American Lithium Energy Software Engineer Interview Questions & Guide 2026
Software engineer prep for American Lithium Energy: design exercises weighted toward the constraints of supply chain and logistics work.
The 60-second brief
At American Lithium Energy, the Software Engineer role is deeply intertwined with the operational realities of battery technology manufacturing. Unlike traditional software roles focused on web or mobile development, your work here is centered on the intersection of code, industrial automation, and quality control. You will be responsible for developing and maintaining the systems that ensure the company's battery cells meet safety and efficiency standards.
Scope in the operational half of the job when the seat carries on-call. Rollout, rollback and what you would put on a dashboard belong inside a design answer rather than after it, and an answer that never reaches them reads as someone who has built systems but not run them.
Focus areas
- Reconcile a movement ledger against derived positions
- Fold late, out-of-order scan events by event time
- Model units, lots and state machines precisely
Overview
This role requires a high degree of adaptability. You will be expected to move beyond pure software development to understand the hardware and machinery you are supporting. The work is challenging, fast-paced, and requires a candidate who is comfortable operating in an environment where technical requirements may shift based on the needs of the production floor. Success in this position is measured by your ability to bridge the gap between software logic and physical manufacturing outcomes.
Be prepared for a role that functions more like a hybrid of software and process engineering. You will likely spend significant time analyzing how your code impacts the reliability and output of industrial machinery.
The American Lithium Energy interview process
American Lithium Energy candidates report 3 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.
Initial Contact
An unlabelled round is first an information problem, and the cheapest information is free. Whoever schedules it can usually tell you how long it runs, who will be in the room and what they work on, whether you will be writing code and in what environment, and whether anything is being sent beforehand. Ask in writing so the answer is on record, then prepare for the two or three formats those answers still leave open instead of betting on one. What separates a strong candidate is not guessing right; it is having an opening that works whichever one it turns out to be.
What to demonstrate
- Whether you can start work from an ambiguous brief, since tolerating a vague scope without stalling is the same thing the job asks for
- Whether the questions you asked beforehand were ones that change your preparation, such as duration, medium and who is joining, rather than ones whose answers you could not have acted on
- Whether you adapt when the round turns out to be something other than what you were told, instead of spending the first ten minutes visibly recalibrating
How to prepare
- Send one short scheduling message asking four things: how long, who is joining and what they work on, whether you will be writing code and where, and whether to prepare anything in advance. Treat a vague reply as real information, since it means the round is loosely structured and you will be shaping it yourself.
- Write one opening that works in any of the formats still open: restate in your own words what you have been asked to do, then ask which of two directions is more useful to them. Say it aloud until it stops sounding recited.
- Set up for the two most likely formats before the call starts, with a blank editor in the language you would choose and a shared document you can type into, so a format surprise costs you nothing in the first minutes
Multi-Person Panel
Coding rounds mostly set a floor. They decide whether you clear the bar, not where you land on the ladder. Level tends to come out of the design discussion and the ownership stories, so the question worth auditing beforehand is whether the scope you describe matches the scope of the job. Work that stops at your own service, or a story whose hard part was writing the code rather than getting several people to agree on an interface, reads a level below where you think you are interviewing, and that gap is usually resolved downwards.
What to demonstrate
- Whether the largest thing you describe owning ran end to end — the decision, the migration path, the rollout, and what you did when it went wrong — or stopped at the change you merged
- Whether design answers include what you would not build, what you would defer, and what you would measure before committing, rather than only what the boxes are
- Whether a disagreement in a story was settled with something checkable — a benchmark, a prototype, a written proposal — instead of by seniority or by waiting it out
- Whether you can say which calls you made alone and which you escalated, and why the line sat where it did
How to prepare
- Write your largest piece of owned work as a timeline of decisions — who decided what, when, and what you did when the plan broke — then delete every sentence whose subject is "we" and see how much survives
- Take one system you know well and drill the migration answer: how old and new paths run side by side under live traffic, how you compare their outputs, what the rollback is once writes are going to both, and which step you would not automate
- Map each line of the ladder in the job posting to a specific thing you have done, find the line you cannot support, and prepare the closest evidence you have plus an honest account of the gap
Executive-Level Interview
When a round has no standard shape, it is often there because something is still open: an area no earlier conversation reached, a round where the signal came out mixed, or a decision someone is not ready to make alone. Work out which by going back over what each earlier round actually covered rather than how it felt, and arrive able to give evidence on that point without being asked twice. Weak answers replay the loop's earlier material at the same depth. Strong ones go a level deeper and stay consistent with what you already said.
What to demonstrate
- Whether your account of a project matches the one you gave earlier in the loop, since what you said before may be available to whoever runs this round
- Whether you can go a level deeper on something already covered, reaching the decision and its alternatives rather than repeating the summary
- Whether you state your own uncertainty accurately, including parts of a system you did not build and decisions you inherited, instead of claiming even ownership across all of it
- Whether you can answer a question you handled poorly earlier by naming what you missed, rather than delivering a polished second version as if the first had not happened
How to prepare
- Reconstruct the loop on one page: for each round, the questions you were asked and the answer you actually gave, not the better one you thought of afterwards. The gaps on that page are your best available guess at why this round exists.
- Take the two claims you made earlier that carry the most weight and assemble the backing for each: the measurement, the date, what broke, the decision you would make differently now.
- Write down the three facts about your work that must not drift between tellings, such as team size, timeline and your own role, and check your stories against that list rather than trusting recall under pressure
Where candidates lose points
Retrying an irreversible external call without an owned idempotency key
Timeouts and connection resets are ambiguous by construction - the partner may have committed before the response was lost - so a generic retry policy around an HTTP client is, in this domain, a machine for buying two labels and dispatching two trucks. Relying on the partner's deduplication is not a substitute, because their window is usually short, their key is often derived from fields you may legitimately change on retry, and many older integrations have no such concept at all. The workable pattern is to generate the key yourself, persist it with an explicit unknown status before the call, and resolve ambiguity by querying the partner for that key rather than re-issuing; the sweeper that does this is the component that has to be correct, not the call site. Teams get this right for payments and then forget that a carrier tender, a warehouse work release and an EDI shipping notice have the same shape.
Judging delivery windows and cut-offs in UTC
A delivery appointment, a receiving cut-off and a same-day promise are all statements about local wall-clock time at a specific stop, so evaluating them in UTC misclassifies on-time performance for any leg that crosses a zone, and misses cut-offs by an hour on the two days a year a region changes offset. The subtlety that catches experienced engineers is that converting a future local time to a UTC instant at write time bakes in the offset rules as they were known then: when a jurisdiction changes its rules, an appointment stored that way silently moves, which is why a future window is better stored as local wall time plus an IANA zone identifier and resolved at read time, while a past event is correctly stored as an instant. Duration arithmetic needs the same care, because a transit that spans a DST boundary is genuinely 23 or 25 hours long in local terms even though the elapsed instant count is unchanged. Storing only a date with no zone - common on partner feeds - is the version of this that cannot be fixed downstream, so the zone has to be captured at ingestion.
Abandoning working code to chase the optimal solution
Get the straightforward version correct, state its complexity, and only then optimise, keeping the working version until the faster one passes the same cases. A correct quadratic solution with a stated path to linear beats a half-written optimal one that never ran.
Finishing a solution without stating its complexity
Give time and space in the same breath as the code, and define n explicitly when there are two sizes, since n nodes and m edges are not interchangeable. Space is the half that gets skipped: count the auxiliary structures you allocate and the recursion stack at its deepest, not only the answer you hand back.
Questions & practice
Find the hottest write keys under a fixed memory budget
Medium · top-k · heap · streaming sketches
One day of writes to inventory_movement is 200 million rows; each carries (item_id, node_id). Distinct pairs reach 60 million. Return the 200 pairs with the most writes so they can be moved behind a single writer before the next peak. First give the exact answer assuming you may hold 60 million counters, then give an answer under a 200 MB budget, and state the error guarantee that second answer carries. Both must be one pass over the day's rows unless you argue for a second.
Approach
- Exact version: one hash pass to build
(item_id, node_id) -> int64, then a single scan of the map maintaining a min-heap of size K = 200, pushing and popping when the incoming count exceeds the heap root. O(n + d log K) with n = 2e8 and d = 6e7, versus O(d log d) if you sort all 60 million entries — a factor of roughly log d / log K, about 3.4x, for no benefit. The heap must be a min-heap: the root is the weakest survivor, so eviction is O(log K). - Cost the map honestly. 60 million entries at a 16-byte key, an int64 count and per-entry overhead is 2-3 GB in most runtimes, which is the whole reason for the second version rather than a theoretical aside.
- Bounded version: Misra-Gries with m counters. Keep at most m keys with counts; on a key already present increment it; on a new key when fewer than m are held, insert at 1; otherwise decrement every held counter and drop those reaching zero. With m = 1,000,000 at roughly 40 bytes per counter, that is about 40 MB, comfortably inside 200 MB alongside the heap.
- State the guarantee as a number, not as 'approximate'. Misra-Gries returns an estimate satisfying f - n/(m+1) <= f_hat <= f, so with n = 2e8 and m = 1e6 every count is an undercount by at most 200. If the 200th hottest pair has hundreds of thousands of writes, a 200-count error cannot reorder the top of the list — and if the counts near rank 200 are within 200 of each other, the ranking there was never meaningful for the decision being made. The sketch also merges: run one per shard, combine, prune back to m, and the bound holds with n the combined length.
- If exactness is genuinely required, argue for two passes rather than more memory: the Misra-Gries pass yields a candidate superset of size m, and a second pass counts only those candidates exactly in O(m) memory. That is the standard way to get an exact top-K under a memory bound, and the cost is one extra read of the day's rows.
Follow-up
- The decision downstream is which keys get a single writer. Does a rank error at position 190 change that decision, and what does the answer tell you about how much accuracy to buy?
- Write volume on one key is bursty — a promotion concentrates it into twenty minutes. Does a daily top-K find it, and what window would?
- How do you keep the sketch across a worker restart without replaying the day?
Size dock doors from overlapping appointment windows
Medium · sweep line · intervals · time zones
For one node and one local calendar day you have up to 200,000 planned dock appointments from shipment_leg: leg_id, planned_arrive_at, planned_depart_at (both TIMESTAMPTZ), plus the node's IANA zone. A door is occupied over [arrive, depart). Return the minimum number of doors that lets every appointment start on time, and the maximal interval over which that peak is sustained. Target O(n log n). Say how you derive the day's boundaries and how you break ties between an arrival and a departure at the same instant.
Approach
- Name the result before computing it: with one interchangeable door type, the minimum door count equals the maximum number of simultaneously occupied intervals. That equality is not a heuristic — interval graphs are perfect, so their chromatic number equals their clique number, and greedy left-to-right assignment achieves it. Say this, because it is what licenses solving a scheduling question with a counter.
- Emit 2n endpoints,
(t, +1)at each arrival and(t, -1)at each departure, sort byt, and at equaltorder the-1before the+1. Half-open occupancy means a trailer leaving at 10:00 frees the door for one arriving at 10:00; ordering arrivals first inflates the answer by exactly the number of back-to-back handoffs, which on a well-packed schedule is most of them. - Scan once with a running counter, tracking the maximum and the endpoint index where it was first reached. The peak is attained on a half-open interval between two consecutive endpoints,
[t_i, t_{i+1}), not at an instant — report it that way or the operations team cannot act on it. Extend the interval while the counter stays at the maximum. - Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by
planned_arrive_atfrom an index, use the min-heap variant instead — push each departure, pop all departures at or before the current arrival, and the heap size is the current occupancy. Same time bound, O(peak) space rather than O(n), which matters when peak occupancy is 40 and n is 200,000. - Derive the day's boundaries from the zone, not from arithmetic on instants. Convert local midnight and the next local midnight to instants in the node's IANA zone; on a transition day that span is 23 or 25 hours, so adding 86,400 seconds silently drops or duplicates an hour of appointments. Decide explicitly what a zero-length dwell means — under half-open semantics it occupies nothing — and state it.
Worked solution (25 min)
- Write the endpoint tuple with the tie-break baked into the sort key — for example
(t, kind)where departure sorts as 0 and arrival as 1 — rather than handling ties in the scan body. - Implement the scan, returning both the maximum and the
[t_i, t_{i+1})span at which it holds. - Build a fixture of six appointments where three are strictly back-to-back at the same minute, and hand-compute the answer before running.
- Add an appointment spanning the local DST transition and derive the day window from the zone, asserting the appointment count inside the window.
- Re-run with the input shuffled to confirm the result depends only on the set of intervals.
Expected result: The back-to-back fixture needs one door, not three; the reported peak is a half-open interval between two endpoints; on the transition day the local window is 23 or 25 hours and no appointment is dropped or double-counted.
Verify it yourself
- Flipping the tie-break to arrivals-first changes the answer on the back-to-back fixture — if it does not, the fixture is not actually testing the tie.
- The maximum equals the largest number of intervals containing any single probe instant, checked by brute force on a small fixture.
- The result is identical under any permutation of the input.
Follow-up
- Doors are typed: some break pallets, some are parcel-only. Does max-overlap still equal the door count?
- Appointments have a tolerance — a trailer may start up to 20 minutes late without penalty. How does that change the objective, and is it still solvable by a sweep?
- Half the appointments are actuals and half are plans. Which do you sweep for tomorrow's staffing, and which for last week's utilisation report?
Parse partner quantity and date segments without floating point
Easy · parsing · unit-of-measure · time zones
A partner sends a delimited flat file whose segments look like QTY+17:4.500:CS and DTM+232:20260317. Quantities carry up to three decimal places in a named unit; each item has an integer pack factor to eaches that is versioned by effective date. Produce observation_event rows with an integer quantity in eaches, the unit recorded, and occurred_at resolved, rejecting any line whose conversion is not exact. Files reach 4 GB. Single pass, no floating point. State your bounds and what you do with the zoneless date.
Approach
- Scan with indices, not a regex. Find the segment terminator, then split the payload on
:by scanning forward and slicing — O(bytes) with no backtracking and no per-line allocation beyond the output row. A regex with nested quantifiers over 4 GB is where this job silently becomes CPU-bound. - Parse the decimal as an integer mantissa plus a scale.
4.500becomes(mantissa = 4500, scale = 3): accumulate digits into an int64, count digits after the point, and never call the runtime's float parser. Reject a mantissa that would overflow int64 when multiplied by the pack factor, checking before the multiply rather than after. - Convert by integer arithmetic and demand exactness:
numerator = mantissa * factor; emitnumerator / 10^scaleonly whennumerator % 10^scale == 0, otherwise reject the line with a reason code. Worked:4.500 CSat 12 eaches per case gives 54000/1000 = 54, exact.0.125 PLat 36 eaches per pallet gives 4500/1000 = 4.5, which is half a sealed unit and must fail at the boundary, not round three services away. - Select the pack factor by the file's effective date, not by the current item master. Factors are properties of a point in time — a supplier moving a case from 12 to 10 must not reinterpret last quarter's file — so the lookup is a range query on the factor's validity interval.
20260317carries no zone and no time. Attach the IANA zone of the node the segment refers to, captured at ingestion, because it cannot be recovered downstream; then pick and document one convention for a date-only field (start of local day is the usual choice) and store the raw local string beside the resolved instant so the assumption stays visible. Complexity: O(total bytes) time, O(longest line) working space, one pass.
Follow-up
- The same file is re-sent in full tomorrow with three lines changed. What makes the second ingest a no-op for the unchanged lines?
- A line names a unit that is not in the ladder for that item. Reject the line, reject the file, or quarantine it — and who finds out?
- The partner starts sending an offset like
+0100on some dates. Does that change your storage decision for a future appointment as well as a past event?
Attribute multi-stop freight cost without fanning it out
Medium · many-to-many joins · window functions · integer money
shipment_leg(leg_id, shipment_id, sequence_no, linehaul_cost_cents, accessorial_cost_cents, actual_arrive_at) joins to fulfilment_order_line through leg_order_line(leg_id, order_line_id, allocated_weight_g). One multi-stop truckload leg carries 40 order lines. The current report SUMs linehaul_cost_cents after joining all three tables and returns roughly forty times the real freight spend. Write the query that returns cost per order for one month, explain the fan-out in terms of the join's row count, and make the per-order amounts sum exactly to the leg totals in integer cents.
Approach
- Name the cardinality: joining shipment_leg to leg_order_line produces one row per (leg, line) pair, so the result has SUM over legs of lines-per-leg rows rather than one row per leg. SUM(linehaul_cost_cents) over that result counts each leg's cost once per line it carries, which is why 40 lines gives 40 times the spend. The bug is not the SUM, it is aggregating a parent measure across a child-expanded row set.
- Compute a share before aggregating anything. In one pass: leg.linehaul_cost_cents * b.allocated_weight_g / SUM(b.allocated_weight_g) OVER (PARTITION BY b.leg_id), which keeps the denominator local to the leg and needs no self-join.
- Do the division in integer cents and settle the remainder deliberately. Floor each share, then distribute the leftover cents one each by descending remainder, ordered by a stable tiebreak such as order_line_id. Floating-point shares leave a residue that makes the freight accrual miss by a cent per leg, which costs more to investigate than the freight.
- Aggregate to the order only after the share exists: GROUP BY order_id over the per-line allocated cents. Restrict the month on shipment_leg.actual_arrive_at, not on the order date, so a leg is attributed in the period it actually ran.
- Index for the shape of the query: leg_order_line needs (leg_id) for the window partition and (order_line_id) for the reverse lookup, and shipment_leg needs an index on actual_arrive_at to bound the month without a full scan.
- Apply the same treatment to accessorial_cost_cents separately. Accessorials such as a detention charge often belong to one stop rather than to the whole leg, so weight-sharing them across every line on the load misattributes cost even though the total ties out.
Follow-up
- A line is cancelled after the leg ran. Does its share of the freight disappear, move to the remaining lines, or stay as a cost with no revenue?
- Weight is the wrong basis for a light bulky pallet. What would you use instead, and does the reconciliation check still hold?
- The carrier invoice arrives three weeks later and differs from the rated cost. Where does the correction land, and does it re-run this allocation?
Model the movement ledger so a retried write is a no-op
Easy · append-only ledger · idempotency · audit history
inventory_movement is append-only: movement_id, item_id, node_id, lot_id, state, delta_qty (signed BIGINT), uom_code, reason_code, ref_type, ref_id, idempotency_key, occurred_at, recorded_at, reversed_by. inventory_position is keyed (item_id, node_id, lot_id, state) with qty, version, last_movement_id. Give the DDL constraints and the exact statements a pick confirmation runs so that a client which times out after the commit and retries changes nothing. Then say how you correct a pick recorded against the wrong lot two days ago, and why the position carries CHECK (qty >= 0) rather than clamping at zero.
Approach
- Put the guarantee in the schema, not the handler: UNIQUE (idempotency_key) on inventory_movement. A SELECT-then-INSERT cannot work, because two concurrent retries both read nothing before either commits and both then insert.
- Claim with INSERT ... ON CONFLICT (idempotency_key) DO NOTHING RETURNING movement_id, and branch on rowcount. Zero rows means the first attempt already committed, so the handler returns success without touching the position. This branch is the whole point: applying the position update on the conflict path is what makes the ledger and the shelf disagree by one pick forever.
- Keep the insert and the position update in one transaction: UPDATE inventory_position SET qty = qty + :delta, version = version + 1, last_movement_id = :id WHERE item_id = :i AND node_id = :n AND lot_id = :l AND state = :s AND version = :v, then test the rowcount and retry the transaction on zero.
- Use lot_id BIGINT NOT NULL DEFAULT 0 rather than NULL. In a default unique index NULLs are distinct from each other, so a NULL lot would let two position rows exist for the same untracked item and split the running sum in half.
- Correct the mis-keyed pick with two compensating movements, never an UPDATE or a deleted_at flag: one reversal restoring the wrong lot, one fresh pick against the right lot, both with reason_code = 'reversal' or 'pick' and ref pointing at the original movement_id. The original row keeps its values; reversed_by is a back-pointer written in the same transaction so a reader does not need a reverse scan to see that the row was undone.
- CHECK (qty >= 0) aborts the transaction and surfaces a real defect. GREATEST(qty + :delta, 0) writes a plausible number instead, so the missing receipt that caused the negative is never investigated and the first symptom is a picker at an empty location.
Worked solution (20 min)
- Write the two CREATE TABLE statements including UNIQUE (idempotency_key), the composite primary key on the position, CHECK (qty >= 0) and lot_id NOT NULL DEFAULT 0.
- Write the handler as one transaction: the ON CONFLICT DO NOTHING RETURNING insert, the rowcount branch, then the versioned conditional UPDATE with its own rowcount test.
- Send the same pick twice with one idempotency key and assert one movement row and a position that moved by delta once, not twice.
- Apply the lot correction as two new movements and show that summing delta_qty per lot now matches the shelf while both the wrong and the right lot retain a legible history.
Expected result: One movement row per idempotency key, a position equal to the signed sum of its movements, and a corrected pick represented as three rows (original, reversal, re-pick) with no row ever updated except reversed_by and the position aggregate.
Verify it yourself
- SUM(delta_qty) per (item_id, node_id, lot_id, state) equals inventory_position.qty after the double-send and after the correction.
- Drop the UNIQUE constraint and confirm the double-send test now fails; if it still passes, the retry is not actually racing.
- Force a negative by replaying a pick against an empty position and confirm the transaction aborts rather than storing zero.
- Query the history of the mis-keyed pick and confirm the original quantity and its reason code are still readable.
Follow-up
- Two retries of the same pick arrive concurrently on different application instances. Walk through both transactions statement by statement and say which one commits a position change.
- occurred_at from a handheld is five minutes ahead of recorded_at because the device clock drifted. Which of your queries break, and which column should each of them actually be using?
- How long do you keep idempotency_key unique for, given the table grows by tens of millions of rows a month?
Where exactly do you live, and what is your current housing situation?
Medium
Approach
- State your assumptions explicitly before working the problem.
- Clarify what is being asked and what a complete answer contains.
- Work from the requirement backwards to the design.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
Can you walk us through the specific technical projects listed on your resume?
Medium
Approach
- Say what you would check first and why it is the highest-information step.
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Why did you leave your previous roles after short tenures?
Medium
Approach
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
- State your assumptions explicitly before working the problem.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
How much experience do you have with Programmable Logic Controllers (PLC)?
Medium
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Redesign a tender endpoint whose retry books two trucks
Medium · idempotency · irreversible effects · retries
POST /shipments/{shipment_id}/tender asks the Carrier Integration Gateway to tender a load and returns the partner booking reference. The HTTP client has a 10 s timeout and a three-attempt retry decorator; partner p99 is 4 s with occasional 40 s stalls. shipment_leg already carries booking_idempotency_key TEXT NOT NULL UNIQUE. Last week two trailers arrived at one dock for one load. Redesign the contract so the physical effect happens at most once: give the resource shape, the status model including the ambiguous outcome, who performs retries, and what the caller does on a timeout.
Approach
- Diagnose the shape, not the bug. A POST to an action with server-minted identity gives the caller no way to name the effect it wants, so every retry is a new request by construction. Replace it with a caller-named sub-resource - PUT /legs/{leg_id}/booking/{booking_idempotency_key} - where the key is in the URI and a second identical PUT converges on the same resource instead of creating another.
- Persist before you call. Write the booking row with status requested and the key committed locally before the gateway touches the partner. A crash between that commit and the call is recoverable by a sweeper; a call with no local record is not recoverable at all, because you cannot ask about a key you never stored.
- Make unknown a first-class status: requested, unknown, confirmed, rejected. A timeout or a connection reset moves the row to unknown and the API answers 202 with the resource and a Location, never a 5xx - a 5xx is an invitation to the decorator to re-issue an irreversible act.
- Move retries off the request path entirely. Delete the decorator for this call and let a sweeper read rows in requested or unknown and resolve each by querying the partner for that key, or by their list-by-reference endpoint when they have no key concept. The sweeper is now the component that must be correct, and it is testable in a way an in-process retry that dies with the pod is not.
- Keep the database transaction off the network call. Commit the state row together with an outbox entry and let a relay make the partner call; a transaction held open across a 40 s stall parks a pooled connection, and at tender peak the pool is what fails first, taking unrelated traffic with it.
- State the caller's rule in one line: a timeout or 5xx from this endpoint means unknown, never not booked, and the only permitted follow-up is to read the booking resource.
Worked solution (35 min)
- Draw the current timeline that produces two trailers: request sent, partner commits, response lost at 10 s, decorator re-issues, partner commits again.
- Rewrite the endpoint as a key-in-URI PUT and write the request and response bodies for first call, duplicate call and ambiguous outcome.
- Write the status table with allowed transitions and mark every transition that touches the partner.
- Write the sweeper's query and its resolution rule for a row stuck in unknown, including the decision it makes when the partner reports nothing for that key.
- Re-examine the connection lifecycle and confirm no transaction is open while the partner call is in flight.
Expected result: A PUT whose URI carries the caller-owned key, a persisted requested state written before any partner contact, an explicit unknown state returned as 202, retries owned by a sweeper reading persisted rows, and no database transaction spanning the external call.
Verify it yourself
- Replaying the same PUT ten times yields one booking reference and one partner-side booking.
- Killing the process immediately after the partner call leaves a row a sweeper can resolve without guessing.
- No code path both holds a row lock and awaits the gateway.
Follow-up
- The partner supports no idempotency key and no query-by-reference. What do you do, and what residual risk do you accept?
- Two sweeper instances pick up the same unknown row at once. What stops the resolution itself from producing a second booking?
- How do you cancel a booking whose outcome is still unknown, and what does the leg's status machine look like during that?
Cut-off misses and on-time drift after a clock rule change
Medium · timezones · dst · event time
Two reports arrive the same week. On the Sunday one region changed its UTC offset, 1,900 lines at nodes in that region were released an hour after the node's 17:00 local shipping cut-off and missed the trailer. Separately, on-time percentage for legs whose dest_zone differs from the origin's reads four points below the carrier's own figure, every week. promised_ship_at is a TIMESTAMPTZ computed at order creation, and on-time compares the delivery instant to the promised day in UTC. Find the single root cause and give the storage and comparison rules you would adopt.
Approach
- Test whether each symptom is zone-dependent before theorising. Group the cut-off misses by node time zone and by date: clustering on one date and one set of zones points at an offset rule, while a uniform spread across zones and dates would point at a scheduler delay. Group the on-time disputes by whether the UTC day and the dest_zone local day of the delivery instant differ; if every dispute falls inside that group, the comparison is the defect. The containment runs one way only: a leg delivered days early also has differing UTC and local dates and is on time under either rule, so the differing-dates group is much larger than the disputed set and finding members of it that are not disputed proves nothing.
- Re-derive the stored promise for the affected lines today and diff it against the stored value. A difference of exactly 3,600 seconds on rows created before the rule change is the signature of a future local time that was resolved to an instant at write time using the offset then in force. The instant did not move; the local wall time it represents did.
- State the distinction the fix rests on. Comparing two instants needs no zone at all, so if the promise really were an instant, on-time would be a plain comparison. The zone matters because both of these promises are statements about local wall time: a 17:00 cut-off at a node, and delivery within the promised local day at the stop.
- Adopt the storage rule by tense. A past event is an instant, so occurred_at, recorded_at, actual_depart_at and actual_arrive_at stay TIMESTAMPTZ. A future local policy is local wall time plus an IANA zone identifier resolved at read time, so the cut-off becomes (17:00, node.time_zone) and the promise carries promise_zone, which the schema already has. Evaluate on-time in the dest_zone local calendar.
- Handle duration arithmetic separately, because it breaks in the other direction. A leg departing 18:00 local and arriving 18:00 local the next day spans 23 elapsed hours across a spring-forward boundary and 25 across a fall-back, so planned transit must be expressed in one domain and converted deliberately rather than by subtracting instants and assuming 24.
- Close the ingestion hole and the deployment hole. Partner feeds that send a bare date with no zone must have the zone attached at ingestion from the node or stop, because it cannot be recovered later, and the tzdata version baked into the image must be refreshed on a schedule, since a stale database reproduces exactly this bug for a rule that changed after the image was built.
Follow-up
- Not every offset change is a whole hour and some zones sit at :30 or :45. Which parts of your fix assume an hour?
- A node in a zone that does not observe daylight saving ships to one that does. Where does the transit duration have to be computed?
- How do you backfill on-time for the last two quarters without restating figures that were already invoiced?
Suggested practice checklist
Roughly ninety minutes on weeknights with one longer weekend block. The plan cuts scope rather than compressing everything, on the assumption that one thing finished per night beats four half-started.
Day 1 — Fix the scope and take a cold baseline
- Read the role description and write the three things the loop will almost certainly test, then write an explicit not-doing list and keep it visible all week.
- Take one twenty-five-minute coding problem and one fifteen-minute design prompt cold, and write the single sentence naming what blocked each, because those two sentences decide where the remaining evenings go.
- Set the week's rule: one thing finished every night, including the night you only have forty minutes.
Deliverable: A one-page scope with a not-doing list and two cold attempts, each carrying one sentence on what blocked it.
Day 2 — One pattern, written three times from blank
- Choose the single pattern most likely to appear in your loop and write it three times from an empty file rather than editing the previous attempt.
- On the third pass, write the invariant as a comment before the loop body and the complexity before the first line of code.
- Stop at ninety minutes even if the third version is imperfect, and write the one thing you would fix given another hour.
Deliverable: Three independent implementations of the same pattern plus a note on what changed between them.
Day 3 — One design, only to the depth you can defend
- Take one system shape and go only as far as requirements, interface and data model, refusing to draw a box you could not survive a follow-up about.
- Attach one number to each non-functional requirement, deriving it rather than asserting it, and write the assumption the number rests on.
- Write the one tradeoff you are choosing against and the observation that would make you reverse it.
Deliverable: One design at interface-and-schema depth with derived numbers and one written reversible tradeoff.
Day 4 — Only the fundamentals you will have to defend
- Write, in under two hundred words each, the answers to the two questions that follow almost any implementation: why this structure and not the obvious alternative, and what happens to this code at a hundred times the input.
- Write what an index actually costs: faster lookups on the indexed columns against a write that now maintains a second structure, plus the cases where the planner declines to use it anyway, low selectivity, or a predicate wrapping the column in a function.
- Delete any answer you cannot deliver aloud in under a minute, since an answer that needs reading is not an answer you have.
Deliverable: Three written answers, each under two hundred words and each timed aloud.
Day 5 — Your own work, timed
- Write a ninety-second and a four-minute version of your main project and time both aloud rather than reading them.
- Prepare the two follow-ups that always come: what you would do differently, and how you knew it worked.
- Put one number in the first sentence and be ready to say exactly where it came from and what it excludes.
Deliverable: Two timed narratives with one defensible number in the opening line.
Day 6 — The one full rehearsal, in the weekend block
- Run a sixty-minute mock covering a coding round and a design round in one sitting with no break, because sustained attention is the thing evenings have not trained.
- Immediately afterwards, and before hearing any feedback, write the three moments you lost the thread.
- Spend the rest of the block only on those three moments, and on nothing you merely feel shaky about.
Deliverable: Mock notes naming three failure moments with a specific fix written under each.
Day 7 — Taper
- Write the twenty-minute warm-up you will actually do on the morning: one problem you can already solve from a blank file, one design you can narrate, and nothing you have never seen.
- Re-read only your own notes from this week and open no new material.
- Write the logistics down: the editor or shared document you will be working in, whether execution and lookups are permitted, and the sentence you will use when you do not know something.
Deliverable: A one-page card holding the design structure, the project numbers, and the logistics.
Disagreement needs an outcome you did not choose
Conflict answers where you were right and everyone came round are the weakest ones. Stronger: the evidence you went and collected, what would have changed your mind, and what you did in the weeks after the call went against you. Implementing a design you argued against, properly, is a specific and checkable behaviour.
Reverse an allocation design after peak contention
Medium · concurrency control · lock contention · reversibility · measurement
You chose optimistic concurrency for allocation: read the position, then UPDATE inventory_position SET qty = qty - :n, version = version + 1 WHERE version = :v, retrying on an affected-row count of zero. It was correct and fast in load tests with spread keys. At peak, a few hundred hot item-node pairs absorbed most write traffic, retries amplified, and allocation p99 went past the checkout budget. Describe a decision you reversed under production evidence: what you originally reasoned, the measurement that forced the change, what you replaced it with, and what you would have measured before committing.
Approach
- Say why the original choice was reasonable, because a reversal story is only useful if the first decision was defensible. Compare-and-set avoids holding a lock across the read, has no deadlock surface, and is uncontended on the long tail of keys, which is most keys most of the time.
- Name the mechanism of the failure rather than calling it contention. On PostgreSQL under READ COMMITTED, a conflicting UPDATE does not fail fast: it blocks on the row lock until the other transaction commits, then re-evaluates its predicate against the new row version and reports zero rows affected. Each loser therefore pays a full lock wait before learning it must retry, so with k writers queued on one pair the work is quadratic in k across the burst, and the retry loop adds round trips rather than avoiding waits.
- Bring the measurement that settled it, not the anecdote: attempts per successful allocation on the hottest pairs, the distribution of write traffic across item-node keys, and the p99 contribution of lock wait time separated from query time. Load tests with spread keys cannot show any of this, which is the real lesson and the thing you would run differently.
- State the replacement and its cost. Serialising each hot key behind a single writer with a bounded queue converts an unbounded retry storm into a bounded wait plus explicit shedding, at the cost of a new component, a routing decision and a failure mode when the writer for a key is unavailable. SELECT ... FOR UPDATE is the smaller change and trades the retry loop for an in-database queue that still consumes a connection per waiter.
- Describe the migration, since reversing a write path in production is where these stories become concrete: route only the measured hot keys first, keep both paths live behind a per-key decision, and verify with the same attempts-per-success metric before widening.
- Close on what you would have measured before committing, and be specific: key skew from production traffic, not from a synthetic generator, is the input the original decision was missing.
Follow-up
- Under REPEATABLE READ on PostgreSQL that same conflict raises a serialization failure instead. What changes in your retry code and your error budget?
- One key becomes so hot that even the single writer saturates. How do you shed load without overselling?
- An allocation must span two positions atomically. What breaks in your replacement design if those rows live on different shards?
Argue against serving available-to-promise from a cache
Hard · caching · replication lag · over-allocation · design review
The availability read sits inside checkout with a p99 budget in the low tens of milliseconds, and it is missing it. A senior engineer proposes serving available-to-promise from a two-second in-memory cache, falling back to a read replica, and leaving the allocation write untouched. You believe this is either harmless or an overselling bug depending on one detail nobody has stated. Describe a design you argued against: the distinction you drew, the evidence you brought, the alternative you offered, and what was actually decided. Be specific about the failure you predicted and whether it happened.
Approach
- Draw the distinction the room is missing before arguing anything: an advisory availability read that decorates a page is a different object from the check that gates an allocation write. Caching the first is ordinary; caching the second removes the atomicity that no-over-allocation depends on, because the check and the write must be one step.
- Make the argument falsifiable with the schema rather than with principle. If the allocation still commits through UPDATE inventory_position SET qty = qty - :n, version = version + 1 WHERE (item_id, node_id, lot_id, state) = (...) AND version = :v AND qty >= :n, with the affected-row count tested, then a stale cache produces failed attempts and a worse conversion rate, not oversold stock. If the write trusts the cached number, the cache is the bug. Ask which one is on the branch.
- Quantify the exposure instead of asserting it. On a hot item-node pair taking 40 allocation attempts per second with a two-second staleness window, roughly 80 attempts can be decided against an unchanged number; multiply by the fraction of pairs whose available quantity is below that to get the oversell rate, and note that both factors peak on the same day. Replication lag has the same shape and is worse, because lag grows precisely under the write burst that makes availability tight.
- Offer a cheaper path to the latency goal so the argument is not simply obstruction: serve the browse and search paths from the cache with an explicit staleness label, keep the authoritative check on the primary row, and attack the p99 where it actually is by measuring whether the cost is the query, the connection pool wait, or fan-out across nodes for a multi-node promise.
- Say where you were willing to lose. If the measurement showed the check was already conditional and the cache only chose candidates, the correct move is to concede quickly and say so, because an engineer who argues the same way regardless of the evidence stops being listened to.
- Report the outcome honestly, including the version that shipped and whether your predicted failure appeared. A strong answer names the metric that would have proved you wrong and whether anyone put it in place.
Follow-up
- The team keeps the primary check but wants the cache to prefilter which nodes are even considered. What can now go wrong that could not before?
- How would you bound overselling on one very hot item-node pair without adding latency to every other pair?
- What would you measure for a week to decide whether the cache is safe, and what result would change your mind?
Turn an implicit fail-open availability answer into a decision
Medium · degradation · fail open · decision records · partial failure
When the inventory service is unreachable, the availability client returns the last value it cached, because a broad except block around the call does that by accident. Nobody chose it. During a 40-minute outage the storefront kept promising stock for items that had sold out, and 900 lines short-shipped. Describe a time you converted an implicit behaviour into an explicit decision: how you surfaced it, the two directions the error can go and what each costs, what you actually chose for the checkout path versus a browse page, and where the choice is now written down.
Approach
- Surface the behaviour as a fact before arguing about it: the except block is a policy, it was never chosen, and it currently applies identically to a browse page and to the promise made at checkout. Framing it as an unowned decision rather than as someone's bug is what gets it looked at.
- Price both error directions with the operations they trigger, since neither is free. Promising stock you do not have produces a short-ship, a customer contact, a re-source or refund and, on the floor, a picker sent to an empty location; refusing stock you do have loses the order outright. Both are real, the second is cheaper to reverse, and that asymmetry is the argument.
- Split the decision by path instead of choosing one policy for the system. A browse page can serve a stale value with a staleness label and be right most of the time; a checkout promise should degrade to a conservative answer, which is not zero but the last known position reduced by an in-flight allowance sized from the recent allocation rate for that key. Applying one policy to both paths is the actual defect.
- Bound the staleness, because a cached value with no age is the same bug wearing a different hat. Serve the cached number while it is under a stated age, then switch to the conservative answer, then refuse; the thresholds need owners and should appear on a dashboard as the share of reads answered from each tier.
- Write it down where the next person meets it: a short decision record giving the behaviour, the two costs, the chosen policy per path and the date, plus a test that asserts the checkout client cannot serve an unlabelled stale value. A decision that lives only in a thread gets reverted by the next broad except block.
- Report what the change actually cost. If the conservative answer suppressed some orders that would have been fillable, say how many, because a degradation policy that was never measured is indistinguishable from one that was never enforced.
Follow-up
- How do you size the in-flight allowance, and what happens to it during a promotion on that item?