cswork / libraryOpen practice workspace

Interview guides · Axis Communications

Axis Communications Software Engineer Interview Questions & Guide 2026

Axis Communications software engineer prep on partial failure: a timed-out request has an unknown outcome, not a failed one.

The 60-second brief

A Software Engineer at Axis Communications plays a critical role in developing the sophisticated technology that defines the global market for network video, access control, and audio systems. You are not just writing code; you are building the intelligence that powers smart, secure, and efficient environments. Your work directly impacts how organizations monitor and protect their physical assets, requiring a deep commitment to quality, reliability, and innovation.

The shape of the workload matters more for your prep than the industry label does. Read-heavy serving, write-heavy ingestion and scheduled batch processing have different binding constraints and fail in different places, so find out which one the team lives in before picking design topics.

Focus areas

  • Keep money in integer minor units
  • Make every write idempotent under client retries
  • Scope every query and cache key by tenant

Overview

In this role, you will often operate at the intersection of hardware and software, navigating the complexities of embedded systems, networking protocols, and modern software architectures. Whether you are working on core firmware, cloud-based solutions, or innovative incubation projects, your contributions are central to maintaining the company's reputation for high-performance, industry-leading solutions. You will collaborate with cross-functional teams, including product managers, hardware engineers, and systems architects, to solve complex, real-world problems.

Expect a work environment that values technical rigor, long-term thinking, and a collaborative spirit. The role is challenging because it requires both a solid grasp of fundamental engineering principles and the ability to adapt to a rapidly evolving security and technology landscape. Success at requires a balance of analytical depth and a genuine curiosity about how your software functions within a larger, interconnected ecosystem.

The Axis Communications interview process

Axis Communications candidates report 4 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.

Initial Screening

Before anything technical happens, someone has to decide which rung of the ladder your loop is calibrated to, and that decision sets the bar for every round after it. It comes from how you describe scope, not from your title, because titles do not convert cleanly between companies. The weak version of the answer is team size and years. The strong version names the largest change you shipped where nobody reviewed the design, what would have broken if you had been wrong, and what you were paged for. Get the level said out loud on this call, because the range and the loop both follow from it.

What to demonstrate

  • Whether the scope in your own account maps onto a level the team actually has an opening at, so a mismatch ends the process cheaply rather than after four interviewers have spent a day
  • Whether your title needs re-mapping: the same word describes very different amounts of independent decision-making at a twenty-person company and a ten-thousand-person one
  • Whether your compensation expectation can be filled at that level in the structure the role pays in, which is why the number gets asked for before any engineer is scheduled

How to prepare

  • Write down two changes from the last two years: the largest one you designed with nobody reviewing the design, and the largest one where someone more senior did. Lead with the first when scope comes up, and be ready to say which parts of the second were yours
  • Ask which level the loop is calibrated to and what changes at the level above it, then plan your weeks from that answer rather than from the posting
  • Settle a total-compensation range beforehand with the split named, base against bonus against equity and its vesting period, so a question about numbers gets a number instead of the word market

Technical Assessment

What this round decides is narrow: whether you can produce code that runs and is correct on inputs nobody showed you. An elegant solution that does not compile scores below a plain one that does, so write a correct brute force first, say out loud that you know its cost, and improve it with the working version still on screen. What separates strong answers is who finds the broken case. Trace your own code against an empty input, a single element, and duplicate keys before you say you are finished, because being told is far more expensive than noticing.

What to demonstrate

  • Whether degenerate inputs get checked without being asked for: an empty collection, one element, every element equal, and the extreme value the input type allows
  • Whether the complexity you state matches the code you actually wrote, including a sort or a copy sitting inside a loop
  • Whether the finished answer is verified against the worked examples before you call it done, rather than assumed correct because the code reads correctly

How to prepare

  • Take five problems you have already solved and, without running anything, write down what each returns for empty input, a single element, and all-duplicates. Then run them and count how many you predicted wrong.
  • Drill the brute force as its own skill: on ten problems, write only the obviously-correct slow version and time how long it takes to get it passing. If that is more than a few minutes, that is what to practise, not the optimal version.
  • Add a fixed last step before you submit anything, reading only the loop bounds and the initial value of each accumulator, which is where most off-by-one errors live

Grandparent Interview

When a round has no standard shape, it is often there because something is still open: an area no earlier conversation reached, a round where the signal came out mixed, or a decision someone is not ready to make alone. Work out which by going back over what each earlier round actually covered rather than how it felt, and arrive able to give evidence on that point without being asked twice. Weak answers replay the loop's earlier material at the same depth. Strong ones go a level deeper and stay consistent with what you already said.

What to demonstrate

  • Whether your account of a project matches the one you gave earlier in the loop, since what you said before may be available to whoever runs this round
  • Whether you can go a level deeper on something already covered, reaching the decision and its alternatives rather than repeating the summary
  • Whether you state your own uncertainty accurately, including parts of a system you did not build and decisions you inherited, instead of claiming even ownership across all of it
  • Whether you can answer a question you handled poorly earlier by naming what you missed, rather than delivering a polished second version as if the first had not happened

How to prepare

  • Reconstruct the loop on one page: for each round, the questions you were asked and the answer you actually gave, not the better one you thought of afterwards. The gaps on that page are your best available guess at why this round exists.
  • Take the two claims you made earlier that carry the most weight and assemble the backing for each: the measurement, the date, what broke, the decision you would make differently now.
  • Write down the three facts about your work that must not drift between tellings, such as team size, timeline and your own role, and check your stories against that list rather than trusting recall under pressure

Final Leadership Review

Where the day includes a partner from product, design or data, that conversation is weighted like the technical ones and prepared for least. They are deciding one thing: whether having you in the room makes their decisions cheaper. That means options with costs attached, not implementation detail and not "it depends". An estimate someone can plan against — a range, the assumption that would push it to the high end, and what you would drop to hit the low one — is worth more than a confident single number, which everyone present already knows is wrong.

What to demonstrate

  • Whether an estimate comes as a range with the assumption most likely to break it, and states what a specific scope cut would actually buy
  • Whether a technical constraint is handed over as a choice with consequences on their side, rather than as a verdict they have no standing to argue with
  • Whether you establish what decision is on the table before proposing anything
  • Whether risk is raised while it can still change the plan, with the trigger that would confirm it, instead of reported afterwards as a slip

How to prepare

  • Take a project that shipped late and write the two-sentence warning you could have given three weeks earlier, naming what you would have needed decided at that point
  • Rehearse one estimate out loud until it arrives in three parts: the range, the single assumption that would blow it, and the smallest thing you would cut to protect the date
  • Rewrite an objection you have actually made — the "we can't do that" version — as two options with their costs, so the choice ends up with the person who owns it

Where candidates lose points

Serialising a tenant's writes through select ... for update on a single counter row

It is the first change that makes a counter correct, and it caps that tenant's write throughput at roughly one divided by the lock hold time. A transaction that takes the lock, makes a network call and then commits holds it for the entire round trip: at 2 ms that is about 500 writes per second for the whole tenant, and the largest tenants are exactly the ones that exceed it. The damage then spreads, because every waiter holds a database connection while it queues, so one hot tenant drains the shared pool and the symptom presents as a site-wide latency incident rather than as a lock problem. The repairs are to shrink the critical section to a single statement, to shard the counter into per-(tenant, hour) or per-(tenant, bucket) rows and sum on read, or to batch in memory and flush periodically while accepting the bounded loss that batching implies.

Treating a timed-out write as a failed write

A timeout says the response did not arrive, not that the work did not happen; the server may well have committed and then lost the connection. Retrying a non-idempotent create after a timeout is the standard way to end up with two of something, and those duplicates land precisely when the system is already degraded and least able to absorb them. The discipline is to treat a timeout as unknown: either the write carries an idempotency key so the retry is safe by construction, or the client re-reads authoritative state before deciding what to do, and the interface says unknown rather than showing a failure that invites a second click.

Not asking what the system looks like if it dies halfway through

For any multi-step write, say what state remains if the process stops between step two and step three, and what brings it back: a single transaction, a saga with compensating actions, an outbox, or a reconciliation job. Partial failure is routine at any real call volume, so 'that shouldn't happen' is an answer with nothing behind it.

Saying 'eventually consistent' without naming the anomaly a user would see

Describe the concrete symptom you are choosing to accept: the author reloads and their own comment is missing for two seconds, or two devices show different balances for a minute. The class of consistency model is a technical label; the tolerable anomaly is the actual product decision.

Questions & practice

How do you approach debugging complex software issues?

Medium · data structures and algorithms

Approach

  1. Restate the input: its shape, its size, and what is guaranteed about it.
  2. Name the brute-force solution and its complexity before improving on it.
  3. State the target complexity and say which constraint rules the naive version out.

Follow-up

  • Which test case would catch an off-by-one here?
  • How does this change if the input no longer fits in memory?

Order a job dependency graph and find its critical path

Medium · topological-sort · dag-longest-path · cycle-detection · critical-path

A workspace defines up to 50,000 jobs with up to 200,000 dependency edges and an estimated duration_seconds per job. Given the edge list, reject the graph if it contains a cycle and name one cycle's nodes; otherwise return a valid execution order, the earliest possible completion time with unlimited workers, and the set of jobs whose slack is zero. Then say which single job to shorten in order to cut the completion time, and by exactly how much. State the complexity of each part.

Approach

  1. Kahn's algorithm for the order: compute indegrees, seed a queue with zero-indegree nodes, emit and decrement. O(V + E), which at 50,000 and 200,000 is milliseconds. If fewer than V nodes are emitted, the graph contains a cycle.
  2. Kahn detects a cycle but cannot name one. The nodes left with indegree above zero contain every cycle, so run one DFS restricted to that residual subgraph with three-colour marking and report the stack slice from the grey node the back edge points at. That is the difference between a usable error message and 'dependency cycle detected'.
  3. Earliest completion with unlimited workers is the longest path, which is NP-hard on a general graph and linear on a DAG. State the precondition, then relax in topological order: earliest_finish[v] = duration[v] + max(earliest_finish[u] for u in preds(v)), taking the max over an empty predecessor set as zero. The makespan T is the maximum over all nodes. O(V + E).
  4. Second pass in reverse topological order for latest_finish, then slack[v] = latest_finish[v] - earliest_finish[v]. Zero-slack nodes form the critical path, and there can be several disjoint critical paths, so return the set rather than one chain. slack[v] = 0 is exactly the statement that some longest path runs through v; equivalently, the longest path through v has length T - slack[v].
  5. The speed-up bound is the point of the question, and the obvious form of it is wrong. Shortening a zero-slack job v by d, with 0 <= d <= duration[v], cuts the makespan by min(d, T - L_avoid(v)), where L_avoid(v) is the longest path in the graph with v deleted: the longest path that avoids v, not the second-longest path overall. The two coincide only when the runner-up path misses v. Counterexample: A of 10 s feeds both B of 5 s and C of 4 s, so T = 15 s and the second-longest path is 14 s, yet shortening A by 10 s leaves a makespan of 5 s. The realised gain is the full 10 s, because both paths ran through A and shrank together, while min(10, 15 - 14) predicts 1 s. The reason is structural: shortening v reduces every path through v by d and leaves every other path alone, so the new makespan is max(T - d, L_avoid(v)).
  6. Compute L_avoid(v) the direct way: delete v and re-run the same forward relaxation, O(V + E) per candidate. The cheaper equivalent skips the deletion, since L_avoid(v) only ever matters through that max: set duration[v] := 0, recompute the makespan as T0(v) = max(T - duration[v], L_avoid(v)), and the gain is min(d, T - T0(v)), which is identical for every d <= duration[v]. Only zero-slack jobs are candidates, because shortening a job with positive slack changes the completion time not at all. One relaxation is milliseconds at this size, so ranking a critical set in the hundreds costs O(k(V + E)) and is worth doing exactly; a critical set in the tens of thousands is not, and there you evaluate a shortlist, longest jobs first, and say that the answer is the best of that shortlist rather than the optimum.

Worked solution (30 min)

  1. Build four fixtures. A: 12 jobs, two branches of 100 s and 95 s that share no job. B: fixture A plus one back edge. C: two disjoint paths tied at 100 s. D: the shared-prefix case, one job of 10 s feeding a 5 s job and a 4 s job, so the longest path is 15 s and the runner-up is 14 s.
  2. Run Kahn; on fixture B confirm it emits fewer than V nodes, then run the residual-subgraph DFS and print the actual cycle.
  3. Compute earliest_finish forward and latest_finish backward, and list the zero-slack set for each fixture.
  4. For each zero-slack job v, recompute the makespan with duration[v] := 0 to get T0(v), and record both the correct bound T - T0(v) and the wrong one, T - second_longest_path, side by side.
  5. Apply the shortening for real (20 s off the critical branch of A, 10 s off the shared prefix of D) and diff the recomputed makespan against each prediction.

Expected result: Fixture A: makespan 100 s, and shortening by 20 s leaves 95 s, a gain of 5 s. Both formulas agree here, because the 95 s branch avoids the shortened job. Fixture D: makespan 15 s, and shortening by 10 s leaves 5 s, a gain of the full 10 s, which T - T0(v) = 15 - 5 = 10 predicts and T - second_longest = 1 does not. Fixture C: the zero-slack set covers both tied paths, and shortening a job on one of them alone gains nothing, since the other path still runs 100 s.

Verify it yourself

  • The cycle printed by the DFS is a real cycle: every consecutive pair is an edge present in the input.
  • Summing durations along any zero-slack path equals the makespan exactly.
  • For every candidate, the predicted gain equals the makespan recomputed from scratch with the shortened duration. Assert the equality; do not eyeball it.
  • Fixture D is the regression test for the bound, and a fixture whose branches are disjoint is not: it passes under either formula and proves nothing.

Follow-up

  • Only m workers are available. What happens to your answer, and what can you still promise about the schedule you produce?
  • Edges arrive incrementally as the customer edits the pipeline. How do you detect a cycle at insert time without re-running Kahn over 250,000 elements?
  • Durations are estimates. How would you express completion time as a distribution, and what breaks about the critical path once you do?

Find peak concurrent sandbox usage from run intervals

Medium · sweep-line · intervals · concurrency-caps · null-semantics

Given up to 5 million job_run rows for one tenant over one day, with run_id, started_at, finished_at, status and wall_clock_limit_seconds, report the maximum number of sandboxes running at once, the earliest instant that maximum is reached, and the first run_id that would breach a per-tenant cap of C. started_at is null while a run is queued; finished_at is null both for runs still executing and for runs in status lost. Treat a run as occupying [started_at, finished_at). Give the complexity and state how you handle each null.

Approach

  1. Turn each run into two sweep events, (started_at, +1) and (end, -1), then sort the 2n events by timestamp with -1 ordered before +1 at equal timestamps. That tie-break is what makes the interval half-open, so a run finishing at 10:00:00 and one starting at 10:00:00 never overlap.
  2. Decide each null out loud before sweeping, because each choice moves the answer. A null started_at means queued and contributes nothing. A null finished_at with status running or leased is clipped to the window end. Status lost has no observed end at all, so clip it at started_at + wall_clock_limit_seconds on the grounds that the supervisor owns the timeout, and record that you did. The table's check (finished_at is null or started_at is not null) guarantees you never see an end without a start.
  3. Sweep once, maintaining a running counter, the maximum, and the timestamp at which the maximum was first attained (update peak_at only on a strict increase, or you will report the last such instant instead of the earliest). Capture the first run_id whose +1 takes the counter to C+1 during the same sweep rather than in a second pass.
  4. Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by started_at, a min-heap of end times gives O(n log k) time and O(k) space with k the peak concurrency, which is the better shape when the rows come from an index scan on (tenant_id, started_at).
  5. If second resolution is acceptable, counting-sort the endpoints into an 86,400-slot delta array and prefix-sum it: O(n + T) time and O(T) space, which beats the comparison sort at 5 million rows. It answers only at second granularity, so state which resolution the cap is defined in.

Follow-up

  • Now report peak concurrency per tenant for 10,000 tenants from one globally sorted stream. What changes about memory and about the sort?
  • The cap has to be enforced at dispatch rather than reported afterwards. What does the admission check look like, and where does it race?
  • How would you answer 'peak concurrency within any 5-minute window' without re-sorting?

Rebuild an hourly rollup with deduplication and late-arrival accounting

Hard · window functions · deduplication · event time vs ingest time · watermarks

From usage_event (event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at, ingested_at), produce the values usage_rollup_hourly should hold for one tenant over one day: per (workspace_id, sku, hour_start) the deduplicated quantity_sum, event_count and source_max_ingested_at, bucketed by occurred_at. Duplicates share (tenant_id, idempotency_key). Also report, per hour, the running total across the day and the share of quantity that arrived more than two hours after the hour began. Write the query, and state which duplicates a daily unique index cannot catch.

Approach

  1. Deduplicate in its own CTE before any aggregation, because a SUM cannot be un-summed: row_number() over (partition by tenant_id, idempotency_key order by ingested_at, event_id) = 1. Include the tiebreaker. Without it the surviving row is non-deterministic when two duplicates share an ingested_at, and a rollup described as deterministically recomputable then disagrees with itself between runs.
  2. Bucket on occurred_at and nothing else, and pin the timezone explicitly. date_trunc('hour', timestamptz) truncates in the session's TimeZone setting, so the same query run by a session set to a non-UTC zone buckets differently; use the three-argument date_trunc('hour', occurred_at, 'UTC') on PostgreSQL 16 or later, or date_trunc('hour', occurred_at at time zone 'UTC') at time zone 'UTC' before that. Filter environment = 'production' explicitly, since metering covers three environments and billing covers one.
  3. Aggregate to the grain with sum(quantity), count(*) and max(ingested_at). The last is not decoration: it is the watermark the row consumed up to, and without it there is no way to prove afterwards what a number did and did not include.
  4. Compute the late share inside the dedup-and-aggregate step as a conditional aggregate, sum(quantity) filter (where ingested_at > hour_start + interval '2 hours'), then divide by the hour's total. Compute the running total as a window over the already aggregated rows: sum(quantity_sum) over (partition by workspace_id, sku order by hour_start rows between unbounded preceding and current row). Running either over raw rows puts the duplicates back.
  5. Answer the index question exactly. The unique constraint is on (ingested_day, tenant_id, idempotency_key), because a unique index on a partitioned table must contain the partition key. It therefore deduplicates only within one ingest day and admits a duplicate whose retry crosses midnight or whose replay runs a week later. That is why this CTE dedups across the whole window being recomputed, and why the dedup horizon is a correctness parameter rather than a retention cost.
  6. Keep the numeric type all the way through. quantity is numeric so the sums are exact; a cast to double precision anywhere in this pipeline reintroduces drift that surfaces only as a few unreconcilable cents per tenant per month, long after the query is out of anyone's mind.

Worked solution (40 min)

  1. Generate a day of events for one tenant across three workspaces and two SKUs, inject 2% duplicates sharing an idempotency_key with a later ingested_at, and inject 1% whose ingested_at is six hours past occurred_at.
  2. Write the dedup CTE alone and confirm its row count drops by exactly the injected duplicate count.
  3. Aggregate and compare quantity_sum against a ground truth computed outside SQL from the generator's own records.
  4. Add the two window and filtered aggregates, and confirm the final hour's running total equals the ungrouped day total for each (workspace, sku).
  5. Run the whole query twice over static data and diff the two outputs.
  6. Re-run with the session TimeZone set to a non-UTC zone and confirm hour_start does not move.

Expected result: One query: a dedup CTE using row_number() over (partition by tenant_id, idempotency_key order by ingested_at, event_id); aggregation by (workspace_id, sku, hour_start) producing quantity_sum, event_count and max(ingested_at) plus a filtered late-quantity aggregate; a running total as a window over the aggregated rows; and an explicit statement that the partition-scoped daily unique index cannot catch a duplicate that crosses the ingest-day boundary or arrives in a later replay.

Verify it yourself

  • Row count after dedup equals raw count minus injected duplicates, exactly.
  • The running total at the final hour equals the ungrouped day total for that (workspace, sku).
  • Two consecutive runs over static data return byte-identical rows.
  • Every hour_start is hour-aligned in UTC and unchanged by the session's TimeZone setting.

Follow-up

  • A dispute forces the same recompute over 40 days for one tenant. What changes about the dedup CTE's memory use and the chosen plan, and what would you do about it?
  • Two runs a minute apart return different quantity_sum values for an hour that is already closed. Give two mechanisms that produce that, and the single query that distinguishes them.
  • Express the same rollup incrementally so it does not re-scan the day each time the watermark advances. What does the incremental version stop being able to answer?

Decide which facts an invoice line copies instead of joining

Medium · denormalisation · immutable records · foreign keys · rounding

invoice_line_item already denormalises tenant_id, which is reachable through invoice_id, and stores amount_minor even though quantity times unit_price_micros would recompute it. A reviewer asks you to normalise both away, and separately asks whether the tenant's legal name and billing address should be copied onto the invoice header. Decide each case. For every field you keep denormalised, name the read pattern or the invariant that justifies it, the anomaly the copy can develop, and the mechanism that prevents that anomaly here.

Approach

  1. Split the question into two kinds of copy, because they fail differently. A copy of a currently mutable fact is a cache: it drifts and needs invalidation. A copy of a fact frozen at write time is not a cache at all, it is the record of what happened, and normalising it away destroys information the source no longer holds.
  2. Keep tenant_id on the line. It costs 8 bytes, it leads every index on the table so no read is ever accidentally cross-tenant, and it turns a wrong join into an empty result rather than another tenant's money. Prevent the drift structurally: a unique constraint on invoice (invoice_id, tenant_id) plus a composite foreign key from the line on (invoice_id, tenant_id) makes a mismatched pair impossible, so the database enforces agreement instead of a code review.
  3. Keep amount_minor. Rounding must happen exactly once, at a named site, with a stated mode (half-even here). If readers recompute from quantity and unit_price_micros, every reader owns a rounding decision, and half-up and half-even diverge systematically across thousands of lines rather than cancelling out. A check constraint can bound the stored value but deliberately cannot re-derive it.
  4. Copy the legal name and billing address onto the invoice header, written once and never updated. The statement must show what was true when it was sealed, and the tenant record will change afterwards. This is a snapshot for the same reason source_rollup_watermark is stored per line: without it, nobody can reconstruct what the customer was told.
  5. Name the read pattern that pays for all of it. Rendering, dispute response and export are per-tenant, per-period reads over thousands of lines that would otherwise join back to slowly changing dimensions that no longer hold the historical value. The write side is a once-per-period batch, so the extra columns cost nothing that matters.
  6. Concede the case where the reviewer is right: a mutable operational attribute such as the tenant's current plan name has no business on a line. If a report wants it, join. If a statement needs the plan as of the period, that is another snapshot and it belongs on the header with the rest.

Follow-up

  • Write the composite foreign key and the unique constraint it requires on the parent. What does it cost on every line insert, and what does it do to a bulk load?
  • A tenant is renamed after being invoiced. Which rows change, and what does the customer see on last quarter's PDF?
  • Where does currency live, and what breaks if a tenant's billing currency changes between two periods?

Can you explain IP masking and why it is used?

Medium

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. Work from the requirement backwards to the design.
  3. State your assumptions explicitly before working the problem.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Explain basic networking concepts such as port forwarding, IP/subnetting, and troubleshooting connectivity.

Medium

Approach

  1. Say what you would check first and why it is the highest-information step.
  2. State your assumptions explicitly before working the problem.
  3. Clarify what is being asked and what a complete answer contains.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

Specify webhook signature verification a customer can implement

Easy · webhooks · hmac · replay protection

The webhook-delivery service signs each payload before POSTing it to a customer endpoint. Write the signature specification a customer implements in their own language: the header format, exactly which bytes are signed, the algorithm, how replay is bounded, and how a signing secret rotates without a delivery gap. Then write the verification steps the customer performs, in order, including what they compare and what they return on failure. Constraint: most customers reach for their web framework's parsed JSON body by default. Deliverable: the spec section plus reference pseudocode.

Approach

  1. Sign the concatenation of the timestamp and the raw body, t + "." + body, and emit a header of the form t=<unix seconds>,v1=<hex>. The timestamp has to be inside the MAC, or an attacker re-stamps a captured body and the tolerance window buys nothing.
  2. Require the raw request bytes. A framework that parses JSON and re-serialises it changes key order, whitespace and number formatting, so the spec must tell the customer to capture the body before the parser runs and give the middleware note for each common framework.
  3. Use HMAC-SHA256, not sha256(secret || body): SHA-256 is a Merkle-Damgard construction, so the naive form admits length extension. Require a constant-time comparison as well, since a short-circuiting byte compare leaks the expected prefix under repeated probing.
  4. Bound replay in two layers: reject when |now - t| exceeds a stated tolerance such as 300 seconds, then deduplicate on the event identifier header. The tolerance is what makes the customer's dedup store finite rather than unbounded.
  5. Rotate by allowing two live secrets and emitting both signatures in one header (v1=<old>,v1=<new>); the customer accepts if any candidate matches, so neither side needs an instantaneous cutover. A failed verification returns 400 and the body is not processed.

Worked solution (15 min)

  1. Write the header grammar and one real example line with a plausible timestamp and hex digest.
  2. Write the signed string construction explicitly as a byte concatenation, and add the sentence telling the customer where in their framework to obtain the raw body.
  3. Write the five verification steps in order: extract t and candidates, check the tolerance, recompute the HMAC over t + '.' + raw body, compare in constant time against each candidate, then deduplicate on the event identifier.
  4. Add the rotation paragraph: two active secrets, both signatures sent, overlap window stated in the dashboard.
  5. State the failure response and the fact that the payload is not processed, plus what the sender does with that 400.

Expected result: A spec where the signed input is the timestamp joined to the exact raw bytes, the algorithm is HMAC-SHA256 compared in constant time, replay is bounded by a stated tolerance plus event-id deduplication, and rotation is an overlap of two accepted signatures rather than a cutover.

Verify it yourself

  • The timestamp is inside the signed string, not merely sent alongside it.
  • The spec names raw bytes and says where the customer gets them before parsing.
  • Rotation requires no coordinated instant on either side.
  • The reason for HMAC over sha256(secret || body) is stated as length extension, not as a preference.

Follow-up

  • A customer's verification passes locally and fails in production behind a proxy that re-encodes the response body. Where do you look first?
  • Why sign with a per-endpoint secret rather than the tenant's API key?

Webhook workers leak until OOM and drop in-flight deliveries

Medium · memory leak · eviction · leases

webhook-delivery workers grow from 400 MB to a 2 GB limit over about 36 hours, are OOM-killed, restart, and repeat. Each restart abandons in-flight attempts, so webhook_delivery rows sit in in_flight until their leases expire and the backlog spikes. The live set measured after a forced full collection also grows. The fleet serves tens of thousands of subscriptions, several thousand of which have been failing for weeks. Give an ordered checklist, the measurement separating retention from fragmentation, and the fix.

Approach

  1. Separate the two failure shapes with one measurement: track resident set size against the live set after a forced full collection. A live set that climbs monotonically is retention; a flat live set under a rising RSS is fragmentation, off-heap or native allocation, or an allocator that never returns pages. The stated symptom puts this in the first category, which rules out allocator tuning as a fix.
  2. Characterise the curve rather than the total. Growth linear in uptime implies an unbounded structure keyed by something that keeps arriving; step growth implies buffering a large object. Correlate the slope against event rate and separately against the count of distinct subscriptions seen, because those two diverge and only one of them will fit.
  3. Diff two heap snapshots an hour apart by retained size grouped by dominant root, not by allocation count, which is dominated by short-lived objects and will point at the wrong thing.
  4. Expect a per-subscription map with no eviction: circuit-breaker or backoff state created on first failure and never removed, so the retained set grows with endpoints that have ever failed, and the several thousand permanently dead endpoints hold theirs forever.
  5. Fix in two places. Bound the in-memory structure with a size-capped LRU or a TTL keyed on last use, and move state that must survive a restart onto the subscription or webhook_delivery row, since the worker holding it in memory is exactly why a restart loses it.
  6. Repair the second-order damage separately, because it will outlive the leak: workers claim by compare-and-set with leased_until, so a bounded lease returns in_flight rows to pending on a known schedule, and a graceful shutdown releases leases instead of waiting them out.

Follow-up

  • The backlog spike after a restart is itself a thundering herd against customer endpoints. What stops the recovery from becoming a second incident?
  • Suppose the live set had been flat while RSS still climbed. Name two causes and the measurement that separates them.
  • How would you size the LRU, and what does a miss on an evicted circuit-breaker entry cost a customer whose endpoint is down?

Suggested practice checklist

Day one measures instead of guessing, under a fixed rubric, and the remaining hours are allocated in proportion to the gaps before any studying begins. The allocation is deliberately not renegotiated midweek, because the area that feels worst on day three is usually the one that is moving.

Day 1 — Diagnostic, scored before you study anything

  • Sit a 110-minute diagnostic in four blocks: forty-five minutes on two coding problems, twenty-five on one design prompt taken to interface and data model, twenty of short-answer fundamentals, and twenty delivering two behavioural answers aloud.
  • Score each block from 0 to 3 on a fixed rubric where 3 is correct and fluent, 2 is correct but slow or prompted, 1 is partially correct and 0 is stuck, grading the artifact rather than how the attempt felt.
  • Allocate days two to five in proportion to 3 minus each block's score, write the allocation down, and commit to leaving it alone.

Deliverable: A scored rubric and a fixed hour allocation for the rest of the week.

Day 2 — Largest gap: find the boundary rather than the subject

  • Split the weakest area into named sub-skills and rate each separately. For coding those are restating the problem, choosing the structure, stating the invariant, turning the invariant into loop bounds, handling empty and single-element input, and accounting for complexity out loud.
  • Attempt three items positioned just above where the rating drops off, and for each write the first move you failed to make.
  • Re-attempt one of them from blank four hours later with nothing open.

Deliverable: A sub-skill map with the two blocking sub-skills circled.

Day 3 — Drill the blocking sub-skill by repeating the shape

  • Do eight short repetitions of the same shape rather than eight different problems, so what gets practised is the pattern and not the puzzle.
  • State the rule you now hold in one sentence, then test it against a case built to break it, a sliding window over an array containing negative values, or a cache-aside read path whose invalidation message is dropped.
  • Have someone else read your one-sentence rule and find the precondition you left out.

Deliverable: One rule statement with its preconditions attached and one counterexample that would have caught the incomplete version.

Day 4 — Second gap, plus maintenance on the strongest area

  • Run the same sub-skill decomposition on the second-largest gap in half the time.
  • Spend twenty-five timed minutes on the block you scored highest, choosing the hardest item you can still finish rather than a warm-up.
  • Write whether each area fails you on recall, on setup, or on execution, and set the fix accordingly: repetition for recall, a written checklist for setup, timed work for execution.

Deliverable: A second sub-skill map plus a one-line failure diagnosis for each area.

Day 5 — The gap that is not a skill

  • Record one technical and one behavioural answer, then count two things in the playback: seconds before your first clarifying question, and sentences you began without knowing where they would end.
  • Practise saying that you do not know, followed by how you would find out, without letting it soften into a guess, and practise stating a complexity or an estimate before being asked for it.
  • Redeliver one answer under a hard ninety-second cap, which forces structure ahead of detail.

Deliverable: Two recordings with a counted reduction in time-to-first-question.

Day 6 — Retest under day-one conditions

  • Sit the same 110-minute structure with new prompts of comparable difficulty and score it on the identical rubric.
  • For any block that did not move, change the method rather than adding hours: a block stuck at 1 usually means the practice was too varied, not too short.
  • Write down which single block you would still lose the offer on.

Deliverable: A second scored rubric placed beside the first, with one named remaining risk.

Day 7 — Full loop under interview conditions

  • Run a sixty-minute mock over the two blocks that moved least, with an interviewer briefed to interrupt and change direction mid-answer.
  • Write the recovery script for going blank: restate the question, state your assumption, name the first thing you would check.
  • Say every rule from the week aloud without reading it, and cut any you cannot state in a single sentence, since a rule you have to reconstruct mid-answer will not survive an interruption.

Deliverable: A one-page card holding the recovery script and only the rules you could state from memory.

The estimate and the day you knew

A slipped date is only a bad story if you sat on it. What matters is what you believed when you gave the number, the signal that told you it was wrong, how many days passed before you said so, and what you cut rather than asking for more time. Scope you defended counts as much as scope you dropped.

What role do you typically take within a team?

Medium · behavioural and engineering judgement

Approach

  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Close with what you would do differently, concretely.
  3. Give the blast radius: what could have broken, and what you measured.

Follow-up

  • What did you decide not to do, and why?
  • How did you know your change caused the improvement?

How do you handle working with teams of varying experience levels?

Medium · behavioural and engineering judgement

Approach

  1. Name the disagreement and how you resolved it with evidence.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Close with what you would do differently, concretely.

Follow-up

  • What would you do differently if you ran that again?
  • What did you decide not to do, and why?

What is your experience with specific coding languages relevant to the role?

Medium · behavioural and engineering judgement

Approach

  1. Name the disagreement and how you resolved it with evidence.
  2. Pick a story where you made the decision, not one where you watched it.
  3. Give the blast radius: what could have broken, and what you measured.

Follow-up

  • How did you know your change caused the improvement?
  • What would you do differently if you ran that again?