CCL Industries software engineer prep on operations: decide what you would need to see to know a release is going wrong.

The 60-second brief

As a Software Engineer at CCL Industries, you play a critical role in maintaining the digital infrastructure that supports a global leader in specialty label, security, and packaging solutions. This position is not merely about writing code; it is about building reliable systems that integrate seamlessly with the complex, high-speed manufacturing and operational environments that define CCL Industries. Your work directly impacts how internal teams manage data, optimize workflows, and maintain the precision required for a company with such a vast international footprint.

Getting the code to run is the floor. What usually separates answers is the case checked without prompting: empty input, a single element, duplicate keys, or a value that overflows the integer type you chose.

Focus areas

  • Make every write idempotent under client retries
  • Evolve APIs without breaking pinned SDK clients
  • Build at-least-once pipelines with explicit deduplication horizons

Overview

You will often find yourself operating at the intersection of software development and industrial application. Whether you are collaborating with cross-functional teams to streamline processes or developing tools that improve operational efficiency, your contributions are vital to the company's continued growth and technical agility. Expect a professional environment where clarity, communication, and practical problem-solving are valued as highly as technical proficiency.

The CCL Industries interview process

CCL Industries candidates report 2 rounds · ≈ 2-4 weeks. The stages below are what candidates describe, not a published process.

Initial Screening

Half of this call is the part candidates treat as small talk: start date, notice period, work authorisation and its timing, location and time zone, on-call, and the number. Those are what kill offers late, after several engineers have each spent a day. Surfacing a hard constraint now costs you nothing and occasionally buys you something, since a loop compressed to fit a competing deadline can usually only be arranged if it is asked for early. The common failure is deflecting the compensation question twice, then discovering at offer stage that the band never reached your number.

What to demonstrate

  • Whether your hard constraints are compatible with the role before a loop gets booked: earliest start, notice period, what authorisation you hold and when it needs action, days on site, willingness to carry a pager
  • Whether you give a compensation range with something behind it, such as current total compensation or a competing timeline, rather than leaving the band untested
  • Whether your stated timeline is real, since a competing deadline raised now is something scheduling can sometimes work around and the same deadline raised at offer stage usually is not

How to prepare

  • Write each constraint down in one line before the call and state them as facts rather than negotiating them live under a question you were not expecting
  • Set your range from two or three current data points for that level and location, and name the structure you are quoting in, so the number is comparable to the one they are holding
  • If another process is running, say where it stands and by when, and ask directly whether this loop can be scheduled inside that window

In-Person/Virtual Interviews

An unlabelled round is first an information problem, and the cheapest information is free. Whoever schedules it can usually tell you how long it runs, who will be in the room and what they work on, whether you will be writing code and in what environment, and whether anything is being sent beforehand. Ask in writing so the answer is on record, then prepare for the two or three formats those answers still leave open instead of betting on one. What separates a strong candidate is not guessing right; it is having an opening that works whichever one it turns out to be.

What to demonstrate

  • Whether you can start work from an ambiguous brief, since tolerating a vague scope without stalling is the same thing the job asks for
  • Whether the questions you asked beforehand were ones that change your preparation, such as duration, medium and who is joining, rather than ones whose answers you could not have acted on
  • Whether you adapt when the round turns out to be something other than what you were told, instead of spending the first ten minutes visibly recalibrating

How to prepare

  • Send one short scheduling message asking four things: how long, who is joining and what they work on, whether you will be writing code and where, and whether to prepare anything in advance. Treat a vague reply as real information, since it means the round is loosely structured and you will be shaping it yourself.
  • Write one opening that works in any of the formats still open: restate in your own words what you have been asked to do, then ask which of two directions is more useful to them. Say it aloud until it stops sounding recited.
  • Set up for the two most likely formats before the call starts, with a blank editor in the language you would choose and a shared document you can type into, so a format surprise costs you nothing in the first minutes

Where candidates lose points

Checking a quota with a select and then writing

Under read-committed isolation, two concurrent transactions both observe a count below the limit and both insert, so the limit is exceeded by exactly the concurrency. Repeatable read does not rescue it either: it provides a stable snapshot, and this is write skew, which snapshot isolation permits by design. The options are serialisable isolation, which detects the conflict and aborts one transaction with a serialisation failure and therefore obliges the caller to retry; a single statement with the predicate inside the write; or a constraint that makes the surplus insert fail outright. The reason this pattern survives review is that it is correct in every test that runs one request at a time.

Treating a timed-out write as a failed write

A timeout says the response did not arrive, not that the work did not happen; the server may well have committed and then lost the connection. Retrying a non-idempotent create after a timeout is the standard way to end up with two of something, and those duplicates land precisely when the system is already degraded and least able to absorb them. The discipline is to treat a timeout as unknown: either the write carries an idempotency key so the retry is safe by construction, or the client re-reads authoritative state before deciding what to do, and the interface says unknown rather than showing a failure that invites a second click.

Check-then-act on shared state

Read, decide, write is not safe under concurrency unless the decision and the write are one atomic step: a unique constraint with conflict handling, a compare-and-set, or a row lock held for the whole transaction. Two requests can both pass the existence check before either inserts, which shows up as duplicate rows under load and never in a single-threaded test.

Saying 'eventually consistent' without naming the anomaly a user would see

Describe the concrete symptom you are choosing to accept: the author reloads and their own comment is missing for two seconds, or two devices show different balances for a minute. The class of consistency model is a technical label; the tolerable anomaly is the actual product decision.

Questions & practice

Order a job dependency graph and find its critical path

Medium · topological-sort · dag-longest-path · cycle-detection · critical-path

A workspace defines up to 50,000 jobs with up to 200,000 dependency edges and an estimated duration_seconds per job. Given the edge list, reject the graph if it contains a cycle and name one cycle's nodes; otherwise return a valid execution order, the earliest possible completion time with unlimited workers, and the set of jobs whose slack is zero. Then say which single job to shorten in order to cut the completion time, and by exactly how much. State the complexity of each part.

Approach

  1. Kahn's algorithm for the order: compute indegrees, seed a queue with zero-indegree nodes, emit and decrement. O(V + E), which at 50,000 and 200,000 is milliseconds. If fewer than V nodes are emitted, the graph contains a cycle.
  2. Kahn detects a cycle but cannot name one. The nodes left with indegree above zero contain every cycle, so run one DFS restricted to that residual subgraph with three-colour marking and report the stack slice from the grey node the back edge points at. That is the difference between a usable error message and 'dependency cycle detected'.
  3. Earliest completion with unlimited workers is the longest path, which is NP-hard on a general graph and linear on a DAG. State the precondition, then relax in topological order: earliest_finish[v] = duration[v] + max(earliest_finish[u] for u in preds(v)), taking the max over an empty predecessor set as zero. The makespan T is the maximum over all nodes. O(V + E).
  4. Second pass in reverse topological order for latest_finish, then slack[v] = latest_finish[v] - earliest_finish[v]. Zero-slack nodes form the critical path, and there can be several disjoint critical paths, so return the set rather than one chain. slack[v] = 0 is exactly the statement that some longest path runs through v; equivalently, the longest path through v has length T - slack[v].
  5. The speed-up bound is the point of the question, and the obvious form of it is wrong. Shortening a zero-slack job v by d, with 0 <= d <= duration[v], cuts the makespan by min(d, T - L_avoid(v)), where L_avoid(v) is the longest path in the graph with v deleted: the longest path that avoids v, not the second-longest path overall. The two coincide only when the runner-up path misses v. Counterexample: A of 10 s feeds both B of 5 s and C of 4 s, so T = 15 s and the second-longest path is 14 s, yet shortening A by 10 s leaves a makespan of 5 s. The realised gain is the full 10 s, because both paths ran through A and shrank together, while min(10, 15 - 14) predicts 1 s. The reason is structural: shortening v reduces every path through v by d and leaves every other path alone, so the new makespan is max(T - d, L_avoid(v)).
  6. Compute L_avoid(v) the direct way: delete v and re-run the same forward relaxation, O(V + E) per candidate. The cheaper equivalent skips the deletion, since L_avoid(v) only ever matters through that max: set duration[v] := 0, recompute the makespan as T0(v) = max(T - duration[v], L_avoid(v)), and the gain is min(d, T - T0(v)), which is identical for every d <= duration[v]. Only zero-slack jobs are candidates, because shortening a job with positive slack changes the completion time not at all. One relaxation is milliseconds at this size, so ranking a critical set in the hundreds costs O(k(V + E)) and is worth doing exactly; a critical set in the tens of thousands is not, and there you evaluate a shortlist, longest jobs first, and say that the answer is the best of that shortlist rather than the optimum.

Worked solution (30 min)

  1. Build four fixtures. A: 12 jobs, two branches of 100 s and 95 s that share no job. B: fixture A plus one back edge. C: two disjoint paths tied at 100 s. D: the shared-prefix case, one job of 10 s feeding a 5 s job and a 4 s job, so the longest path is 15 s and the runner-up is 14 s.
  2. Run Kahn; on fixture B confirm it emits fewer than V nodes, then run the residual-subgraph DFS and print the actual cycle.
  3. Compute earliest_finish forward and latest_finish backward, and list the zero-slack set for each fixture.
  4. For each zero-slack job v, recompute the makespan with duration[v] := 0 to get T0(v), and record both the correct bound T - T0(v) and the wrong one, T - second_longest_path, side by side.
  5. Apply the shortening for real (20 s off the critical branch of A, 10 s off the shared prefix of D) and diff the recomputed makespan against each prediction.

Expected result: Fixture A: makespan 100 s, and shortening by 20 s leaves 95 s, a gain of 5 s. Both formulas agree here, because the 95 s branch avoids the shortened job. Fixture D: makespan 15 s, and shortening by 10 s leaves 5 s, a gain of the full 10 s, which T - T0(v) = 15 - 5 = 10 predicts and T - second_longest = 1 does not. Fixture C: the zero-slack set covers both tied paths, and shortening a job on one of them alone gains nothing, since the other path still runs 100 s.

Verify it yourself

  • The cycle printed by the DFS is a real cycle: every consecutive pair is an edge present in the input.
  • Summing durations along any zero-slack path equals the makespan exactly.
  • For every candidate, the predicted gain equals the makespan recomputed from scratch with the shortened duration. Assert the equality; do not eyeball it.
  • Fixture D is the regression test for the bound, and a fixture whose branches are disjoint is not: it passes under either formula and proves nothing.

Follow-up

  • Only m workers are available. What happens to your answer, and what can you still promise about the schedule you produce?
  • Edges arrive incrementally as the customer edits the pipeline. How do you detect a cycle at insert time without re-running Kahn over 250,000 elements?
  • Durations are estimates. How would you express completion time as a distribution, and what breaks about the critical path once you do?

Find peak concurrent sandbox usage from run intervals

Medium · sweep-line · intervals · concurrency-caps · null-semantics

Given up to 5 million job_run rows for one tenant over one day, with run_id, started_at, finished_at, status and wall_clock_limit_seconds, report the maximum number of sandboxes running at once, the earliest instant that maximum is reached, and the first run_id that would breach a per-tenant cap of C. started_at is null while a run is queued; finished_at is null both for runs still executing and for runs in status lost. Treat a run as occupying [started_at, finished_at). Give the complexity and state how you handle each null.

Approach

  1. Turn each run into two sweep events, (started_at, +1) and (end, -1), then sort the 2n events by timestamp with -1 ordered before +1 at equal timestamps. That tie-break is what makes the interval half-open, so a run finishing at 10:00:00 and one starting at 10:00:00 never overlap.
  2. Decide each null out loud before sweeping, because each choice moves the answer. A null started_at means queued and contributes nothing. A null finished_at with status running or leased is clipped to the window end. Status lost has no observed end at all, so clip it at started_at + wall_clock_limit_seconds on the grounds that the supervisor owns the timeout, and record that you did. The table's check (finished_at is null or started_at is not null) guarantees you never see an end without a start.
  3. Sweep once, maintaining a running counter, the maximum, and the timestamp at which the maximum was first attained (update peak_at only on a strict increase, or you will report the last such instant instead of the earliest). Capture the first run_id whose +1 takes the counter to C+1 during the same sweep rather than in a second pass.
  4. Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by started_at, a min-heap of end times gives O(n log k) time and O(k) space with k the peak concurrency, which is the better shape when the rows come from an index scan on (tenant_id, started_at).
  5. If second resolution is acceptable, counting-sort the endpoints into an 86,400-slot delta array and prefix-sum it: O(n + T) time and O(T) space, which beats the comparison sort at 5 million rows. It answers only at second granularity, so state which resolution the cap is defined in.

Follow-up

  • Now report peak concurrency per tenant for 10,000 tenants from one globally sorted stream. What changes about memory and about the sort?
  • The cap has to be enforced at dispatch rather than reported afterwards. What does the admission check look like, and where does it race?
  • How would you answer 'peak concurrency within any 5-minute window' without re-sorting?

Seal an hour under late data with bounded memory

Hard · watermarks · late-data · quantile-sketch · conditional-write

Metering ingest reads 256 partitions at 10,000 to 40,000 events/second. Events carry occurred_at and ingested_at, and during a producer replay the gap between them is hours. Seal each UTC hour once no more than 50 parts per million of that hour's eventual quantity can still arrive, using memory that does not grow with the size of the replay. Define the watermark, the lateness parameter and how you measure it, the structure holding open hours, and the write that performs the seal. State what an idle partition does to your watermark.

Approach

  1. Two clocks, two jobs. Bucket by occurred_at, because that is the hour the customer is billed for, and advance the watermark on ingested_at, because that is what the fold has consumed and what source_max_ingested_at records. Conflating them is what makes late data invisible.
  2. The global watermark is the min over partitions of each partition's committed ingested_at, not the max: the fold is trustworthy only as far as the slowest partition. The consequence is that one idle partition pins the watermark forever and nothing seals, so an idle partition must promote its watermark to wall clock after a stated idle timeout, and that timeout becomes a correctness parameter, because a partition that is slow rather than idle gets sealed past.
  3. Choose the lateness L from the measured distribution of ingested_at - occurred_at, weighted by quantity rather than by event count. The target is 50 ppm of the hour's quantity, and a replay is rare in events while carrying disproportionate mass, so an event-weighted quantile picks an L that is comfortably wrong at exactly the moment it matters.
  4. Measure that quantile in bounded memory. A Greenwald-Khanna summary gives epsilon-approximate quantiles in O((1/epsilon) log(epsilon n)) space; a t-digest costs more per merge but has relative error that tightens at the tails, which is the half of the distribution you are reading at p99.99. Keep a separate summary per tenant class, because one tenant's batch importer is not the population.
  5. Hold open hours in a min-heap keyed by hour_start. When the watermark advances, pop every hour with hour_end + L < W and seal it: O(log H_open) per advance and O(1) amortised per event to touch its bucket. Memory is open hours multiplied by distinct (tenant, workspace, sku) keys, so cap the number of simultaneously open hours and spill the oldest into usage_rollup_hourly as status='open' with a revision bump. While an hour is open the row is upsertable, so the store is your overflow.
  6. The seal itself is a conditional write: update ... set status='sealed', sealed_at=now() where status='open' returning .... Two sealers race on every restart, and the loser must see zero rows and stop rather than write a second value. After the seal, an event for that hour is not an upsert but an adjustment, and source_max_ingested_at is what proves it arrived afterwards.

Follow-up

  • A replay starts during the sealing window for a period you are about to close. What do you do, and what is the customer-visible consequence of each option?
  • Your measured quantity-weighted p99.99 lateness is six hours and the invoice must be issued at 02:00 UTC on the first. How do you reconcile those two numbers?
  • How would you detect that L has drifted before it costs you an hour's quantity?

Enforce a concurrent-run quota that survives simultaneous requests

Medium · isolation levels · write skew · quotas · lock contention

A plan allows at most 20 concurrently running rows in job_run per tenant. The table holds run_id, tenant_id, workspace_id, status (queued, leased, running, succeeded, failed, timed_out, cancelled, lost), lease_token, leased_until, started_at and finished_at. Today the service runs select count(*) from job_run where tenant_id = $1 and status = 'running', compares the result to 20, then inserts. Under load a tenant exceeds the cap by exactly the number of concurrent requests. Name the anomaly, say which isolation levels do and do not prevent it, and give a version that holds, as SQL.

Approach

  1. Name it: write skew. Each transaction reads a predicate (the count of running rows), neither modifies what the other read, and both then insert rows that jointly violate an invariant no single row expresses. Read committed permits it. So does repeatable read, because snapshot isolation's first-updater-wins check fires only on conflicting row updates, and these are inserts touching disjoint rows.
  2. Enumerate the fixes with their real costs. SERIALIZABLE works: PostgreSQL's SSI tracks the predicate read and aborts one transaction with SQLSTATE 40001, which obliges the caller to retry and makes the abort rate rise with contention on a hot tenant. Folding the predicate into the write as insert ... select ... where (select count(*) ...) < 20 narrows the race to the statement's snapshot but does not close it under read committed.
  3. Give the version that holds at read committed: serialise on a row both transactions must touch. update tenant_concurrency set running = running + 1 where tenant_id = $1 and running < 20 returning running updates zero rows when the cap is reached, and zero rows is the rejection. This works because at read committed a blocked UPDATE re-evaluates its WHERE clause against the newly committed row; at repeatable read the same statement raises a serialisation error instead, so the isolation level changes the calling contract.
  4. State the cost you just bought. That row is now a per-tenant serialisation point, so admission throughput for the tenant is bounded by one divided by the lock hold time; at a 2 ms hold that is roughly 500 admissions/second. Keep the critical section to the single UPDATE, with no network call or scheduling decision inside the transaction, and decrement in the same transaction that writes the terminal status.
  5. Close the leak the status enum implies: a run can end as lost, so a crashed worker otherwise consumes a slot forever. Reconcile on a schedule against status = 'running' and leased_until < now(), and treat the counter as a fast path over job_run, which stays the system of record.

Follow-up

  • Write the retry loop for the SERIALIZABLE version. What does the caller see when it keeps aborting, and what bounds the retries?
  • Two regions each keep a counter. What is the effective cap, and what does admission do when the counter store is unreachable?
  • The cap changes mid-flight on a plan upgrade. Do running jobs get killed, and what does the counter row look like during the change?

Rebuild an hourly rollup with deduplication and late-arrival accounting

Hard · window functions · deduplication · event time vs ingest time · watermarks

From usage_event (event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at, ingested_at), produce the values usage_rollup_hourly should hold for one tenant over one day: per (workspace_id, sku, hour_start) the deduplicated quantity_sum, event_count and source_max_ingested_at, bucketed by occurred_at. Duplicates share (tenant_id, idempotency_key). Also report, per hour, the running total across the day and the share of quantity that arrived more than two hours after the hour began. Write the query, and state which duplicates a daily unique index cannot catch.

Approach

  1. Deduplicate in its own CTE before any aggregation, because a SUM cannot be un-summed: row_number() over (partition by tenant_id, idempotency_key order by ingested_at, event_id) = 1. Include the tiebreaker. Without it the surviving row is non-deterministic when two duplicates share an ingested_at, and a rollup described as deterministically recomputable then disagrees with itself between runs.
  2. Bucket on occurred_at and nothing else, and pin the timezone explicitly. date_trunc('hour', timestamptz) truncates in the session's TimeZone setting, so the same query run by a session set to a non-UTC zone buckets differently; use the three-argument date_trunc('hour', occurred_at, 'UTC') on PostgreSQL 16 or later, or date_trunc('hour', occurred_at at time zone 'UTC') at time zone 'UTC' before that. Filter environment = 'production' explicitly, since metering covers three environments and billing covers one.
  3. Aggregate to the grain with sum(quantity), count(*) and max(ingested_at). The last is not decoration: it is the watermark the row consumed up to, and without it there is no way to prove afterwards what a number did and did not include.
  4. Compute the late share inside the dedup-and-aggregate step as a conditional aggregate, sum(quantity) filter (where ingested_at > hour_start + interval '2 hours'), then divide by the hour's total. Compute the running total as a window over the already aggregated rows: sum(quantity_sum) over (partition by workspace_id, sku order by hour_start rows between unbounded preceding and current row). Running either over raw rows puts the duplicates back.
  5. Answer the index question exactly. The unique constraint is on (ingested_day, tenant_id, idempotency_key), because a unique index on a partitioned table must contain the partition key. It therefore deduplicates only within one ingest day and admits a duplicate whose retry crosses midnight or whose replay runs a week later. That is why this CTE dedups across the whole window being recomputed, and why the dedup horizon is a correctness parameter rather than a retention cost.
  6. Keep the numeric type all the way through. quantity is numeric so the sums are exact; a cast to double precision anywhere in this pipeline reintroduces drift that surfaces only as a few unreconcilable cents per tenant per month, long after the query is out of anyone's mind.

Worked solution (40 min)

  1. Generate a day of events for one tenant across three workspaces and two SKUs, inject 2% duplicates sharing an idempotency_key with a later ingested_at, and inject 1% whose ingested_at is six hours past occurred_at.
  2. Write the dedup CTE alone and confirm its row count drops by exactly the injected duplicate count.
  3. Aggregate and compare quantity_sum against a ground truth computed outside SQL from the generator's own records.
  4. Add the two window and filtered aggregates, and confirm the final hour's running total equals the ungrouped day total for each (workspace, sku).
  5. Run the whole query twice over static data and diff the two outputs.
  6. Re-run with the session TimeZone set to a non-UTC zone and confirm hour_start does not move.

Expected result: One query: a dedup CTE using row_number() over (partition by tenant_id, idempotency_key order by ingested_at, event_id); aggregation by (workspace_id, sku, hour_start) producing quantity_sum, event_count and max(ingested_at) plus a filtered late-quantity aggregate; a running total as a window over the aggregated rows; and an explicit statement that the partition-scoped daily unique index cannot catch a duplicate that crosses the ingest-day boundary or arrives in a later replay.

Verify it yourself

  • Row count after dedup equals raw count minus injected duplicates, exactly.
  • The running total at the final hour equals the ungrouped day total for that (workspace, sku).
  • Two consecutive runs over static data return byte-identical rows.
  • Every hour_start is hour-aligned in UTC and unchanged by the session's TimeZone setting.

Follow-up

  • A dispute forces the same recompute over 40 days for one tenant. What changes about the dedup CTE's memory use and the chosen plan, and what would you do about it?
  • Two runs a minute apart return different quantity_sum values for an hour that is already closed. Give two mechanisms that produce that, and the single query that distinguishes them.
  • Express the same rollup incrementally so it does not re-scan the day each time the watermark advances. What does the incremental version stop being able to answer?

Pouvez-vous décrire votre parcours?

Medium

Approach

  1. Work from the requirement backwards to the design.
  2. Clarify what is being asked and what a complete answer contains.
  3. Say what you would check first and why it is the highest-information step.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Authorisation cache with a bounded revocation window

Hard · caching · invalidation · availability · authz

The edge gateway serves about 30k requests/second from roughly 120 pods across three regions and may add no more than 10 ms at p99. Each request presents an API key that must resolve to an authorisation context: tenant, workspace, scopes, entitlements and credential version. The control plane that owns those rows takes tens of writes/second. A revoked credential must stop authorising within a bound you state as a number. Design the cache - what is keyed, what invalidates it, how many tiers - and specify what the gateway does for the duration of a control-plane outage.

Approach

  1. Fix the entry shape before the topology: key on SHA-256 of the presented secret, value is the resolved context plus the principal's auth_version and a fetched_at. Cache negative lookups too, with a much shorter TTL and a bounded-size structure, because otherwise every sprayed invalid key is a control-plane round trip, and unbounded negative entries let a sprayer evict live ones.
  2. Compute the control-plane read load before choosing a TTL, and notice the multiplier is pods, not regions, when the cache is in-process: distinct_active_keys x pods / TTL. At 50,000 active credentials, 120 pods and a 60 s TTL that is 100,000 reads/second against a single-writer primary with read replicas, which is not serviceable - so the design needs two tiers, a per-region shared cache in front of the control plane with the in-process cache held to a few seconds.
  3. State the bound as the sum of the tiers, not as a hope: with a 10 s in-process TTL over a 60 s regional TTL, worst-case staleness absent any invalidation message is 70 s, because an in-process entry can be filled from a regional entry that was itself about to expire. Publish-subscribe invalidation on every credential and entitlement mutation makes the typical case sub-second, but it is lossy under partition, so the TTL is the only enforced bound and both tiers must subscribe.
  4. Make auth_version propagate through the same path: a password reset or sign-out-everywhere bumps the principal and revokes its keys with no hook of its own, so the invalidation publisher has to expand principal -> credentials and publish per key, or the cache keeps serving keys whose auth_version no longer matches.
  5. Decide the partition behaviour in advance and write it as two rules: on a cache hit past TTL, serve from the stale entry up to a grace ceiling (say 10 minutes); on a cache miss, refuse, because authorising something never seen converts a control-plane outage into an authorisation bypass. Worst-case revoked-key lifetime during an outage is then TTL + grace, about 11 minutes, and that number is the price of not turning a control-plane outage into a total data-plane outage.
  6. Protect the refill path: per-key single-flight so a mass invalidation or a cold pod does not stampede the control plane, TTL jitter so entries created together do not expire together, and a small separately replicated deny-list for compromised keys that is consulted on the hot path and survives control-plane loss.

Worked solution (35 min)

  1. Write the cache entry shape - key, value fields, and which of those fields a request actually reads on the hot path - and mark which field makes a password reset propagate.
  2. Compute control-plane reads/second for TTLs of 10 s, 60 s and 300 s using distinct_keys x cache_instances / TTL, once with cache_instances = 3 regions and once with cache_instances = 120 pods, and note which of the two the in-process design actually implies.
  3. Enumerate the four states a revocation can be in - published and received, published and dropped, control plane unreachable, pod started after the publish - and write which entry serves the next request in each.
  4. Write the outage policy as two rules (hit past TTL within grace: serve; miss: refuse) and compute worst-case revoked-key lifetime as the sum of both tier TTLs plus the grace.

Expected result: A two-tier design with a single stated number: roughly 10 s in-process over 60 s regional, so about 70 s worst-case staleness without invalidation and typically under a second with it, plus a 10-minute stale-serve grace giving about 11 minutes worst case during a control-plane outage; fail-open on a warm hit, fail-closed on a miss; a separately replicated deny-list for compromised keys; per-key single-flight and TTL jitter on the refill path.

Verify it yourself

  • Recompute the read load with pods rather than regions as the multiplier. If the number exceeds what read replicas can serve, a single in-process tier is not a viable design and you need a shared tier, a longer TTL, or routing that gives each pod a slice of the key space.
  • Trace a password reset end to end. If your invalidation publishes only on credential rows, the reset revokes nothing and the auth_version field in the cache entry is decorative.
  • State the outage behaviour as a decision already made rather than as an alert. If the answer is a human paging someone, the availability target for the control plane has not actually been set.

Follow-up

  • A key is found in a public repository and must stop working in seconds, not minutes. What changes, and what does it cost on the request path?
  • One region is partitioned from the control plane while the control plane itself is healthy. What do that region's pods do, and how do you distinguish this from a control-plane outage?
  • How would you measure the actual revocation bound in production rather than asserting it from the configuration?

Webhook workers leak until OOM and drop in-flight deliveries

Medium · memory leak · eviction · leases

webhook-delivery workers grow from 400 MB to a 2 GB limit over about 36 hours, are OOM-killed, restart, and repeat. Each restart abandons in-flight attempts, so webhook_delivery rows sit in in_flight until their leases expire and the backlog spikes. The live set measured after a forced full collection also grows. The fleet serves tens of thousands of subscriptions, several thousand of which have been failing for weeks. Give an ordered checklist, the measurement separating retention from fragmentation, and the fix.

Approach

  1. Separate the two failure shapes with one measurement: track resident set size against the live set after a forced full collection. A live set that climbs monotonically is retention; a flat live set under a rising RSS is fragmentation, off-heap or native allocation, or an allocator that never returns pages. The stated symptom puts this in the first category, which rules out allocator tuning as a fix.
  2. Characterise the curve rather than the total. Growth linear in uptime implies an unbounded structure keyed by something that keeps arriving; step growth implies buffering a large object. Correlate the slope against event rate and separately against the count of distinct subscriptions seen, because those two diverge and only one of them will fit.
  3. Diff two heap snapshots an hour apart by retained size grouped by dominant root, not by allocation count, which is dominated by short-lived objects and will point at the wrong thing.
  4. Expect a per-subscription map with no eviction: circuit-breaker or backoff state created on first failure and never removed, so the retained set grows with endpoints that have ever failed, and the several thousand permanently dead endpoints hold theirs forever.
  5. Fix in two places. Bound the in-memory structure with a size-capped LRU or a TTL keyed on last use, and move state that must survive a restart onto the subscription or webhook_delivery row, since the worker holding it in memory is exactly why a restart loses it.
  6. Repair the second-order damage separately, because it will outlive the leak: workers claim by compare-and-set with leased_until, so a bounded lease returns in_flight rows to pending on a known schedule, and a graceful shutdown releases leases instead of waiting them out.

Follow-up

  • The backlog spike after a restart is itself a thundering herd against customer endpoints. What stops the recovery from becoming a second incident?
  • Suppose the live set had been flat while RSS still climbed. Name two causes and the measurement that separates them.
  • How would you size the LRU, and what does a miss on an evicted circuit-breaker entry cost a customer whose endpoint is down?

Suggested practice checklist

For a candidate senior enough that the loop turns on design and judgement rather than on whether the coding round gets finished. Five days build one system properly and then stress it; coding gets a single maintenance day, on the assumption that the risk at this level is an unexamined tradeoff rather than a missed algorithm.

Day 1 — Numbers before diagrams

  • Build your own reference card of the figures you will re-derive all week: bytes for a realistic record, requests per second implied by a given daily active count, and the storage that a year at a given write rate produces. Derive each one rather than copying it, because the derivation is what survives a follow-up.
  • Turn one product statement into capacity requirements. From ten million daily users at four writes and forty reads each, state the peak-to-average factor you are assuming and why, then produce peak write QPS, peak read QPS and a year of storage.
  • Write the two numbers whose order of magnitude changes the design, the read-to-write ratio and the working-set size against memory per node, and state the threshold at which each one flips your answer.

Deliverable: A one-page numbers card and one worked capacity estimate with every assumption written down.

Day 2 — One system, from requirements to schema

  • Spend the first ten minutes producing only functional requirements, non-functional targets with numbers attached, a p99 latency, a durability expectation, a consistency requirement, and an explicit out-of-scope list.
  • Define the interface before the boxes: the three or four endpoints, their parameters, what each returns, and which of them are idempotent.
  • Write the data model, then write the single access pattern that justifies it, and state what the schema would have to become if the dominant access pattern were the other one.

Deliverable: One design carried to endpoint-and-schema depth, with non-functional targets expressed as numbers and a written out-of-scope list.

Day 3 — The consistency you are actually buying

  • Write out what a client sees under asynchronous replication when its write commits on the leader and its next read is served by a lagging follower, then write the two fixes, pinning that session's reads to the leader for a bounded window or carrying a version token the replica must reach, and the cost of each.
  • Work the quorum arithmetic on paper for N of three with W and R of two, and separate what R + W > N does guarantee, that any read set intersects any write set, from what it does not: on its own it is not linearizability, and a sloppy quorum that accepts writes on nodes outside the preference list breaks even the intersection.
  • Take two storage choices with different defaults, a single-leader relational store committing synchronously and a quorum-replicated store that converges eventually, and write the specific product behaviour that would be wrong under each, rather than a general statement about which is stronger.

Deliverable: A page separating what quorum overlap guarantees from what it does not, with one concrete product misbehaviour attached to each gap.

Day 4 — Failure is the design

  • For one write path, work through the case where the client times out after the server has already committed, then design the idempotency key: who generates it, how long it is retained, and what the duplicate request returns.
  • Express the retry policy as parameters rather than as a word: maximum attempts, base delay, backoff factor, jitter, and which error classes are retried at all. Then state why retrying a non-idempotent write without a key is a correctness bug and not merely waste.
  • Compute the fan-out effect on tail latency. If a request waits on ten backends and each independently exceeds its p99 one percent of the time, the chance at least one is slow is 1 - 0.99^10, about ten percent. Then write why independence is the optimistic assumption and what correlates them in practice.
  • Name the backpressure mechanism for one queue or one dependency in the design, a bounded queue with shedding or a concurrency limit, and write what the caller is told when it engages.

Deliverable: One write path with an idempotency design, a parameterised retry policy, and a written tail-latency calculation with its assumption named.

Day 5 — Scaling the hot path

  • Choose cache-aside or write-through for one read path and write the staleness window each produces, then name the invalidation event and what the system does when that event is lost.
  • Design against the stampede: either coalesce requests so only one recomputes a missing key, or refresh early with jittered expiry, and write why identical TTLs on keys populated in the same moment produce a synchronised expiry and a thundering herd.
  • Shard one table by a key you choose, then answer the two questions that break the choice: which queries now require a scatter-gather, and what happens to the distribution when one tenant is a hundred times larger than the median.
  • Write the cost of adding a node under plain modulo placement, where nearly every key moves, against consistent hashing, where roughly one key in n+1 moves, and state what virtual nodes are for.

Deliverable: A caching and sharding decision for one path, each with its failure mode and its rebalancing cost written beside it.

Day 6 — Keep the coding hand in, at the bar that applies to you

  • Solve one medium problem in thirty minutes, then spend twenty more making it production-shaped: named invariants, validation at the boundary, and errors that distinguish a caller mistake from an internal fault.
  • Write the tests you would require of a colleague's version of that function: one for empty input, one for the boundary, and one for the case the implementation is most likely to get wrong.
  • Read a piece of your own code from six months ago and write the change you would ask for, phrased as you would actually phrase it in review.

Deliverable: One problem hardened to review standard, with its test list and one written review comment.

Day 7 — Defend it while being interrupted

  • Run a forty-five-minute design mock with an interviewer briefed to change a requirement halfway, a tenfold traffic increase or a new strict consistency requirement, and to push on one number you estimated.
  • Rehearse the two sentences a senior loop is listening for: naming the tradeoff you are choosing against and why, and saying what you would measure to learn that the choice was wrong.
  • Prepare the design you regret: a real decision, the constraint that produced it, what it cost, and what you changed afterwards.

Deliverable: Mock notes recording how the design changed under the new requirement, plus a written account of one regretted decision.

Disagreement needs an outcome you did not choose

Conflict answers where you were right and everyone came round are the weakest ones. Stronger: the evidence you went and collected, what would have changed your mind, and what you did in the weeks after the call went against you. Implementing a design you argued against, properly, is a specific and checkable behaviour.

Describe a time that you had a conflict at work and how you worked through it.

Medium · behavioural and engineering judgement

Approach

  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Name the disagreement and how you resolved it with evidence.
  3. Give the blast radius: what could have broken, and what you measured.

Follow-up

  • How did you know your change caused the improvement?
  • What would you do differently if you ran that again?

Reverse a webhook ordering decision after measuring its cost

Medium · reversing decisions · head-of-line blocking · at-least-once · api contracts

You argued for strict per-subscription ordering in webhook-delivery, which means one in-flight attempt per subscription. It shipped. Three months later a single unresponsive endpoint holds one subscription's queue at a six-hour backlog, and two customers report events arriving out of order anyway once their own retries are counted. Describe a decision you reversed: what you originally optimised for, the measurement that changed your mind, what the reversal cost in engineering time and customer change, and how you told the people who had already built on the original guarantee.

Approach

  1. State the original decision as a trade you made knowingly. Ordering across a network requires a single in-flight attempt per subscription, and its price is head-of-line blocking whenever one endpoint is slow. 'We priced it wrong' is a much stronger opening than 'we did not realise', and it is usually the true one.
  2. Bring the measurement that flipped it, not the anecdote: backlog age at the ninety-ninth percentile per subscription, the share of subscriptions where one slow endpoint gated an otherwise healthy queue, and the delivery throughput lost to serialisation. A reversal justified by complaints is indistinguishable from a reversal justified by fatigue.
  3. Name what you learned about the guarantee itself, which is the engineering content of this story. At-least-once delivery means a retried event already arrives after newer ones and the consumer already must be idempotent, so a guarantee the customer has to defend against anyway was never worth what it cost to provide.
  4. Describe the migration, because reversing a published contract is the hard half and the part candidates skip. Parallel attempts behind a per-subscription flag, a monotonically increasing sequence number added to the envelope so order-sensitive consumers can sort or discard, documentation that states at-least-once and unordered in those words, and a deprecation measured in quarters because the client is a pinned SDK inside a build pipeline you cannot see or redeploy.
  5. Give the cost in the two currencies that matter: engineer-weeks, and how many customers had to change code. Then say who you told before it shipped rather than in a changelog afterwards, and which large customer you left on the old behaviour and for how long.
  6. Close with the signal you now weight differently, stated as something you would do earlier next time: measuring the blocking cost on the slowest decile of endpoints before committing to the guarantee, rather than after a customer noticed.

Follow-up

  • A customer insists they need ordering. What do you offer them that is not global serialisation?
  • How did you choose the deprecation window given that you cannot see or redeploy the clients?
  • What would have to be true for you to reverse back?

Estimate a tenant-leading index migration you have never run

Hard · estimation · online migration · index builds · uncertainty

Someone needs a date. usage_event carries an index on (occurred_at) and needs (tenant_id, occurred_at); the largest tenant holds roughly a hundred times the median tenant's rows, the table is partitioned daily with years of retention, and you have never run a migration on a table this large. Give an estimate you would defend: how you decompose the work, the two or three numbers you would go and measure first, the range and confidence you state, and what you commit to when the person asking needs a single date today.

Approach

  1. Refuse the bare number and then give one anyway, in the form that is actually useful: a range plus the measurement that collapses it. 'Four to eleven days; one afternoon building this index on a restored copy of the largest partition takes that to within a day' is an answer, while 'it depends' is not.
  2. Decompose by failure mode rather than into equal chunks, because that is where estimates go wrong. On a partitioned parent you create the index ON ONLY the parent, build each partition's index with CREATE INDEX CONCURRENTLY, then ALTER INDEX ... ATTACH PARTITION, at which point the parent index becomes valid. CONCURRENTLY does not block writes but scans each partition twice, waits out older transactions, cannot run inside a transaction block, and on failure leaves an invalid index you must drop concurrently and retry.
  3. Name the two unknowns that dominate and price them: build time on one restored partition of realistic size, and whether the planner actually chooses the new index for the skewed tenant, since selectivity for a tenant holding most of the rows is a different question from selectivity for the median tenant. Both are half-day measurements against a replica, and both are cheaper than being wrong by a week.
  4. State the assumptions the range is conditional on, because that is what makes a slip a re-estimate instead of a credibility event: no partition above a stated row count, one concurrent build at a time so it does not compete with ingest for I/O, and an ingest backlog that can absorb the added write amplification while both indexes exist.
  5. Budget the step nobody budgets: verification and the old index's removal. Dropping the old index is fast, but deciding it is safe to drop means confirming no plan still uses it, and that confirmation waits on real traffic across a full weekly cycle rather than on your patience.
  6. Answer the single-date request honestly. Commit to a date for the first checkpoint — the measured build number from the replica — and to re-estimating on that date, and say plainly what you are not committing to yet. A date with a scheduled re-estimate is worth more to the asker than a confident wrong one, and you should say why in those words.

Follow-up

  • The concurrent build fails half way through the largest partition. What is the state of the database and what do you do next?
  • Your estimate slips by sixty percent. Which assumption broke, and at what point would you have known?
  • The person asking needs the date for a customer commitment. Does your answer change?