Interview guides · ATI Systems
ATI Systems Software Engineer Interview Guide
ATI Systems Software Engineer interview guide: reported rounds, questions and how candidates describe the process.
The 60-second brief
A Software Engineer at ATI Systems plays a pivotal role in bridging the gap between sophisticated software architectures and the high-stakes hardware environments the company serves. You will be responsible for developing, maintaining, and optimizing systems that drive ATI Systems' specialized technology, ensuring that software performance remains robust under demanding operational conditions. This position is critical because your work directly influences the reliability and efficiency of the company’s core platforms. You will find yourself working at the intersection of software development and hardware integration, requiring a mindset that values both clean code and functional, real-world application. It is an environment where precision is paramount, and your contributions will have a tangible impact on the products that define the company's market presence.
This guide is scoped to a Software Engineer candidate at ATI Systems.
Focus areas
- Web Testing / Test Strategy
- Payment / Purchasing Testing
- End-to-End Testing
The ATI Systems interview process
ATI Systems candidates report 2 rounds over 2-4 weeks. The stages below are what candidates describe, not a published process.
Phone Screen
Initial discussion about your professional background and the core responsibilities of the position.
What to demonstrate
- Initial discussion about your professional background and the core responsibilities of the position
- Depth in Web Testing / Test Strategy
How to prepare
- Be able to walk your CV end to end in two minutes, and say why this company specifically.
- Have your salary expectations, notice period and location constraints ready, and ask for the rest of the loop in writing.
On-site Assessment
Hands-on evaluation designed to gauge your practical skills in a real-world environment.
What to demonstrate
- Hands-on evaluation designed to gauge your practical skills in a real-world environment
- Depth in Web Testing / Test Strategy
How to prepare
- Answer aloud and timed: How do you ensure software performance remains stable when integrated with electronic circuitry?
- Answer aloud and timed: Describe your process for debugging a system where the software and hardware inputs do not align.
Where candidates lose points
Be prepared for technical depth
Do not just talk about what you did; be prepared to explain why you chose specific architectures or tools.
Practice your communication
Since you will be working with cross-functional teams, being able to explain complex technical concepts simply is a major advantage.
Follow up professionally
If you do not hear back within the expected timeframe, a polite follow-up email is appropriate, though be prepared for varying communication speeds.
Always research the specific products or services ATI Systems currently offers
Connecting your answers to the company's actual business goals will set you apart from other candidates.
Questions & practice
How would you approach the testing of a complex platform, such as a course-based website with registration, lo
Medium · Technical and Domain Knowledge
How would you approach the testing of a complex platform, such as a course-based website with registration, login, search, and purchasing features?
Approach
- Restate the input: its shape, its size, and what is guaranteed about it.
- Name the brute-force solution and its complexity before improving on it.
- Choose the data structure from the access pattern, not from familiarity.
- State the target complexity and say which constraint rules the naive version out.
Follow-up
- How does this change if the input no longer fits in memory?
- What is the worst case, and how likely is it on real data?
Track a rolling failure rate per destination for circuit decisions
Easy · sliding window · ring buffer · circuit breaker
The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.
Approach
- Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
- Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
- State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
- Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
Follow-up
- The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
- A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?
Identify the heaviest tenants in a five-minute window under memory pressure
Medium · top-k · heavy hitters · streaming
The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.
Approach
- Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
- Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
- State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
- Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.
Follow-up
- The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
- Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?
Explain why the owner filter ignores the listing index
Medium · composite index · query plans · sort elimination
The only index on resource is (tenant_id, status, updated_at DESC, resource_id DESC). A new endpoint returns one user's resources across all statuses, newest created first: WHERE tenant_id = $1 AND owner_user_id = $2 ORDER BY created_at DESC LIMIT 20. On a tenant with 2M rows it takes 900 ms and EXPLAIN shows a sort above a large scan. Explain precisely why the existing index cannot serve it, give the index that can, and state which of these the new index still will not help: owner_user_id alone across tenants; the same query ordered by updated_at. PostgreSQL 16.
Approach
- Separate the two jobs an index does. For filtering, a composite btree is seekable only on a left prefix, so with no predicate on status the scan can at best range over tenant_id and test owner_user_id per row; PostgreSQL 16 has no btree skip scan to jump the unconstrained column.
- For ordering, the index is sorted by (status, updated_at) within a tenant and not by created_at, so the LIMIT cannot stop early: every matching row is read and then sorted. That is the 'Sort Method: top-N heapsort' line, and it is why the plan reads 2M rows to answer with 20.
- Derive the replacement from the access path — equality, equality, then the ordering column: CREATE INDEX CONCURRENTLY ON resource (tenant_id, owner_user_id, created_at DESC). The scan seeks to the (tenant, owner) range and walks 20 entries in order, so the Sort node disappears along with the row-read.
- Treat INCLUDE (title, status) as conditional, not free. An index-only scan still visits the heap for any row whose page is not marked all-visible, so on a table taking 1.2k writes/second the win depends on autovacuum keeping the visibility map current, and the wider index costs more on every insert.
Follow-up
- 90% of rows are status='active'. Would a partial index WHERE status = 'active' change your answer, and for which of the three queries?
- A dashboard runs this for 40 owners in one page load. What changes about the design?
Denormalise tenant onto revisions and backfill it live
Hard · denormalisation · online migration · backfill
resource_revision (revision_id, resource_id, version, actor_user_id, change_kind, patch, request_id, created_at) has 400M rows and no tenant column; tenant_id lives only on resource. Two reads need it: a tenant-scoped audit feed ordered by created_at DESC, and an offboarding purge. Both join back to resource today. Justify adding tenant_id to resource_revision against those two reads, name the anomaly the copy introduces and the constraint that prevents it, then give the ordered migration for a live table taking 1.2k writes/second — the lock each step takes, how the backfill is batched, and where each step stops being reversible. PostgreSQL 16.
Approach
- Justify from the access path rather than from taste. Without the column, the audit feed either scans resource_revision by created_at and discards other tenants' rows, or resolves the tenant's resource_ids first and probes with them — both proportional to the tenant's whole history rather than to one page. With (tenant_id, created_at DESC, revision_id DESC) it is a seek that stops at 50 rows, and the purge becomes a ranged delete instead of a join.
- Name the cost exactly: a second copy of a fact can disagree with the first. Make the disagreement unwritable rather than documented — add UNIQUE (resource_id, tenant_id) on resource so it can serve as a foreign-key target, then FOREIGN KEY (resource_id, tenant_id) REFERENCES resource (resource_id, tenant_id) on the revision table. A revision can then only ever carry its parent's tenant.
- Step one, expand: ALTER TABLE resource_revision ADD COLUMN tenant_id BIGINT NULL, with no default, so it is a catalogue change and no rewrite. It still needs ACCESS EXCLUSIVE for an instant, and that instant queues behind the longest open transaction on the table while every later query queues behind it — set lock_timeout to 2s and retry rather than wait.
- Step two, dual-write: deploy the writer that populates tenant_id on every new revision while reads still use the join. Reversible by redeploying the previous build, because nothing reads the column yet.
Follow-up
- The backfill is half finished and a rollback is required. What state is the table in, and what does the previous build do with a half-populated column?
- How do you verify the backfill actually finished, given rows are still being inserted while it runs?
Are you familiar with PCB Design and what software have you used?
Medium · Technical and Domain Knowledge
Approach
- Fix the scope first: who calls this, how often, and what they do when it fails.
- Name the read and write paths separately; they rarely have the same bottleneck.
- Choose a partition key and say what query it makes expensive.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- What breaks first when traffic grows ten times?
- How does this behave when that dependency is down for an hour?
How do you ensure software performance remains stable when integrated with electronic circuitry?
Medium · Technical and Domain Knowledge
Approach
- Say who the caller is and what they do when the call fails halfway.
- Define the identity of a request so a retry cannot double-apply it.
- Separate accepted, pending, failed and confirmed; they are different facts.
- Design the error taxonomy before the success shape; callers branch on it.
Follow-up
- What happens if the caller retries after a timeout?
- How does a client discover it is on an old version of this contract?
How do you prioritize features when building a platform that requires high user interactivity?
Medium · Problem-Solving and Methodology
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Describe your process for debugging a system where the software and hardware inputs do not align.
Medium · Problem-Solving and Methodology
Approach
- Establish what changed and when, before forming any theory.
- Pick a bisection that eliminates candidates whichever way it turns out.
- Check the instrumentation before believing the symptom.
- Separate the trigger from the cause; the deploy is rarely the bug.
Follow-up
- What would you look at first, and what would it rule out?
- How would you tell a cause from a coincidence here?
Suggested practice checklist
Built from the rounds and topics ATI Systems candidates report.
Day 1 — Map the ATI Systems loop
- Write out the reported sequence: Phone Screen, On-site Assessment.
- For each round, write one sentence on what it is judging, from the description above, and mark the one you are least ready for.
Deliverable: A one-page map of the 2 reported rounds, with the weakest marked.
Day 2 — Work Web Testing / Test Strategy
- Spend the session on Web Testing / Test Strategy, which ATI Systems candidates report being tested on.
- Write one worked example in Web Testing / Test Strategy and time yourself on it.
Deliverable: One timed worked example in Web Testing / Test Strategy.
Day 3 — Work Payment / Purchasing Testing
- Spend the session on Payment / Purchasing Testing, which ATI Systems candidates report being tested on.
- Write one worked example in Payment / Purchasing Testing and time yourself on it.
Deliverable: One timed worked example in Payment / Purchasing Testing.
Day 4 — Work End-to-End Testing
- Spend the session on End-to-End Testing, which ATI Systems candidates report being tested on.
- Write one worked example in End-to-End Testing and time yourself on it.
Deliverable: One timed worked example in End-to-End Testing.
Day 5 — Answer out loud: Technical and Domain Knowledge
- Answer aloud, timed: Are you familiar with PCB Design and what software have you used?
- Answer aloud, timed: How would you approach the testing of a complex platform, such as a course-based website with registration, login, search, and purchasing features?
Deliverable: Spoken answers to 2 reported Technical and Domain Knowledge question(s), under time.
Day 6 — Answer out loud: Problem-Solving and Methodology
- Answer aloud, timed: Describe your process for debugging a system where the software and hardware inputs do not align.
- Answer aloud, timed: How do you prioritize features when building a platform that requires high user interactivity?
Deliverable: Spoken answers to 2 reported Problem-Solving and Methodology question(s), under time.
Day 7 — Dry run for ATI Systems
- Run one full mock under time, then write down the two questions you most want to ask your interviewers.
Deliverable: A completed timed mock and two questions to ask.
Behavioural preparation
Behavioural rounds judge the decision you made and what it cost.
Turn a code review disagreement into a decision
Easy · code review · optimistic concurrency · communication
A colleague's change updates a row with UPDATE resource SET version = version + 1 WHERE resource_id = $1 AND version = $2 and treats an affected-row count of zero as a successful no-op. You read that as a silently lost update; they think returning 200 is friendlier to clients than returning a conflict. Describe how you have handled a review disagreement of this shape: what goes in the comment, when you leave the thread, and who decides. Then write the comment you would leave here, in under 80 words.
Approach
- Sort the disagreement before writing anything. A silently discarded write is a correctness claim about data; the choice between 409 and 412 is taste. Only the first justifies blocking a merge, and saying which one you are doing is most of the value of the comment.
- Make the claim reproducible in the comment itself with an interleaving rather than a principle: A reads version 7, B reads version 7, B commits version 8, A's predicate matches zero rows, A is told it succeeded and A's edit is gone.
- Offer the alternative with its cost attached: return 409 carrying the current version and the revision that won, so the client can re-read and re-apply. Note that automatic retry is not the fix, because a retry re-reads the winner's state and reapplies an intent formed against data that no longer exists.
- Apply an escalation rule you can state: two round trips on the thread, then a call, and the service's owner decides rather than the reviewer. A reviewer who cannot be overruled is a bottleneck with extra steps.
Follow-up
- Where would you put the test that fails if someone reintroduces the swallowed zero rowcount?
- The author says clients cannot handle a 409. How do you check whether that is true?
Argue against a design, lose, and commit anyway
Medium · disagreement · service boundaries · decision records
Describe a design you argued against and lost. State the failure you predicted as a named mechanism, not a feeling about complexity: two services that would need one transaction, a projection with no rebuild path, a write path with no idempotency key. Say what evidence you brought, what the decision maker weighed instead, and what you did after the decision was made: what you instrumented, what you wrote down, and whether the prediction came true. Five minutes.
Approach
- State the prediction in falsifiable form up front: the mechanism, the condition that triggers it, and the observable outcome. A prediction that cannot be checked also cannot be credited to you later.
- Show the evidence you had at the time and label each piece honestly as measured, analogous, or intuition. Keeping the intuition is fine; disguising it as data is the thing that erodes your standing in the next argument.
- Represent the opposing case at full strength, including the constraint you did not control: a fixed date, a team boundary, or the fact that the decision was cheap to reverse and yours was not.
- Make disagree-and-commit concrete. Name the artefact you left behind so the prediction could be settled without you: the alert and its threshold, the counter on the dashboard, the decision note that recorded the trade-off and the condition that would revisit it.
Follow-up
- What threshold on that alert would have proved you right, and did anyone ever look at it?
- If the same proposal arrived tomorrow with the same deadline, would you argue it the same way?
Ship under a deadline and bound the debt you chose
Medium · pagination · technical debt · tradeoffs
You have four days to ship a tenant-facing listing endpoint. The version you would defend uses keyset pagination over (tenant_id, status, updated_at DESC, resource_id DESC); the version you can finish uses LIMIT/OFFSET with no matching index. Describe a deadline call you actually made of this shape: what you shipped, what you knowingly deferred, how you bounded the damage with a mechanism rather than an intention, and the specific numeric condition that would force the follow-up. Name who you told and where you wrote it down.
Approach
- Name the deferred failure precisely instead of calling it slow. OFFSET n makes the database produce and discard n rows, so cost grows with page depth; without an index matching the sort, every matching row is read and sorted before the limit applies; and rows inserted between two page fetches shift across the boundary so items are skipped or repeated with nothing in the response to signal it.
- Bound the blast radius with something mechanical rather than a promise: cap maximum page depth, cap page size, restrict the endpoint to one internal caller, or keep it behind a flag. State which failure each cap removes and which it leaves standing.
- Attach a number to the trigger and wire it to an alarm: the first tenant crossing N resources, or the endpoint's p99 crossing its share of the 400 ms budget, so the debt announces itself instead of waiting to be remembered.
- Write it where the next engineer looks, which is the code and the ticket, not a chat message: what was deferred, why, the cap, and the trigger.
Follow-up
- At what page depth does the offset version breach your latency budget, given your page size and row counts?
- What breaks first when you switch to keyset pagination later, and what does a client holding an old page token see?