cswork / libraryOpen practice workspace

Interview guides · Anadarko Petroleum

Anadarko Petroleum Data Scientist Interview Questions & Guide 2026

Anadarko Petroleum data scientist prep: probability, sampling distributions, and stating the assumption behind every test you run.

The 60-second brief

As a Data Scientist at Anadarko Petroleum, you occupy a critical intersection between advanced computational science and physical asset optimization. In the energy sector, data science is not merely about digital products; it directly influences high-stakes physical operations, capital allocation, and safety protocols. You will be responsible for transforming massive, complex datasets—ranging from seismic sensor outputs and drilling telemetry to supply chain logistics—into actionable insights that drive exploration and production efficiency.

Seniority shifts the scope more than the words in the title do. Earlier-career loops mostly check that you execute a well-posed analysis correctly; senior loops check that you can decide which question is worth answering and defend what you chose not to do.

Focus areas

  • Trace an on-time miss to one node
  • Join daily snapshots to shipment events safely
  • Size safety stock under variable lead times

Overview

Your work will directly impact how Anadarko Petroleum models reservoirs, predicts equipment failures, and automates drilling parameters. By developing and deploying machine learning models, you help the company reduce operational downtime, minimize environmental footprints, and maximize resource recovery. This role requires a unique blend of deep technical expertise and the ability to collaborate closely with geophysicists, petroleum engineers, and business leaders who rely on your models to make multi-million-dollar decisions.

The environment is intellectually rigorous and highly collaborative. You will work on massive, high-dimensional datasets that present unique challenges not typically found in standard consumer tech roles. For a data scientist who thrives on solving physical-world problems with tangible, high-impact outcomes, this position offers an incredibly rewarding career path.

The Anadarko Petroleum interview process

Anadarko Petroleum candidates report 2 rounds · ≈ 2-4 weeks. The stages below are what candidates describe, not a published process.

Initial Screening

Most candidates lose this call inside the first two minutes, during the walkthrough of their own background. The account runs chronologically, sits at the level of tools and titles, and never arrives at a decision anyone could have disagreed with. Anchor on a problem instead of a timeline: what the team could not answer, what you did about it, what happened next. Ninety seconds is enough, and stopping on time leaves room for the half of the call that belongs to you. What you ask about how work gets prioritised signals your level more reliably than the walkthrough does.

What to demonstrate

  • Whether your background summary has a shape (problem, decision, consequence) or is a chronological list of tools and employers
  • Whether you can account for gaps, short stints and the reason you are looking, unprompted and without hedging
  • The substance of the questions you ask back, which an experienced screener reads as a level signal

How to prepare

  • Time your opening walkthrough against a clock. If it runs past two minutes, compress the earliest role into a single clause and spend the recovered time on the most recent one
  • Write one honest sentence for every gap or short stint visible on your resume and offer it before being asked about it
  • Prepare questions about how work arrives and gets prioritised: who writes the request, how often priorities change, and what happens to an analysis after it is delivered

Technical and Behavioral Panel

Most of the weight in this round sits on the disagreement questions. Data work routinely produces an answer someone senior did not want, and the interviewer is trying to learn what you do in that hour. Both failure modes are common: folding as soon as a director pushes back, and treating the pushback as ignorance to be corrected with a better chart. A strong answer usually contains a specific thing the other person knew that you did not, and describes how you found out whether it changed the conclusion.

What to demonstrate

  • Whether you can state the other side's argument accurately before you explain why you disagreed
  • What you treated as evidence during the disagreement, such as a rerun under their assumption or a holdout check, rather than persuasion technique
  • Whether you distinguish being overruled from being wrong, and can give an example of each

How to prepare

  • Write out one disagreement where you turned out to be wrong, and say what in the data misled you. Candidates prepare the story where they were right, and the follow-up asks for the other one.
  • For your main disagreement story, be ready to say what result would have made you drop your position. If no such result exists, you were not arguing from the data.
  • Practise stating the opposing position out loud in one sentence the stakeholder would accept, then continue the story.

Where candidates lose points

Averaging rates across SKU-locations instead of re-summing

Fill rate, turns, OEE and on-time rate are all ratios whose denominators differ by orders of magnitude between cells, so an unweighted mean gives a slow-moving C item at a small node the same vote as a high-volume A item at a national node. The blended figure then moves whenever the portfolio mix moves, and it can improve in every cell while the company-level ratio worsens, or the reverse, which is Simpson's paradox with a warehouse attached. Always sum numerator and denominator to the reporting level and divide once, and when a rate must be compared across nodes, standardise on a fixed SKU mix before reading anything into the difference.

Scoring intermittent demand with MAPE

MAPE is undefined whenever the actual is zero, which is most days for a C-class item at a forward-stocking location, and it is asymmetric even where it is defined: under-forecasting is bounded at 100 percent error while over-forecasting is unbounded. Optimising it therefore drives systematic under-forecasting on exactly the items whose stockouts are most expensive, and the bias is invisible in the headline because the zero-actual rows were dropped before averaging. Use WMAPE (sum of absolute errors over sum of actuals), a scaled error such as RMSSE, or a pinball loss at the service quantile the policy targets, and always state the aggregation level and forecast lag, because the same series scores very differently at daily SKU-store level and weekly SKU-region level.

Over-explaining the method and under-explaining the implication

Lead with the answer and what you would do about it, then give the approach when asked. Roughly one sentence of method per three of implication is the right ratio for a stakeholder-facing answer; the interviewer already knows what a regression is.

Reporting a mean for a heavy-tailed metric without saying what it hides

For spend, session length or items per order, a small fraction of units carries most of the total, so the mean has a wide standard error and one account can move it. Fix the handling before you see the result: cap or winsorise at a pre-declared percentile, and report the median or the share above a threshold next to the mean. Capping changes the estimand, so say which question the capped number answers, and check how much of any difference comes from the top 0.1 percent of units.

Questions & practice

Explain the mathematical difference between Random Forest and Support Vector Machines (SVMs). Under what conditions would you choose one over the other?

Medium · machine learning and modelling

Approach

  1. Set a baseline first, so any model has something honest to beat.
  2. Pick an evaluation metric that matches the cost of each error type, not a default.
  3. Say how the offline result would be validated online before it is trusted.

Follow-up

  • How would you choose the decision threshold, and who owns that choice?
  • What would you monitor after launch to know the model is still valid?

What loss functions would you use for a regression problem with heavy outliers, and why?

Medium · machine learning and modelling

Approach

  1. Set a baseline first, so any model has something honest to beat.
  2. Check what information would not exist at prediction time, and exclude it.
  3. Pick an evaluation metric that matches the cost of each error type, not a default.

Follow-up

  • How would you choose the decision threshold, and who owns that choice?
  • What would you monitor after launch to know the model is still valid?

Explain the concept of bias-variance tradeoff and how you address overfitting in tree-based models.

Medium · machine learning and modelling

Approach

  1. Frame the prediction: the label, the moment of prediction, and the action it triggers.
  2. Pick an evaluation metric that matches the cost of each error type, not a default.
  3. Set a baseline first, so any model has something honest to beat.

Follow-up

  • How would you choose the decision threshold, and who owns that choice?
  • What would you monitor after launch to know the model is still valid?

Reconstruct replenishment cycles from a daily inventory series

Medium · event sessionisation · state reconstruction · lead time

For one sku-location you have a daily series: inventory_date, on_hand_qty, in_transit_qty, on_order_qty, allocated_qty, shipped_qty, demand_qty, reorder_point_qty, stockout_flag. There is no purchase-order table. Infer the replenishment cycles: a cycle opens on the first day inventory position falls to or below reorder_point_qty, and closes on the first subsequent receipt. Receipts must be inferred from the series itself. Return one row per cycle with trigger date, receipt date, inferred lead time in days, demand during the cycle and stockout days, then report mean and standard deviation of the inferred lead time.

Approach

  1. Derive the receipt signal from the stock balance rather than looking for a column that does not exist: on_hand today equals on_hand yesterday plus receipts minus units shipped, so implied_receipt = on_hand_qty.diff() + shipped_qty, and a positive value means goods arrived.
  2. State what else can make that quantity positive: a cycle-count adjustment, a customer return, or a scrap reversal. Corroborate each candidate receipt with a matching fall in in_transit_qty on the same or adjacent day, and discard the ones with no corroboration.
  3. Debounce arrivals. A load split across two dock shifts produces positive implied receipts on consecutive days; collapse runs of receipt days separated by less than a chosen gap into a single arrival and make the gap an explicit parameter.
  4. Compute inventory position as on_hand + in_transit + on_order - allocated, not on hand alone, or every day after a trigger looks like another trigger and the cycle count explodes.
  5. Walk the series once with an explicit state variable (awaiting-trigger, awaiting-receipt) rather than trying to vectorise the pairing. The state machine is what makes cycles non-overlapping, and it is what a reviewer can check line by line. Be clear that cycles defined this way do not tile the calendar: the stretch from a receipt until the position next falls to the reorder point sits inside no cycle.

Worked solution (35 min)

  1. Sort by inventory_date, assert no duplicate dates and no calendar gaps, and compute position = on_hand_qty + in_transit_qty + on_order_qty - allocated_qty.
  2. Compute implied_receipt = on_hand_qty.diff() + shipped_qty and mark receipt days where it is positive and in_transit_qty fell.
  3. Collapse consecutive receipt days into single arrivals using a gap threshold of one day.
  4. Iterate the series with a two-state machine, emitting a cycle row when a trigger is followed by an arrival, and carrying an open trigger forward across days.
  5. For each cycle sum demand_qty and stockout_flag between trigger and receipt, then compute mean and standard deviation of the lead times across cycles.

Expected result: A cycle table with non-overlapping intervals ordered in time, each with receipt_date strictly after trigger_date, plus two scalars: mean inferred lead time and its standard deviation across cycles. The cycles cover only the trigger-to-receipt stretches, so they will not add up to the length of the series; the post-receipt stretches where stock is still above the reorder point are outside every cycle by definition.

Verify it yourself

  • Assert no two cycles overlap and that every receipt_date is strictly later than its trigger_date.
  • Partition the calendar into four exhaustive categories and sum demand_qty over all of them: cycle days (trigger to receipt), post-receipt gap days (receipt to the next trigger), the head before the first trigger, and the tail after the last receipt. The total must equal total demand_qty. Summing cycles plus head and tail alone under-counts by exactly the gaps, which is the arithmetic proof that cycles do not tile the series.
  • Confirm the day counts of those same four categories sum exactly to the number of days in the series. A shortfall means two cycles overlap or a boundary day is double-counted. Cycle count times mean cycle length is not a substitute for this check, since it ignores the gaps.
  • Confirm total inferred receipts across the window approximately equals total shipped_qty plus the change in on_hand_qty from first day to last.

Follow-up

  • Two orders are open at once because the trigger fired again before the first arrived. How does your state machine change?
  • The policy quotes lead time in working days. What do you need from dim_location to convert, and where does the timezone matter?
  • You now have mean and standard deviation of lead time. Write the safety stock this implies and say which assumption you are least comfortable with.

Dead stock cells excluding SKUs used as substitutes

Medium · anti-join · null semantics · dead stock

Find dead stock: sku_id x location_id cells whose latest fct_inventory_daily row has on_hand_qty > 0 and which have no fct_order_line with that sku_id and ship_from_location_id in the last 90 days. Also exclude any SKU that filled another line as a substitute in that window; fct_order_line.substituted_sku_id is NULL on every line that was not substituted. Value each cell at on_hand_qty * standard_cost_cents taken from the snapshot, not from dim_sku. Return the cell, days since its last demand line, and value, ordered by value. Treat line_status = 'cancelled_no_supply' as demand.

Approach

  1. Take the latest snapshot per sku-location with ROW_NUMBER() OVER (PARTITION BY sku_id, location_id ORDER BY inventory_date DESC) = 1, or an equivalent MAX(inventory_date) join, and keep rows with on_hand_qty > 0.
  2. Anti-join demand with NOT EXISTS against fct_order_line on both sku_id and ship_from_location_id over the 90-day window, counting every line status including cancelled_no_supply, because unmet demand is still demand and a cell with it is not dead.
  3. Write the substitute exclusion as NOT EXISTS, or force substituted_sku_id IS NOT NULL inside the subquery. NOT IN over a column that contains NULLs evaluates to NULL for every candidate that is not an explicit match, so the predicate is never true and the result set is empty.
  4. Value from the snapshot's standard_cost_cents rather than dim_sku, since the dimension carries only the cost in force today and is revised at period close without back-dating.
  5. Get days since last demand from a LEFT JOIN LATERAL MAX(ordered_at_utc), and report cells that never had a line in a separate bucket instead of as a very large number.

Follow-up

  • The query returns zero rows. Name the two likeliest causes and say which you would test first, with the one-line test.
  • How do you separate genuinely dead stock from a seasonal item out of season and from a lifecycle_status = 'pre_launch' SKU?
  • The same SKU is dead at one node and short at another. Write the query that finds that pattern and say what it implies about the policy.

Stockout streaks of three days or more per cell

Medium · window functions · gaps and islands · stockout analysis

fct_inventory_daily carries one row per sku_id x location_id x inventory_date for every active pair, including days with nothing on hand, plus stockout_flag marking days where available_qty reached zero. Return every run of consecutive stockout days lasting three days or more: sku, location, start date, end date, run length, and demand_qty summed across the run. Return alongside it, per sku-location, the count of such runs in the window. Verify that the daily row series is contiguous for each pair before relying on date arithmetic, and say what you do about pairs that fail.

Approach

  1. Filter to stockout_flag = TRUE, then assign ROW_NUMBER() OVER (PARTITION BY sku_id, location_id ORDER BY inventory_date).
  2. Form the island key as inventory_date - rn * INTERVAL '1 day'. Two rows share a key only when their dates are exactly consecutive, so the key cannot weld separate runs together; the exposure runs the other way. A day with no snapshot row inside a true stockout breaks that run into fragments, and any fragment under three days is deleted by the threshold, so the run leaves the output rather than appearing with a wrong length.
  3. Prove contiguity before trusting the key: per sku-location compare COUNT(DISTINCT inventory_date) against (MAX(inventory_date) - MIN(inventory_date) + 1), and separately confirm no pair carries two rows on one date, since a duplicate date advances rn without advancing the calendar and shifts every key after it. Pairs that fail get a generated date spine: LEFT JOIN generate_series over the window so each day is labelled stockout, in stock, or no snapshot, then apply a stated rule for the no-snapshot days instead of letting the key make that call silently. The conservative rule is to break the run at the hole and mark both fragments gap_adjacent.
  4. Group by sku, location and island key for MIN and MAX date, COUNT(*) as length and SUM(demand_qty) as the demand exposed to the stockout, keeping runs of length >= 3.
  5. Aggregate once more per sku-location for the run count, and mark runs touching either window edge as censored, since their true length is unknown from this window alone.

Worked solution (30 min)

  1. CTE completeness: per sku_id, location_id compute COUNT(DISTINCT inventory_date) and the date span, and flag pairs where they disagree or where COUNT(*) exceeds COUNT(DISTINCT inventory_date).
  2. CTE flagged: SELECT the stockout rows with ROW_NUMBER partitioned by sku_id, location_id ordered by inventory_date.
  3. CTE islands: add grp = inventory_date - rn * INTERVAL '1 day'.
  4. GROUP BY sku_id, location_id, grp producing MIN, MAX, COUNT() and SUM(demand_qty); filter COUNT() >= 3.
  5. Second aggregate over that result for runs per sku-location, plus a censored flag where start equals the window start or end equals the window end.

Expected result: One row per qualifying run with start_date, end_date, length and summed demand_qty, every length at least 3, plus a per-cell run count whose sum across cells equals the number of run rows returned. Length, end_date - start_date + 1 and the island's row count agree by construction of the key, so their agreement is not evidence that the runs are real.

Verify it yourself

  • Every gap between two consecutive returned runs for the same sku-location contains at least one day carrying a snapshot row with stockout_flag = FALSE. A gap made only of days with no snapshot row is a hole rather than a recovery, and those two runs are likely one run the key split.
  • The completeness CTE flags zero pairs. Where it flags any, that pair's run lengths and run count are lower bounds and must be labelled as such, not published beside clean pairs as if comparable.
  • Total stockout days across all returned runs is less than or equal to the total count of stockout_flag rows in the window.

Follow-up

  • The longest runs cluster on X-class A items. What does that combination suggest to look at before touching the safety stock policy?
  • How would you estimate lost demand across a run, given that demand_qty records the orders that were placed but not the orders nobody bothered to place?
  • The snapshot is taken at each location's local end of day and the pairs span several timezones. What breaks, and what stays true?

How do you optimize memory usage when processing exceptionally large datasets in Python?

Medium · product sense and metrics

Approach

  1. Decompose the metric into the rates that drive it, and say which one you would check first.
  2. Restate the decision this analysis has to support, and who acts on the answer.
  3. Name one primary metric, then the guardrail that stops it being gamed.

Follow-up

  • How would you detect that the metric is being gamed rather than genuinely improving?
  • What would you do if the primary metric and the guardrail moved in opposite directions?

Write a script to parse a structured log file and extract specific error metrics.

Medium · product sense and metrics

Approach

  1. State what result would change your recommendation, so the answer is falsifiable.
  2. Name one primary metric, then the guardrail that stops it being gamed.
  3. Restate the decision this analysis has to support, and who acts on the answer.

Follow-up

  • How would you detect that the metric is being gamed rather than genuinely improving?
  • What would you do if the primary metric and the guardrail moved in opposite directions?

Describe your proficiency with Python and R. In what scenarios would you choose one language over the other for asset optimization modeling?

Medium

Approach

  1. Work from the decision backwards to the evidence you would need.
  2. Clarify what is being asked and what a complete answer would contain.
  3. Say what you would check first and why it is the highest-information step.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

A planner scorecard that aggregation cannot flatter

Hard · wmape · gameable metrics · forecast bias

Demand planners will be scored on forecast accuracy. fct_inventory_daily carries demand_qty, forecast_qty_lag7, forecast_qty_lag28 and stockout_flag at sku by location by date, with NULL forecasts before a series existed. Specify the scorecard: error metric, grain, lag, exclusion policy and guardrail. Then show the three ways a planner raises the headline without forecasting better, and state which single number you would prefer to accuracy if you could publish only one.

Approach

  1. Fix the grain and lag to the decision. The ordering policy consumes a forecast at one horizon for one sku-location-week cell, so the score is computed there; a number quoted at any other grain is not the number the policy used and cannot be compared to it.
  2. Choose WMAPE, sum of absolute errors over sum of actuals, or a pinball loss at the service quantile the policy targets. Rule out MAPE explicitly: it is undefined at zero actuals, which is most days for a C item at a forward-stocking location, and it is asymmetric where it is defined, so optimising it drives systematic under-forecasting.
  3. Show why aggregation flatters, and show it as arithmetic rather than opinion. The absolute value of a sum is at most the sum of absolute values, so errors cancelling across SKUs, locations or weeks make aggregated WMAPE weakly lower than the disaggregated figure on the same denominator, with no forecasting improvement involved.
  4. Name the other two routes: scoring at a shorter lag than ordering actually uses, and exclusion drift, where NULL-forecast rows, zero-demand cells or stockout days are dropped without publishing the excluded count, quietly removing the hardest cells from the sample.
  5. Set the guardrail on signed bias, weighted mean percentage error over the same window and cells, reported per ABC/XYZ cell. A series can be inaccurate but unbiased, or accurate on average and persistently short, and only the second wrecks inventory in one direction.
  6. Answer the last question directly: prefer the outcome that accuracy is a means to, achieved fill rate at a given inventory at cost per cell, because that is what the business buys, and accuracy that does not move it is not worth paying for.

Worked solution (40 min)

  1. Build the scored panel at sku by location by week, summing demand_qty and taking the forecast at the lag the ordering policy uses, excluding NULL-forecast cells and counting every exclusion.
  2. Compute WMAPE and signed WMPE per planner per ABC/XYZ cell by re-summing numerator and denominator, never by averaging cell ratios.
  3. Recompute the same WMAPE at region and at month to demonstrate the mechanical improvement, and record the difference as the aggregation premium.
  4. Recompute with and without stockout days and with and without zero-demand cells, recording each shift as the exclusion premium.
  5. Publish WMAPE, WMPE, the excluded-row count and the paired inventory-and-service outcome, with grain and lag printed on the page rather than held in a footnote.

Expected result: A scorecard pinned to sku by location by week at the ordering lag, using WMAPE with signed bias beside it and per-ABC/XYZ reporting so the tail cannot be abandoned; three gaming routes each sized on the real data as an aggregation premium, a lag premium and an exclusion premium; and a stated preference for achieved fill rate at a given inventory at cost as the single number, with forecast accuracy kept as a diagnostic rather than as the target.

Verify it yourself

  • Aggregated WMAPE is less than or equal to disaggregated WMAPE on the same rows in every roll-up tested; a case where it is higher means the two were computed over different denominators.
  • On one panel, the absolute value of WMPE is at most WMAPE; a violation means the two used different exclusions.
  • Excluded rows plus scored rows equal the full panel; if they do not, rows are being dropped somewhere other than the stated policy.

Follow-up

  • Two planners have identical WMAPE and opposite bias. Which one is doing more damage, and to what?
  • The scorecard is per planner but forecasts are hierarchical and reconciled. Whose number is the reconciled one, and who gets charged for the reconciliation loss?

On-time rate improved the week the promise field changed

Medium · definition change · metric hygiene · release artefact

Customer on-time delivery jumped from 88 percent to 95 percent in one week and has stayed there. That week a release began writing re-confirmed dates into fct_order_line.promised_delivery_date, while original_promised_delivery_date still carries the first promise and both columns are populated for all history. Using fct_order_line (actual_delivery_at_utc, promised_delivery_date, original_promised_delivery_date, line_status) and dim_location.timezone, determine how much of the seven points is real. Deliverable: two numbers that sum to seven and one sentence of recommendation.

Approach

  1. Recompute the whole series twice on identical rows, once against promised_delivery_date and once against original_promised_delivery_date. Both columns exist for all history, so the counterfactual is free and the split is arithmetic rather than an estimate.
  2. Read the gap between the two series in the weeks before the release. If it was near zero and opens abruptly in the release week, the jump is the measurement changing. If the original-promise series also rises, that component is real and should be credited.
  3. Measure the mechanism directly rather than inferring it: by week, the share of lines where promised_delivery_date > original_promised_delivery_date and the mean slip in days. Any metric that can be satisfied by moving its own target is not measuring service.
  4. Handle the date-versus-timestamp comparison explicitly. actual_delivery_at_utc is a UTC instant while the promise is a local date, so convert using dim_location.timezone and compare against local end of day. Doing the comparison in UTC moves an entire timezone's deliveries across the boundary and invents a second, smaller step.
  5. Recommend the original-promise definition for the published metric and keep the re-promise series as a separate operational measure, stating that the two answer different questions rather than that one is simply wrong.

Follow-up

  • Re-promises are legitimate when a customer agrees to the new date. How would you let those count without reopening the loophole?
  • What automated check would catch the next definition change before it reaches a chart?
  • Supplier inbound on-time has the same structure. Where is its equivalent loophole, and what does the metric tree already say about it?

Suggested practice checklist

For a candidate whose interviews will centre on A/B testing, metric movement and causal claims. Design comes before arithmetic, arithmetic before analysis, and the week ends by rehearsing the readout rather than the derivation.

Day 1 — Design one test end to end on paper

  • Take a single feature change and write the full design: randomization unit, the exact point of exposure, the primary metric with its grain, guardrails, allocation, planned duration, and the decision rule committed before any data exists.
  • Write why the randomization unit must sit at or above the level where treatment can spill over, and give one case where user-level randomization is still contaminated (shared accounts or devices, or two participants in the same marketplace).
  • State in advance what you will do if the primary metric is flat while a secondary metric is significant.

Deliverable: A one-page test design with a decision rule written before launch.

Day 2 — Power arithmetic until it is automatic

  • Compute required sample size per arm for a binary metric with the normal approximation, n is approximately 2 times (z for alpha/2 plus z for power) squared times p(1 minus p) divided by delta squared, for baselines of 2, 10 and 40 percent at a 5 percent relative lift, and note that for a fixed relative lift the requirement falls as the baseline rises because delta grows proportionally with p.
  • Redo the calculation for a continuous metric using variance in place of p(1 minus p), and show why a heavy-tailed quantity such as revenue per user needs either far more traffic or a capped version with a stated cap.
  • Convert one of the results into weeks given a weekly eligible traffic figure, then list the two honest ways to shorten it (accept a larger detectable effect, or reduce variance) and write why quietly lowering the power target is a decision to miss more real wins, not a speedup.

Deliverable: A small script or sheet that maps baseline, minimum detectable effect, alpha and power to sample size and weeks, cross-checked against a published calculator.

Day 3 — Variance and the unit-of-analysis problem

  • Take a ratio metric whose denominator is not the randomization unit (clicks per session, randomized by user) and compute the standard error twice, once naively at session level and once by the delta method or a user-level bootstrap, then record how much the naive version understates it.
  • Implement CUPED on simulated data: choose a pre-period covariate X measured before assignment, estimate theta as Cov(Y, X) divided by Var(X), and analyse Y minus theta times (X minus its mean) in place of Y. Confirm the variance of the adjusted outcome equals the raw variance multiplied by one minus the squared correlation between Y and X, so a correlation of 0.45 removes about 20 percent of the variance and not 80.
  • Now run that simulation a few hundred times and confirm the adjusted effect estimate is unbiased for the same effect rather than numerically identical to the raw one. Within any single run the two differ, sometimes by a large fraction of the true effect, because the two arms' pre-period covariate means never coincide exactly in a finite sample; they agree in expectation, which is the property that matters and the one to state out loud.

Deliverable: A notebook showing the adjusted estimator with a measurably smaller variance than the raw one, plus a repeated-simulation table showing the two estimators agreeing on average while differing run by run.

Day 4 — Validity threats you can actually test for

  • Run a sample ratio mismatch check as a chi-square goodness-of-fit test against the intended allocation, and write the three causes you would chase first (assignment logged before exposure, an arm-specific redirect or load failure, bot filtering applied asymmetrically).
  • Simulate peeking: generate A/A data, test daily at alpha 0.05 across 14 looks, record the inflated false positive rate, then apply an alpha-spending boundary or commit to a fixed horizon and confirm the rate returns to nominal.
  • Write how you would separate a novelty effect from a durable lift using the treatment effect plotted against days since first exposure, and what shape would change your recommendation.

Deliverable: One table showing the peeking false positive rate before and after correction, plus a written SRM triage list.

Day 5 — When randomization is not available

  • Write the identifying assumption for difference-in-differences (parallel trends in the absence of treatment), then plot pre-period trends for two candidate control groups and justify rejecting one of them.
  • Design a switchback test for a change where user-level randomization would leak across participants, choosing a time-block length against the carryover you expect and saying how you would detect carryover in the data.
  • List what an interrupted time series or a synthetic control buys you and the one thing neither can rule out: an unobserved shock that coincides with the launch.

Deliverable: A one-page memo recommending a single quasi-experimental design and naming its weakest assumption explicitly.

Day 6 — The readout query

  • Write the assignment-to-exposure join that returns exactly one row per unit per experiment, and handle units appearing in both arms by excluding and counting them rather than silently keeping one.
  • Compute the per-arm metric, its variance and the relative lift with a confidence interval in SQL, then reproduce the identical numbers in a notebook as a cross-check.
  • Add a segment breakdown and write the sentence that keeps it from being p-hacking: segments declared in advance, everything else reported as exploratory and corrected for multiplicity.

Deliverable: A single query that outputs the full readout table, matched to a notebook recomputation.

Day 7 — Present it to someone who will not read the appendix

  • Give a 10-minute readout of a real or simulated experiment in the order decision, number, uncertainty, caveat.
  • Have your listener ask "can we ship it" in the case where the primary is flat and a guardrail moved, and answer with a recommendation rather than a request for more data.
  • Rewrite your opening line so the recommendation lands before any methodology.

Deliverable: A one-page readout whose first line is the recommendation.

Stories where someone disagreed with you

Have two ready. In one, the data was on your side and you had to move someone who outranked you. In the other, the pushback was correct and you changed position. The second is the harder story and it lands better, because it shows you separate being right from being attached to an answer. Name the person's actual objection.

How do you handle high-dimensional data and mitigate the curse of dimensionality in predictive modeling?

Medium · behavioural and stakeholder questions

Approach

  1. Name the disagreement or constraint, and how you resolved it with evidence.
  2. Close with what you would do differently, concretely.
  3. Pick a story where you drove the decision, not one where you observed it.

Follow-up

  • What would you do differently if you ran that project again?
  • What did you decide not to do, and why?

Explain your experience working in a Linux environment. What command-line tools do you use for data manipulation and process monitoring?

Medium · behavioural and stakeholder questions

Approach

  1. Name the disagreement or constraint, and how you resolved it with evidence.
  2. State the situation in two sentences and spend the rest on your reasoning.
  3. Pick a story where you drove the decision, not one where you observed it.

Follow-up

  • What did you decide not to do, and why?
  • How did you know the outcome was caused by your change?

Tell a sponsor the effect cannot be measured in six weeks

Hard · power · selection bias · quasi experiments · saying no

A VP wants a read in six weeks on a forward-stocking policy now live at eight of forty nodes. Replenishment lead time on the affected lanes is five weeks, the eight nodes were chosen by the ops team because they were the worst performers, and the cross-node standard deviation of weekly fill rate is about 3 points. The VP has already told his leadership team that a number is coming. Tell him what you can and cannot deliver in six weeks, and propose the design and timeline you would commit to instead.

Approach

  1. Do the power arithmetic in front of him rather than asserting the test is underpowered: comparing eight treated against thirty-two untreated node means with a between-node standard deviation of 3 points gives a standard error near 3 times the square root of one eighth plus one thirty-second, about 1.2 points, so the minimum detectable effect at 80 percent power and a two-sided 5 percent test is roughly 3.3 points. Any real effect smaller than that comes back as a null you cannot interpret.
  2. Name the burn-in problem separately: with a five-week lead time, six weeks covers barely one replenishment cycle, so whatever you measure is the transition rather than the new steady state, and the transition usually looks worse than the policy is.
  3. Name the selection problem third: nodes picked because they were worst will improve toward the network mean without any policy, so a simple before-and-after at those nodes is biased upward and will over-claim.
  4. Offer what is genuinely deliverable in six weeks: an implementation read, meaning whether the policy is actually in force at the eight nodes, whether inventory positions moved as designed, and whether any leading indicator such as short_reason_code mix is moving, framed explicitly as operational verification and not an effect estimate.
  5. Propose the real design with dates: extend to sixteen weeks covering roughly three cycles, use a difference in differences against matched comparison nodes chosen on pre-period fill rate and volume, cluster variance at the node, and pre-register the burn-in window that will be excluded.
  6. Help him with the commitment he already made: give him the exact wording for what he reports at week six, so the honest answer arrives as something he can say rather than as a refusal.

Follow-up

  • He asks you to add the remaining thirty-two nodes to the rollout next month. What does that do to your design?