Interview guides · ANCA (UK)
ANCA (UK) Software Engineer Interview Questions & Guide 2026
ANCA (UK) software engineer prep on partial failure: a timed-out request has an unknown outcome, not a failed one.
The 60-second brief
A Software Engineer at ANCA (UK) plays a pivotal role in the development and maintenance of high-precision CNC grinding machine software. This position is central to the company’s mission of delivering world-class manufacturing solutions, bridging the gap between complex mechanical engineering and sophisticated software control systems. Your work directly impacts the accuracy, efficiency, and reliability of machines used globally across industries like aerospace, automotive, and medical device manufacturing.
Ask how many rounds there are and what each one is before you plan your weeks, because the composition is what your hours should follow. A loop with three coding rounds and one short design conversation deserves a different split from the reverse, and whoever schedules it will usually say plainly which it is.
Focus areas
- Paginate large result sets with keyset cursors
- Bound every outbound call with a timeout
- Make every write idempotent under retry
Overview
This role is both intellectually stimulating and technically demanding. You will not only be writing code; you will be solving problems that require an understanding of tool and cutter geometry, machine kinematics, and real-time control systems. Success in this role requires a candidate who is as comfortable discussing mathematical models of cutting tools as they are implementing robust, user-friendly interfaces in C# and WPF.
The ANCA (UK) interview process
ANCA (UK) candidates report 5 rounds · ≈ 4-6 weeks. The stages below are what candidates describe, not a published process.
Initial Technical Screening
Input bounds are the part of the prompt most often skimmed, and they usually contain the answer. They tell you which complexity class is admissible, which narrows the search before you have thought about the problem itself. As a rough planning figure, a compiled language does on the order of 10^8 simple operations per second and an interpreted one roughly an order of magnitude less. So n up to about twenty admits enumerating subsets, a few thousand admits a quadratic pass, and a million admits neither: you need near-linear, or linear with a log factor. If the bounds are missing, ask for them.
What to demonstrate
- Whether the approach is justified by the stated input size rather than by whichever pattern you recognised first
- Whether you ask about the properties that change the algorithm: whether the input arrives sorted, whether duplicates occur, whether values are bounded integers, whether it all fits in memory
- Whether you can name the bottleneck in your own solution and what would remove it, even when you deliberately leave it in place
- Whether a claimed speedup is real, since memoising a recursion only helps when subproblems genuinely overlap and the state can be keyed cheaply
How to prepare
- For each algorithm you rely on, write down the largest n it handles in roughly a second, then check two of those figures by timing them in the language you will actually type in
- For two weeks, write one line naming your target complexity and the bound that justifies it before you write any code, then compare that line with what you ended up submitting
- Practise the conversion backwards: given a required O(n log n), list the mechanisms that get you there (sorting, a heap, an ordered map, divide and conquer) and choose by what the problem needs to query, not by what you used last
Problem-Solving Methodology
An unlabelled round is first an information problem, and the cheapest information is free. Whoever schedules it can usually tell you how long it runs, who will be in the room and what they work on, whether you will be writing code and in what environment, and whether anything is being sent beforehand. Ask in writing so the answer is on record, then prepare for the two or three formats those answers still leave open instead of betting on one. What separates a strong candidate is not guessing right; it is having an opening that works whichever one it turns out to be.
What to demonstrate
- Whether you can start work from an ambiguous brief, since tolerating a vague scope without stalling is the same thing the job asks for
- Whether the questions you asked beforehand were ones that change your preparation, such as duration, medium and who is joining, rather than ones whose answers you could not have acted on
- Whether you adapt when the round turns out to be something other than what you were told, instead of spending the first ten minutes visibly recalibrating
How to prepare
- Send one short scheduling message asking four things: how long, who is joining and what they work on, whether you will be writing code and where, and whether to prepare anything in advance. Treat a vague reply as real information, since it means the round is loosely structured and you will be shaping it yourself.
- Write one opening that works in any of the formats still open: restate in your own words what you have been asked to do, then ask which of two directions is more useful to them. Say it aloud until it stops sounding recited.
- Set up for the two most likely formats before the call starts, with a blank editor in the language you would choose and a shared document you can type into, so a format surprise costs you nothing in the first minutes
Cultural Alignment
When a round has no standard shape, it is often there because something is still open: an area no earlier conversation reached, a round where the signal came out mixed, or a decision someone is not ready to make alone. Work out which by going back over what each earlier round actually covered rather than how it felt, and arrive able to give evidence on that point without being asked twice. Weak answers replay the loop's earlier material at the same depth. Strong ones go a level deeper and stay consistent with what you already said.
What to demonstrate
- Whether your account of a project matches the one you gave earlier in the loop, since what you said before may be available to whoever runs this round
- Whether you can go a level deeper on something already covered, reaching the decision and its alternatives rather than repeating the summary
- Whether you state your own uncertainty accurately, including parts of a system you did not build and decisions you inherited, instead of claiming even ownership across all of it
- Whether you can answer a question you handled poorly earlier by naming what you missed, rather than delivering a polished second version as if the first had not happened
How to prepare
- Reconstruct the loop on one page: for each round, the questions you were asked and the answer you actually gave, not the better one you thought of afterwards. The gaps on that page are your best available guess at why this round exists.
- Take the two claims you made earlier that carry the most weight and assemble the backing for each: the measurement, the date, what broke, the decision you would make differently now.
- Write down the three facts about your work that must not drift between tellings, such as team size, timeline and your own role, and check your stories against that list rather than trusting recall under pressure
Practical Examinations
You cannot drill a format you do not know, so put the preparation into material that travels. Three pieces of your own work, each rehearsed until you can take a follow-up you did not anticipate, will carry a conversation or a code walkthrough equally well. Specificity is what separates that from filler. A number needs its definition before it means anything: a p99 is over some window and measured at some hop, and a server-side figure excludes the queueing and network time a client would see. The number you cannot qualify is the one to leave out.
What to demonstrate
- Whether your examples carry detail only someone who did the work would hold, such as what the binding constraint actually was, which alternative you rejected and why it was worse, and what you measured on each side of the change
- Whether a number survives one follow-up, meaning you can say what it was measured over and whether it moved because of your change or merely alongside it
- Whether a failure is described with the specific change that followed it, rather than a lesson stated in general terms
- Whether your part in a team effort is stated accurately, including what other people did
How to prepare
- Write a page on each of three projects covering the constraint, the option you rejected, the measurement before and after, and what went wrong. Cut any line you cannot take a follow-up on, since you are writing the parts you will be pressed on rather than a summary.
- Recover the real figures while you still have access: request volume, data size, latency with its percentile and window, team size, timeline. Note where each came from, whether a dashboard, a design document or memory, and mark the estimates so you can say which they are out loud.
- Take your weakest project story to someone who works in a different area and have them ask why four times in succession. The point where you run out of answer is the part to go and re-read before the round.
Conversational Interviews
This round has no label, so treat it first as a question to ask rather than a format to guess. The person scheduling it can usually say how long it runs, who will be in the room and what they work on, whether you will write code and in what environment, and whether anything will be sent beforehand. Ask in writing so the answer is on record, then prepare for the two or three formats those answers still leave open instead of betting on one. What separates a strong candidate is not guessing right; it is having an opening that works whichever one it turns out to be.
What to demonstrate
- Whether you can start work from an ambiguous brief, since tolerating a vague scope without stalling is the same thing the job asks for
- Whether the questions you asked beforehand were ones that change your preparation, such as duration, medium and who is joining, rather than ones whose answers you could not have acted on
- Whether you adapt when the round turns out to be something other than what you were told, instead of spending the first ten minutes visibly recalibrating
How to prepare
- Send one short scheduling message asking four things: how long, who is joining and what they work on, whether you will be writing code and where, and whether to prepare anything in advance. Treat a vague reply as real information, since it means the round is loosely structured and you will be shaping it yourself.
- Write one opening that works in any of the formats still open: restate in your own words what you have been asked to do, then ask which of two directions is more useful to them. Say it aloud until it stops sounding recited.
- Set up for the two most likely formats before the call starts, with a blank editor in the language you would choose and a shared document you can type into, so a format surprise costs you nothing in the first minutes
Where candidates lose points
Letting a slow dependency consume unbounded concurrency
The failure that takes a service down is usually not an error but a delay. A dependency answering in thirty seconds instead of fifty milliseconds holds each request's worker or connection six hundred times longer, and since required concurrency is arrival rate times latency, a fleet sized for sixty in-flight requests now needs thirty-six thousand to sustain the same rate - so it queues, and requests whose clients have already abandoned them still occupy resources. Retries make it precisely worse: a policy of three attempts triples the load on a dependency at the exact moment it is least able to serve, which is how one slow dependency becomes an outage of everything sharing that pool. Containment is four specific things - a timeout on every outbound call shorter than the caller's remaining budget, a bounded pool per dependency so one cannot starve the others, backoff with full jitter rather than a fixed delay so retries do not resynchronise, and a circuit that stops sending once the failure rate makes an attempt pointless.
Choosing an index from the columns a query mentions rather than from how it filters and orders
A composite B-tree index on (a, b, c) can be seeked only as a left prefix: equality on a, then equality on b, then a range or an ordering on c. A query that filters on b alone cannot seek into it at all and at best gets a full scan of the index; a query that filters a and ranges on b gets no benefit from c, because the index is only sorted by c within a fixed (a, b) pair. The practical consequence is that one index per column is close to useless for multi-predicate queries while a single correctly ordered composite index turns a scan into a lookup. The ordering half is what gets missed: if the index cannot satisfy the ORDER BY, the database must read every matching row and sort before the limit can apply, so a LIMIT 20 over a million matching rows still reads a million rows.
Treating a network call as though it were a local function call
A remote call can be slow, fail, or return after you stopped waiting, so name the timeout, the retry policy, and what the caller sees while the dependency is down. A call with no timeout turns one slow dependency into an exhausted thread or connection pool in every service upstream of it.
Trusting input because it came from your own front end
Anything crossing a trust boundary is hostile: parameterise queries instead of building SQL by concatenation, validate against an allow-list rather than a deny-list, and bound the size of anything you allocate from a request. Raising this unprompted in an API or design question is a cheap and unusually strong signal.
Questions & practice
Merge partitioned event streams into one ordered feed with bounded lateness
Hard · k-way merge · watermarks · out-of-order streams
The read-model service consumes 64 log partitions carrying about 4,000 events per second in total. Each partition is ordered within itself, but partitions drift by up to 30 seconds, and the activity feed must present a tenant's events in occurred_at order. Produce the merge. State its complexity, the buffer it requires in events and in bytes, what happens when one partition is idle, and what you do with an event that arrives after you have already emitted its position. Payloads average 1 KB.
Approach
- Merge with a min-heap over the 64 partition heads keyed on (occurred_at, event_id): O(log P) per event and O(n log P) overall. The tie-break on event_id is what makes the output deterministic when two partitions carry the same millisecond, which matters because the feed is paginated and a non-deterministic order reorders pages under the reader.
- Emitting the heap head is only correct once every partition has produced everything up to that timestamp, so the emit condition is a watermark: the minimum across partitions of the highest occurred_at seen, less the allowed lateness. Events are held until the watermark passes them, which is what turns individually ordered streams into a jointly ordered one.
- Size the buffer from the lateness rather than guessing: 4,000 events per second times 30 seconds is 120,000 buffered events, and at 1 KB each about 120 MB of heap. That number is the real price of the ordering guarantee and belongs in front of whoever asked for it.
- Handle the idle partition explicitly, because it fails the feed rather than corrupting it: a partition with no traffic never advances its own maximum, so the watermark freezes and output stops entirely. Either every partition emits a periodic idle marker carrying the broker's current time, or the watermark falls back to wall clock for a partition silent beyond a threshold.
- Choose the late-event policy from what the projection is keyed on. The projection upserts on (aggregate_id, aggregate_version) and discards a version it has already applied, so a late event is safe to apply out of order and correctness never depended on the merge at all. Apply it, recompute the affected feed page, and count lateness so the 30-second budget can be re-derived from data rather than folklore.
- Say what the merge does not buy: ordering is guaranteed within one aggregate by the log's partitioning, and no watermark makes the cross-aggregate order authoritative. Two events from different aggregates in the same millisecond have no true order, so the feed's order is a presentation choice that must be stable rather than correct.
Worked solution (35 min)
- Write the heap comparator on (occurred_at, event_id) and the per-partition head refill.
- Write the watermark computation and the emit-loop condition, then list which buffered events are held at a chosen instant.
- Compute the buffer at 4,000 events per second, 30 seconds and 1 KB per event, and state what fraction of a worker's heap that represents.
- Add the idle-partition marker and trace the watermark with one silent partition, both with and without the marker.
- Write the late-event path and name the key that makes applying it safe.
Expected result: A 64-way min-heap merge at O(n log P) with a deterministic (occurred_at, event_id) comparator, a watermark of the per-partition minimum less 30 seconds gating emission, a stated buffer of 120,000 events and roughly 120 MB, idle markers so a silent partition cannot freeze the watermark, and a late-event policy justified by the projection's idempotency on (aggregate_id, aggregate_version).
Verify it yourself
- Feeding the partitions in an adversarial interleaving produces the same output sequence as feeding them in timestamp order.
- Silencing one partition stalls output without the idle marker and does not stall it with the marker.
- Applying a late event twice leaves the projection byte-identical, which is what permits the out-of-order path to exist.
Follow-up
- The lateness budget is raised to five minutes. What is the new buffer, and what besides memory changes?
- The consumer restarts. Where does it resume from, and what does the feed look like for the first 30 seconds?
- One partition is ten minutes behind because its producer is slow. Do you stall the feed or emit without it?
Identify the heaviest tenants in a five-minute window under memory pressure
Medium · top-k · heavy hitters · streaming
The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.
Approach
- Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
- Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
- State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
- Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.
- Choose and defend it: at 50,000 tenants the exact rings cost under 100 MB in a process that already holds more, so ship exact. Keep the sketch for the case that actually motivates it, a per-principal or per-IP key where cardinality runs to millions and is not bounded by anything you control.
- Raise the fleet problem before it is asked: each of 20 to 40 instances sees only its share, and the top 50 of one shard is not the top 50 of the fleet. Either aggregate counts centrally or accept that a per-instance threshold multiplied by instance count is the limit you are really enforcing.
Follow-up
- The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
- Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?
- You switch to per-principal keys and cardinality goes to 10 million. Walk through what changes.
Canonicalise a request body into a stable idempotency fingerprint
Medium · parsing · canonicalisation · hashing
idempotency_key.request_fingerprint is a SHA-256 over the method, path and canonicalised body, and a retry whose fingerprint differs must be rejected with 422 rather than served the stored response. Write the canonicaliser. Bodies are JSON up to 256 KB nested at most 32 levels; clients vary key order, whitespace and unicode escaping, and some send 64-bit ids as JSON numbers. Produce a deterministic byte string such that semantically identical bodies match and any semantic difference does not. State your complexity and name two normalisations you refuse to perform.
Approach
- Parse once into a tree, then re-serialise under fixed rules: object keys sorted, array order preserved, one escaping convention, no insignificant whitespace. Parsing is O(n) and sorting keys is O(k log k) per object, so O(n log n) overall with O(depth) stack, and the 32-level cap is enforced during parsing because hostile nesting is how a canonicaliser becomes a stack overflow.
- Sort keys by their UTF-8 bytes and say why the obvious implementation is wrong in some runtimes: a default string comparison that orders by UTF-16 code units places surrogate pairs, meaning code points from U+10000 up, below U+E000 to U+FFFF, which is not UTF-8 byte order, so two services written in different languages disagree on the same document.
- Do not re-encode numbers through a double. IEEE-754 binary64 represents integers exactly only up to 2^53, so normalising a 19-digit id through a float changes it, and 1 against 1.0 cannot be reconciled without deciding whether they are the same value. Preserve the literal token, and require ids as strings at the API boundary if you want them comparable.
- Reject duplicate keys rather than picking one. JSON permits them and parsers disagree, most keeping the last, so any choice you make ties the fingerprint to a parser detail that the code handling the request does not necessarily share.
- Frame the hash preimage so concatenation cannot collide: delimit or length-prefix the method, path and body, otherwise one request's fields can be rearranged into another request with the same byte stream and the same fingerprint.
- Name the refusals and their consequence: no case folding, no dropping of null-valued keys, no Unicode normalisation. Each makes two different requests fingerprint alike, and the resulting failure is the worst one this table has, since the second request is answered with the first one's stored response and its effect never happens.
Follow-up
- A client sends the same logical request with an extra field your API ignores. Same key, different fingerprint, so you return 422. Is that the right answer?
- Where does the fingerprint get computed relative to request decompression and the body-size limit?
- The endpoint takes 1,000 requests per second with 256 KB bodies. What does hashing cost, and does it belong at the edge or in the core service?
Explain why the owner filter ignores the listing index
Medium · composite index · query plans · sort elimination
The only index on resource is (tenant_id, status, updated_at DESC, resource_id DESC). A new endpoint returns one user's resources across all statuses, newest created first: WHERE tenant_id = $1 AND owner_user_id = $2 ORDER BY created_at DESC LIMIT 20. On a tenant with 2M rows it takes 900 ms and EXPLAIN shows a sort above a large scan. Explain precisely why the existing index cannot serve it, give the index that can, and state which of these the new index still will not help: owner_user_id alone across tenants; the same query ordered by updated_at. PostgreSQL 16.
Approach
- Separate the two jobs an index does. For filtering, a composite btree is seekable only on a left prefix, so with no predicate on status the scan can at best range over tenant_id and test owner_user_id per row; PostgreSQL 16 has no btree skip scan to jump the unconstrained column.
- For ordering, the index is sorted by (status, updated_at) within a tenant and not by created_at, so the LIMIT cannot stop early: every matching row is read and then sorted. That is the 'Sort Method: top-N heapsort' line, and it is why the plan reads 2M rows to answer with 20.
- Derive the replacement from the access path — equality, equality, then the ordering column: CREATE INDEX CONCURRENTLY ON resource (tenant_id, owner_user_id, created_at DESC). The scan seeks to the (tenant, owner) range and walks 20 entries in order, so the Sort node disappears along with the row-read.
- Treat INCLUDE (title, status) as conditional, not free. An index-only scan still visits the heap for any row whose page is not marked all-visible, so on a table taking 1.2k writes/second the win depends on autovacuum keeping the visibility map current, and the wider index costs more on every insert.
- Answer the two negatives explicitly. owner_user_id alone is not a left prefix of the new index, so it degrades to a full scan of the index at best. Ordered by updated_at, the query still seeks on the (tenant, owner) pair but must sort, because only created_at is ordered within that pair.
- Measure both sides with EXPLAIN (ANALYZE, BUFFERS) and compare estimated against actual rows at the lowest node — a 2M-versus-200 misestimate there is usually what chose the plan, and adding an index will not fix a statistics problem.
Follow-up
- 90% of rows are status='active'. Would a partial index WHERE status = 'active' change your answer, and for which of the three queries?
- A dashboard runs this for 40 owners in one page load. What changes about the design?
- How do you roll this index out on a table taking 1.2k writes/second, and what does it cost on every insert from then on?
Keep soft-deleted accounts from blocking re-registration
Easy · soft delete · unique constraints · engine differences
app_user holds user_id, tenant_id, email CITEXT, password_hash (NULL for SSO principals), email_verified_at, auth_version, status ('invited','active','suspended','deactivated'), created_at, updated_at, deleted_at. Two live accounts for one address inside a tenant must be impossible, but an address freed by a soft delete must be reusable, and the same tenant may delete and re-register it repeatedly. Write the uniqueness DDL for PostgreSQL 16, then the equivalent for MySQL 8 where partial indexes do not exist, and say what each permits once three deleted rows already hold that address.
Approach
- Start from what is actually unique: not (tenant_id, email), but (tenant_id, email) among live rows. PostgreSQL says that directly — CREATE UNIQUE INDEX app_user_live_email ON app_user (tenant_id, email) WHERE deleted_at IS NULL. A full constraint over the same two columns burns the address permanently the first time someone deletes an account.
- Keep case-insensitivity in the type or the index, never in the application: CITEXT as given, or UNIQUE (tenant_id, lower(email)) as an expression index where the extension is unavailable. A case-sensitive unique column is exactly how two accounts for one human appear.
- For MySQL 8 the predicate has to move inside the key: add a discriminator column that is a constant 0 while the row is live and is set to user_id on delete, with UNIQUE (tenant_id, email, deleted_marker). Live rows share the constant and still collide; deleted rows differ from each other and stop colliding.
- State the NULL variant and its dependency: leaving the marker NULL for deleted rows also works, because a unique index treats NULLs as distinct — true in MySQL, and true in PostgreSQL only under the default NULLS DISTINCT, which PostgreSQL 15 lets you reverse. Check the polarity against the three existing deleted rows: constant-on-live is what preserves the collision you want, and reversing it silently admits duplicate live accounts.
- Say what a soft delete must do besides setting deleted_at: increment auth_version so existing tokens stop validating, leave resource.owner_user_id and resource_revision.actor_user_id intact, and accept that the address is retained — erasure is a different requirement answered by scrubbing the column, not by a DELETE that would break those references.
Worked solution (20 min)
- Create the PostgreSQL partial unique index, insert a live row, soft delete it, and insert the same address again.
- Repeat the delete-and-reinsert cycle three times and confirm three deleted rows coexist with exactly one live row.
- Write the MySQL form with the discriminator, then deliberately reverse the polarity so live rows carry NULL, and show two live duplicates commit.
- Attempt a second live insert on both engines and map the resulting 23505 / ER_DUP_ENTRY to the 409 the handler should return.
Expected result: PostgreSQL rejects only the second live row and admits unlimited deleted ones. MySQL behaves identically with UNIQUE (tenant_id, email, deleted_marker) where live = 0; with the polarity reversed, two live rows commit and nothing afterwards can tell them apart.
Verify it yourself
- Group live rows by (tenant_id, lower(email)) after a randomised insert/delete run — no group exceeds one.
- Inserting 'User@x.test' after 'user@x.test' is rejected; if it is accepted, the case handling is in application code rather than in the index.
- EXPLAIN a login lookup and confirm the partial index is chosen — it is only usable by queries that carry the deleted_at IS NULL predicate, so a query without it falls back to a scan.
Follow-up
- A deleted account re-registers with the same address the next day. Do the old resource rows follow the new user_id, and how does the API keep the two principals apart?
- How do you honour an erasure request while resource_revision.actor_user_id still references this table?
- What changes if a user may hold membership in two tenants?
How do you approach modeling the kinematics of a multi-axis machine in software?
Medium
Approach
- State your assumptions explicitly before working the problem.
- Work from the requirement backwards to the design.
- Say what you would check first and why it is the highest-information step.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Can you explain how you would handle data binding in a complex WPF environment?
Medium
Approach
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
- Clarify what is being asked and what a complete answer contains.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
What branch of mathematics would you use to describe the geometry of a cutting tool?
Medium
Approach
- Say what you would check first and why it is the highest-information step.
- State your assumptions explicitly before working the problem.
- Clarify what is being asked and what a complete answer contains.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Shard by tenant when one tenant outgrows a single shard
Hard · sharding · hot partition · routing · online migration
One primary holds resource, resource_revision, outbox_event and idempotency_key for every tenant and is at its write ceiling at 1.2k writes/second. tenant_id leads every index. Shard across eight primaries. One tenant holds 22% of all rows and by itself exceeds a single shard's write capacity. Design the routing, the split of that tenant, and the online move of a tenant between shards with writes continuing. State what breaks for queries that are tenant-scoped today, and exactly what a write must do when it arrives at the old shard after the cutover.
Approach
- Route on a unit smaller than a tenant from the start. Make the routing key (tenant_id, bucket) with a fixed bucket count - 64 over eight shards - and keep a directory mapping each (tenant_id, bucket) to a shard, carrying a version and cached in every service. An ordinary tenant has all 64 buckets pointing at one shard and behaves exactly as it does today; only the hot tenant has its buckets spread. Hashing tenant_id alone spreads tenants evenly, gives you no way to move one, and has no answer at all for a tenant larger than a node. The bucket count is the part you cannot change later without rehashing rows, so pick it well above the shard count and rebalance by moving buckets, not by re-bucketing.
- For the tenant that exceeds one node, its buckets must land on different shards - that is the whole point of bucketing it, and buckets confined to its own shard would rename the rows while leaving every write on the node whose ceiling it already exceeds. Size it from measured numbers rather than from its row share: 22% of rows says nothing about write rate. The current primary tops out near 1.2k writes/second on this hardware and workload, so a tenant peaking at W writes/second needs its buckets spread over at least ceil(W / headroom-per-shard) shards, where the divisor is the share of each shard's ceiling you are willing to give it while that shard still serves other tenants - not the full 1.2k. Size on its peak, not its mean.
- Fix the co-location invariant at the right grain. What must commit in one transaction is a resource, its resource_revision row and its outbox_event row, so the bucket is a property of the resource: derive it once at creation and stamp it into resource_id, and every later revision and event routes with its parent for free. Per-tenant co-location was never the requirement, and mistaking it for one is what makes a tenant look unsplittable. What genuinely breaks is an invariant spanning two resources of one tenant - a per-tenant counter, uniqueness across its resources - which now needs either a home-shard table or two-phase commit, and 2PC at this write rate is not a serious option.
- Keep the idempotency constraint arbitrating, because it is now enforced per shard. PRIMARY KEY (tenant_id, idempotency_key) only continues to reject a retry if the same key always lands on the same shard, so derive the create-path bucket from hash(tenant_id, idempotency_key) and mint the new resource_id inside that bucket, which also puts the key row and the resource it guards in one transaction. A bucket chosen from anything that differs between a request and its retry - a timestamp, the worker id, a client-supplied resource id - splits one key across two shards, both inserts succeed, and the write endpoint's retry safety is silently gone.
- State what the split costs the hot tenant's reads. Its listing, one 21-entry index scan today, becomes a scatter-gather: every bucket-shard returns 21 rows, a coordinator merges and discards the surplus, latency becomes the slowest shard's rather than the median's, and the keyset cursor has to carry a position per bucket instead of one (updated_at, resource_id) pair. Counts over that tenant fan out the same way. The relay becomes one leader per shard; consumers are unaffected because their ordering guarantee was always per aggregate and a resource's events never leave its bucket.
- Move one bucket at a time, reversibly, and fence the straggler at the shard rather than at the caller. Copy from a snapshot while the bucket stays read-write, tail changes until the remaining delta is a few seconds of writes, fence writes for that (tenant_id, bucket) alone with a retryable status, apply the final delta, bump the routing version. Scoping the fence to a bucket is what makes a seconds-long freeze affordable. Then have each shard store the routing epoch it believes it holds for each (tenant_id, bucket) and reject any write carrying an older one: without that token, a service on a stale map commits successfully to a database nothing will ever read again, and the loss stays invisible for days. Outside the data path, anything that aggregated across tenants in one query - admin reporting, the A-Z index, global counters - becomes a fan-out across eight shards with a merge, and per-tenant uniqueness survives only on tables that stay whole on the tenant's home shard.
Worked solution (40 min)
- Write the routing lookup keyed by (tenant_id, bucket), its version field, where it is cached and invalidated, and the request-path cost.
- From the tenant's measured peak write rate and the per-shard headroom you will grant it, compute how many shards its buckets must span, assign them, and show no single shard carries its whole write rate.
- Trace one create end to end: which value picks the bucket, where resource_id gets it stamped, and why the revision, outbox and idempotency rows land on the same shard.
- Write the move steps for one bucket, then the epoch check the shard performs on every write, and trace a stale-map write through it.
Expected result: A versioned (tenant_id, bucket) to shard directory cached in every service, with ordinary tenants pointing all their buckets at one shard. The hot tenant's buckets are deliberately assigned to different shards, enough of them that its peak write rate divided across them fits the headroom granted on each, because no single node can carry it. The bucket is derived once and stamped into resource_id, so a resource, its revisions and its outbox rows commit together on one shard while the tenant spans several; only cross-resource invariants within the tenant lose their single-shard transaction. The create-path bucket comes from hash(tenant_id, idempotency_key) so the per-shard unique constraint still arbitrates retries. The tenant's listing becomes a scatter-gather with a per-bucket cursor. Migration moves one bucket at a time - snapshot copy, tail, seconds-long fence for that bucket, final delta, routing-version bump - and a routing epoch per (tenant_id, bucket) is checked by the shard so a stale caller's write is rejected rather than committed where nothing will read it.
Verify it yourself
- The hot tenant's buckets resolve to more than one shard, and its peak write rate split across them is inside the headroom each shard has after its other tenants.
- A resource's rows, its revisions, its outbox rows and its idempotency key row always resolve to a single shard, so no one write spans two.
- The same (tenant_id, idempotency_key) routes to the same bucket on every retry, so the per-shard unique constraint still rejects the duplicate.
- A write carrying an old routing epoch is rejected by the shard rather than merely misrouted by the caller.
Follow-up
- The fence lasts 90 seconds instead of 4 because the final delta keeps growing. What is happening, and what do you do while the tenant is fenced?
- Two tenants must merge into one account. What does that cost under this scheme, and which step is not reversible?
- A shard is lost entirely. Which tenants are affected, and what is the source of truth for rebuilding them?
One log partition stops advancing while the others drain
Easy · poison message · head-of-line blocking · consumer lag · projections
Search results for a subset of tenants are hours stale; the rest are current. The projection consumer reports lag of zero on 15 of 16 partitions and 400,000 on one. Its error rate is flat and its CPU is idle. outbox_event has no pending rows older than a second, so the relay has published everything it holds. Identify the mechanism, give the ordered checks, and state what you do in the first ten minutes versus what you change permanently.
Approach
- Read the lag distribution first. A slow consumer lags everywhere; zero on fifteen partitions and 400,000 on one is not throughput. Idle CPU on the stuck partition means the consumer is not advancing its offset at all, which points at one message it cannot get past rather than at a rate problem.
- Exonerate the producer before touching the consumer. No pending outbox rows older than a second means the relay published, so the event exists in the log. This separates never sent from sent and never applied, which are different code paths and usually different owners.
- Read the message at the stuck offset and the handler's log lines for its event_id. A flat error rate with no progress has two explanations and you must distinguish them: the handler is throwing and the retry loop is swallowing it, or the handler is blocking on something and never returning. Idle CPU with no error lines favours the second.
- Mitigate before diagnosing further. Move the offending event to a dead-letter store and commit the offset past it. Adding consumers does nothing here, because a partition is consumed by exactly one member of the group, and the blast radius is every aggregate hashed to that partition, not only the aggregate that produced the bad event.
- Fix permanently by bounding handler attempts and dead-lettering on exhaustion, so no single message can stop a partition. Then replay the dead-lettered event once the handler is fixed: it carries aggregate_id and aggregate_version, so a consumer that discards versions it has already applied can absorb the replay, and resource_revision is the fallback if the event itself is unusable.
Follow-up
- The dead-lettered event carried aggregate_version 7 and the projection had applied 6. What must the replay do differently if 8 and 9 landed in the meantime?
- How do you show staleness to the user while the partition is behind, given the API already returns the projection's watermark?
- What changes if the message is poison because a previous deploy wrote a payload shape the current code cannot parse?
Suggested practice checklist
Four days sample coding, design, fundamentals and the practical rounds at deliberately shallow depth, which is enough to surface the topics you did not know were in scope. That map, rather than a guess made on day one, decides where the last three days go.
Day 1 — Coding, one pass at shallow depth
- Solve one problem from each of six families, an array with two pointers, hash counting, binary search, a tree traversal, a graph traversal and one dynamic program, under a hard twenty-minute cap with no extensions, marking each finished, late, or stalled.
- For every stall, write the exact move you could not make rather than the subject, so the note reads could not turn the recurrence into a loop rather than bad at dynamic programming.
- Fix nothing today. The value of the pass is the unfixed record.
Deliverable: Six timed attempts marked finished, late or stalled, each stall carrying a named blocking move.
Day 2 — Design, one pass at shallow depth
- Spend twenty minutes each on three different shapes, a read-heavy feed, a write-heavy ingest path, and something needing a transaction across two entities, stopping each at requirements, interface and data model.
- After each, write the first question you could not answer, which is usually a number you could not estimate or a failure mode you had no vocabulary for.
- Mark which of the three you would be most relieved not to be asked, and treat that as data rather than as a preference.
Deliverable: Three shallow designs, each with the first unanswerable question written at the bottom.
Day 3 — Fundamentals and the practical rounds
- Answer eight short questions in writing at four minutes each, covering the material that fills the gaps between the big rounds: what happens between a URL and a rendered page, what an index costs on write, when a process is preferable to a thread, and what conditions a deadlock requires.
- Do one thirty-minute practical task of the kind a take-home compresses: read an unfamiliar two-hundred-line file and write what it does, what you would change, and the one thing you remain unsure of.
- Score every answer fluent, correct but slow, or absent, and keep the absent ones visible.
Deliverable: Eight scored short answers and one written reading of unfamiliar code.
Day 4 — The rounds that are about you, and the map
- Deliver three behavioural answers aloud against a timer, a conflict, a failure you owned, and a decision made without enough information, marking any that ran past three minutes or contained no number.
- Assemble the map: every marked item from days one to three on a single page, sorted by how likely it is to appear in your loop rather than by how uncomfortable it felt.
- Choose exactly two areas for the remaining three days and write down what you are deliberately abandoning.
Deliverable: A one-page scored map of the whole surface area with two areas chosen and the rest explicitly abandoned.
Day 5 — First chosen area, to the depth you skipped
- Work the higher-ranked area in four focused blocks, choosing items one level above where you stalled rather than repeating what already works.
- After each block write the rule you extracted in one sentence with its precondition attached, since a rule carrying no precondition is exactly what fails under a variation.
- Re-attempt the day-one or day-two item that exposed this area and compare against the original timing.
Deliverable: Four worked blocks, a timed re-attempt against the original, and three one-sentence rules with preconditions.
Day 6 — Second chosen area, where the gap is coverage rather than speed
- Treat the second area differently from the first. Day five drilled something you could already half-do; this one is usually a topic you had simply never met, so build one worked reference example end to end and keep it, rather than attempting six problems badly.
- Write down the vocabulary you were missing on day two or three, five terms at most, each with the one sentence that makes it usable in an answer rather than the textbook definition.
- Redo the shallow attempt that exposed this area and note whether you now fail later in the problem, because moving the failure point is the realistic gain from a single day and is worth more than a score that did not change.
Deliverable: One worked reference example for the newly covered area, a five-term vocabulary list, and a note on where the failure point moved.
Day 7 — Reassemble the loop
- Sit two rounds back to back with no gap, ordering them so the area you chose second comes last, because the map was built from rested, isolated attempts and the loop will reach your weaker area when you are already spent.
- Write where the second round suffered from the first, which is normally the point at which structure collapses into narration.
- Reduce the week to one page holding only the rules you can state without reading them.
Deliverable: Mock notes on cross-round carryover plus a one-page card of rules you can recite from memory.
Review and mentoring: what you let through
Counting review comments or mentees proves nothing. The useful version is a specific change you approved with a reservation you stated, or one you blocked and the delay that cost. Say which standard you were holding and why it was worth the friction. A mentoring story needs the thing the other person can now do without you.
How do you handle feedback from non-technical stakeholders, such as machine operators or sales teams?
Medium · behavioural and engineering judgement
Approach
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
- Pick a story where you made the decision, not one where you watched it.
Follow-up
- What would you do differently if you ran that again?
- What did you decide not to do, and why?
Describe a time you had to learn a new domain-specific concept quickly to complete a software task.
Medium · behavioural and engineering judgement
Approach
- Pick a story where you made the decision, not one where you watched it.
- Close with what you would do differently, concretely.
- Give the blast radius: what could have broken, and what you measured.
Follow-up
- What did you decide not to do, and why?
- What would you do differently if you ran that again?
Can you walk us through a complex project where you had to balance technical debt with new feature development?
Medium · behavioural and engineering judgement
Approach
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Close with what you would do differently, concretely.
Follow-up
- What did you decide not to do, and why?
- How did you know your change caused the improvement?