Interview guides · Bally's Intralot
Bally's Intralot Software Engineer Interview Questions & Guide 2026
Debugging practice for Bally's Intralot software engineer candidates: reproduce it, narrow it, then change one thing per run.
The 60-second brief
A Software Engineer at Bally's Intralot plays a pivotal role in the development and maintenance of high-stakes technology solutions within the global lottery and gaming industry. You are responsible for building robust, scalable systems that support millions of transactions, ensuring that the infrastructure remains secure, reliable, and efficient for end-users worldwide.
The behavioural round is a technical round in narrative form. Prepare it by collecting specifics you actually owned, such as a design you argued against, an incident you diagnosed, or a decision you later reversed, rather than by rehearsing phrasing.
Focus areas
- Bound every outbound call with a timeout
- Make every write idempotent under retry
- Detect concurrent edits instead of losing writes
Overview
This position is inherently strategic; your work directly impacts the availability and performance of products that define the company's market presence. Whether you are focusing on backend systems, system architecture, or service delivery, you will be expected to contribute fresh ideas that optimize service costs and improve the user experience. You will collaborate across departments, working closely with project managers, technical leads, and operations teams to bridge the gap between complex business requirements and high-quality technical implementation.
The Bally's Intralot interview process
Bally's Intralot candidates report 4 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.
Initial Screening
The person on this call usually cannot evaluate your code and does not need to. They write a short paragraph, and that paragraph is what a hiring manager skims when deciding who to put on your loop. So the test is not whether your work was hard, it is whether a non-engineer can repeat it correctly. Name systems by what they did rather than by their internal codename, give each project a shape (what was breaking, what you changed, what happened after), and keep the whole walkthrough near ninety seconds. Depth that cannot survive a paraphrase reads as vagueness.
What to demonstrate
- Whether a non-engineer can restate your projects without distorting them, since their paraphrase is what travels to the hiring manager, not your sentences
- Whether each project has a shape rather than a stack list: the failure or constraint, the change you made, the result and how it was measured
- Whether you can say what was yours inside a team project without either inflating it or disappearing into the plural
How to prepare
- Rewrite each headline project as two sentences with no internal system names and no acronyms outside your company, then say them to someone outside engineering and have them repeat them back. Fix whatever came back wrong
- Attach one measured number to each project: the baseline, the change, and the window it was measured over. Where nothing was ever measured, say that plainly rather than reaching for a plausible percentage
- Time the background walkthrough against a clock. If it runs past two minutes, compress the earliest role to a single clause and spend the recovered time on the most recent one
Technical Assessments
The same problem is scored by two different mechanisms depending on the format, and preparing for one does not cover the other. With a person watching, partial progress is visible and a hint is a correction you can absorb; silence is the expensive failure, because nobody can read a half-written function. With an automated grader there is no partial credit for what you were about to do, nobody to ask, and the worked examples in the prompt are the entire specification. Read them as a contract, down to whether an empty result should be an empty list or no output at all.
What to demonstrate
- In a live session, whether your commentary tracks what your hands are doing, and whether a hint redirects you or gets defended against
- In an automated one, whether you cover the cases the examples do not show, since the hidden cases are where the score moves
- Whether you manage the clock on purpose: abandoning an approach that is not converging while there is still time to write something simpler that finishes
How to prepare
- Have someone hand you a problem and feed you one deliberately wrong hint. Practise testing it against a concrete case instead of accepting or rejecting it on authority.
- Do one timed run a week in a plain browser editor with autocomplete, linting and your own snippets switched off, which is closer to what these environments give you
- For the automated format, write the harness before the solution: a main that feeds the worked examples plus an empty and a single-element case and prints expected against actual, so a wrong submission is caught by you first
Interviews with Leads
An unlabelled round is first an information problem, and the cheapest information is free. Whoever schedules it can usually tell you how long it runs, who will be in the room and what they work on, whether you will be writing code and in what environment, and whether anything is being sent beforehand. Ask in writing so the answer is on record, then prepare for the two or three formats those answers still leave open instead of betting on one. What separates a strong candidate is not guessing right; it is having an opening that works whichever one it turns out to be.
What to demonstrate
- Whether you can start work from an ambiguous brief, since tolerating a vague scope without stalling is the same thing the job asks for
- Whether the questions you asked beforehand were ones that change your preparation, such as duration, medium and who is joining, rather than ones whose answers you could not have acted on
- Whether you adapt when the round turns out to be something other than what you were told, instead of spending the first ten minutes visibly recalibrating
How to prepare
- Send one short scheduling message asking four things: how long, who is joining and what they work on, whether you will be writing code and where, and whether to prepare anything in advance. Treat a vague reply as real information, since it means the round is loosely structured and you will be shaping it yourself.
- Write one opening that works in any of the formats still open: restate in your own words what you have been asked to do, then ask which of two directions is more useful to them. Say it aloud until it stops sounding recited.
- Set up for the two most likely formats before the call starts, with a blank editor in the language you would choose and a shared document you can type into, so a format surprise costs you nothing in the first minutes
Interviews with Management
When a round has no standard shape, it is often there because something is still open: an area no earlier conversation reached, a round where the signal came out mixed, or a decision someone is not ready to make alone. Work out which by going back over what each earlier round actually covered rather than how it felt, and arrive able to give evidence on that point without being asked twice. Weak answers replay the loop's earlier material at the same depth. Strong ones go a level deeper and stay consistent with what you already said.
What to demonstrate
- Whether your account of a project matches the one you gave earlier in the loop, since what you said before may be available to whoever runs this round
- Whether you can go a level deeper on something already covered, reaching the decision and its alternatives rather than repeating the summary
- Whether you state your own uncertainty accurately, including parts of a system you did not build and decisions you inherited, instead of claiming even ownership across all of it
- Whether you can answer a question you handled poorly earlier by naming what you missed, rather than delivering a polished second version as if the first had not happened
How to prepare
- Reconstruct the loop on one page: for each round, the questions you were asked and the answer you actually gave, not the better one you thought of afterwards. The gaps on that page are your best available guess at why this round exists.
- Take the two claims you made earlier that carry the most weight and assemble the backing for each: the measurement, the date, what broke, the decision you would make differently now.
- Write down the three facts about your work that must not drift between tellings, such as team size, timeline and your own role, and check your stories against that list rather than trusting recall under pressure
Where candidates lose points
Paginating with LIMIT/OFFSET over a set that changes while the client is reading it
OFFSET n makes the database produce and discard n rows before returning anything, so the cost of a page grows with its depth rather than with its size and page 500 costs five hundred pages of work. The correctness problem is worse than the cost: if a row is inserted or reordered between two page fetches, rows shift across the offset boundary and are either skipped entirely or returned twice, and neither outcome leaves any trace in the response for the client to detect. Keyset pagination - WHERE (sort_key, id) < ($last_sort_key, $last_id) ORDER BY sort_key DESC, id DESC LIMIT n, backed by an index in exactly that order - reads only the rows it returns and is stable against concurrent inserts. It requires the tie-break column: a timestamp is not unique, and duplicate sort keys straddling a page boundary reintroduce the skip it was adopted to remove.
Shipping a migration and the code that depends on it as a single change
During any rolling deploy, and for as long as a rollback remains possible, old and new code execute against the same schema at the same time. A migration that drops or renames a column breaks every instance that has not restarted yet, and code that requires a column the migration has not applied breaks every instance that restarted early. The discipline is expand then contract: add the new column nullable, write both shapes, backfill in batches, move reads across once the backfill is verified, and only then stop writing the old shape and drop it - four deploys, usually spread over days. It feels disproportionate until the first rollback, at which point it is the only reason the previous version still runs.
Retrying a write that is not safe to repeat
A timeout tells you nothing about whether the server applied the write, so a blind retry of a create or a charge can duplicate it. Either make the operation idempotent, with a caller-supplied key the server deduplicates on or a conditional update, or do not retry it; and use exponential backoff with jitter so the retries of many clients do not synchronise into a second outage.
Starting work without saying what you are about to spend time on
State the plan before executing it: the approach, roughly how long it will take, and what you intend to leave hand-waved. That gives the interviewer a chance to redirect you in ten seconds rather than watching you spend fifteen minutes on the wrong sub-problem.
Questions & practice
Track a rolling failure rate per destination for circuit decisions
Easy · sliding window · ring buffer · circuit breaker
The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.
Approach
- Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
- Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
- State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
- Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
- Expire idle destinations, or memory grows with every destination ever seen rather than with the live set. Hold the rings in a bounded LRU keyed on destination_id and treat a miss as no history, which is the correct default for an endpoint that has been silent for a minute.
- Keep the half-open probe out of the window arithmetic. After the circuit opens, one probe per interval decides whether to close it, and folding that single success into a window that still holds a 100 percent failure history would reopen the destination on one data point.
Worked solution (20 min)
- Define the bucket struct and the advance step: take floor(finished_at_ms / 1000), compare with the ring's current second, zero min(delta, 60) buckets forward, then write into the new head.
- Trace a destination that receives 5 attempts, goes silent for 90 seconds, then receives one more, and confirm the rate is computed from one attempt rather than six.
- Compute total memory for 40,000 destinations at 60 buckets of two 4-byte counters, and state what changes if the window widens to 300 seconds.
- Write the open rule as a single predicate combining the minimum-attempt floor with the rate threshold.
Expected result: A per-destination ring of 60 one-second (attempts, failures) buckets advanced lazily for amortised O(1) cost, roughly 480 bytes of counters per destination and about 20 to 25 MB for 40,000 of them, an LRU bound on live rings, and an open rule requiring both a minimum attempt count in the window and a rate above threshold.
Verify it yourself
- After 60 seconds of silence a destination's window holds zero attempts and cannot open a circuit.
- Memory measured with one hot destination and 39,999 idle ones is indistinguishable from the reverse, which the deque version would fail.
- Replaying the same attempt stream with the clock shifted by an hour yields the same final rate.
Follow-up
- The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
- A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?
- How would you make the window survive a process restart, and is it worth the cost?
Diff a projection against the primary without per-row point reads
Hard · reconciliation · range hashing · throttling
The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.
Approach
- Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
- Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
- For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
- Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.
- Pin the comparison to a point in time or it reports lag as drift: consider only rows whose updated_at is older than now minus a lag margin, and re-check each candidate mismatch individually before repairing. At 1,200 writes per second a diff without this reports thousands of false positives, and an unattended repairer would then overwrite live rows with stale values.
- Make the run resumable and throttled: batch by range key, persist the last completed range, and watch a signal such as replica lag or primary CPU, pausing rather than pressing on. A reconciliation that cannot be stopped and resumed gets killed halfway and restarted from zero, which is how a repair becomes an incident.
Follow-up
- The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
- Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?
- How would you run this continuously at low cost instead of only as incident response?
Merge partitioned event streams into one ordered feed with bounded lateness
Hard · k-way merge · watermarks · out-of-order streams
The read-model service consumes 64 log partitions carrying about 4,000 events per second in total. Each partition is ordered within itself, but partitions drift by up to 30 seconds, and the activity feed must present a tenant's events in occurred_at order. Produce the merge. State its complexity, the buffer it requires in events and in bytes, what happens when one partition is idle, and what you do with an event that arrives after you have already emitted its position. Payloads average 1 KB.
Approach
- Merge with a min-heap over the 64 partition heads keyed on (occurred_at, event_id): O(log P) per event and O(n log P) overall. The tie-break on event_id is what makes the output deterministic when two partitions carry the same millisecond, which matters because the feed is paginated and a non-deterministic order reorders pages under the reader.
- Emitting the heap head is only correct once every partition has produced everything up to that timestamp, so the emit condition is a watermark: the minimum across partitions of the highest occurred_at seen, less the allowed lateness. Events are held until the watermark passes them, which is what turns individually ordered streams into a jointly ordered one.
- Size the buffer from the lateness rather than guessing: 4,000 events per second times 30 seconds is 120,000 buffered events, and at 1 KB each about 120 MB of heap. That number is the real price of the ordering guarantee and belongs in front of whoever asked for it.
- Handle the idle partition explicitly, because it fails the feed rather than corrupting it: a partition with no traffic never advances its own maximum, so the watermark freezes and output stops entirely. Either every partition emits a periodic idle marker carrying the broker's current time, or the watermark falls back to wall clock for a partition silent beyond a threshold.
- Choose the late-event policy from what the projection is keyed on. The projection upserts on (aggregate_id, aggregate_version) and discards a version it has already applied, so a late event is safe to apply out of order and correctness never depended on the merge at all. Apply it, recompute the affected feed page, and count lateness so the 30-second budget can be re-derived from data rather than folklore.
- Say what the merge does not buy: ordering is guaranteed within one aggregate by the log's partitioning, and no watermark makes the cross-aggregate order authoritative. Two events from different aggregates in the same millisecond have no true order, so the feed's order is a presentation choice that must be stable rather than correct.
Follow-up
- The lateness budget is raised to five minutes. What is the new buffer, and what besides memory changes?
- The consumer restarts. Where does it resume from, and what does the feed look like for the first 30 seconds?
- One partition is ten minutes behind because its producer is slow. Do you stall the feed or emit without it?
Denormalise tenant onto revisions and backfill it live
Hard · denormalisation · online migration · backfill
resource_revision (revision_id, resource_id, version, actor_user_id, change_kind, patch, request_id, created_at) has 400M rows and no tenant column; tenant_id lives only on resource. Two reads need it: a tenant-scoped audit feed ordered by created_at DESC, and an offboarding purge. Both join back to resource today. Justify adding tenant_id to resource_revision against those two reads, name the anomaly the copy introduces and the constraint that prevents it, then give the ordered migration for a live table taking 1.2k writes/second — the lock each step takes, how the backfill is batched, and where each step stops being reversible. PostgreSQL 16.
Approach
- Justify from the access path rather than from taste. Without the column, the audit feed either scans resource_revision by created_at and discards other tenants' rows, or resolves the tenant's resource_ids first and probes with them — both proportional to the tenant's whole history rather than to one page. With (tenant_id, created_at DESC, revision_id DESC) it is a seek that stops at 50 rows, and the purge becomes a ranged delete instead of a join.
- Name the cost exactly: a second copy of a fact can disagree with the first. Make the disagreement unwritable rather than documented — add UNIQUE (resource_id, tenant_id) on resource so it can serve as a foreign-key target, then FOREIGN KEY (resource_id, tenant_id) REFERENCES resource (resource_id, tenant_id) on the revision table. A revision can then only ever carry its parent's tenant.
- Step one, expand: ALTER TABLE resource_revision ADD COLUMN tenant_id BIGINT NULL, with no default, so it is a catalogue change and no rewrite. It still needs ACCESS EXCLUSIVE for an instant, and that instant queues behind the longest open transaction on the table while every later query queues behind it — set lock_timeout to 2s and retry rather than wait.
- Step two, dual-write: deploy the writer that populates tenant_id on every new revision while reads still use the join. Reversible by redeploying the previous build, because nothing reads the column yet.
- Step three, backfill: batch by primary key rather than by created_at so the cursor is dense and resumable — UPDATE resource_revision rr SET tenant_id = r.tenant_id FROM resource r WHERE r.resource_id = rr.resource_id AND rr.revision_id > $1 AND rr.revision_id <= $1 + 5000 AND rr.tenant_id IS NULL — committing per batch and persisting the cursor. Throttle on replica replay lag and on dead-tuple count, since each batch writes 5,000 new row versions. Run the backfill before the index exists so those updates can stay HOT.
- Step four, index then enforce then contract: CREATE INDEX CONCURRENTLY (cannot run inside a transaction block, scans the table twice, waits on open transactions, and leaves an INVALID index to drop concurrently if it fails); ADD CONSTRAINT ... CHECK (tenant_id IS NOT NULL) NOT VALID, then VALIDATE CONSTRAINT, which takes only SHARE UPDATE EXCLUSIVE, after which SET NOT NULL uses the validated check instead of re-scanning on PostgreSQL 12 and later. Only then move the audit reads onto the column and, in a later deploy, delete the join path.
Follow-up
- The backfill is half finished and a rollback is required. What state is the table in, and what does the previous build do with a half-populated column?
- How do you verify the backfill actually finished, given rows are still being inserted while it runs?
- A resource must now be movable between tenants. What does that do to the composite foreign key and to the revisions already written?
Find version gaps and relay lag with window functions
Medium · window functions · event tables · frame semantics
outbox_event holds event_id, aggregate_type, aggregate_id, aggregate_version, event_type, payload, status ('pending','published','dead'), attempts, created_at, published_at. A projection is missing rows and you must decide whether the relay skipped events or the consumer dropped them. Write three queries over the last seven days: one listing every aggregate_id whose published aggregate_version sequence has a hole, one giving per-day counts with a running total, and one returning the newest published event per aggregate. For each, say where the window function is evaluated relative to WHERE and LIMIT. PostgreSQL 16.
Approach
- Gaps: compute lead(aggregate_version) OVER (PARTITION BY aggregate_id ORDER BY aggregate_version) in a subquery, then filter next_version <> aggregate_version + 1 in the outer query. Window functions are evaluated after WHERE, GROUP BY and HAVING and before the outer ORDER BY and LIMIT, so the predicate cannot sit in the same WHERE clause and PostgreSQL 16 has no QUALIFY.
- Say what the seven-day filter does to the answer: it truncates every partition, so the first row per aggregate has no predecessor inside the window and a hole spanning the boundary is invisible. Widen the window, or join to resource.version as the authority for the true maximum.
- Running total: SELECT date_trunc('day', created_at) AS d, count() AS n, sum(count()) OVER (ORDER BY date_trunc('day', created_at) ROWS UNBOUNDED PRECEDING). An aggregate inside a window call is legal because grouping runs before windowing. The grouping key is unique per row here so ROWS and RANGE agree, but write the frame anyway — over ungrouped rows with tied timestamps the default RANGE frame pulls in every peer row and the total jumps.
- Newest per aggregate: DISTINCT ON (aggregate_id) ... ORDER BY aggregate_id, aggregate_version DESC is the cheap PostgreSQL-only form when an index matches that order; row_number() OVER (PARTITION BY aggregate_id ORDER BY aggregate_version DESC) = 1 is the portable form and needs a subquery for the same evaluation-order reason as the gap query.
- Interpret rather than report: no gaps plus a normal p95 of published_at - created_at points at the consumer; gaps or a fat lag tail point at the relay; rows still 'pending' with attempts > 0 point at neither, because they never left the database.
- Be explicit that the partial index on (created_at, event_id) WHERE status = 'pending' does not serve any of these — they read published rows. Name the index a recurring monitor would need, and say why a query run twice a year may not deserve one.
Worked solution (30 min)
- Write the three queries against seven days of data and confirm each returns without error.
- In a scratch copy, delete one middle event for a single aggregate and confirm the gap query names that aggregate and the versions either side.
- Run a running total over ungrouped rows ordered by date_trunc('second', created_at), once with the default frame and once with ROWS, and record where the two series diverge.
- Compare the DISTINCT ON and row_number() plans on the same data and record rows-read for each.
Expected result: The gap query returns one row per hole with the version on each side; the daily query returns seven rows whose running total ends at the seven-day count; the newest-per-aggregate query returns exactly one row per aggregate_id present in the window. The RANGE running total is higher than the ROWS one at every tied second.
Verify it yourself
- The per-day counts sum to COUNT(*) over the same predicate.
- Re-running the gap query after reinserting the deleted event returns zero rows.
- count(*) of the newest-per-aggregate result equals count(DISTINCT aggregate_id) over the same filter.
Follow-up
- Relay failover redelivers events. Does a duplicate break the gap query, and how would you detect one from this table alone?
- Turn the gap check into a continuous monitor rather than a query someone runs after an incident. What does it watch?
- The consumer claims it never received event 4,812,006. What do you look at, in what order?
Can you describe the difference between call-by-value and call-by-reference?
Medium
Approach
- State your assumptions explicitly before working the problem.
- Clarify what is being asked and what a complete answer contains.
- Work from the requirement backwards to the design.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
What are your career goals and personal expectations for this role?
Medium
Approach
- Work from the requirement backwards to the design.
- Clarify what is being asked and what a complete answer contains.
- Say what you would check first and why it is the highest-information step.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
How would you describe the architecture of a high-level system and the technologies used between its stages?
Medium
Approach
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
- State your assumptions explicitly before working the problem.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
Relay committed events to the log without gaps or reordering
Medium · transactional outbox · at-least-once · ordering · leases
outbox_event rows are written in the same transaction as the state change and carry aggregate_type, aggregate_id, aggregate_version, payload and status, with a partial index on (created_at, event_id) WHERE status = 'pending'. The relay publishes about 4k events/second to a partitioned append-only log keyed by aggregate_id, with one leader per partition range holding a lease. Consumers must never miss an event; they may see one twice. Design the claim-publish-mark loop, and state exactly what consumers observe when a leader's lease expires while it is mid-batch.
Approach
- Claim with SELECT ... WHERE status='pending' ORDER BY created_at, event_id LIMIT $batch FOR UPDATE SKIP LOCKED inside a transaction. SKIP LOCKED lets several relay workers share a range without serialising on each other's rows, and the partial index keeps the claim proportional to the backlog rather than to a table that is overwhelmingly published rows. At 4k/second a batch of 500 is eight claims per second, each an index scan of 500 entries.
- Publish before marking, never the reverse, and say why it is a choice. Marking first loses the event outright if the process dies in the gap, and the loss is silent - nothing remains to retry, and it surfaces later as a projection missing a row. Publishing first can repeat the event, and repetition is what every consumer is already built to survive. That single ordering is the whole at-least-once guarantee.
- Preserve the only ordering on offer. Partition by aggregate_id and never publish two events for one aggregate concurrently: claim in (created_at, event_id) order and publish sequentially within an aggregate, or hash aggregate_id to a worker slot. Order across aggregates is not available at any price here, which is why the event carries aggregate_version and the full fact rather than a delta - a consumer can then discard what it has already applied without coordinating with anyone.
- State the failover behaviour precisely, because it is the consistency-versus-availability decision in this design. A lease expires because the holder is slow, and no mechanism distinguishes that from dead, so for the length of the lease window two leaders can publish the same claimed batch. The system accepts duplicates to avoid stalling publication for every aggregate in the range whenever one worker pauses. Consumers deduplicate on (aggregate_id, aggregate_version) and drop anything at or below what they have applied.
- Bound the failure paths and pick the right alarm. A row that fails to publish increments attempts, records last_error, and moves to 'dead' after a limit so one poison payload cannot block the backlog behind it. Alert on the age of the oldest pending row, not on the relay's error rate: the failure worth catching is a relay reporting itself healthy while nothing is being published.
Worked solution (25 min)
- Write the claim statement and check it against the partial index: which columns it seeks on, how many entries it touches, and what two concurrent workers do to each other.
- Write both orderings of publish and mark, and for each state what exists after a crash at every point in the loop.
- Write the consumer's dedupe rule on (aggregate_id, aggregate_version) and test it against a replayed batch of 500.
- Compute the backlog after a 40-minute outage and the batch rate needed to drain it while 4k/second continues to arrive.
Expected result: A claim using FOR UPDATE SKIP LOCKED over the partial index in (created_at, event_id) order, publish to the aggregate_id partition, then mark published - in that order, accepting duplicates on lease expiry. Per-aggregate order is preserved by never publishing an aggregate concurrently; cross-aggregate order is explicitly not guaranteed. Failures increment attempts and terminate at 'dead'. The alarm is the age of the oldest pending row.
Verify it yourself
- Killing the relay mid-batch produces duplicates on restart and no gap.
- The claim query's plan uses the partial index and reads at most batch-size entries regardless of table size.
- Two relay workers on the same range never block on each other's rows.
- Events for one aggregate_id arrive in aggregate_version order, and no consumer relies on order across aggregates.
Follow-up
- The relay is down 40 minutes and 9.6 million rows are pending. What does catch-up do to the primary, and what changes in the claim loop to survive it?
- A consumer insists it never received an event. Which single query settles whether the relay lost it, and what does each answer look like?
- Delivery is at-least-once. What would exactly-once require end to end, and why is that a property of the consumer rather than of the relay?
Listing latency scales with page size, not with filters
Easy · n+1 · latency · query batching
The tenant listing endpoint reads resource filtered by tenant_id and status, ordered by updated_at DESC, and returns each row plus the owner's display name from app_user and the actor of that resource's latest resource_revision. p99 is 55 ms at 10 rows per page and 1.4 s at 200. Database telemetry shows 401 statements per request, each under 1 ms, and nothing in the slow-query log. Diagnose the cause and give the fix, stating the statement count per request and the p99 you expect afterwards.
Approach
- Read the counters before forming a theory. 401 statements for 200 rows is one driver query plus two per row, and sub-millisecond execution with an empty slow-query log rules out a bad plan. The time is round trips, which is why it is invisible in every per-query metric and scales with rows returned rather than with filter selectivity.
- Name the two per-row statements from their normalised text: a single-row app_user lookup by user_id, and a resource_revision lookup by resource_id ordered by version DESC LIMIT 1. Confirm by dropping those two response fields and watching the statement count fall to one. That locates the calls in the serialisation layer, not the repository.
- Check that the arithmetic accounts for the whole gap. Measure one round trip to the replica in isolation; 400 trips at roughly 3 ms of network plus 0.2 ms of execution is about 1.3 s on top of a 55 ms baseline, which matches. If the multiplication had fallen short, the N+1 would only be part of the story and you would keep looking.
- Batch both lookups. Collect owner_user_ids and resource_ids from the driver query, then issue WHERE tenant_id = $1 AND user_id = ANY($2) for the users, and PostgreSQL's SELECT DISTINCT ON (resource_id) ... WHERE resource_id = ANY($2) ORDER BY resource_id, version DESC for the latest revision, which the UNIQUE (resource_id, version) index serves directly. On an engine without DISTINCT ON, use a lateral join or a row_number window. Three statements per request at any page size.
- Keep the tenant predicate in the batched query. The per-row version was implicitly scoped because its ids came from tenant-scoped rows; a batched user_id = ANY(...) with no tenant_id is an unscoped read that behaves correctly only as long as the id list is trustworthy.
- Re-measure at 10, 50 and 200 rows and confirm the statement count is constant. Latency should now track bytes returned.
Follow-up
- The page size is capped at 200 today. What breaks first if it is raised to 2,000, and is it still this bug?
- How do you stop the next N+1 from reaching production, given that no individual query is slow and the endpoint's tests pass?
- The latest-revision actor is only used to render an avatar. Make the case for denormalising it onto resource, and name the write anomaly that introduces.
Suggested practice checklist
Day one measures instead of guessing, under a fixed rubric, and the remaining hours are allocated in proportion to the gaps before any studying begins. The allocation is deliberately not renegotiated midweek, because the area that feels worst on day three is usually the one that is moving.
Day 1 — Diagnostic, scored before you study anything
- Sit a 110-minute diagnostic in four blocks: forty-five minutes on two coding problems, twenty-five on one design prompt taken to interface and data model, twenty of short-answer fundamentals, and twenty delivering two behavioural answers aloud.
- Score each block from 0 to 3 on a fixed rubric where 3 is correct and fluent, 2 is correct but slow or prompted, 1 is partially correct and 0 is stuck, grading the artifact rather than how the attempt felt.
- Allocate days two to five in proportion to 3 minus each block's score, write the allocation down, and commit to leaving it alone.
Deliverable: A scored rubric and a fixed hour allocation for the rest of the week.
Day 2 — Largest gap: find the boundary rather than the subject
- Split the weakest area into named sub-skills and rate each separately. For coding those are restating the problem, choosing the structure, stating the invariant, turning the invariant into loop bounds, handling empty and single-element input, and accounting for complexity out loud.
- Attempt three items positioned just above where the rating drops off, and for each write the first move you failed to make.
- Re-attempt one of them from blank four hours later with nothing open.
Deliverable: A sub-skill map with the two blocking sub-skills circled.
Day 3 — Drill the blocking sub-skill by repeating the shape
- Do eight short repetitions of the same shape rather than eight different problems, so what gets practised is the pattern and not the puzzle.
- State the rule you now hold in one sentence, then test it against a case built to break it, a sliding window over an array containing negative values, or a cache-aside read path whose invalidation message is dropped.
- Have someone else read your one-sentence rule and find the precondition you left out.
Deliverable: One rule statement with its preconditions attached and one counterexample that would have caught the incomplete version.
Day 4 — Second gap, plus maintenance on the strongest area
- Run the same sub-skill decomposition on the second-largest gap in half the time.
- Spend twenty-five timed minutes on the block you scored highest, choosing the hardest item you can still finish rather than a warm-up.
- Write whether each area fails you on recall, on setup, or on execution, and set the fix accordingly: repetition for recall, a written checklist for setup, timed work for execution.
Deliverable: A second sub-skill map plus a one-line failure diagnosis for each area.
Day 5 — The gap that is not a skill
- Record one technical and one behavioural answer, then count two things in the playback: seconds before your first clarifying question, and sentences you began without knowing where they would end.
- Practise saying that you do not know, followed by how you would find out, without letting it soften into a guess, and practise stating a complexity or an estimate before being asked for it.
- Redeliver one answer under a hard ninety-second cap, which forces structure ahead of detail.
Deliverable: Two recordings with a counted reduction in time-to-first-question.
Day 6 — Retest under day-one conditions
- Sit the same 110-minute structure with new prompts of comparable difficulty and score it on the identical rubric.
- For any block that did not move, change the method rather than adding hours: a block stuck at 1 usually means the practice was too varied, not too short.
- Write down which single block you would still lose the offer on.
Deliverable: A second scored rubric placed beside the first, with one named remaining risk.
Day 7 — Full loop under interview conditions
- Run a sixty-minute mock over the two blocks that moved least, with an interviewer briefed to interrupt and change direction mid-answer.
- Write the recovery script for going blank: restate the question, state your assumption, name the first thing you would check.
- Say every rule from the week aloud without reading it, and cut any you cannot state in a single sentence, since a rule you have to reconstruct mid-answer will not survive an interruption.
Deliverable: A one-page card holding the recovery script and only the rules you could state from memory.
The estimate and the day you knew
A slipped date is only a bad story if you sat on it. What matters is what you believed when you gave the number, the signal that told you it was wrong, how many days passed before you said so, and what you cut rather than asking for more time. Scope you defended counts as much as scope you dropped.
What is your experience with data structures and their application in system design?
Medium · behavioural and engineering judgement
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
Follow-up
- What did you decide not to do, and why?
- What would you do differently if you ran that again?
Estimate work you have never done and defend the range
Hard · estimation · backfills · expand-contract
You are asked to estimate a change you have never attempted: add a column to a 100-million-row table, populate it, move reads across, and drop the old shape. Give a range with the assumptions that generate it, including batch size, the signal your backfill throttles on, and wall-clock hours, and name the three unknowns that would move the number most. Then describe a real estimate you gave under comparable ignorance: how you expressed its uncertainty, what you committed to, and how wrong you turned out to be.
Approach
- Decompose into independently deployable steps before estimating anything: add the column nullable, write both shapes, backfill in batches, verify, move reads, stop writing the old shape, drop it. That is four deploys spread over days, and the calendar estimate is dominated by them rather than by the loop's runtime.
- Do the arithmetic aloud for the part that has arithmetic in it: batch size times number of batches times per-batch duration, at a write rate the primary can absorb alongside roughly 1.2k writes per second of production traffic. The loop is throttled by replication lag and lock waits, not by how fast it can issue statements.
- Price the schema step by its lock rather than its statement duration. In PostgreSQL an ALTER TABLE taking ACCESS EXCLUSIVE waits for every open transaction on that table while later queries queue behind it, so a millisecond change issued during a thirty-second analytics query stalls that table for thirty seconds. Adding a nullable column with a non-volatile default avoids a rewrite from version 11; a new index wants CREATE INDEX CONCURRENTLY, which cannot run inside a transaction block and leaves an invalid index behind if it fails.
- Express the answer as a range whose endpoints each trace to a stated assumption, then name the cheapest experiment that collapses it, which is almost always running one real batch against the real table and multiplying.
- Commit to a checkpoint rather than a completion date: the day you report a measured number from that first batch. That is a promise you can keep under uncertainty, and it is what the asker actually needs in order to plan.
Follow-up
- How do you verify the backfill genuinely finished, given rows written by production traffic while it ran?
- Where does the backfill resume from after a worker is killed mid-batch, and what makes that resume point trustworthy?
- Your first batch comes back ten times slower than assumed. What do you tell the person waiting on the estimate, and when?
Reverse your own decision and price the reversal
Medium · reversibility · measurement · migrations
Describe a technical decision you made and later reversed. Pick one that cost something: a service you split and merged back, a cache you added and removed, an index you created that pushed the planner onto a worse plan, a projection you rebuilt from scratch. State what you believed when you decided, the measurement that changed your mind, how long the wrong version ran in production, and what the reversal cost in migrations, dual writes, and a deprecation window for callers you did not own.
Approach
- State the original rationale without irony, in the version you would still defend given what was known then. If it is not defensible, the story is about carelessness rather than judgement, and a different example serves you better.
- Give the measurement that moved with a before and after: the p99 that did not improve, the cache hit rate that sat at 40%, the plan that flipped to a sequential scan once the table passed a size you can name.
- Cost the reversal in steps, not adjectives: expand-and-contract deploys, the dual-write window, the callers who had to be notified, the rows already written in the wrong shape that had to be backfilled or abandoned.
- Distinguish reversal from rewrite by naming what you kept. Most good reversals preserve the schema or the interface and undo one decision inside it, which is also why they were affordable.
- Finish on the process change: the smallest experiment that would have produced the same measurement in a day, and why you did not run it the first time.
Follow-up
- What in that decision was irreversible, and did you know it was irreversible when you made it?
- How did you tell the people who had already built on top of the original decision?
- What do you now measure before committing to a change of this size?