Interview guides · Cedent
Cedent Software Engineer Interview Questions & Guide 2026
Code reading practice for Cedent software engineer prep: work out what unfamiliar code does before judging it.
The 60-second brief
As a Software Engineer at Cedent, you occupy a vital position driving the design, development, and deployment of complex enterprise applications across diverse client ecosystems. Your work directly impacts how organizations manage their technical infrastructure, cloud environments, data pipelines, and specialized platforms such as ServiceNow, Workday, MuleSoft, and SailPoint. By delivering robust, scalable solutions, you help bridge the gap between business objectives and technical execution.
Find out what you will be typing into. A shared plain-text editor with no autocomplete, compiler or test runner changes what you have to hold in your head, and practising inside your own configured environment hides exactly that gap.
Focus areas
- Scope every query and cache key by tenant
- Keep money in integer minor units
- Bound blast radius with per-tenant concurrency limits
Overview
The scope of this role is broad and intellectually stimulating, encompassing everything from core software development in Java, Python, and.NET to cloud administration, containerization with Kubernetes, and enterprise integration. Whether you are building web applications, optimizing cloud infrastructure, or configuring enterprise resource planning tools, you operate at the intersection of modern engineering practices and complex system architecture. Success in this environment requires adaptability, strong technical fluency, and a passion for solving intricate software problems.
You will find that Cedent values engineers who take ownership of their deliverables and collaborate seamlessly across distributed teams. While the pace can be fast and demands a high degree of technical versatility, the opportunity for professional growth is immense. Expect to work on high-impact initiatives that test your problem-solving capabilities and elevate your engineering expertise to new heights.
The Cedent interview process
Cedent candidates report 3 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.
Recruiter Screening
Before anything technical happens, someone has to decide which rung of the ladder your loop is calibrated to, and that decision sets the bar for every round after it. It comes from how you describe scope, not from your title, because titles do not convert cleanly between companies. The weak version of the answer is team size and years. The strong version names the largest change you shipped where nobody reviewed the design, what would have broken if you had been wrong, and what you were paged for. Get the level said out loud on this call, because the range and the loop both follow from it.
What to demonstrate
- Whether the scope in your own account maps onto a level the team actually has an opening at, so a mismatch ends the process cheaply rather than after four interviewers have spent a day
- Whether your title needs re-mapping: the same word describes very different amounts of independent decision-making at a twenty-person company and a ten-thousand-person one
- Whether your compensation expectation can be filled at that level in the structure the role pays in, which is why the number gets asked for before any engineer is scheduled
How to prepare
- Write down two changes from the last two years: the largest one you designed with nobody reviewing the design, and the largest one where someone more senior did. Lead with the first when scope comes up, and be ready to say which parts of the second were yours
- Ask which level the loop is calibrated to and what changes at the level above it, then plan your weeks from that answer rather than from the posting
- Settle a total-compensation range beforehand with the split named, base against bonus against equity and its vesting period, so a question about numbers gets a number instead of the word market
Technical Rounds
What this round decides is narrow: whether you can produce code that runs and is correct on inputs nobody showed you. An elegant solution that does not compile scores below a plain one that does, so write a correct brute force first, say out loud that you know its cost, and improve it with the working version still on screen. What separates strong answers is who finds the broken case. Trace your own code against an empty input, a single element, and duplicate keys before you say you are finished, because being told is far more expensive than noticing.
What to demonstrate
- Whether degenerate inputs get checked without being asked for: an empty collection, one element, every element equal, and the extreme value the input type allows
- Whether the complexity you state matches the code you actually wrote, including a sort or a copy sitting inside a loop
- Whether the finished answer is verified against the worked examples before you call it done, rather than assumed correct because the code reads correctly
How to prepare
- Take five problems you have already solved and, without running anything, write down what each returns for empty input, a single element, and all-duplicates. Then run them and count how many you predicted wrong.
- Drill the brute force as its own skill: on ten problems, write only the obviously-correct slow version and time how long it takes to get it passing. If that is more than a few minutes, that is what to practise, not the optimal version.
- Add a fixed last step before you submit anything, reading only the loop bounds and the initial value of each accumulator, which is where most off-by-one errors live
Final Stakeholder Discussions
Nobody in the room with you decides this. Interviewers typically write their rounds up separately, often before seeing anyone else's, and the outcome is settled later from those write-ups. A split panel gets resolved by whichever note carries specific evidence, so what you want out of each room is one concrete thing that person could write down: a bug you caught yourself, a trade-off you named, a decision you owned. The rest is arithmetic. The project you describe in a behavioural conversation is often the same system you sketched an hour earlier, and the two accounts have to agree.
What to demonstrate
- Whether the scale, team size and timeline you attach to a project hold steady when that project resurfaces in a different round
- Whether each interviewer leaves with a specific thing to cite rather than a general impression of competence
- Whether a trade-off you defended in one round survives a challenge in another, instead of being quietly swapped for the answer the new interviewer seemed to want
- Whether a question you have already answered earlier in the day gets the same answer at the same depth, without visible impatience
How to prepare
- Write a one-page sheet per project fixing the figures you will quote — request volume, data size, team size, elapsed time, what broke — and say them aloud from the sheet until they come out identical every time
- For each round on the schedule, decide in advance the one sentence you want in that person's notes, then check in a mock that you said it outright instead of leaving it to be inferred
- Have someone ask you the same project question twice, an hour apart, and diff the two answers for numbers that moved or a trade-off that reversed
Where candidates lose points
Holding money in a floating-point type, or rounding it more than once
Binary floating point cannot represent 0.01 or 0.1 exactly, so sums drift and two code paths that should agree disagree by cents nobody can trace back. The fix is integer minor units or an exact decimal type end to end, with sub-cent rates expressed as scaled integers such as micro-units, because a per-request price genuinely is smaller than a cent. The second half of the trap is rounding position: rounding each line and then summing gives a different total from summing and rounding once, and half-up and half-even diverge systematically across many lines, so rounding must happen at one named place and every downstream reader must carry the rounded value rather than recompute it from quantity and rate.
Treating a timed-out write as a failed write
A timeout says the response did not arrive, not that the work did not happen; the server may well have committed and then lost the connection. Retrying a non-idempotent create after a timeout is the standard way to end up with two of something, and those duplicates land precisely when the system is already degraded and least able to absorb them. The discipline is to treat a timeout as unknown: either the write carries an idempotency key so the retry is safe by construction, or the client re-reads authoritative state before deciding what to do, and the interface says unknown rather than showing a failure that invites a second click.
Choosing a schema before the access patterns are known
Write the queries first, with their filters, sort orders, cardinalities and which ones sit on the latency-critical path, then design tables and indexes to serve them. An index nothing queries still costs write throughput and storage, and a hot query with no supporting index becomes a full scan that only hurts once the table is big.
A queue or buffer with no bound
Every producer-consumer boundary needs a capacity and a policy for reaching it: block the producer, shed load, or drop the oldest entry. Unbounded buffering converts a temporary slowdown into memory exhaustion and hides the backpressure signal that would have revealed the consumer was falling behind.
Questions & practice
Fold a deduplicated usage stream into hourly rollups
Easy · aggregation · deduplication · watermarks · exact-arithmetic
You are given one day of usage_event rows, up to 250 million, each carrying event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at and ingested_at. Produce usage_rollup_hourly cells keyed (tenant_id, workspace_id, sku, hour_start) with quantity_sum, event_count and source_max_ingested_at. An event counts once per (tenant_id, idempotency_key). The rollup grain has no environment column, so state your filter. One pass. Give your time and space bounds, and say what the deduplication actually costs in memory.
Approach
- Bucket on
occurred_at, neveringested_at:hour_start = date_trunc('hour', occurred_at at time zone 'UTC'). The two columns answer different questions.occurred_atsays which hour the customer is billed for;ingested_atsays how current the fold is. Using the second for the first makes late data invisible instead of correctable. - The fold is trivial and the deduplication is the entire cost, so price it before designing anything clever. An exact set over
(tenant_id, idempotency_key)at 250M entries, stored as a 16-byte 128-bit hash in an open-addressed table at 0.7 load factor, needs about 357M slots at 16 bytes each, roughly 5.7 GB. The fix is partitioning byhash(tenant_id) % Pso each shard holds 1/P of the set and no tenant's keys straddle shards. - Rule out a Bloom filter as a replacement, in the right direction: a false positive reports 'already seen' for an event never seen, so you drop a real event and lose revenue with no error raised. It is usable only as a negative pre-filter in front of the exact set, where a miss is conclusive and a hit must fall through to the real lookup.
- Accumulate in scaled integers, not binary floating point.
numeric(20,6)admits values below 10^14, so one event scaled to micro-units can reach 10^20, past int64's 9.22 x 10^18; use a 128-bit or arbitrary-precision accumulator unless you first bound the per-event maximum. binary64 represents integers exactly only to 2^53, about 9.01 x 10^15, and cannot represent 0.1 at all, so two runs that sum in different orders disagree. - Carry
source_max_ingested_at = max(ingested_at)over the events folded into each cell, and countevent_countover accepted, post-dedup events. Without that watermark there is no way to prove later what a number did and did not include, which is the first question any reconciliation asks. - State the environment filter explicitly, because the rollup grain cannot record it. A fold that quietly includes
stagingbills non-production traffic; one that quietly excludes it loses a cost signal. Production-only is the billing answer, and either way it belongs in the job name and the output metadata. Complexity: O(n) time, O(distinct dedup keys) space, dominated by the dedup set rather than by the cells.
Follow-up
- A producer retries at 23:59:59 and the retry lands at 00:00:01. The unique index on the daily-partitioned table must include the partition key. What gets double-counted, and what is the smallest change that fixes it?
- The consumer acknowledges its batch before committing the fold. Which failure loses revenue now, and which arrangement duplicates instead?
- What makes a re-run over the same day produce byte-identical rollups?
Find peak concurrent sandbox usage from run intervals
Medium · sweep-line · intervals · concurrency-caps · null-semantics
Given up to 5 million job_run rows for one tenant over one day, with run_id, started_at, finished_at, status and wall_clock_limit_seconds, report the maximum number of sandboxes running at once, the earliest instant that maximum is reached, and the first run_id that would breach a per-tenant cap of C. started_at is null while a run is queued; finished_at is null both for runs still executing and for runs in status lost. Treat a run as occupying [started_at, finished_at). Give the complexity and state how you handle each null.
Approach
- Turn each run into two sweep events,
(started_at, +1)and(end, -1), then sort the 2n events by timestamp with-1ordered before+1at equal timestamps. That tie-break is what makes the interval half-open, so a run finishing at 10:00:00 and one starting at 10:00:00 never overlap. - Decide each null out loud before sweeping, because each choice moves the answer. A null
started_atmeans queued and contributes nothing. A nullfinished_atwith statusrunningorleasedis clipped to the window end. Statuslosthas no observed end at all, so clip it atstarted_at + wall_clock_limit_secondson the grounds that the supervisor owns the timeout, and record that you did. The table'scheck (finished_at is null or started_at is not null)guarantees you never see an end without a start. - Sweep once, maintaining a running counter, the maximum, and the timestamp at which the maximum was first attained (update
peak_atonly on a strict increase, or you will report the last such instant instead of the earliest). Capture the firstrun_idwhose+1takes the counter to C+1 during the same sweep rather than in a second pass. - Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by
started_at, a min-heap of end times gives O(n log k) time and O(k) space with k the peak concurrency, which is the better shape when the rows come from an index scan on(tenant_id, started_at). - If second resolution is acceptable, counting-sort the endpoints into an 86,400-slot delta array and prefix-sum it: O(n + T) time and O(T) space, which beats the comparison sort at 5 million rows. It answers only at second granularity, so state which resolution the cap is defined in.
Worked solution (20 min)
- Write the null policy as three lines of prose first, one per case, and keep them beside the output.
- Emit 2n endpoint tuples
(timestamp, delta, run_id)and sort on the key(timestamp, delta)so-1precedes+1. - Sweep, tracking
cur,peak,peak_atupdated only on a strict increase, and the firstrun_idwhose+1takescurto C+1. - Build a fixture with two runs where one ends exactly when the next starts, three genuinely overlapping runs, one run with a null
finished_atand statusrunning, and one with statuslostand a 300-secondwall_clock_limit_seconds. - Re-run with every timestamp shifted by a constant and confirm the peak is unchanged while
peak_atshifts by the same constant.
Expected result: Peak is 3, from the overlapping trio. The exact-handoff pair yields a peak of 1, not 2. peak_at is the start instant of the third overlapping run. The lost run occupies exactly [started_at, started_at + 300s) under the stated policy.
Verify it yourself
- Setting
peak_aton>=rather than>moves the reported instant to the last time the peak was attained. Flip it and watch the fixture change. - Sorting by timestamp alone, without the delta tie-break, raises the reported peak on the handoff fixture.
- The deltas over the whole sweep sum to zero once every open-ended run has been clipped.
Follow-up
- Now report peak concurrency per tenant for 10,000 tenants from one globally sorted stream. What changes about memory and about the sort?
- The cap has to be enforced at dispatch rather than reported afterwards. What does the admission check look like, and where does it race?
- How would you answer 'peak concurrency within any 5-minute window' without re-sorting?
Locate a billing reconciliation gap without rescanning ninety million events
Hard · reconciliation · dimensional-bisection · watermarks · hypothesis-testing
A tenant's sealed invoice total is 0.4% below the sum of its raw usage_event rows for the period. That tenant has 90 million events over 30 days in a table partitioned daily on ingested_at, and its rollups carry source_max_ingested_at, revision and sealed_at. Recomputing all 30 days from raw is correct, and you are not going to do it. Give the procedure that locates the divergent (workspace, sku, hour) cell, the cost of each probe, and the one query you run before any of it.
Approach
- Run the free query first. Sum raw quantity for the period restricted to
ingested_at <= source_max_ingested_atof the sealed rollups, and compare that against the unrestricted sum. The rollup stores the watermark precisely so this can be answered without a scan. If the whole 0.4% sits above the watermark, nothing is broken: it is late data, it becomes an adjustment line, and the investigation ends in one query. - Only if the gap survives that test do you bisect, and you bisect by dimension rather than by rows. Compare 30 per-day totals, then inside the offending day compare the 6 SKUs, then the workspaces, then the 24 hours. That is roughly 30 + 6 + W + 24 grouped probes, each an indexed range scan over one daily partition for one tenant, against O(N) per attempt for the naive re-fold.
- Quantify why naive is not merely slow but unusable mid-incident: at a generous 200,000 rows/second sequential, 90 million rows is about 7.5 minutes per attempt, you will want ten attempts, and every one competes for I/O on the same partitions live ingest is writing. The diagnostic worsens the backlog it is diagnosing.
- Before fetching each comparison, state what it would look like under each hypothesis. Two adjacent hours off by equal and opposite amounts is
occurred_atversusingested_atbucketing. A whole day offset by exactly N hours is a timezone applied at the wrong layer. A gap confined to one SKU in one workspace is an environment filter. The same(tenant_id, idempotency_key)present in twoingested_daypartitions is the dedup horizon losing a retry that crossed midnight. - Make the next bisection cheap by storing the aggregate you keep recomputing. A per-
(tenant_id, ingested_day)count and quantity checksum turns step two from thirty probes into one read, and it is the same number the reconciliation job already produces. - Whatever you find, the sealed period does not change value. The correction is an adjustment line pointing at the line it reverses, carrying its own
source_rollup_watermark, because the original invoice is the evidence of what the customer was charged.
Follow-up
- The gap is 0.4% in one direction on one day and 0.4% the other way the next day. What does that shape rule in, and what does it rule out?
- How do you distinguish a duplicate from a restatement, given
revisionandrecomputed_aton the rollup? - Ingest is still running while you investigate. What makes your two numbers comparable at all?
Migrate a live partitioned event table without blocking ingest
Hard · online migration · ddl locks · expand and contract · partitioning
usage_event is range-partitioned daily on ingested_at, holds roughly 250M rows per day across 400 live partitions, and is written at 10-40k rows/second. Two changes are required: quantity must move from double precision to numeric(20,6), and a new environment column must become NOT NULL with a default of 'production'. Ingest cannot stop. Give the ordered plan, naming for each step the lock it takes, what that lock blocks, and roughly how long it is held. Identify the one step that cannot be rolled back cleanly once traffic depends on it.
Approach
- Classify the two changes before planning anything. Adding a column with a non-volatile default has been metadata-only since PostgreSQL 11, so it is cheap. Changing double precision to numeric is not binary-coercible, so
alter column ... typerewrites every partition under ACCESS EXCLUSIVE and rebuilds its indexes; on this volume that is hours of blocked ingest and is simply not an option, which is why the plan is expand-and-contract rather than one statement. - Expand: add
quantity_numeric numeric(20,6)andenvironmentwith its default on the parent. Both are catalogue-only but both take a brief ACCESS EXCLUSIVE that cascades to partitions, so run each withlock_timeoutset to a second or two and retry on failure. A queued ACCESS EXCLUSIVE request blocks every reader behind it, which is how a metadata-only change turns into an outage. - Dual-write: deploy producer code that populates both columns on every insert, and leave it running before anything reads the new column. This is the step that cannot be reverted cleanly. Once readers depend on quantity_numeric, reverting the writer leaves rows with a null there, and the gap is only discoverable by re-reading the old column, which the readers have stopped doing.
- Backfill older partitions in batches keyed on the primary key, oldest first, committing every few thousand rows with a pause between batches, and skipping the partition still receiving writes until it rotates. Each batch is an ordinary UPDATE taking row locks only. The cost is bloat and WAL rather than blocking, so watch dead tuples and let autovacuum keep pace instead of wrapping 400 partitions in one transaction.
- Make NOT NULL cheap with the three-step form:
add constraint ... check (environment is not null) not valid(brief ACCESS EXCLUSIVE, no scan), thenvalidate constraint(SHARE UPDATE EXCLUSIVE, scans while reads and writes continue), thenset not null, which from PostgreSQL 12 uses the validated check and skips its own full scan. Do this per partition, then on the parent. - Switch and contract: move reads to the new column behind a flag, verify over a full period that both columns agree on freshly written rows, drop the old column (metadata-only), and only then remove the dual-write. Any index on the new column goes on with CREATE INDEX CONCURRENTLY per partition, since CIC is not supported on a partitioned parent: create the parent index with ONLY, build each child concurrently, then ALTER INDEX ... ATTACH PARTITION until the parent index becomes valid.
Worked solution (45 min)
- On a scratch cluster, build 10 partitions of 2M rows each and run a writer at a few thousand inserts/second.
- Run the naive type change and measure how long writes stall and how far ingest lag grows before killing it.
- Run the expand step with
lock_timeout = '2s'while the writer runs, and observe a clean lock timeout and retry instead of a pile-up of blocked readers. - Backfill in 5k-row batches and chart dead tuples and WAL generated per batch.
- Run the not-valid, validate, set-not-null sequence and confirm from
pg_stat_activityand timings that nothing held an exclusive lock through a full scan. - Add an index with CIC per partition plus ATTACH PARTITION and confirm the parent index reports valid only after the last attach.
Expected result: An ordered expand, dual-write, backfill, switch, contract plan with the lock named per step: metadata-only ADD COLUMN under a brief ACCESS EXCLUSIVE taken with lock_timeout; batched UPDATE backfill under row locks; CHECK NOT VALID, then VALIDATE under SHARE UPDATE EXCLUSIVE, then SET NOT NULL; CREATE INDEX CONCURRENTLY per partition with ATTACH PARTITION; and the dual-write-to-read switch identified as the step that cannot be reverted cleanly.
Verify it yourself
- No step in the plan holds ACCESS EXCLUSIVE for longer than the configured lock_timeout.
- The writer's error rate stays at zero through the rehearsal apart from the deliberate lock timeout.
- After VALIDATE, SET NOT NULL completes in milliseconds on a table where the naive form scanned every row.
- Freshly written rows agree on both columns for a full verification period before the old column is dropped.
Follow-up
- A CREATE INDEX CONCURRENTLY fails halfway through the partition list. What state is the table in, how do you detect it, and what do you run?
- The producer computes quantity itself. What happens to a request already in flight when the dual-write deploy lands, and does it matter?
- Give two queries that prove the backfill is complete: one cheap enough to run every minute, one authoritative.
Find the join that inflates every invoice total
Medium · join fan-out · aggregation grain · sql correctness
invoice_line_item holds line_id, invoice_id, tenant_id, sku, rate_tier, quantity, unit_price_micros, amount_minor (bigint), currency, kind, voided_at. invoice_payment_attempt holds attempt_id, invoice_id, tenant_id, amount_minor, status (succeeded, failed, pending), created_at, and an invoice has many attempts. A finance report runs select i.invoice_id, sum(l.amount_minor), count(p.attempt_id) from invoice i join invoice_line_item l using (invoice_id) join invoice_payment_attempt p using (invoice_id) group by 1 and the totals are wrong. Say precisely what the sum now equals, and write a version that is also correct for invoices with zero attempts.
Approach
- Compute what the query actually returns before fixing it. The two joins form a Cartesian product per invoice, so each line row repeats once per attempt row:
sum(l.amount_minor)is the true total multiplied by the attempt count, andcount(p.attempt_id)is attempts times lines. Three lines and two attempts report double the money and six attempts. - Reject the reflex repair.
count(distinct p.attempt_id)does fix the count, because attempt_id is unique.sum(distinct l.amount_minor)does not fix the sum, because two legitimate lines with equal amounts collapse into one. DISTINCT inside an aggregate deduplicates values, not rows, and the difference stays invisible until two lines happen to match. - Aggregate each branch to invoice grain before joining: one CTE summing lines by invoice_id, one counting attempts by invoice_id, then join the two results. A LATERAL subquery per invoice is equivalent and sometimes plans better when the outer set is small. Either way every aggregate stays at the grain it was defined at.
- Keep invoices with no attempts by making the attempt branch a LEFT JOIN with
coalesce(attempt_count, 0). An inner join here silently drops every unpaid invoice, which is usually the exact population finance is asking about. - Push each filter to its own grain:
where l.voided_at is nullbelongs inside the line CTE, not the outer query, or it would also filter the attempt branch through the join. Put the tenant predicate on both branches, since the denormalised tenant_id is what stops a wrong join crossing tenants. - Leave yourself a standing check: an invoice total is a function of its non-voided lines and of nothing about payments, so if changing the payment filter moves the money figure, the fan-out is back.
Follow-up
- Add a third branch for credit notes applied to the invoice. Does the CTE shape still hold, and when would a single pass with
filter (where ...)be better? - Over 500k invoices this report takes minutes. Which grain would you materialise, and how do you keep it correct when a line is voided?
- The same report is needed per tenant per month. What index makes the line CTE cheap?
How do you approach scaling an existing monolithic application into a modular, cloud-native architecture?
Medium · system design and architecture
Approach
- Fix the scope first: who calls this, how often, and what they do when it fails.
- State the consistency you need, and where you are willing to be stale.
- Choose a partition key and say what query it makes expensive.
Follow-up
- What breaks first when traffic grows ten times?
- What would you drop to keep the system up under load?
What strategies do you use for monitoring, logging, and troubleshooting distributed cloud environments?
Medium · system design and architecture
Approach
- State the consistency you need, and where you are willing to be stale.
- Choose a partition key and say what query it makes expensive.
- Name the failure you are designing for, then the recovery path.
Follow-up
- How does this behave when that dependency is down for an hour?
- What breaks first when traffic grows ten times?
How do you secure cloud environments, manage identity access management, and protect sensitive data?
Medium · system design and architecture
Approach
- Name the read and write paths separately; they rarely have the same bottleneck.
- Fix the scope first: who calls this, how often, and what they do when it fails.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- What breaks first when traffic grows ten times?
- What would you drop to keep the system up under load?
How do you design and deploy scalable, fault-tolerant infrastructure using cloud services?
Medium · system design and architecture
Approach
- Choose a partition key and say what query it makes expensive.
- Name the read and write paths separately; they rarely have the same bottleneck.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- How does this behave when that dependency is down for an hour?
- What would you drop to keep the system up under load?
What experience do you have with API integration, and how do you ensure secure, reliable data exchange between services?
Medium
Approach
- Work from the requirement backwards to the design.
- Clarify what is being asked and what a complete answer contains.
- Say what you would check first and why it is the highest-information step.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
A resumable usage export that never skips a row
Easy · pagination · indexing · tenant scoping · visibility
Customers pull their own rows from usage_event through GET /v1/usage to reconcile against their own systems. The table is append-only and partitioned daily on ingested_at; a large tenant adds millions of rows a day while the export is being walked, and a client may pause for hours and resume. Specify the cursor, the index it requires, the tenant scoping, the ordering guarantee you can honestly offer, the per-page cost as the walk deepens, and what the client must do to avoid missing rows.
Approach
- Rule out LIMIT/OFFSET on two independent grounds and say both, because fixing only one leaves the other. Correctness: rows inserted between page requests shift the window, so a walking client skips rows and repeats others, which for a reconciliation consumer is silent data loss rather than an error anyone sees. Cost: the database still produces and discards the skipped rows, so page N costs time proportional to N x page_size and a deep page degrades from milliseconds to seconds.
- Use keyset pagination over a stable, unique, indexed ordering: WHERE tenant_id = $1 AND (ingested_at, event_id) > ($2, $3) ORDER BY ingested_at, event_id LIMIT $4, carrying the last row's pair as the cursor. The row-value comparison navigates a composite btree directly, so each page is O(log n + page_size) and stays constant as the walk deepens. The precondition is that the cursor columns never change value for a row, which ingested_at satisfies and updated_at would not.
- Lead the index with tenant_id - (tenant_id, ingested_at, event_id) - which is simultaneously the correctness guard and the plan choice. An index on (ingested_at) alone forces a filter across every tenant's rows, and on a table where one tenant holds most of them that is fine only for that tenant and terrible for everyone else. Because ingested_at is also the partition key, a resumed cursor prunes to the partitions from the cursor forward.
- Name the visibility hazard rather than assuming it away: in PostgreSQL now() is transaction start time, so a transaction that starts at T, inserts, and commits at T+8 s writes a row whose ingested_at is T but which becomes visible only at T+8 s. A walker that has already passed T never returns it. The gap equals the writer's longest transaction, so the mitigation is either a safety lag - serve only rows older than now() minus the longest permitted transaction - or a client that re-walks a trailing overlap window and deduplicates on event_id, which is stable and unique.
- Offer the guarantee you can actually keep: ordering by (ingested_at, event_id) with no claim whatsoever about occurred_at order, and completeness only behind the safety lag or with the documented overlap-and-dedup obligation on the client. Saying this in the API reference is part of the design, because the client's reconciliation logic is what has to absorb it.
Worked solution (20 min)
- Write the keyset query and the exact index it needs, then read the query plan and confirm there is no Sort node.
- Insert rows concurrently while walking with a LIMIT/OFFSET pager and count the distinct rows returned against the rows that exist; repeat with the keyset pager and compare.
- Construct the out-of-order commit case by hand: open a transaction, insert, hold it open while the walker passes that timestamp, then commit, and check whether the walker ever returns that row.
- Choose the mitigation - safety lag or client overlap plus event_id dedup - and write down the number it depends on.
Expected result: Keyset pagination on (tenant_id, ingested_at, event_id) with a matching composite index, constant per-page cost and no sort; the guarantee limited to ingested_at ordering with nothing claimed about occurred_at; completeness delivered by a safety lag equal to the longest permitted write transaction, or by a documented client overlap window with deduplication on event_id.
Verify it yourself
- The plan for a page should be an index scan with no Sort node. A Sort means the index column order does not match the ORDER BY and the constant-cost claim is false.
- Under concurrent inserts the offset pager and the keyset pager return different sets. Count the difference rather than reasoning about it.
- Your safety lag must be at least the longest transaction the writing service permits. If you cannot name that number, the completeness guarantee is not enforceable and should not be documented.
Follow-up
- The customer wants to reconcile by occurred_at instead of ingested_at. What breaks, and what would you offer them in its place?
- One tenant starts a full-history export. How do you keep it from occupying every connection in the pool?
- A customer reports a missing row. What do you check first, and what would each answer tell you?
What is your approach to unit testing and test-driven development in complex software projects?
Medium · debugging and production issues
Approach
- Say what evidence would prove you wrong, then go and look for it.
- Pick a bisection that eliminates candidates whichever way it turns out.
- Establish what changed and when, before forming any theory.
Follow-up
- What would you add now so this is faster to diagnose next time?
- What would you look at first, and what would it rule out?
Can you walk me through your debugging process when a production application experiences intermittent failures?
Medium · debugging and production issues
Approach
- Pick a bisection that eliminates candidates whichever way it turns out.
- Establish what changed and when, before forming any theory.
- Separate the trigger from the cause; the deploy is rarely the bug.
Follow-up
- How would you tell a cause from a coincidence here?
- What would you add now so this is faster to diagnose next time?
Suggested practice checklist
For someone who has spent the last few years shipping features and reading other people's code, and who has not solved a timed problem from a blank file in a long time. Five days rebuild the primitives and the patterns that sit on them, working from invariants rather than remembered solutions, and the last two attach that back to the rest of the loop.
Day 1 — Rebuild the primitives by implementing them
- Implement a dynamic array with doubling growth and an operation counter, then change the growth rule to add a fixed sixteen slots instead, and time both for n of ten thousand, a hundred thousand and a million. The fixed-increment version resizes n/16 times at O(n) each, so its total work is quadratic; doubling is what makes append amortised constant.
- Implement a hash map with separate chaining and a load-factor resize, then insert ten thousand keys engineered to land in one bucket and record what happens to lookup time, so that average-case O(1) becomes a claim with a stated precondition rather than a reflex.
- For dynamic-array append and hash-map insert, write down which cost is amortised rather than worst-case, which single operation pays the whole bill, and what a system with a hard per-operation deadline would have to do instead.
Deliverable: Two working implementations plus a timing table showing the input at which each structure's advertised complexity stops holding.
Day 2 — Arrays under an invariant: two pointers, sliding window, binary search
- Solve longest-subarray-with-sum-at-most-K using a sliding window, then run it on an input containing negative numbers and watch it return the wrong answer: extending the window only moves the sum monotonically when every element is non-negative, and that precondition is the whole reason the technique works.
- Write the binary search that finds the first index satisfying a predicate rather than an exact value, put the loop invariant above the loop in a comment, and verify termination on the two inputs that break careless versions: the empty range, and a range where every element satisfies the predicate.
- Compute the midpoint as lo + (hi - lo) / 2 and write one line on why the obvious (lo + hi) / 2 is a genuine defect in a fixed-width integer type and a non-issue in a language with arbitrary-precision integers.
Deliverable: Three solved problems, each with its invariant written above the loop, plus one recorded input on which the sliding window is provably wrong.
Day 3 — Sorting, heaps, and the greedy argument that has to be proved
- Solve one top-k problem three ways, by full sort, by a size-k heap, and by quickselect, then write the values of n and k at which each becomes the right choice, along with quickselect's quadratic worst case and why a randomised pivot makes that unlikely rather than impossible.
- Implement bottom-up heapify and count sift-down steps to confirm it does linear work rather than n log n, because most nodes sit near the bottom of the tree and therefore move only a short distance.
- Take interval scheduling by earliest finishing time and write the exchange argument out in full: given any optimal schedule, swapping in the earliest-finishing interval keeps it feasible and no smaller. Then construct the weighted variant where that same greedy fails and name what has to replace it.
Deliverable: A three-way top-k comparison with measured crossover points, one written exchange argument, and one counterexample to a greedy rule that looks almost identical.
Day 4 — Recursion, memoisation, and the step to a table
- Take one problem with overlapping subproblems, such as edit distance or coin change, instrument the plain recursion with a call counter to show the blow-up, then add memoisation and re-count.
- Convert the memoised version to a bottom-up table and state the two properties you relied on: each subproblem's result depends only on its arguments, and the dependencies form a DAG you can enumerate in order.
- Rewrite one deep recursion with an explicit stack, then find the input length at which the original hits the interpreter's frame limit, which defaults to about a thousand frames in CPython, so you know when the rewrite is required rather than decorative.
Deliverable: One problem in three forms, naive, memoised and tabulated, with call counts for each and the input length at which recursion depth becomes the binding constraint.
Day 5 — Graphs, where most of the work is choosing the traversal
- Implement BFS and DFS over one adjacency list, then answer for each which finds a shortest path in an unweighted graph and which you would use to detect a cycle in a directed graph, including why the in-progress versus finished distinction matters for the second.
- Implement topological sort by in-degree, feed it a graph containing a cycle, and confirm the failure signature is that fewer than V nodes come out rather than an exception, then note that the order it produces is one of several valid ones.
- Run a shortest-path search on a graph with a single negative edge weight and show the wrong answer, then write the precondition Dijkstra actually needs, non-negative weights, because it finalises a node's distance the first time that node is popped, and name the algorithm you would switch to and its own limit.
Deliverable: A small graph library with BFS, DFS and topological sort, plus two inputs that produce documented wrong answers under the wrong algorithm choice.
Day 6 — One day for everything that is not an algorithm
- Sketch one system only to the depth a coding-heavy loop tends to reach: the endpoints, what the service stores, and the single query pattern that decides the schema. Stop at twenty-five minutes.
- Prepare the project answer for an interviewer who codes, which means rehearsing the two levels they push to: the specific thing you built, and why you chose that approach over the alternative they will name. Open with a number and be ready to say what it excludes.
- Prepare the answer to what you would do differently, choosing a real technical mistake with a specific fix rather than a complaint about process or staffing.
Deliverable: One design sketch at endpoint-and-schema depth, plus a project answer rehearsed to two levels of follow-up.
Day 7 — Solve out loud, under time
- Do three timed problems at twenty-five minutes each in a plain editor with no autocomplete and no execution until the end, then tally separately the failures that were syntax and the ones that were approach, because those two numbers call for different fixes.
- Narrate one solution from the first sentence, stating the approach and its complexity before writing any code, and rehearse the sentence you will use when you realise mid-solution that the approach is wrong.
- Re-solve from blank the two problems you were slowest on this week and compare the times against the day they first appeared.
Deliverable: A recording of one fully narrated solution and a tally that separates syntax failures from approach failures.
Outage answers are graded on instruments
Nobody is scoring your stamina at three in the morning. What carries weight is which signal told you something was wrong, what you measured before touching anything, what you rolled back versus what you fixed forward, and why you picked one. 'We restarted it and it went away' is a story about not knowing.
How do you handle conflicting technical requirements from different stakeholders during the design phase?
Medium · behavioural and engineering judgement
Approach
- Close with what you would do differently, concretely.
- Pick a story where you made the decision, not one where you watched it.
- Give the blast radius: what could have broken, and what you measured.
Follow-up
- What did you decide not to do, and why?
- How did you know your change caused the improvement?
Describe a project where you collaborated with cross-functional teams to deliver a complex solution.
Medium · behavioural and engineering judgement
Approach
- Pick a story where you made the decision, not one where you watched it.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- How did you know your change caused the improvement?
- What would you do differently if you ran that again?
Argue against failing open when the control plane is unreachable
Hard · revocation · cache staleness · fail-open vs fail-closed · influence
The gateway caches credential-to-context decisions with a sixty-second TTL. A design proposal says that when control-plane reads fail, pods should keep serving from expired entries indefinitely so a control-plane outage never becomes a product outage. You believe that converts every revocation into an unbounded one. Describe a design you argued against while it was still a live proposal: what you measured or modelled to make the case, what you conceded, who decided, and what happened afterwards. Say what would have changed your mind before the decision, not after it.
Approach
- Reframe it from a values argument into a bounded-staleness argument. Both sides already accept the cache; the disagreement is only about the ceiling on how long a revoked credential keeps authorising. Put a number on the table — serve stale for up to fifteen minutes, then fail closed — and make the other side argue against a number rather than against a principle.
- Bring arithmetic rather than adjectives: the rate of revocations with revoked_reason in ('suspected_leak','auth_version_bump'), the observed distribution of control-plane unavailability, and the product of the two, which is expected requests served by revoked credentials per outage-hour. At 30k requests/second the unbounded version is not a subtle exposure and the number says so.
- Concede the strong half of the opposing case first, because that is what buys you the room: failing closed turns one service's outage into a total outage across three regions, and a control plane doing tens of writes per second is not engineered to the gateway's availability target. A proposal you have not steelmanned reads as reflex.
- Propose the asymmetry that usually resolves this: stale entitlements cost bounded money (a quota fifteen minutes out of date over-serves by a computable amount), while a stale revocation costs unbounded access. Split the cached decision by what it authorises, give the two halves different staleness ceilings, and let the entitlement half fail open while the revocation half fails closed.
- State the propagation dependency plainly, since it is the part that is missed: validity is also derived from the principal's auth_version, so password reset and sign-out-everywhere flow through this same cache. A design that bounds staleness for explicit revocation and not for auth_version bumps has only fixed half of it.
- Say who decided, and what you did afterwards in either outcome: write the decision down with its number and a review date, and instrument the exposure you were worried about so the next round of the argument is settled by data instead of by seniority.
Follow-up
- Publish-subscribe invalidation is lossy under a partition, and a TTL is the only hard bound. What TTL do you pick, and what does it cost you at 30k requests/second?
- The key was revoked because it was found in a public repository. Does your answer change, and where does that urgency live in the design?
- You lost the argument and six weeks later the failure you predicted happens. What do you say in the review, and what do you not say?