Interview guides · Aurora Solar
Aurora Solar Software Engineer Interview Questions & Guide 2026
Debugging practice for Aurora Solar software engineer candidates: reproduce it, narrow it, then change one thing per run.
The 60-second brief
A Software Engineer at Aurora Solar plays a pivotal role in accelerating the world’s transition to solar energy. You will be building sophisticated software solutions that allow solar professionals to design, sell, and install solar energy systems with unparalleled precision and efficiency. The work is highly technical, often involving complex geometry, 3D visualization, and data-intensive workflows that directly impact the renewable energy industry.
If the seat owns a service boundary, scope your preparation toward failure behaviour rather than topology. Retrying over an at-least-once channel produces duplicates by construction, so a retry policy is only as safe as the idempotency key underneath it.
Focus areas
- Trace a symptom to a mechanism under load
- Choose indexes from the query's access path
- Detect concurrent edits instead of losing writes
Overview
This role is critical because your code serves as the foundation for the Aurora Solar platform, which handles everything from high-fidelity 3D site modeling to complex financial modeling and proposal generation. You will be expected to tackle challenging engineering problems that require both deep technical expertise and a strong product-oriented mindset. Whether you are optimizing rendering performance or architecting scalable backend services, your contributions are essential to the company’s goal of making solar energy accessible and reliable for everyone.
The work at Aurora Solar often bridges the gap between pure software engineering and domain-specific challenges like spatial computing and energy modeling. Be prepared to showcase how your technical skills can be applied to real-world, physical-world problems.
The Aurora Solar interview process
Aurora Solar candidates report 5 rounds · ≈ 4-6 weeks. The stages below are what candidates describe, not a published process.
Recruiter Screen
Before anything technical happens, someone has to decide which rung of the ladder your loop is calibrated to, and that decision sets the bar for every round after it. It comes from how you describe scope, not from your title, because titles do not convert cleanly between companies. The weak version of the answer is team size and years. The strong version names the largest change you shipped where nobody reviewed the design, what would have broken if you had been wrong, and what you were paged for. Get the level said out loud on this call, because the range and the loop both follow from it.
What to demonstrate
- Whether the scope in your own account maps onto a level the team actually has an opening at, so a mismatch ends the process cheaply rather than after four interviewers have spent a day
- Whether your title needs re-mapping: the same word describes very different amounts of independent decision-making at a twenty-person company and a ten-thousand-person one
- Whether your compensation expectation can be filled at that level in the structure the role pays in, which is why the number gets asked for before any engineer is scheduled
How to prepare
- Write down two changes from the last two years: the largest one you designed with nobody reviewing the design, and the largest one where someone more senior did. Lead with the first when scope comes up, and be ready to say which parts of the second were yours
- Ask which level the loop is calibrated to and what changes at the level above it, then plan your weeks from that answer rather than from the posting
- Settle a total-compensation range beforehand with the split named, base against bonus against equity and its vesting period, so a question about numbers gets a number instead of the word market
Hiring Manager Interview
This round is a resourcing decision in the shape of a conversation: how large a piece of work can be handed to you with a one-line brief and no check-in for two weeks. The manager is listening for the seams in your story, the places where you settled something yourself and the places you went back for a ruling. Most candidates describe the system and skip the decisions, which reads as having been present rather than responsible. Say who wanted the work, which option you rejected and why, and where you would have stopped and escalated.
What to demonstrate
- Whether you can point at a design decision that was yours rather than the team's, and name the alternative you turned down and the constraint that killed it
- What you treat as yours to settle against what you take to someone else, and how long you sit on a blocker before raising it
- Whether the scope you claim survives a follow-up into the unglamorous part of it: the data migration, the backfill, the rollout to users who were already on the old path
- Whether you asked what problem the request was solving before building what was literally asked for, and what changed in the design once you had the answer
How to prepare
- Write out the brief for your last two projects exactly as it reached you, usually one sentence in a ticket, then list every question you had to answer yourself before code could be written. That list is most of what this round is asking for.
- For one decision in each project, write down the rejected option, what you were trading against, and the piece of evidence that would have flipped you. A tradeoff you cannot argue in reverse was not really a decision.
- Have an escalation ready: a blocker you took to your manager, what you had already tried, and the specific thing you were asking them to decide. If every example is something you handled alone, that reads as someone who does not ask.
Technical Assessment
What this round decides is narrow: whether you can produce code that runs and is correct on inputs nobody showed you. An elegant solution that does not compile scores below a plain one that does, so write a correct brute force first, say out loud that you know its cost, and improve it with the working version still on screen. What separates strong answers is who finds the broken case. Trace your own code against an empty input, a single element, and duplicate keys before you say you are finished, because being told is far more expensive than noticing.
What to demonstrate
- Whether degenerate inputs get checked without being asked for: an empty collection, one element, every element equal, and the extreme value the input type allows
- Whether the complexity you state matches the code you actually wrote, including a sort or a copy sitting inside a loop
- Whether the finished answer is verified against the worked examples before you call it done, rather than assumed correct because the code reads correctly
How to prepare
- Take five problems you have already solved and, without running anything, write down what each returns for empty input, a single element, and all-duplicates. Then run them and count how many you predicted wrong.
- Drill the brute force as its own skill: on ten problems, write only the obviously-correct slow version and time how long it takes to get it passing. If that is more than a few minutes, that is what to practise, not the optimal version.
- Add a fixed last step before you submit anything, reading only the loop bounds and the initial value of each accumulator, which is where most off-by-one errors live
Technical Interviews
The same problem is scored by two different mechanisms depending on the format, and preparing for one does not cover the other. With a person watching, partial progress is visible and a hint is a correction you can absorb; silence is the expensive failure, because nobody can read a half-written function. With an automated grader there is no partial credit for what you were about to do, nobody to ask, and the worked examples in the prompt are the entire specification. Read them as a contract, down to whether an empty result should be an empty list or no output at all.
What to demonstrate
- In a live session, whether your commentary tracks what your hands are doing, and whether a hint redirects you or gets defended against
- In an automated one, whether you cover the cases the examples do not show, since the hidden cases are where the score moves
- Whether you manage the clock on purpose: abandoning an approach that is not converging while there is still time to write something simpler that finishes
How to prepare
- Have someone hand you a problem and feed you one deliberately wrong hint. Practise testing it against a concrete case instead of accepting or rejecting it on authority.
- Do one timed run a week in a plain browser editor with autocomplete, linting and your own snippets switched off, which is closer to what these environments give you
- For the automated format, write the harness before the solution: a main that feeds the worked examples plus an empty and a single-element case and prints expected against actual, so a wrong submission is caught by you first
Behavioral Interviews
Many of these questions are about something that went wrong, and the grading sits mostly in the hours after you knew. Who found out first, whether that was you or an alert or a user, how long it took you to say it out loud, and whether the people who needed the news got it while they could still act on it. Engineers under-tell this part because it feels like confessing. The pattern it is looking for is the opposite: the quiet fix, an incident absorbed without telling anyone, after which nothing changed and the same failure is still available.
What to demonstrate
- How the problem was found, and whether that route was one you had built or one that happened to you, since a user reporting it first means your instrumentation did not cover that failure
- Whether time-to-detect and time-to-tell are separate numbers in your account and whether you know both, because a fast fix that nobody heard about until the retro is a different answer from a slow one that was announced immediately
- Whether the resolution left something durable behind, a check that fires or a default that changed, rather than depending on people remembering to be careful
- Whether you can say what the failure cost without either inflating it or waving it away
How to prepare
- Reconstruct one incident you were part of as a timeline with clock times: first bad request, first signal, first person who knew, first message outside the team, mitigation, permanent fix. The gaps between those entries are what gets asked about
- Look up the configuration of the signal that caught it, including its evaluation window and threshold. An alert defined on a five-minute aggregate cannot fire until the condition holds across that window, which puts a floor under time-to-detect that has nothing to do with how severe the failure was. Be able to say what that floor was and whether anyone had chosen it deliberately
- Prepare one story where you escalated early and the severity turned out to be smaller than you thought, including what it cost the people you pulled in. Without it, every answer you give about raising alarms is unfalsifiable
Where candidates lose points
Choosing an index from the columns a query mentions rather than from how it filters and orders
A composite B-tree index on (a, b, c) can be seeked only as a left prefix: equality on a, then equality on b, then a range or an ordering on c. A query that filters on b alone cannot seek into it at all and at best gets a full scan of the index; a query that filters a and ranges on b gets no benefit from c, because the index is only sorted by c within a fixed (a, b) pair. The practical consequence is that one index per column is close to useless for multi-predicate queries while a single correctly ordered composite index turns a scan into a lookup. The ordering half is what gets missed: if the index cannot satisfy the ORDER BY, the database must read every matching row and sort before the limit can apply, so a LIMIT 20 over a million matching rows still reads a million rows.
Running a schema change as though the lock lasts as long as the statement
In PostgreSQL an ALTER TABLE that needs an ACCESS EXCLUSIVE lock must first wait for every open transaction touching that table, and while it waits, later queries needing a conflicting lock queue behind it rather than overtaking it. A DDL statement that would execute in milliseconds, issued while a thirty-second analytics query is open, therefore stalls all traffic on that table for thirty seconds: the outage length is set by the longest open transaction, not by the change. The defences are specific and worth knowing by name - set lock_timeout low and retry rather than queue, add columns without a volatile default so no table rewrite occurs (from version 11 a non-volatile default is a metadata-only change), build indexes with CREATE INDEX CONCURRENTLY while accepting that it cannot run inside a transaction block and leaves an invalid index behind if it fails, and add constraints as NOT VALID followed by a separate VALIDATE CONSTRAINT, which takes a weaker lock.
Listing technologies instead of trade-offs
Name the property the design needs first, such as ordered range scans, multi-entity transactions, cheap appends, or a predictable p99, then pick something that provides it and say what it gives up in exchange. Almost any component is defensible once you state the requirement it satisfies and the one it sacrifices.
Comparing floating-point values for equality, or holding money in them
Binary floating point cannot represent 0.1 exactly, so repeated addition drifts and an equality check fails on values that are mathematically equal. Store currency as integer minor units or a decimal type, and compare floats against a tolerance you chose for a stated reason.
Questions & practice
Track a rolling failure rate per destination for circuit decisions
Easy · sliding window · ring buffer · circuit breaker
The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.
Approach
- Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
- Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
- State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
- Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
- Expire idle destinations, or memory grows with every destination ever seen rather than with the live set. Hold the rings in a bounded LRU keyed on destination_id and treat a miss as no history, which is the correct default for an endpoint that has been silent for a minute.
- Keep the half-open probe out of the window arithmetic. After the circuit opens, one probe per interval decides whether to close it, and folding that single success into a window that still holds a 100 percent failure history would reopen the destination on one data point.
Follow-up
- The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
- A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?
- How would you make the window survive a process restart, and is it worth the cost?
Diff a projection against the primary without per-row point reads
Hard · reconciliation · range hashing · throttling
The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.
Approach
- Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
- Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
- For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
- Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.
- Pin the comparison to a point in time or it reports lag as drift: consider only rows whose updated_at is older than now minus a lag margin, and re-check each candidate mismatch individually before repairing. At 1,200 writes per second a diff without this reports thousands of false positives, and an unattended repairer would then overwrite live rows with stale values.
- Make the run resumable and throttled: batch by range key, persist the last completed range, and watch a signal such as replica lag or primary CPU, pausing rather than pressing on. A reconciliation that cannot be stopped and resumed gets killed halfway and restarted from zero, which is how a repair becomes an incident.
Worked solution (35 min)
- Compute the naive cost explicitly at 40,000,000 reads and 0.5 ms each, then at 100 concurrent, and state what those connections do to a pool already carrying 1,200 writes per second.
- Write the merge-join version over (tenant_id, resource_id) and state its memory.
- Define the range aggregate: the range key, the per-row hash input, and the combining function, with one sentence excluding XOR.
- Work an example with 40,000,000 rows, branching factor 256 and 5 differing rows, and count the ranges examined.
- Add the watermark filter and the resume point, and name the throttle signal the loop watches.
Expected result: A rejection of per-row point reads backed by the time cost and the cache-eviction argument, a single ordered merge join as the dense-case answer at O(n) time and O(1) memory, a range-hash drill-down examining O(d log_B(n/d)) ranges using a sum or multiset hash rather than XOR, a watermark excluding recently written rows, and a resumable throttled run loop.
Verify it yourself
- Injecting one known stale row makes exactly one leaf range mismatch and the drill-down reaches it.
- Duplicating a row on one side is detected, which is precisely the case XOR would miss.
- Running the diff twice against an idle system reports zero mismatches both times.
Follow-up
- The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
- Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?
- How would you run this continuously at low cost instead of only as incident response?
Identify the heaviest tenants in a five-minute window under memory pressure
Medium · top-k · heavy hitters · streaming
The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.
Approach
- Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
- Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
- State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
- Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.
- Choose and defend it: at 50,000 tenants the exact rings cost under 100 MB in a process that already holds more, so ship exact. Keep the sketch for the case that actually motivates it, a per-principal or per-IP key where cardinality runs to millions and is not bounded by anything you control.
- Raise the fleet problem before it is asked: each of 20 to 40 instances sees only its share, and the top 50 of one shard is not the top 50 of the fleet. Either aggregate counts centrally or accept that a per-instance threshold multiplied by instance count is the limit you are really enforcing.
Follow-up
- The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
- Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?
- You switch to per-principal keys and cardinality goes to 10 million. Walk through what changes.
Hold a per-tenant active cap against concurrent creates
Hard · write skew · isolation levels · constraints
A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.
Approach
- Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
- Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
- Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
- State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.
- For the job case the invariant is expressible per row, so let the database hold it: a partial unique index on job_run (tenant_id, job_type) WHERE status IN ('queued','running') makes a second running export unwritable and the loser takes 23505, mapped to 409. That is strictly better than a counter — no drift, no reconciliation — and it is available only because the cap is one rather than fifty.
- Add the retry discipline each route demands: under SERIALIZABLE both 40001 and deadlock 40P01 are retryable and the retry must re-execute the read, while under READ COMMITTED with the counter nothing retries, because the conflict is reported to the caller rather than raised as an error.
Worked solution (35 min)
- Reproduce with two sessions that both count 49, both insert and both commit, at READ COMMITTED and then at REPEATABLE READ; record the final active count for each.
- Repeat both sessions at SERIALIZABLE and record which SQLSTATE the loser receives and at which statement it is raised.
- Implement the counter form and run a 20-way concurrent create against a tenant sitting at 45 active resources.
- Implement the partial unique index for the job case and race 20 enqueues of the same export.
Expected result: READ COMMITTED and REPEATABLE READ both finish at 51. SERIALIZABLE finishes at 50 with one transaction aborted at 40001 — usually at commit, though SSI may raise it at an earlier statement. The counter form finishes at exactly 50: of the twenty creates, the five that take the tenant from 45 to 50 return 201 and the remaining fifteen match zero rows and return 409, with no error raised. The job index admits one running export and rejects the rest with 23505.
Verify it yourself
- count(*) WHERE status='active' never exceeds the cap across 50 randomised concurrent runs.
- Remove the active_resource_count < 50 predicate and the same test must start failing; if it still passes, the race is not being exercised.
- At SERIALIZABLE, confirm every participating session is SERIALIZABLE — one session at a lower level and the guarantee is gone.
- After each run, the counter equals the real count of active rows.
Follow-up
- A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
- The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?
- How do you detect after the fact that the counter drifted, without locking the table?
Keep soft-deleted accounts from blocking re-registration
Easy · soft delete · unique constraints · engine differences
app_user holds user_id, tenant_id, email CITEXT, password_hash (NULL for SSO principals), email_verified_at, auth_version, status ('invited','active','suspended','deactivated'), created_at, updated_at, deleted_at. Two live accounts for one address inside a tenant must be impossible, but an address freed by a soft delete must be reusable, and the same tenant may delete and re-register it repeatedly. Write the uniqueness DDL for PostgreSQL 16, then the equivalent for MySQL 8 where partial indexes do not exist, and say what each permits once three deleted rows already hold that address.
Approach
- Start from what is actually unique: not (tenant_id, email), but (tenant_id, email) among live rows. PostgreSQL says that directly — CREATE UNIQUE INDEX app_user_live_email ON app_user (tenant_id, email) WHERE deleted_at IS NULL. A full constraint over the same two columns burns the address permanently the first time someone deletes an account.
- Keep case-insensitivity in the type or the index, never in the application: CITEXT as given, or UNIQUE (tenant_id, lower(email)) as an expression index where the extension is unavailable. A case-sensitive unique column is exactly how two accounts for one human appear.
- For MySQL 8 the predicate has to move inside the key: add a discriminator column that is a constant 0 while the row is live and is set to user_id on delete, with UNIQUE (tenant_id, email, deleted_marker). Live rows share the constant and still collide; deleted rows differ from each other and stop colliding.
- State the NULL variant and its dependency: leaving the marker NULL for deleted rows also works, because a unique index treats NULLs as distinct — true in MySQL, and true in PostgreSQL only under the default NULLS DISTINCT, which PostgreSQL 15 lets you reverse. Check the polarity against the three existing deleted rows: constant-on-live is what preserves the collision you want, and reversing it silently admits duplicate live accounts.
- Say what a soft delete must do besides setting deleted_at: increment auth_version so existing tokens stop validating, leave resource.owner_user_id and resource_revision.actor_user_id intact, and accept that the address is retained — erasure is a different requirement answered by scrubbing the column, not by a DELETE that would break those references.
Follow-up
- A deleted account re-registers with the same address the next day. Do the old resource rows follow the new user_id, and how does the API keep the two principals apart?
- How do you honour an erasure request while resource_revision.actor_user_id still references this table?
- What changes if a user may hold membership in two tenants?
How would you implement an autocomplete input component that handles a large array of items efficiently?
Medium · system design and architecture
Approach
- Name the failure you are designing for, then the recovery path.
- Fix the scope first: who calls this, how often, and what they do when it fails.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- What breaks first when traffic grows ten times?
- What would you drop to keep the system up under load?
Describe the core concepts of Java, such as inheritance and multi-threading, and how you apply them in production environments.
Medium
Approach
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
How do you approach building a small application using specific libraries or frameworks from scratch?
Medium
Approach
- Clarify what is being asked and what a complete answer contains.
- Work from the requirement backwards to the design.
- Say what you would check first and why it is the highest-information step.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
Design the bulk write endpoint a migration script retries blindly
Medium · batch api · partial failure · idempotency
A customer's migration script pushes 2 million resources through POST /v1/resources:batch, up to 500 items per call, and retries any call that errors or times out. Within a call some items fail validation, some collide with rows that already exist, and some succeed. Specify the request and response shape, whether a batch is atomic or per-item, how idempotency works for the call and for each item, the status code for a mixed outcome, the size and item-count limits with their error codes, and exactly what the script does after a timeout mid-batch.
Approach
- Choose atomicity deliberately and price it. All-or-nothing means one transaction holding locks for the whole batch on a primary already absorbing about 1.2k writes/second, which bounds batch size by lock duration, and it turns one bad row into 499 rejections the script must resend. Per-item partial success is the right default for a migration, and the contract's job is then to make a partial outcome impossible to miss.
- Require a client-supplied id on every item and echo it in every result. Deriving a per-item key from the array index breaks the first time the script resends a batch with the failures removed: the indices shift, previously-succeeded items acquire new keys, and they are created a second time.
- Key the effects at two levels. The call's Idempotency-Key covers an exact resend of the same bytes; per-item keys of (tenant_id, client_item_id) make a partially-applied batch safe to resend whole. Resending an identical batch must reproduce the same per-item results, not 500 conflicts the script has to interpret.
- Answer a mixed outcome with one status plus per-item detail: 200, or 207 borrowed from WebDAV if you prefer it - document whichever you pick - carrying an array of client_item_id, per-item status, and either resource_id or an error code from the same taxonomy the single-item endpoint uses. Reserve 4xx for the request as a whole: unparseable body, too many items, payload over the limit (413). Put a failed count at the top level so that even a script checking only the cheapest thing cannot conclude success while rows were dropped.
- Cap the request before doing any of it: item count, total bytes, and concurrent batches per tenant, since one tenant's migration otherwise consumes write capacity everyone shares. Anything that cannot finish inside the request deadline belongs on job_run behind a 202, not in a synchronous call that will time out halfway.
- Script behaviour after a timeout: the outcome is unknown and no results were received, so resend the identical batch with the same keys and read the results. Never resend 'only the items I have no result for' - a timeout yields no results at all, and that rule silently means resend everything anyway.
Worked solution (30 min)
- Write the request schema with the per-item client id, and the response schema with per-item status and a top-level failed count.
- Write the atomicity decision and the sentence of justification that names the lock cost or the resend cost.
- Define both key levels and trace a resend of a half-applied batch through them, item by item.
- List the whole-request rejections with their status codes and limits.
- Write the script's timeout rule and the pacing it should apply between calls.
Expected result: A per-item batch with client-supplied item ids, per-item idempotency plus a call-level key, a mixed-outcome response that a status-only check cannot misread, explicit request caps, and a resend rule that is correct when no results were received.
Verify it yourself
- Resending an identical batch twice leaves exactly the same set of resource rows as sending it once.
- Resending a batch with the successful items removed does not create duplicates of anything.
- A caller that reads only the top-level fields can still tell that some items failed.
Follow-up
- At 500 items per call, what is the wall-clock time for 2 million rows, and what pacing do you publish so the migration does not become an incident?
- One item in every batch fails with the same code. How does the script discover that without a human reading logs?
Edge instances grow 400 MB per hour until the nightly restart
Hard · memory leak · heap analysis · metric cardinality · gc
Edge API instances start at 700 MB resident and grow about 400 MB/hour; a nightly rolling restart has hidden it for weeks. Growth continues unchanged when request rate halves overnight, p99 degrades in the last hours before an instance is recycled, and heap used immediately after a forced full GC rises monotonically. The service holds no product state. Name the discriminating measurement that separates the plausible causes, give the most likely cause, and give the fix and how you would verify it.
Approach
- Separate resident memory from live heap first, because they fail differently. Resident size can grow from fragmentation, native buffers or thread stacks while the heap is flat; heap used after a full GC rising monotonically is the measurement that says objects are reachable and not being released. You already have it, so this is retention, not fragmentation, and that closes off half the candidate list.
- Use the rate's independence from traffic as the discriminator. Growth that continues at half the request rate rules out per-request objects that are merely slow to collect and points at a structure that grows with distinct values observed rather than with call volume. Write the candidates that have that property: a metrics registry keyed on a high-cardinality label, an unevicted cache, an interner, a per-key lock map.
- Take two heap snapshots an hour apart and diff by retained size, reading the dominator tree, not by allocation count or instance count. Expect one root holding a map with millions of entries, then follow the reference chain to the code that inserts and never removes. Allocation profilers point at churn, which is the wrong signal here.
- The candidate that fits this service is an observability label carrying an identifier, such as a request path recorded before templating so that /v1/resources/48213 becomes its own metric series. That grows with distinct ids seen, is independent of rate, and explains the late p99 degradation, since GC cost rises with the size of the live set.
- Fix by bounding cardinality at the source: template the path to /v1/resources/{id} before it becomes a label, move tenant id from a label to a log field or an exemplar, and cap the registry with a bounded map that evicts. Add a cardinality ceiling that fails loudly in a lower environment rather than growing quietly in production.
- Verify with a soak rather than a restart. Hold one instance out of the nightly recycle for 48 hours with the fix and compare post-GC heap and series count against an unfixed control taking the same traffic.
Follow-up
- Post-GC heap is now flat but resident size still creeps. What are you looking at, and does it matter?
- How would you have detected this before an OOM, given the nightly restart masked the trend?
- That label is what makes one dashboard useful. How do you keep the dashboard and lose the leak?
Suggested practice checklist
Four days sample coding, design, fundamentals and the practical rounds at deliberately shallow depth, which is enough to surface the topics you did not know were in scope. That map, rather than a guess made on day one, decides where the last three days go.
Day 1 — Coding, one pass at shallow depth
- Solve one problem from each of six families, an array with two pointers, hash counting, binary search, a tree traversal, a graph traversal and one dynamic program, under a hard twenty-minute cap with no extensions, marking each finished, late, or stalled.
- For every stall, write the exact move you could not make rather than the subject, so the note reads could not turn the recurrence into a loop rather than bad at dynamic programming.
- Fix nothing today. The value of the pass is the unfixed record.
Deliverable: Six timed attempts marked finished, late or stalled, each stall carrying a named blocking move.
Day 2 — Design, one pass at shallow depth
- Spend twenty minutes each on three different shapes, a read-heavy feed, a write-heavy ingest path, and something needing a transaction across two entities, stopping each at requirements, interface and data model.
- After each, write the first question you could not answer, which is usually a number you could not estimate or a failure mode you had no vocabulary for.
- Mark which of the three you would be most relieved not to be asked, and treat that as data rather than as a preference.
Deliverable: Three shallow designs, each with the first unanswerable question written at the bottom.
Day 3 — Fundamentals and the practical rounds
- Answer eight short questions in writing at four minutes each, covering the material that fills the gaps between the big rounds: what happens between a URL and a rendered page, what an index costs on write, when a process is preferable to a thread, and what conditions a deadlock requires.
- Do one thirty-minute practical task of the kind a take-home compresses: read an unfamiliar two-hundred-line file and write what it does, what you would change, and the one thing you remain unsure of.
- Score every answer fluent, correct but slow, or absent, and keep the absent ones visible.
Deliverable: Eight scored short answers and one written reading of unfamiliar code.
Day 4 — The rounds that are about you, and the map
- Deliver three behavioural answers aloud against a timer, a conflict, a failure you owned, and a decision made without enough information, marking any that ran past three minutes or contained no number.
- Assemble the map: every marked item from days one to three on a single page, sorted by how likely it is to appear in your loop rather than by how uncomfortable it felt.
- Choose exactly two areas for the remaining three days and write down what you are deliberately abandoning.
Deliverable: A one-page scored map of the whole surface area with two areas chosen and the rest explicitly abandoned.
Day 5 — First chosen area, to the depth you skipped
- Work the higher-ranked area in four focused blocks, choosing items one level above where you stalled rather than repeating what already works.
- After each block write the rule you extracted in one sentence with its precondition attached, since a rule carrying no precondition is exactly what fails under a variation.
- Re-attempt the day-one or day-two item that exposed this area and compare against the original timing.
Deliverable: Four worked blocks, a timed re-attempt against the original, and three one-sentence rules with preconditions.
Day 6 — Second chosen area, where the gap is coverage rather than speed
- Treat the second area differently from the first. Day five drilled something you could already half-do; this one is usually a topic you had simply never met, so build one worked reference example end to end and keep it, rather than attempting six problems badly.
- Write down the vocabulary you were missing on day two or three, five terms at most, each with the one sentence that makes it usable in an answer rather than the textbook definition.
- Redo the shallow attempt that exposed this area and note whether you now fail later in the problem, because moving the failure point is the realistic gain from a single day and is worth more than a score that did not change.
Deliverable: One worked reference example for the newly covered area, a five-term vocabulary list, and a note on where the failure point moved.
Day 7 — Reassemble the loop
- Sit two rounds back to back with no gap, ordering them so the area you chose second comes last, because the map was built from rested, isolated attempts and the loop will reach your weaker area when you are already spent.
- Write where the second round suffered from the first, which is normally the point at which structure collapses into narration.
- Reduce the week to one page holding only the rules you can state without reading them.
Deliverable: Mock notes on cross-round carryover plus a one-page card of rules you can recite from memory.
'We rewrote it in a better framework' is not a story
A migration is a cost you chose to pay, not an achievement. The story is what the old system made expensive, what you measured before committing, what kept serving traffic during the cutover, and what you would have done if the numbers had come back flat. Without those, a rewrite reads as taste.
How do you handle rendering performance for complex 3D graphics in a browser environment?
Medium · behavioural and engineering judgement
Approach
- Name the disagreement and how you resolved it with evidence.
- State the situation in two sentences and spend the rest on the reasoning.
- Close with what you would do differently, concretely.
Follow-up
- What did you decide not to do, and why?
- How did you know your change caused the improvement?
Describe a time when you had a conflict with a colleague and how you resolved it.
Medium · behavioural and engineering judgement
Approach
- Close with what you would do differently, concretely.
- Pick a story where you made the decision, not one where you watched it.
- Give the blast radius: what could have broken, and what you measured.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Tell us about a mistake you made in a previous project; how did you identify it and what steps did you take to correct it?
Medium · behavioural and engineering judgement
Approach
- Name the disagreement and how you resolved it with evidence.
- Close with what you would do differently, concretely.
- Give the blast radius: what could have broken, and what you measured.
Follow-up
- How did you know your change caused the improvement?
- What did you decide not to do, and why?