the people who had already built on top of the original decision?
- What do you now measure before committing to a change of this size?