Interview guides · Apollo
Apollo Software Engineer Interview Questions & Guide 2026
A prep plan for Apollo software engineer candidates: answer first, read the solution second, repeat the misses later.
The 60-second brief
As a Software Engineer at Apollo, you are at the heart of building the infrastructure that powers global sales intelligence. This role is critical to the company’s mission of helping businesses discover, contact, and close their ideal customers. You will work on massive datasets, complex distributed systems, and user-facing features that directly impact the productivity of sales teams worldwide.
State every complexity claim with the assumption sitting under it. Hash lookup is O(1) on average and only for a hash that spreads your actual keys; comparison-based sorting cannot beat n log n, though counting or radix sort can when the keys are bounded integers.
Focus areas
- Trace a symptom to a mechanism under load
- Choose indexes from the query's access path
- Detect concurrent edits instead of losing writes
Overview
The work at Apollo is characterized by high scale and rapid iteration. You will be expected to tackle challenges ranging from backend scalability and data processing pipelines to front-end performance and intuitive user experiences. Because Apollo operates in a highly competitive and fast-moving market, the engineering team prioritizes pragmatic, high-impact solutions. You will have the opportunity to influence product direction, improve system reliability, and contribute to the core architecture that keeps Apollo ahead of the competition.
The Apollo interview process
Apollo candidates report 3 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.
Initial Screening
The person on this call usually cannot evaluate your code and does not need to. They write a short paragraph, and that paragraph is what a hiring manager skims when deciding who to put on your loop. So the test is not whether your work was hard, it is whether a non-engineer can repeat it correctly. Name systems by what they did rather than by their internal codename, give each project a shape (what was breaking, what you changed, what happened after), and keep the whole walkthrough near ninety seconds. Depth that cannot survive a paraphrase reads as vagueness.
What to demonstrate
- Whether a non-engineer can restate your projects without distorting them, since their paraphrase is what travels to the hiring manager, not your sentences
- Whether each project has a shape rather than a stack list: the failure or constraint, the change you made, the result and how it was measured
- Whether you can say what was yours inside a team project without either inflating it or disappearing into the plural
How to prepare
- Rewrite each headline project as two sentences with no internal system names and no acronyms outside your company, then say them to someone outside engineering and have them repeat them back. Fix whatever came back wrong
- Attach one measured number to each project: the baseline, the change, and the window it was measured over. Where nothing was ever measured, say that plainly rather than reaching for a plausible percentage
- Time the background walkthrough against a clock. If it runs past two minutes, compress the earliest role to a single clause and spend the recovered time on the most recent one
Technical Assessments
Most of the time lost in this format is not lost to thinking. It goes to a standard-library call you half-remember, an off-by-one in a loop bound, and a debugging loop that mutates code at random until something passes. When output is wrong, stop re-reading the whole function: take the smallest input that reproduces it and walk the state through by hand, printing intermediates if the environment allows. Guessing at a fix without a failing case you understand is how a five-minute bug becomes twenty, and the clock does not pause while you do it.
What to demonstrate
- Whether you reach the right structure without a detour, and can write it from memory rather than only recall that one exists
- Whether overflow is considered where the language has fixed-width integers, since a signed 32-bit value stops at 2,147,483,647 and then wraps in Java, is undefined behaviour in C++, and does not arise in Python, whose integers grow instead
- Whether recursion depth is treated as a constraint on large inputs, given that CPython's default limit is 1000 frames and a deep recursion can exhaust the stack in any language where an iterative version would not
- Whether a failing case is isolated and explained before any edit is made to the code
How to prepare
- From an empty file and with no references open, implement the pieces you lean on most: a heap push and pop, an iterative DFS with an explicit stack, and a binary search whose midpoint is written lo + (hi - lo) / 2, which avoids the overflow that (lo + hi) / 2 can hit in a fixed-width integer type
- Time yourself on the ten library calls you look up most, such as sorting with a custom comparator, splitting and joining strings, and finding the next key at or above a value in an ordered map, until the lookup is gone
- Take a solution you know is broken and, before touching it, write one sentence naming the input, the expected value and the actual value. Repeat until you do it without deciding to.
Behavioral Interviews
What you say here is written down by each interviewer and compared afterwards, so the unit of evaluation is a claim someone else could check, not a well-told narrative. Two things make a story checkable: detail only a participant would hold, and a clean line around which part was yours. Vague ownership is the usual failure and it is usually accidental, because engineers say we about the team's work and we about their own, so the thing they personally built disappears into the plural. Name the part you wrote, and name who did the rest.
What to demonstrate
- Whether your details are ones a participant would hold and an observer would not: the constraint that ruled out the obvious approach, the first attempt that failed, the person who objected and on what grounds
- Whether ownership survives a direct question, since a follow-up to we decided is routinely who decided, and an answer that stays plural at that point is read as the work belonging to someone else
- Whether the numbers you quote are ones you would say identically to a former colleague with the dashboard open
How to prepare
- Go through each story replacing every we with either I or a named role (the on-call engineer, the reviewer, the other team) and check the story still holds together. Wherever it stops making sense you have found a part you cannot actually speak to
- Open the artefacts for two of your stories, the pull request, the design doc, the incident notes, and read them for dates and figures you have been rounding in the retelling. Correct your version to match
- For each story write the single sentence you would least want repeated to a former teammate, then either make it accurate or take it out
Where candidates lose points
Letting a slow dependency consume unbounded concurrency
The failure that takes a service down is usually not an error but a delay. A dependency answering in thirty seconds instead of fifty milliseconds holds each request's worker or connection six hundred times longer, and since required concurrency is arrival rate times latency, a fleet sized for sixty in-flight requests now needs thirty-six thousand to sustain the same rate - so it queues, and requests whose clients have already abandoned them still occupy resources. Retries make it precisely worse: a policy of three attempts triples the load on a dependency at the exact moment it is least able to serve, which is how one slow dependency becomes an outage of everything sharing that pool. Containment is four specific things - a timeout on every outbound call shorter than the caller's remaining budget, a bounded pool per dependency so one cannot starve the others, backoff with full jitter rather than a fixed delay so retries do not resynchronise, and a circuit that stops sending once the failure rate makes an attempt pointless.
Shipping a migration and the code that depends on it as a single change
During any rolling deploy, and for as long as a rollback remains possible, old and new code execute against the same schema at the same time. A migration that drops or renames a column breaks every instance that has not restarted yet, and code that requires a column the migration has not applied breaks every instance that restarted early. The discipline is expand then contract: add the new column nullable, write both shapes, backfill in batches, move reads across once the backfill is verified, and only then stop writing the old shape and drop it - four deploys, usually spread over days. It feels disproportionate until the first rollback, at which point it is the only reason the previous version still runs.
A cache with no invalidation story
Say how an entry goes stale, how long you can serve it stale, and what happens when many requests miss the same key at the same instant. One popular key expiring under load sends every concurrent request to the origin together; single-flight coalescing, jittered expiry, or serving stale while revalidating are the standard answers.
Starting work without saying what you are about to spend time on
State the plan before executing it: the approach, roughly how long it will take, and what you intend to leave hand-waved. That gives the interviewer a chance to redirect you in ten seconds rather than watching you spend fifteen minutes on the wrong sub-problem.
Questions & practice
Evaluate a mathematical expression string.
Medium · data structures and algorithms
Approach
- Walk one small example through your approach before writing the whole thing.
- Choose the data structure from the access pattern, not from familiarity.
- Name the brute-force solution and its complexity before improving on it.
Follow-up
- How does this change if the input no longer fits in memory?
- What is the worst case, and how likely is it on real data?
Implement a function to reverse words in a string while preserving the order of delimiters.
Medium · data structures and algorithms
Approach
- Name the brute-force solution and its complexity before improving on it.
- Restate the input: its shape, its size, and what is guaranteed about it.
- Walk one small example through your approach before writing the whole thing.
Follow-up
- How does this change if the input no longer fits in memory?
- Which test case would catch an off-by-one here?
Implement a pop-sequence validation check for two strings.
Medium · data structures and algorithms
Approach
- Choose the data structure from the access pattern, not from familiarity.
- Walk one small example through your approach before writing the whole thing.
- Name the brute-force solution and its complexity before improving on it.
Follow-up
- What is the worst case, and how likely is it on real data?
- Which test case would catch an off-by-one here?
Solve a subarray sum problem (e.g., finding subarrays equal to a target).
Medium · data structures and algorithms
Approach
- Restate the input: its shape, its size, and what is guaranteed about it.
- Name the brute-force solution and its complexity before improving on it.
- Walk one small example through your approach before writing the whole thing.
Follow-up
- What is the worst case, and how likely is it on real data?
- How does this change if the input no longer fits in memory?
Identify the heaviest tenants in a five-minute window under memory pressure
Medium · top-k · heavy hitters · streaming
The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.
Approach
- Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
- Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
- State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
- Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.
- Choose and defend it: at 50,000 tenants the exact rings cost under 100 MB in a process that already holds more, so ship exact. Keep the sketch for the case that actually motivates it, a per-principal or per-IP key where cardinality runs to millions and is not bounded by anything you control.
- Raise the fleet problem before it is asked: each of 20 to 40 instances sees only its share, and the top 50 of one shard is not the top 50 of the fleet. Either aggregate counts centrally or accept that a per-instance threshold multiplied by instance count is the limit you are really enforcing.
Worked solution (25 min)
- Size the exact structure: 300 one-second counters per tenant across 50,000 tenants, plus the running-total trick that makes a window read O(1).
- Write the top-k extraction with a size-50 min-heap and compare its complexity against sorting all 50,000 sums.
- Substitute N = 900,000 and m = 1,000 into N/(m+1) and state in requests what the sketch can and cannot distinguish.
- Write the sub-window merge for the sliding case and state the resulting bound for 30 merged summaries.
Expected result: An exact per-tenant ring of 300 one-second counters at roughly 60 to 90 MB for 50,000 tenants with O(1) window reads, top-50 extraction by a size-k min-heap in O(d log k), a Misra-Gries bound of N/(m+1) with the numbers substituted, the sub-window merge needed to slide it, and a decision to ship exact at this cardinality with the sketch reserved for unbounded keys.
Verify it yourself
- The exact window sum for one tenant equals a replay of its raw records over the same five minutes.
- The heap result matches a full sort of the tenant sums on a sample.
- The sketch's count for a known heavy tenant is at most the true count and no less than the true count minus N/(m+1).
Follow-up
- The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
- Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?
- You switch to per-principal keys and cardinality goes to 10 million. Walk through what changes.
Keep soft-deleted accounts from blocking re-registration
Easy · soft delete · unique constraints · engine differences
app_user holds user_id, tenant_id, email CITEXT, password_hash (NULL for SSO principals), email_verified_at, auth_version, status ('invited','active','suspended','deactivated'), created_at, updated_at, deleted_at. Two live accounts for one address inside a tenant must be impossible, but an address freed by a soft delete must be reusable, and the same tenant may delete and re-register it repeatedly. Write the uniqueness DDL for PostgreSQL 16, then the equivalent for MySQL 8 where partial indexes do not exist, and say what each permits once three deleted rows already hold that address.
Approach
- Start from what is actually unique: not (tenant_id, email), but (tenant_id, email) among live rows. PostgreSQL says that directly — CREATE UNIQUE INDEX app_user_live_email ON app_user (tenant_id, email) WHERE deleted_at IS NULL. A full constraint over the same two columns burns the address permanently the first time someone deletes an account.
- Keep case-insensitivity in the type or the index, never in the application: CITEXT as given, or UNIQUE (tenant_id, lower(email)) as an expression index where the extension is unavailable. A case-sensitive unique column is exactly how two accounts for one human appear.
- For MySQL 8 the predicate has to move inside the key: add a discriminator column that is a constant 0 while the row is live and is set to user_id on delete, with UNIQUE (tenant_id, email, deleted_marker). Live rows share the constant and still collide; deleted rows differ from each other and stop colliding.
- State the NULL variant and its dependency: leaving the marker NULL for deleted rows also works, because a unique index treats NULLs as distinct — true in MySQL, and true in PostgreSQL only under the default NULLS DISTINCT, which PostgreSQL 15 lets you reverse. Check the polarity against the three existing deleted rows: constant-on-live is what preserves the collision you want, and reversing it silently admits duplicate live accounts.
- Say what a soft delete must do besides setting deleted_at: increment auth_version so existing tokens stop validating, leave resource.owner_user_id and resource_revision.actor_user_id intact, and accept that the address is retained — erasure is a different requirement answered by scrubbing the column, not by a DELETE that would break those references.
Worked solution (20 min)
- Create the PostgreSQL partial unique index, insert a live row, soft delete it, and insert the same address again.
- Repeat the delete-and-reinsert cycle three times and confirm three deleted rows coexist with exactly one live row.
- Write the MySQL form with the discriminator, then deliberately reverse the polarity so live rows carry NULL, and show two live duplicates commit.
- Attempt a second live insert on both engines and map the resulting 23505 / ER_DUP_ENTRY to the 409 the handler should return.
Expected result: PostgreSQL rejects only the second live row and admits unlimited deleted ones. MySQL behaves identically with UNIQUE (tenant_id, email, deleted_marker) where live = 0; with the polarity reversed, two live rows commit and nothing afterwards can tell them apart.
Verify it yourself
- Group live rows by (tenant_id, lower(email)) after a randomised insert/delete run — no group exceeds one.
- Inserting 'User@x.test' after 'user@x.test' is rejected; if it is accepted, the case handling is in application code rather than in the index.
- EXPLAIN a login lookup and confirm the partial index is chosen — it is only usable by queries that carry the deleted_at IS NULL predicate, so a query without it falls back to a scan.
Follow-up
- A deleted account re-registers with the same address the next day. Do the old resource rows follow the new user_id, and how does the API keep the two principals apart?
- How do you honour an erasure request while resource_revision.actor_user_id still references this table?
- What changes if a user may hold membership in two tenants?
Denormalise tenant onto revisions and backfill it live
Hard · denormalisation · online migration · backfill
resource_revision (revision_id, resource_id, version, actor_user_id, change_kind, patch, request_id, created_at) has 400M rows and no tenant column; tenant_id lives only on resource. Two reads need it: a tenant-scoped audit feed ordered by created_at DESC, and an offboarding purge. Both join back to resource today. Justify adding tenant_id to resource_revision against those two reads, name the anomaly the copy introduces and the constraint that prevents it, then give the ordered migration for a live table taking 1.2k writes/second — the lock each step takes, how the backfill is batched, and where each step stops being reversible. PostgreSQL 16.
Approach
- Justify from the access path rather than from taste. Without the column, the audit feed either scans resource_revision by created_at and discards other tenants' rows, or resolves the tenant's resource_ids first and probes with them — both proportional to the tenant's whole history rather than to one page. With (tenant_id, created_at DESC, revision_id DESC) it is a seek that stops at 50 rows, and the purge becomes a ranged delete instead of a join.
- Name the cost exactly: a second copy of a fact can disagree with the first. Make the disagreement unwritable rather than documented — add UNIQUE (resource_id, tenant_id) on resource so it can serve as a foreign-key target, then FOREIGN KEY (resource_id, tenant_id) REFERENCES resource (resource_id, tenant_id) on the revision table. A revision can then only ever carry its parent's tenant.
- Step one, expand: ALTER TABLE resource_revision ADD COLUMN tenant_id BIGINT NULL, with no default, so it is a catalogue change and no rewrite. It still needs ACCESS EXCLUSIVE for an instant, and that instant queues behind the longest open transaction on the table while every later query queues behind it — set lock_timeout to 2s and retry rather than wait.
- Step two, dual-write: deploy the writer that populates tenant_id on every new revision while reads still use the join. Reversible by redeploying the previous build, because nothing reads the column yet.
- Step three, backfill: batch by primary key rather than by created_at so the cursor is dense and resumable — UPDATE resource_revision rr SET tenant_id = r.tenant_id FROM resource r WHERE r.resource_id = rr.resource_id AND rr.revision_id > $1 AND rr.revision_id <= $1 + 5000 AND rr.tenant_id IS NULL — committing per batch and persisting the cursor. Throttle on replica replay lag and on dead-tuple count, since each batch writes 5,000 new row versions. Run the backfill before the index exists so those updates can stay HOT.
- Step four, index then enforce then contract: CREATE INDEX CONCURRENTLY (cannot run inside a transaction block, scans the table twice, waits on open transactions, and leaves an INVALID index to drop concurrently if it fails); ADD CONSTRAINT ... CHECK (tenant_id IS NOT NULL) NOT VALID, then VALIDATE CONSTRAINT, which takes only SHARE UPDATE EXCLUSIVE, after which SET NOT NULL uses the validated check instead of re-scanning on PostgreSQL 12 and later. Only then move the audit reads onto the column and, in a later deploy, delete the join path.
Follow-up
- The backfill is half finished and a rollback is required. What state is the table in, and what does the previous build do with a half-populated column?
- How do you verify the backfill actually finished, given rows are still being inserted while it runs?
- A resource must now be movable between tenants. What does that do to the composite foreign key and to the revisions already written?
Create a geo-based offline meeting scheduler with notification logic.
Medium · system design and architecture
Approach
- State the consistency you need, and where you are willing to be stale.
- Name the read and write paths separately; they rarely have the same bottleneck.
- Name the failure you are designing for, then the recovery path.
Follow-up
- How does this behave when that dependency is down for an hour?
- What breaks first when traffic grows ten times?
Design a scalable backend architecture for a live comment section.
Medium · system design and architecture
Approach
- Fix the scope first: who calls this, how often, and what they do when it fails.
- State the consistency you need, and where you are willing to be stale.
- Name the failure you are designing for, then the recovery path.
Follow-up
- What would you drop to keep the system up under load?
- What breaks first when traffic grows ten times?
Choose what to break when replication lag reaches forty seconds
Hard · replication lag · read-after-write · consistency vs availability · load shedding
Reads are served from two replicas: 14k requests/second, about 85% absorbed by cache, so roughly 2.1k reads/second reach the database. Writes go to the primary at 1.2k/second. A tenant's backfill drives replication lag from under 100 ms to 40 seconds and it is still climbing. Sessions that have just written are pinned to the primary. Decide, endpoint class by endpoint class, whether to serve stale, fail, or route to the primary, and justify each choice with the load it adds to the primary. Then state what you would have built beforehand.
Approach
- Establish blast radius before cause, because mitigation and diagnosis have different deadlines. The decisive arithmetic is what happens if the database reads move to the primary: 2.1k reads/second on top of 1.2k writes/second roughly triples its operation count, on the node already absorbing the backfill that caused this. Reads and writes are not equal in cost, so treat that as an argument against a blanket move rather than as a capacity model - but it is enough to rule out routing everything to the primary.
- Classify endpoints by what staleness costs, not by how important they feel. Reads whose staleness is invisible - listings, search, counters - stay on the replica and return the watermark so the client can tell. Reads that immediately follow that same session's write keep their primary pin, which is a small bounded slice of traffic rather than the whole 2.1k/second. Reads that feed a decision with a side effect - authorisation, quota, the read half of a read-modify-write - must not be stale at all, because a 40-second-old permission row is the stale-permission failure wearing a different costume; those go to the primary or fail.
- Shed instead of queueing. If the must-be-fresh class alone exceeds the primary's headroom, refuse its lowest-value slice with 503 and a retry-after. A request queued behind a saturated primary holds a connection for a client that has already given up, and the retry storm that follows is what turns degradation into an outage. Bound the connection pool per role so the read fallback cannot consume the write path's connections - that bulkhead is the single decision that determines whether writes survive the next ten minutes.
- Attack the cause in parallel, since it is the one thing that can be stopped. The backfill is the load generator. A backfill that reads replication lag as its throttle signal and pauses above a threshold would have made this a non-event, with batch sizes small enough that each batch's write volume is a fraction of what a replica can apply per second. That is most of the answer to what should have existed beforehand.
- Name the mechanism you would prefer over session pinning. Capture the write position at commit and require the read path to be at or past it: compare the primary's pg_current_wal_lsn() at commit time against the replica's pg_last_wal_replay_lsn(), and fall back to the primary only for the specific request that is ahead of the replica. Session pinning is the cheap approximation and it over-pins - every read in the window goes to the primary whether or not it needed to, which is a share of the cost being paid right now.
Worked solution (35 min)
- List the endpoints in three buckets - staleness invisible, staleness visible to the writer only, staleness unsafe - and attach the share of the 2.1k reads/second each bucket carries.
- Compute the primary's operation count under each routing option and mark which options are arithmetically available.
- Write the pin rule and its window, then the shed rule: which slice, what status code, what retry-after.
- Write the backfill's throttle predicate against a measured lag value, including its pause threshold and resume condition.
Expected result: Staleness-invisible reads stay on the replica and return a watermark. Reads following the session's own write keep a bounded primary pin. Reads that gate a side effect go to the primary or fail, with the lowest-value slice shed as 503 plus retry-after if headroom runs out. Connection pools are bounded per role so the read fallback cannot starve writes. The backfill is throttled on measured replication lag. The durable fix is a commit-position token compared against the replica's replay position, replacing blanket session pinning.
Verify it yourself
- The traffic routed to the primary under the plan is stated as a rate, not as a category.
- No element of the plan increases the write path's connection usage.
- The backfill throttle references a measured lag value and has an explicit resume condition.
- Every endpoint left on a replica returns something with which a client can detect staleness.
Follow-up
- Lag returns to normal in nine minutes. Which mitigation do you remove first, and which one stays permanently?
- A user reports their change did not save, and the write committed. Trace the path that produces that report and name the signal that would have shown it before the report arrived.
- The replica is 40 seconds behind but otherwise healthy. Do you take it out of rotation? What does that do to the other replica's lag?
p99 jumped on one listing filter while p50 stayed flat
Medium · query planning · composite index · percentiles · tail latency
After a release that added an owner_user_id filter to the resource listing, p99 rose from 90 ms to 1.9 s while p50 stayed at 40 ms. Traffic and row counts are unchanged. resource carries the index (tenant_id, status, updated_at DESC, resource_id DESC). The new query filters tenant_id and owner_user_id, orders by updated_at DESC, resource_id DESC, and takes 20 rows. On PostgreSQL, explain the shape of the regression, prove it from a query plan, and give the index you would add.
Approach
- Start from the shape. A flat p50 with a moved p99 means a subset of requests changed cost, not all of them, so the first job is naming the subset. Bucket the endpoint's latency by the tenant's row count; the natural hypothesis is that large tenants are a small share of requests and all of the tail.
- Get the plan for the new query on a large tenant with EXPLAIN (ANALYZE, BUFFERS). Expect an index scan over the tenant's range, a filter discarding most of it, then a Sort feeding the Limit, possibly reporting Sort Method: external merge Disk. Read actual rows on the scan node, not estimated.
- Explain why the existing index cannot serve it. A composite B-tree is seekable only as a left prefix, and with no equality predicate on status the scan cannot treat updated_at as an ordering, because rows in the tenant's range are ordered by status first. Everything matching must be read and sorted before LIMIT 20 can apply, so a tenant with 400,000 rows pays 400,000 rows to return 20.
- Add (tenant_id, owner_user_id, updated_at DESC, resource_id DESC). Equality on the first two columns leaves the index ordered by updated_at within that pair, so the plan becomes an index scan that stops after 20 rows with no Sort node. PostgreSQL can scan a B-tree backwards, so the DESC markers matter only if the two sort columns ever disagree in direction; keeping them explicit documents the order the keyset cursor depends on.
- Price the fix. This is a fourth index on a table taking about 1.2k writes/second, and every insert and version bump maintains it. Justify it against the query it serves, and check whether it makes an existing index redundant, which here it does not, since the original still serves the status-filtered default listing.
- Re-measure per tenant-size bucket rather than in aggregate. A fleet-wide p99 can improve while the largest tenant is still on the old plan.
Follow-up
- The endpoint paginates with OFFSET. What does page 500 cost with your index, and what does the keyset version cost?
- How would you have caught this before release, given that a 10,000-row seed database produces the same plan shape at an unnoticeable cost?
- If a fourth index were unacceptable on write grounds, what else could serve this query?
Suggested practice checklist
For a candidate senior enough that the loop turns on design and judgement rather than on whether the coding round gets finished. Five days build one system properly and then stress it; coding gets a single maintenance day, on the assumption that the risk at this level is an unexamined tradeoff rather than a missed algorithm.
Day 1 — Numbers before diagrams
- Build your own reference card of the figures you will re-derive all week: bytes for a realistic record, requests per second implied by a given daily active count, and the storage that a year at a given write rate produces. Derive each one rather than copying it, because the derivation is what survives a follow-up.
- Turn one product statement into capacity requirements. From ten million daily users at four writes and forty reads each, state the peak-to-average factor you are assuming and why, then produce peak write QPS, peak read QPS and a year of storage.
- Write the two numbers whose order of magnitude changes the design, the read-to-write ratio and the working-set size against memory per node, and state the threshold at which each one flips your answer.
Deliverable: A one-page numbers card and one worked capacity estimate with every assumption written down.
Day 2 — One system, from requirements to schema
- Spend the first ten minutes producing only functional requirements, non-functional targets with numbers attached, a p99 latency, a durability expectation, a consistency requirement, and an explicit out-of-scope list.
- Define the interface before the boxes: the three or four endpoints, their parameters, what each returns, and which of them are idempotent.
- Write the data model, then write the single access pattern that justifies it, and state what the schema would have to become if the dominant access pattern were the other one.
Deliverable: One design carried to endpoint-and-schema depth, with non-functional targets expressed as numbers and a written out-of-scope list.
Day 3 — The consistency you are actually buying
- Write out what a client sees under asynchronous replication when its write commits on the leader and its next read is served by a lagging follower, then write the two fixes, pinning that session's reads to the leader for a bounded window or carrying a version token the replica must reach, and the cost of each.
- Work the quorum arithmetic on paper for N of three with W and R of two, and separate what R + W > N does guarantee, that any read set intersects any write set, from what it does not: on its own it is not linearizability, and a sloppy quorum that accepts writes on nodes outside the preference list breaks even the intersection.
- Take two storage choices with different defaults, a single-leader relational store committing synchronously and a quorum-replicated store that converges eventually, and write the specific product behaviour that would be wrong under each, rather than a general statement about which is stronger.
Deliverable: A page separating what quorum overlap guarantees from what it does not, with one concrete product misbehaviour attached to each gap.
Day 4 — Failure is the design
- For one write path, work through the case where the client times out after the server has already committed, then design the idempotency key: who generates it, how long it is retained, and what the duplicate request returns.
- Express the retry policy as parameters rather than as a word: maximum attempts, base delay, backoff factor, jitter, and which error classes are retried at all. Then state why retrying a non-idempotent write without a key is a correctness bug and not merely waste.
- Compute the fan-out effect on tail latency. If a request waits on ten backends and each independently exceeds its p99 one percent of the time, the chance at least one is slow is 1 - 0.99^10, about ten percent. Then write why independence is the optimistic assumption and what correlates them in practice.
- Name the backpressure mechanism for one queue or one dependency in the design, a bounded queue with shedding or a concurrency limit, and write what the caller is told when it engages.
Deliverable: One write path with an idempotency design, a parameterised retry policy, and a written tail-latency calculation with its assumption named.
Day 5 — Scaling the hot path
- Choose cache-aside or write-through for one read path and write the staleness window each produces, then name the invalidation event and what the system does when that event is lost.
- Design against the stampede: either coalesce requests so only one recomputes a missing key, or refresh early with jittered expiry, and write why identical TTLs on keys populated in the same moment produce a synchronised expiry and a thundering herd.
- Shard one table by a key you choose, then answer the two questions that break the choice: which queries now require a scatter-gather, and what happens to the distribution when one tenant is a hundred times larger than the median.
- Write the cost of adding a node under plain modulo placement, where nearly every key moves, against consistent hashing, where roughly one key in n+1 moves, and state what virtual nodes are for.
Deliverable: A caching and sharding decision for one path, each with its failure mode and its rebalancing cost written beside it.
Day 6 — Keep the coding hand in, at the bar that applies to you
- Solve one medium problem in thirty minutes, then spend twenty more making it production-shaped: named invariants, validation at the boundary, and errors that distinguish a caller mistake from an internal fault.
- Write the tests you would require of a colleague's version of that function: one for empty input, one for the boundary, and one for the case the implementation is most likely to get wrong.
- Read a piece of your own code from six months ago and write the change you would ask for, phrased as you would actually phrase it in review.
Deliverable: One problem hardened to review standard, with its test list and one written review comment.
Day 7 — Defend it while being interrupted
- Run a forty-five-minute design mock with an interviewer briefed to change a requirement halfway, a tenfold traffic increase or a new strict consistency requirement, and to push on one number you estimated.
- Rehearse the two sentences a senior loop is listening for: naming the tradeoff you are choosing against and why, and saying what you would measure to learn that the choice was wrong.
- Prepare the design you regret: a real decision, the constraint that produced it, what it cost, and what you changed afterwards.
Deliverable: Mock notes recording how the design changed under the new requirement, plus a written account of one regretted decision.
Outage answers are graded on instruments
Nobody is scoring your stamina at three in the morning. What carries weight is which signal told you something was wrong, what you measured before touching anything, what you rolled back versus what you fixed forward, and why you picked one. 'We restarted it and it went away' is a story about not knowing.
How do you handle disagreements with stakeholders or team members?
Medium · behavioural and engineering judgement
Approach
- Pick a story where you made the decision, not one where you watched it.
- Close with what you would do differently, concretely.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- How did you know your change caused the improvement?
- What did you decide not to do, and why?
Tell us about the most challenging technical task you have completed.
Medium · behavioural and engineering judgement
Approach
- State the situation in two sentences and spend the rest on the reasoning.
- Name the disagreement and how you resolved it with evidence.
- Pick a story where you made the decision, not one where you watched it.
Follow-up
- What would you do differently if you ran that again?
- What did you decide not to do, and why?
Estimate work you have never done and defend the range
Hard · estimation · backfills · expand-contract
You are asked to estimate a change you have never attempted: add a column to a 100-million-row table, populate it, move reads across, and drop the old shape. Give a range with the assumptions that generate it, including batch size, the signal your backfill throttles on, and wall-clock hours, and name the three unknowns that would move the number most. Then describe a real estimate you gave under comparable ignorance: how you expressed its uncertainty, what you committed to, and how wrong you turned out to be.
Approach
- Decompose into independently deployable steps before estimating anything: add the column nullable, write both shapes, backfill in batches, verify, move reads, stop writing the old shape, drop it. That is four deploys spread over days, and the calendar estimate is dominated by them rather than by the loop's runtime.
- Do the arithmetic aloud for the part that has arithmetic in it: batch size times number of batches times per-batch duration, at a write rate the primary can absorb alongside roughly 1.2k writes per second of production traffic. The loop is throttled by replication lag and lock waits, not by how fast it can issue statements.
- Price the schema step by its lock rather than its statement duration. In PostgreSQL an ALTER TABLE taking ACCESS EXCLUSIVE waits for every open transaction on that table while later queries queue behind it, so a millisecond change issued during a thirty-second analytics query stalls that table for thirty seconds. Adding a nullable column with a non-volatile default avoids a rewrite from version 11; a new index wants CREATE INDEX CONCURRENTLY, which cannot run inside a transaction block and leaves an invalid index behind if it fails.
- Express the answer as a range whose endpoints each trace to a stated assumption, then name the cheapest experiment that collapses it, which is almost always running one real batch against the real table and multiplying.
- Commit to a checkpoint rather than a completion date: the day you report a measured number from that first batch. That is a promise you can keep under uncertainty, and it is what the asker actually needs in order to plan.
Follow-up
- How do you verify the backfill genuinely finished, given rows written by production traffic while it ran?
- Where does the backfill resume from after a worker is killed mid-batch, and what makes that resume point trustworthy?
- Your first batch comes back ten times slower than assumed. What do you tell the person waiting on the estimate, and when?