cswork / libraryOpen practice workspace

Interview guides · Balyo

Balyo Software Engineer Interview Questions & Guide 2026

Concurrency drills for Balyo software engineer prep: races, lock ordering, and what a check-then-act sequence assumes.

The 60-second brief

A Software Engineer at Balyo occupies a critical position at the intersection of robotics, automation, and industrial efficiency. You will be responsible for developing and maintaining the sophisticated software that powers autonomous material handling vehicles, directly impacting the operational capabilities of large-scale logistics and warehouse environments. Your work is not merely about writing code; it is about enabling precision, safety, and reliability in dynamic, real-world settings where software must interface seamlessly with complex hardware systems.

Seniority moves the scope further than the words in the title do. An earlier-career loop mostly checks that you implement something correctly and can reason about its cost, while a senior loop checks that you can pick between two defensible designs and say what you gave up.

Focus areas

  • Bound every outbound call with a timeout
  • Paginate large result sets with keyset cursors
  • Detect concurrent edits instead of losing writes

Overview

This role is both challenging and intellectually stimulating, as it requires a high degree of technical problem-solving and a genuine interest in the robotics domain. You will work within highly collaborative, cross-functional teams, contributing to projects that push the boundaries of what autonomous mobile robots can achieve. For a Software Engineer, success at Balyo means balancing rigorous technical standards with the agility required to solve unique, high-stakes engineering problems in the industrial sector.

The Balyo interview process

Balyo candidates report 2 rounds · ≈ 2-4 weeks. The stages below are what candidates describe, not a published process.

Initial Screening

The person on this call usually cannot evaluate your code and does not need to. They write a short paragraph, and that paragraph is what a hiring manager skims when deciding who to put on your loop. So the test is not whether your work was hard, it is whether a non-engineer can repeat it correctly. Name systems by what they did rather than by their internal codename, give each project a shape (what was breaking, what you changed, what happened after), and keep the whole walkthrough near ninety seconds. Depth that cannot survive a paraphrase reads as vagueness.

What to demonstrate

  • Whether a non-engineer can restate your projects without distorting them, since their paraphrase is what travels to the hiring manager, not your sentences
  • Whether each project has a shape rather than a stack list: the failure or constraint, the change you made, the result and how it was measured
  • Whether you can say what was yours inside a team project without either inflating it or disappearing into the plural

How to prepare

  • Rewrite each headline project as two sentences with no internal system names and no acronyms outside your company, then say them to someone outside engineering and have them repeat them back. Fix whatever came back wrong
  • Attach one measured number to each project: the baseline, the change, and the window it was measured over. Where nothing was ever measured, say that plainly rather than reaching for a plausible percentage
  • Time the background walkthrough against a clock. If it runs past two minutes, compress the earliest role to a single clause and spend the recovered time on the most recent one

In-Depth Discussions

An unlabelled round is first an information problem, and the cheapest information is free. Whoever schedules it can usually tell you how long it runs, who will be in the room and what they work on, whether you will be writing code and in what environment, and whether anything is being sent beforehand. Ask in writing so the answer is on record, then prepare for the two or three formats those answers still leave open instead of betting on one. What separates a strong candidate is not guessing right; it is having an opening that works whichever one it turns out to be.

What to demonstrate

  • Whether you can start work from an ambiguous brief, since tolerating a vague scope without stalling is the same thing the job asks for
  • Whether the questions you asked beforehand were ones that change your preparation, such as duration, medium and who is joining, rather than ones whose answers you could not have acted on
  • Whether you adapt when the round turns out to be something other than what you were told, instead of spending the first ten minutes visibly recalibrating

How to prepare

  • Send one short scheduling message asking four things: how long, who is joining and what they work on, whether you will be writing code and where, and whether to prepare anything in advance. Treat a vague reply as real information, since it means the round is loosely structured and you will be shaping it yourself.
  • Write one opening that works in any of the formats still open: restate in your own words what you have been asked to do, then ask which of two directions is more useful to them. Say it aloud until it stops sounding recited.
  • Set up for the two most likely formats before the call starts, with a blank editor in the language you would choose and a shared document you can type into, so a format surprise costs you nothing in the first minutes

Where candidates lose points

Letting a slow dependency consume unbounded concurrency

The failure that takes a service down is usually not an error but a delay. A dependency answering in thirty seconds instead of fifty milliseconds holds each request's worker or connection six hundred times longer, and since required concurrency is arrival rate times latency, a fleet sized for sixty in-flight requests now needs thirty-six thousand to sustain the same rate - so it queues, and requests whose clients have already abandoned them still occupy resources. Retries make it precisely worse: a policy of three attempts triples the load on a dependency at the exact moment it is least able to serve, which is how one slow dependency becomes an outage of everything sharing that pool. Containment is four specific things - a timeout on every outbound call shorter than the caller's remaining budget, a bounded pool per dependency so one cannot starve the others, backoff with full jitter rather than a fixed delay so retries do not resynchronise, and a circuit that stops sending once the failure rate makes an attempt pointless.

Shipping a migration and the code that depends on it as a single change

During any rolling deploy, and for as long as a rollback remains possible, old and new code execute against the same schema at the same time. A migration that drops or renames a column breaks every instance that has not restarted yet, and code that requires a column the migration has not applied breaks every instance that restarted early. The discipline is expand then contract: add the new column nullable, write both shapes, backfill in batches, move reads across once the backfill is verified, and only then stop writing the old shape and drop it - four deploys, usually spread over days. It feels disproportionate until the first rollback, at which point it is the only reason the previous version still runs.

Trusting input because it came from your own front end

Anything crossing a trust boundary is hostile: parameterise queries instead of building SQL by concatenation, validate against an allow-list rather than a deny-list, and bound the size of anything you allocate from a request. Raising this unprompted in an API or design question is a cheap and unusually strong signal.

Sharing mutable state with no stated owner

Say which thread, request or task owns each mutable structure, and what protects it when the answer is more than one: a lock, a queue that hands ownership across, or an immutable copy per reader. A structure documented as safe for concurrent reads is usually not safe for a concurrent write alongside those reads.

Questions & practice

Identify the heaviest tenants in a five-minute window under memory pressure

Medium · top-k · heavy hitters · streaming

The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.

Approach

  1. Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
  2. Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
  3. State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
  4. Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.
  5. Choose and defend it: at 50,000 tenants the exact rings cost under 100 MB in a process that already holds more, so ship exact. Keep the sketch for the case that actually motivates it, a per-principal or per-IP key where cardinality runs to millions and is not bounded by anything you control.
  6. Raise the fleet problem before it is asked: each of 20 to 40 instances sees only its share, and the top 50 of one shard is not the top 50 of the fleet. Either aggregate counts centrally or accept that a per-instance threshold multiplied by instance count is the limit you are really enforcing.

Follow-up

  • The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
  • Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?
  • You switch to per-principal keys and cardinality goes to 10 million. Walk through what changes.

Diff a projection against the primary without per-row point reads

Hard · reconciliation · range hashing · throttling

The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.

Approach

  1. Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
  2. Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
  3. For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
  4. Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.
  5. Pin the comparison to a point in time or it reports lag as drift: consider only rows whose updated_at is older than now minus a lag margin, and re-check each candidate mismatch individually before repairing. At 1,200 writes per second a diff without this reports thousands of false positives, and an unattended repairer would then overwrite live rows with stale values.
  6. Make the run resumable and throttled: batch by range key, persist the last completed range, and watch a signal such as replica lag or primary CPU, pausing rather than pressing on. A reconciliation that cannot be stopped and resumed gets killed halfway and restarted from zero, which is how a repair becomes an incident.

Worked solution (35 min)

  1. Compute the naive cost explicitly at 40,000,000 reads and 0.5 ms each, then at 100 concurrent, and state what those connections do to a pool already carrying 1,200 writes per second.
  2. Write the merge-join version over (tenant_id, resource_id) and state its memory.
  3. Define the range aggregate: the range key, the per-row hash input, and the combining function, with one sentence excluding XOR.
  4. Work an example with 40,000,000 rows, branching factor 256 and 5 differing rows, and count the ranges examined.
  5. Add the watermark filter and the resume point, and name the throttle signal the loop watches.

Expected result: A rejection of per-row point reads backed by the time cost and the cache-eviction argument, a single ordered merge join as the dense-case answer at O(n) time and O(1) memory, a range-hash drill-down examining O(d log_B(n/d)) ranges using a sum or multiset hash rather than XOR, a watermark excluding recently written rows, and a resumable throttled run loop.

Verify it yourself

  • Injecting one known stale row makes exactly one leaf range mismatch and the drill-down reaches it.
  • Duplicating a row on one side is detected, which is precisely the case XOR would miss.
  • Running the diff twice against an idle system reports zero mismatches both times.

Follow-up

  • The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
  • Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?
  • How would you run this continuously at low cost instead of only as incident response?

Find overlapping job attempts and peak concurrency from lease records

Medium · sweep line · intervals · leases

A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.

Approach

  1. Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
  2. For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
  3. For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
  4. Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
  5. State the clock caveat: started_at and finished_at are written by different workers, so under skew of a few hundred milliseconds an apparent overlap shorter than that bound is not evidence. Filter reported overlaps by a minimum duration, or prefer timestamps written by whichever component heartbeats the lease.
  6. Scale the sort rather than assuming it fits: the sweep emits two endpoints per attempt, so 50,000,000 records become 100,000,000 endpoints, and at roughly 24 bytes each, an 8-byte timestamp plus a 4-byte job_type plus a kind flag padded to alignment, that is about 2.4 GB of sort keys before any scratch space. Either push the ordering into the database behind an index on (job_type, started_at) or run an external merge sort in chunks; the overlap pass sorts n records rather than 2n, so it is the cheaper of the two.

Follow-up

  • A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
  • Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
  • How would you compute both answers incrementally as records arrive rather than in a daily batch?

Hold a per-tenant active cap against concurrent creates

Hard · write skew · isolation levels · constraints

A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.

Approach

  1. Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
  2. Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
  3. Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
  4. State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.
  5. For the job case the invariant is expressible per row, so let the database hold it: a partial unique index on job_run (tenant_id, job_type) WHERE status IN ('queued','running') makes a second running export unwritable and the loser takes 23505, mapped to 409. That is strictly better than a counter — no drift, no reconciliation — and it is available only because the cap is one rather than fifty.
  6. Add the retry discipline each route demands: under SERIALIZABLE both 40001 and deadlock 40P01 are retryable and the retry must re-execute the read, while under READ COMMITTED with the counter nothing retries, because the conflict is reported to the caller rather than raised as an error.

Follow-up

  • A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
  • The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?
  • How do you detect after the fact that the counter drifted, without locking the table?

Write the update path that detects a concurrent edit

Medium · optimistic concurrency · transactional outbox · audit history

resource carries version INT NOT NULL DEFAULT 1. resource_revision holds revision_id, resource_id, version, actor_user_id, change_kind, patch JSONB, request_id, created_at with UNIQUE (resource_id, version). outbox_event holds aggregate_type, aggregate_id, aggregate_version, event_type, payload, status. A PUT carries the version the client read. Write the exact statements for the single transaction that applies the edit, records the revision and enqueues 'resource.updated', and give the handler's branch on zero affected rows. Then say what PostgreSQL 16 does under READ COMMITTED when two of these updates hit one row at once.

Approach

  1. One transaction, three writes, no network call inside it: UPDATE resource SET title = $3, version = version + 1, updated_at = now() WHERE resource_id = $1 AND tenant_id = $4 AND version = $2; then INSERT the resource_revision row at version $2 + 1; then INSERT the outbox_event row at the same aggregate_version. The event goes to a table rather than a broker because no transaction spans both.
  2. Branch on the affected-row count before doing anything else. Zero has three causes — stale version, wrong tenant, row gone — so re-read once and map to 409 carrying the current version, or 404 for an id outside the caller's tenant, which also stops the endpoint confirming that another tenant's id exists.
  3. State the engine behaviour instead of assuming it. Under READ COMMITTED the second UPDATE blocks on the row lock, and when the first commits PostgreSQL re-evaluates the WHERE clause against the newly committed row, so the version predicate now fails and the statement reports zero rows. Under REPEATABLE READ the identical collision raises SQLSTATE 40001 instead, so the handler must fold both shapes into one conflict response.
  4. Keep UNIQUE (resource_id, version) even though the predicate already serialises writers. It is what makes a lost update unwritable if any other path ever reaches the revision table, and it converts a logic bug into 23505 rather than into a silently missing history row.
  5. Refuse to auto-retry the whole PUT. A retry re-reads the winner's state and reapplies an intent formed against data that no longer exists — the silent overwrite the version token was added to detect. Return the conflict; merge field-wise only if the patches are provably disjoint.
  6. Note that now() is the transaction timestamp in PostgreSQL, so resource.updated_at, the revision's created_at and the outbox row share one instant, which is what later makes reconciliation between the three tables unambiguous.

Worked solution (25 min)

  1. Write the three statements plus the rowcount branch and confirm they sit in one BEGIN/COMMIT with no outbound call between them.
  2. Run two clients that both read version 7 and apply their updates 5 ms apart; assert one 200 and one 409.
  3. Assert resource.version = 8, exactly one resource_revision row at version 8, and one outbox_event row at aggregate_version 8.
  4. Repeat at REPEATABLE READ and record the different failure shape (SQLSTATE 40001) the handler must also map to 409.
  5. Delete the version predicate and re-run: both writes commit and the first edit disappears with no error raised anywhere.

Expected result: Exactly one of the two commits. version = 8 with one revision row and one outbox row at version 8, the loser gets 409 carrying version 8, and no state exists in which the resource moved but the revision or the outbox row is missing.

Verify it yourself

  • COUNT(*) of resource_revision for that resource equals resource.version, with no gap in the version sequence.
  • Kill the process between the UPDATE and the outbox INSERT — the transaction rolls back and no event describes a change that never happened.
  • Under a 50-way race, resource.version equals the number of 2xx responses rather than the number of requests.

Follow-up

  • A client sends the version it read ten minutes ago and the resource has moved three versions. What is in your 409 so it can resolve the conflict without a full re-fetch?
  • Two editors, two disjoint fields, no overlap. Does your answer still refuse the second write, and should it?
  • Every write now touches a second hot table. How do you keep the outbox insert and its partial index from becoming the write bottleneck at 1.2k writes/second?

Can you explain your process for troubleshooting complex software issues?

Medium

Approach

  1. Work from the requirement backwards to the design.
  2. Clarify what is being asked and what a complete answer contains.
  3. Say what you would check first and why it is the highest-information step.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

How do you approach technical project requirements and implementation?

Medium

Approach

  1. Work from the requirement backwards to the design.
  2. Say what you would check first and why it is the highest-information step.
  3. State your assumptions explicitly before working the problem.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

Relay committed events to the log without gaps or reordering

Medium · transactional outbox · at-least-once · ordering · leases

outbox_event rows are written in the same transaction as the state change and carry aggregate_type, aggregate_id, aggregate_version, payload and status, with a partial index on (created_at, event_id) WHERE status = 'pending'. The relay publishes about 4k events/second to a partitioned append-only log keyed by aggregate_id, with one leader per partition range holding a lease. Consumers must never miss an event; they may see one twice. Design the claim-publish-mark loop, and state exactly what consumers observe when a leader's lease expires while it is mid-batch.

Approach

  1. Claim with SELECT ... WHERE status='pending' ORDER BY created_at, event_id LIMIT $batch FOR UPDATE SKIP LOCKED inside a transaction. SKIP LOCKED lets several relay workers share a range without serialising on each other's rows, and the partial index keeps the claim proportional to the backlog rather than to a table that is overwhelmingly published rows. At 4k/second a batch of 500 is eight claims per second, each an index scan of 500 entries.
  2. Publish before marking, never the reverse, and say why it is a choice. Marking first loses the event outright if the process dies in the gap, and the loss is silent - nothing remains to retry, and it surfaces later as a projection missing a row. Publishing first can repeat the event, and repetition is what every consumer is already built to survive. That single ordering is the whole at-least-once guarantee.
  3. Preserve the only ordering on offer. Partition by aggregate_id and never publish two events for one aggregate concurrently: claim in (created_at, event_id) order and publish sequentially within an aggregate, or hash aggregate_id to a worker slot. Order across aggregates is not available at any price here, which is why the event carries aggregate_version and the full fact rather than a delta - a consumer can then discard what it has already applied without coordinating with anyone.
  4. State the failover behaviour precisely, because it is the consistency-versus-availability decision in this design. A lease expires because the holder is slow, and no mechanism distinguishes that from dead, so for the length of the lease window two leaders can publish the same claimed batch. The system accepts duplicates to avoid stalling publication for every aggregate in the range whenever one worker pauses. Consumers deduplicate on (aggregate_id, aggregate_version) and drop anything at or below what they have applied.
  5. Bound the failure paths and pick the right alarm. A row that fails to publish increments attempts, records last_error, and moves to 'dead' after a limit so one poison payload cannot block the backlog behind it. Alert on the age of the oldest pending row, not on the relay's error rate: the failure worth catching is a relay reporting itself healthy while nothing is being published.

Worked solution (25 min)

  1. Write the claim statement and check it against the partial index: which columns it seeks on, how many entries it touches, and what two concurrent workers do to each other.
  2. Write both orderings of publish and mark, and for each state what exists after a crash at every point in the loop.
  3. Write the consumer's dedupe rule on (aggregate_id, aggregate_version) and test it against a replayed batch of 500.
  4. Compute the backlog after a 40-minute outage and the batch rate needed to drain it while 4k/second continues to arrive.

Expected result: A claim using FOR UPDATE SKIP LOCKED over the partial index in (created_at, event_id) order, publish to the aggregate_id partition, then mark published - in that order, accepting duplicates on lease expiry. Per-aggregate order is preserved by never publishing an aggregate concurrently; cross-aggregate order is explicitly not guaranteed. Failures increment attempts and terminate at 'dead'. The alarm is the age of the oldest pending row.

Verify it yourself

  • Killing the relay mid-batch produces duplicates on restart and no gap.
  • The claim query's plan uses the partial index and reads at most batch-size entries regardless of table size.
  • Two relay workers on the same range never block on each other's rows.
  • Events for one aggregate_id arrive in aggregate_version order, and no consumer relies on order across aggregates.

Follow-up

  • The relay is down 40 minutes and 9.6 million rows are pending. What does catch-up do to the primary, and what changes in the claim loop to survive it?
  • A consumer insists it never received an event. Which single query settles whether the relay lost it, and what does each answer look like?
  • Delivery is at-least-once. What would exactly-once require end to end, and why is that a property of the consumer rather than of the relay?

One log partition stops advancing while the others drain

Easy · poison message · head-of-line blocking · consumer lag · projections

Search results for a subset of tenants are hours stale; the rest are current. The projection consumer reports lag of zero on 15 of 16 partitions and 400,000 on one. Its error rate is flat and its CPU is idle. outbox_event has no pending rows older than a second, so the relay has published everything it holds. Identify the mechanism, give the ordered checks, and state what you do in the first ten minutes versus what you change permanently.

Approach

  1. Read the lag distribution first. A slow consumer lags everywhere; zero on fifteen partitions and 400,000 on one is not throughput. Idle CPU on the stuck partition means the consumer is not advancing its offset at all, which points at one message it cannot get past rather than at a rate problem.
  2. Exonerate the producer before touching the consumer. No pending outbox rows older than a second means the relay published, so the event exists in the log. This separates never sent from sent and never applied, which are different code paths and usually different owners.
  3. Read the message at the stuck offset and the handler's log lines for its event_id. A flat error rate with no progress has two explanations and you must distinguish them: the handler is throwing and the retry loop is swallowing it, or the handler is blocking on something and never returning. Idle CPU with no error lines favours the second.
  4. Mitigate before diagnosing further. Move the offending event to a dead-letter store and commit the offset past it. Adding consumers does nothing here, because a partition is consumed by exactly one member of the group, and the blast radius is every aggregate hashed to that partition, not only the aggregate that produced the bad event.
  5. Fix permanently by bounding handler attempts and dead-lettering on exhaustion, so no single message can stop a partition. Then replay the dead-lettered event once the handler is fixed: it carries aggregate_id and aggregate_version, so a consumer that discards versions it has already applied can absorb the replay, and resource_revision is the fallback if the event itself is unusable.

Follow-up

  • The dead-lettered event carried aggregate_version 7 and the projection had applied 6. What must the replay do differently if 8 and 9 landed in the meantime?
  • How do you show staleness to the user while the partition is behind, given the API already returns the projection's watermark?
  • What changes if the message is poison because a previous deploy wrote a payload shape the current code cannot parse?

Suggested practice checklist

Roughly ninety minutes on weeknights with one longer weekend block. The plan cuts scope rather than compressing everything, on the assumption that one thing finished per night beats four half-started.

Day 1 — Fix the scope and take a cold baseline

  • Read the role description and write the three things the loop will almost certainly test, then write an explicit not-doing list and keep it visible all week.
  • Take one twenty-five-minute coding problem and one fifteen-minute design prompt cold, and write the single sentence naming what blocked each, because those two sentences decide where the remaining evenings go.
  • Set the week's rule: one thing finished every night, including the night you only have forty minutes.

Deliverable: A one-page scope with a not-doing list and two cold attempts, each carrying one sentence on what blocked it.

Day 2 — One pattern, written three times from blank

  • Choose the single pattern most likely to appear in your loop and write it three times from an empty file rather than editing the previous attempt.
  • On the third pass, write the invariant as a comment before the loop body and the complexity before the first line of code.
  • Stop at ninety minutes even if the third version is imperfect, and write the one thing you would fix given another hour.

Deliverable: Three independent implementations of the same pattern plus a note on what changed between them.

Day 3 — One design, only to the depth you can defend

  • Take one system shape and go only as far as requirements, interface and data model, refusing to draw a box you could not survive a follow-up about.
  • Attach one number to each non-functional requirement, deriving it rather than asserting it, and write the assumption the number rests on.
  • Write the one tradeoff you are choosing against and the observation that would make you reverse it.

Deliverable: One design at interface-and-schema depth with derived numbers and one written reversible tradeoff.

Day 4 — Only the fundamentals you will have to defend

  • Write, in under two hundred words each, the answers to the two questions that follow almost any implementation: why this structure and not the obvious alternative, and what happens to this code at a hundred times the input.
  • Write what an index actually costs: faster lookups on the indexed columns against a write that now maintains a second structure, plus the cases where the planner declines to use it anyway, low selectivity, or a predicate wrapping the column in a function.
  • Delete any answer you cannot deliver aloud in under a minute, since an answer that needs reading is not an answer you have.

Deliverable: Three written answers, each under two hundred words and each timed aloud.

Day 5 — Your own work, timed

  • Write a ninety-second and a four-minute version of your main project and time both aloud rather than reading them.
  • Prepare the two follow-ups that always come: what you would do differently, and how you knew it worked.
  • Put one number in the first sentence and be ready to say exactly where it came from and what it excludes.

Deliverable: Two timed narratives with one defensible number in the opening line.

Day 6 — The one full rehearsal, in the weekend block

  • Run a sixty-minute mock covering a coding round and a design round in one sitting with no break, because sustained attention is the thing evenings have not trained.
  • Immediately afterwards, and before hearing any feedback, write the three moments you lost the thread.
  • Spend the rest of the block only on those three moments, and on nothing you merely feel shaky about.

Deliverable: Mock notes naming three failure moments with a specific fix written under each.

Day 7 — Taper

  • Write the twenty-minute warm-up you will actually do on the morning: one problem you can already solve from a blank file, one design you can narrate, and nothing you have never seen.
  • Re-read only your own notes from this week and open no new material.
  • Write the logistics down: the editor or shared document you will be working in, whether execution and lookups are permitted, and the sentence you will use when you do not know something.

Deliverable: A one-page card holding the design structure, the project numbers, and the logistics.

What the behavioural round is actually measuring

Every story you tell gets read for blast radius and judgement: what could have broken, who else it touched, what you knew at the moment you decided. Nobody can audit your code in an hour, so they audit your reasoning instead. Pick work where the call was genuinely yours and the consequences were real enough to remember.

Can you tell me about your previous internship experience?

Medium · behavioural and engineering judgement

Approach

  1. Give the blast radius: what could have broken, and what you measured.
  2. Close with what you would do differently, concretely.
  3. State the situation in two sentences and spend the rest on the reasoning.

Follow-up

  • What would you do differently if you ran that again?
  • What did you decide not to do, and why?

What is your experience with the specific tools and languages required for our robotics stack?

Medium · behavioural and engineering judgement

Approach

  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Name the disagreement and how you resolved it with evidence.
  3. Pick a story where you made the decision, not one where you watched it.

Follow-up

  • What did you decide not to do, and why?
  • How did you know your change caused the improvement?

What are your personal passions outside of work, and how do they inform your approach to challenges?

Medium · behavioural and engineering judgement

Approach

  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Close with what you would do differently, concretely.
  3. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • What did you decide not to do, and why?

Qu'est ce qui vous plait/motive dans le métier d'ingénieur?

Medium · behavioural and engineering judgement

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.

Follow-up

  • What would you do differently if you ran that again?
  • What did you decide not to do, and why?