cswork / libraryOpen practice workspace

Interview guides · Akumin

Akumin Software Engineer Interview Questions & Guide 2026

Concurrency drills for Akumin software engineer prep: races, lock ordering, and what a check-then-act sequence assumes.

The 60-second brief

As a Software Engineer at Akumin, you are at the intersection of advanced healthcare technology and operational excellence. This role is critical to the company’s mission of providing high-quality diagnostic imaging and cancer care services, where your software solutions directly impact the efficiency of clinicians and the experience of patients. You are not just writing code; you are building the digital infrastructure that powers complex medical workflows.

Find out what you will be typing into. A shared plain-text editor with no autocomplete, compiler or test runner changes what you have to hold in your head, and practising inside your own configured environment hides exactly that gap.

Focus areas

  • Choose indexes from the query's access path
  • Bound every outbound call with a timeout
  • Paginate large result sets with keyset cursors

Overview

You will likely focus on specialized systems such as Radiology Information Systems (RIS) or Salesforce Revenue Cloud integrations. Your work ensures that data flows seamlessly across the organization, allowing healthcare providers to focus on patient outcomes rather than administrative hurdles. This role demands a balance of technical precision and the ability to translate complex business requirements into scalable, reliable software.

Expect to work in an environment where your contributions have high visibility. Whether you are managing revenue cloud architectures or optimizing application performance for diagnostic tools, you will be a key contributor to the technological backbone of. This is a role for engineers who thrive on solving complex, mission-critical problems in a fast-paced healthcare environment.

The Akumin interview process

Akumin candidates report 2 rounds · ≈ 2-4 weeks. The stages below are what candidates describe, not a published process.

Initial Screening

The person on this call usually cannot evaluate your code and does not need to. They write a short paragraph, and that paragraph is what a hiring manager skims when deciding who to put on your loop. So the test is not whether your work was hard, it is whether a non-engineer can repeat it correctly. Name systems by what they did rather than by their internal codename, give each project a shape (what was breaking, what you changed, what happened after), and keep the whole walkthrough near ninety seconds. Depth that cannot survive a paraphrase reads as vagueness.

What to demonstrate

  • Whether a non-engineer can restate your projects without distorting them, since their paraphrase is what travels to the hiring manager, not your sentences
  • Whether each project has a shape rather than a stack list: the failure or constraint, the change you made, the result and how it was measured
  • Whether you can say what was yours inside a team project without either inflating it or disappearing into the plural

How to prepare

  • Rewrite each headline project as two sentences with no internal system names and no acronyms outside your company, then say them to someone outside engineering and have them repeat them back. Fix whatever came back wrong
  • Attach one measured number to each project: the baseline, the change, and the window it was measured over. Where nothing was ever measured, say that plainly rather than reaching for a plausible percentage
  • Time the background walkthrough against a clock. If it runs past two minutes, compress the earliest role to a single clause and spend the recovered time on the most recent one

Technical Evaluations

Input bounds are the part of the prompt most often skimmed, and they usually contain the answer. They tell you which complexity class is admissible, which narrows the search before you have thought about the problem itself. As a rough planning figure, a compiled language does on the order of 10^8 simple operations per second and an interpreted one roughly an order of magnitude less. So n up to about twenty admits enumerating subsets, a few thousand admits a quadratic pass, and a million admits neither: you need near-linear, or linear with a log factor. If the bounds are missing, ask for them.

What to demonstrate

  • Whether the approach is justified by the stated input size rather than by whichever pattern you recognised first
  • Whether you ask about the properties that change the algorithm: whether the input arrives sorted, whether duplicates occur, whether values are bounded integers, whether it all fits in memory
  • Whether you can name the bottleneck in your own solution and what would remove it, even when you deliberately leave it in place
  • Whether a claimed speedup is real, since memoising a recursion only helps when subproblems genuinely overlap and the state can be keyed cheaply

How to prepare

  • For each algorithm you rely on, write down the largest n it handles in roughly a second, then check two of those figures by timing them in the language you will actually type in
  • For two weeks, write one line naming your target complexity and the bound that justifies it before you write any code, then compare that line with what you ended up submitting
  • Practise the conversion backwards: given a required O(n log n), list the mechanisms that get you there (sorting, a heap, an ordered map, divide and conquer) and choose by what the problem needs to query, not by what you used last

Where candidates lose points

Running a schema change as though the lock lasts as long as the statement

In PostgreSQL an ALTER TABLE that needs an ACCESS EXCLUSIVE lock must first wait for every open transaction touching that table, and while it waits, later queries needing a conflicting lock queue behind it rather than overtaking it. A DDL statement that would execute in milliseconds, issued while a thirty-second analytics query is open, therefore stalls all traffic on that table for thirty seconds: the outage length is set by the longest open transaction, not by the change. The defences are specific and worth knowing by name - set lock_timeout low and retry rather than queue, add columns without a volatile default so no table rewrite occurs (from version 11 a non-volatile default is a metadata-only change), build indexes with CREATE INDEX CONCURRENTLY while accepting that it cannot run inside a transaction block and leaves an invalid index behind if it fails, and add constraints as NOT VALID followed by a separate VALIDATE CONSTRAINT, which takes a weaker lock.

Choosing an index from the columns a query mentions rather than from how it filters and orders

A composite B-tree index on (a, b, c) can be seeked only as a left prefix: equality on a, then equality on b, then a range or an ordering on c. A query that filters on b alone cannot seek into it at all and at best gets a full scan of the index; a query that filters a and ranges on b gets no benefit from c, because the index is only sorted by c within a fixed (a, b) pair. The practical consequence is that one index per column is close to useless for multi-predicate queries while a single correctly ordered composite index turns a scan into a lookup. The ordering half is what gets missed: if the index cannot satisfy the ORDER BY, the database must read every matching row and sort before the limit can apply, so a LIMIT 20 over a million matching rows still reads a million rows.

Saying 'eventually consistent' without naming the anomaly a user would see

Describe the concrete symptom you are choosing to accept: the author reloads and their own comment is missing for two seconds, or two devices show different balances for a minute. The class of consistency model is a technical label; the tolerable anomaly is the actual product decision.

A cache with no invalidation story

Say how an entry goes stale, how long you can serve it stale, and what happens when many requests miss the same key at the same instant. One popular key expiring under load sends every concurrent request to the origin together; single-flight coalescing, jittered expiry, or serving stale while revalidating are the standard answers.

Questions & practice

Track a rolling failure rate per destination for circuit decisions

Easy · sliding window · ring buffer · circuit breaker

The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.

Approach

  1. Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
  2. Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
  3. State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
  4. Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
  5. Expire idle destinations, or memory grows with every destination ever seen rather than with the live set. Hold the rings in a bounded LRU keyed on destination_id and treat a miss as no history, which is the correct default for an endpoint that has been silent for a minute.
  6. Keep the half-open probe out of the window arithmetic. After the circuit opens, one probe per interval decides whether to close it, and folding that single success into a window that still holds a 100 percent failure history would reopen the destination on one data point.

Follow-up

  • The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
  • A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?
  • How would you make the window survive a process restart, and is it worth the cost?

Find overlapping job attempts and peak concurrency from lease records

Medium · sweep line · intervals · leases

A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.

Approach

  1. Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
  2. For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
  3. For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
  4. Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
  5. State the clock caveat: started_at and finished_at are written by different workers, so under skew of a few hundred milliseconds an apparent overlap shorter than that bound is not evidence. Filter reported overlaps by a minimum duration, or prefer timestamps written by whichever component heartbeats the lease.
  6. Scale the sort rather than assuming it fits: the sweep emits two endpoints per attempt, so 50,000,000 records become 100,000,000 endpoints, and at roughly 24 bytes each, an 8-byte timestamp plus a 4-byte job_type plus a kind flag padded to alignment, that is about 2.4 GB of sort keys before any scratch space. Either push the ordering into the database behind an index on (job_type, started_at) or run an external merge sort in chunks; the overlap pass sorts n records rather than 2n, so it is the cheaper of the two.

Worked solution (30 min)

  1. Write the interval derivation with the COALESCE and state in one line which of the two end sources is observed and which is assumed.
  2. Write the concurrency sweep: the endpoint tuples, the sort key including the end-before-start tie-break, and the per-job_type counter.
  3. Hand-trace four attempts of one job, two disjoint and two overlapping by three seconds, and confirm the overlap detector fires exactly once.
  4. Add the skew filter as a minimum overlap duration, state the value you chose, and justify it from how the timestamps are written.

Expected result: One global sort by (job_run_id, started_at) driving a running-maximum-end check for overlaps, plus a sweep over 2n endpoints with ends ordered before starts for per-job_type peak concurrency, both O(n log n), with half-open intervals, NULL finished_at falling back to lease_expires_at, and overlaps shorter than the clock-skew bound excluded.

Verify it yourself

  • Two attempts touching at exactly the same instant report concurrency 1, not 2.
  • A job with a single attempt never appears in the overlap output regardless of its lease.
  • The reported peak timestamp for a job_type lies inside at least one of that type's intervals.

Follow-up

  • A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
  • Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
  • How would you compute both answers incrementally as records arrive rather than in a daily batch?

Merge partitioned event streams into one ordered feed with bounded lateness

Hard · k-way merge · watermarks · out-of-order streams

The read-model service consumes 64 log partitions carrying about 4,000 events per second in total. Each partition is ordered within itself, but partitions drift by up to 30 seconds, and the activity feed must present a tenant's events in occurred_at order. Produce the merge. State its complexity, the buffer it requires in events and in bytes, what happens when one partition is idle, and what you do with an event that arrives after you have already emitted its position. Payloads average 1 KB.

Approach

  1. Merge with a min-heap over the 64 partition heads keyed on (occurred_at, event_id): O(log P) per event and O(n log P) overall. The tie-break on event_id is what makes the output deterministic when two partitions carry the same millisecond, which matters because the feed is paginated and a non-deterministic order reorders pages under the reader.
  2. Emitting the heap head is only correct once every partition has produced everything up to that timestamp, so the emit condition is a watermark: the minimum across partitions of the highest occurred_at seen, less the allowed lateness. Events are held until the watermark passes them, which is what turns individually ordered streams into a jointly ordered one.
  3. Size the buffer from the lateness rather than guessing: 4,000 events per second times 30 seconds is 120,000 buffered events, and at 1 KB each about 120 MB of heap. That number is the real price of the ordering guarantee and belongs in front of whoever asked for it.
  4. Handle the idle partition explicitly, because it fails the feed rather than corrupting it: a partition with no traffic never advances its own maximum, so the watermark freezes and output stops entirely. Either every partition emits a periodic idle marker carrying the broker's current time, or the watermark falls back to wall clock for a partition silent beyond a threshold.
  5. Choose the late-event policy from what the projection is keyed on. The projection upserts on (aggregate_id, aggregate_version) and discards a version it has already applied, so a late event is safe to apply out of order and correctness never depended on the merge at all. Apply it, recompute the affected feed page, and count lateness so the 30-second budget can be re-derived from data rather than folklore.
  6. Say what the merge does not buy: ordering is guaranteed within one aggregate by the log's partitioning, and no watermark makes the cross-aggregate order authoritative. Two events from different aggregates in the same millisecond have no true order, so the feed's order is a presentation choice that must be stable rather than correct.

Follow-up

  • The lateness budget is raised to five minutes. What is the new buffer, and what besides memory changes?
  • The consumer restarts. Where does it resume from, and what does the feed look like for the first 30 seconds?
  • One partition is ten minutes behind because its producer is slow. Do you stall the feed or emit without it?

Keep soft-deleted accounts from blocking re-registration

Easy · soft delete · unique constraints · engine differences

app_user holds user_id, tenant_id, email CITEXT, password_hash (NULL for SSO principals), email_verified_at, auth_version, status ('invited','active','suspended','deactivated'), created_at, updated_at, deleted_at. Two live accounts for one address inside a tenant must be impossible, but an address freed by a soft delete must be reusable, and the same tenant may delete and re-register it repeatedly. Write the uniqueness DDL for PostgreSQL 16, then the equivalent for MySQL 8 where partial indexes do not exist, and say what each permits once three deleted rows already hold that address.

Approach

  1. Start from what is actually unique: not (tenant_id, email), but (tenant_id, email) among live rows. PostgreSQL says that directly — CREATE UNIQUE INDEX app_user_live_email ON app_user (tenant_id, email) WHERE deleted_at IS NULL. A full constraint over the same two columns burns the address permanently the first time someone deletes an account.
  2. Keep case-insensitivity in the type or the index, never in the application: CITEXT as given, or UNIQUE (tenant_id, lower(email)) as an expression index where the extension is unavailable. A case-sensitive unique column is exactly how two accounts for one human appear.
  3. For MySQL 8 the predicate has to move inside the key: add a discriminator column that is a constant 0 while the row is live and is set to user_id on delete, with UNIQUE (tenant_id, email, deleted_marker). Live rows share the constant and still collide; deleted rows differ from each other and stop colliding.
  4. State the NULL variant and its dependency: leaving the marker NULL for deleted rows also works, because a unique index treats NULLs as distinct — true in MySQL, and true in PostgreSQL only under the default NULLS DISTINCT, which PostgreSQL 15 lets you reverse. Check the polarity against the three existing deleted rows: constant-on-live is what preserves the collision you want, and reversing it silently admits duplicate live accounts.
  5. Say what a soft delete must do besides setting deleted_at: increment auth_version so existing tokens stop validating, leave resource.owner_user_id and resource_revision.actor_user_id intact, and accept that the address is retained — erasure is a different requirement answered by scrubbing the column, not by a DELETE that would break those references.

Follow-up

  • A deleted account re-registers with the same address the next day. Do the old resource rows follow the new user_id, and how does the API keep the two principals apart?
  • How do you honour an erasure request while resource_revision.actor_user_id still references this table?
  • What changes if a user may hold membership in two tenants?

Write the update path that detects a concurrent edit

Medium · optimistic concurrency · transactional outbox · audit history

resource carries version INT NOT NULL DEFAULT 1. resource_revision holds revision_id, resource_id, version, actor_user_id, change_kind, patch JSONB, request_id, created_at with UNIQUE (resource_id, version). outbox_event holds aggregate_type, aggregate_id, aggregate_version, event_type, payload, status. A PUT carries the version the client read. Write the exact statements for the single transaction that applies the edit, records the revision and enqueues 'resource.updated', and give the handler's branch on zero affected rows. Then say what PostgreSQL 16 does under READ COMMITTED when two of these updates hit one row at once.

Approach

  1. One transaction, three writes, no network call inside it: UPDATE resource SET title = $3, version = version + 1, updated_at = now() WHERE resource_id = $1 AND tenant_id = $4 AND version = $2; then INSERT the resource_revision row at version $2 + 1; then INSERT the outbox_event row at the same aggregate_version. The event goes to a table rather than a broker because no transaction spans both.
  2. Branch on the affected-row count before doing anything else. Zero has three causes — stale version, wrong tenant, row gone — so re-read once and map to 409 carrying the current version, or 404 for an id outside the caller's tenant, which also stops the endpoint confirming that another tenant's id exists.
  3. State the engine behaviour instead of assuming it. Under READ COMMITTED the second UPDATE blocks on the row lock, and when the first commits PostgreSQL re-evaluates the WHERE clause against the newly committed row, so the version predicate now fails and the statement reports zero rows. Under REPEATABLE READ the identical collision raises SQLSTATE 40001 instead, so the handler must fold both shapes into one conflict response.
  4. Keep UNIQUE (resource_id, version) even though the predicate already serialises writers. It is what makes a lost update unwritable if any other path ever reaches the revision table, and it converts a logic bug into 23505 rather than into a silently missing history row.
  5. Refuse to auto-retry the whole PUT. A retry re-reads the winner's state and reapplies an intent formed against data that no longer exists — the silent overwrite the version token was added to detect. Return the conflict; merge field-wise only if the patches are provably disjoint.
  6. Note that now() is the transaction timestamp in PostgreSQL, so resource.updated_at, the revision's created_at and the outbox row share one instant, which is what later makes reconciliation between the three tables unambiguous.

Worked solution (25 min)

  1. Write the three statements plus the rowcount branch and confirm they sit in one BEGIN/COMMIT with no outbound call between them.
  2. Run two clients that both read version 7 and apply their updates 5 ms apart; assert one 200 and one 409.
  3. Assert resource.version = 8, exactly one resource_revision row at version 8, and one outbox_event row at aggregate_version 8.
  4. Repeat at REPEATABLE READ and record the different failure shape (SQLSTATE 40001) the handler must also map to 409.
  5. Delete the version predicate and re-run: both writes commit and the first edit disappears with no error raised anywhere.

Expected result: Exactly one of the two commits. version = 8 with one revision row and one outbox row at version 8, the loser gets 409 carrying version 8, and no state exists in which the resource moved but the revision or the outbox row is missing.

Verify it yourself

  • COUNT(*) of resource_revision for that resource equals resource.version, with no gap in the version sequence.
  • Kill the process between the UPDATE and the outbox INSERT — the transaction rolls back and no event describes a change that never happened.
  • Under a 50-way race, resource.version equals the number of 2xx responses rather than the number of requests.

Follow-up

  • A client sends the version it read ten minutes ago and the resource has moved three versions. What is in your 409 so it can resolve the conflict without a full re-fetch?
  • Two editors, two disjoint fields, no overlap. Does your answer still refuse the second write, and should it?
  • Every write now touches a second hot table. How do you keep the outbox insert and its partial index from becoming the write bottleneck at 1.2k writes/second?

How do you design for scalability when requirements are evolving?

Medium · system design and architecture

Approach

  1. Choose a partition key and say what query it makes expensive.
  2. Fix the scope first: who calls this, how often, and what they do when it fails.
  3. State the consistency you need, and where you are willing to be stale.

Follow-up

  • How does this behave when that dependency is down for an hour?
  • What breaks first when traffic grows ten times?

How do you balance technical debt with the need to deliver new features?

Medium · system design and architecture

Approach

  1. Name the read and write paths separately; they rarely have the same bottleneck.
  2. State the consistency you need, and where you are willing to be stale.
  3. Fix the scope first: who calls this, how often, and what they do when it fails.

Follow-up

  • What breaks first when traffic grows ten times?
  • How does this behave when that dependency is down for an hour?

Explain a complex technical challenge you faced and the steps you took to overcome it.

Medium · system design and architecture

Approach

  1. State the consistency you need, and where you are willing to be stale.
  2. Choose a partition key and say what query it makes expensive.
  3. Name the read and write paths separately; they rarely have the same bottleneck.

Follow-up

  • How does this behave when that dependency is down for an hour?
  • What breaks first when traffic grows ten times?

How have you managed complex integrations within a Salesforce ecosystem?

Medium

Approach

  1. Say what you would check first and why it is the highest-information step.
  2. State your assumptions explicitly before working the problem.
  3. Work from the requirement backwards to the design.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

What is your strategy for optimizing application performance in a high-demand environment?

Medium

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. Say what you would check first and why it is the highest-information step.
  3. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Design the async export contract a client can resume safely

Hard · async operations · idempotency · leases

A tenant asks for a CSV of every resource. The work runs for minutes on the worker fleet through a job_run row carrying a lease, an attempt count and a dedupe_key, far past the edge's 400 ms budget. Callers are a browser that polls and a script that walks away and checks later. Specify what the submit call returns, the operation resource and its states, how a duplicate submit is handled, how a client learns about completion, what cancellation means given that a lease can expire mid-run, and how the result is fetched and when it expires.

Approach

  1. Split the API in two. Submit returns 202 with an operation id and a location to poll, and never blocks on the work. The operation is a real resource with its own lifecycle - queued, running, succeeded, failed, cancelled - plus attempt, a monotonic progress figure, and a terminal error drawn from the same code taxonomy the synchronous endpoints use, so a client needs one error vocabulary rather than two.
  2. Deduplicate at submit using job_run.dedupe_key, unique over (job_type, dedupe_key) while status is 'queued' or 'running': a repeat submit of the same logical export returns 200 with the existing operation instead of 202 with a new one, and the partial index deliberately permits a legitimate re-run once the first has finished. Pair it with the request's idempotency key so an HTTP-level retry of the submit is exact rather than merely similar.
  3. Tell the poller how to poll: Retry-After on the polling response, a minimum interval enforced at the edge, and a documented maximum lifetime after which an operation is reaped. Polling is the contract of record; the webhook is the fast path, and both must lead to the same terminal state, so a client that receives the completion event and then polls anyway sees no contradiction.
  4. Be exact about cancellation. A cancel request records intent; it cannot stop work already executing. The handler reads the flag at checkpoints, and because a lease expires on a clock that cannot distinguish a dead worker from a slow one, a second copy may start after the cancel was recorded - so the handler re-reads the flag immediately after claiming the lease. 'cancelled' becomes terminal only when no lease is outstanding; reporting it earlier shows a client a stopped job while a worker is still writing output.
  5. Make the handler safe to run twice, because the lease guarantees that it will be. Write output to a deterministic object key derived from the operation id so a second copy overwrites its own work instead of appending a second file, and record completion with a conditional update that only the copy holding the current lease can win.
  6. Treat result fetch as a separate authorised read: a short-lived signed URL, the tenant checked when it is issued rather than only when the file was produced, and a documented retention after which the operation remains terminal but the bytes are gone - a state the client must be able to tell apart from a failure.

Worked solution (40 min)

  1. Write the submit request and its two possible responses, 202 for new and 200 for a duplicate, and the dedupe_key construction.
  2. Draw the operation state machine, marking which transitions a client may observe and which are terminal.
  3. Write the cancellation sequence across a lease expiry, showing where the second copy reads the flag.
  4. Define the output key, the completion update's predicate, and why both are needed for a double run.
  5. Specify result fetch: URL lifetime, authorisation point, retention, and the distinct response once the bytes are gone.

Expected result: A 202-plus-operation contract with deduplicated submits, a documented poll interval alongside an optional completion webhook, cancellation defined as recorded intent with a terminal state gated on lease ownership, an idempotent handler writing to a deterministic key, and a separately authorised expiring result.

Verify it yourself

  • Submitting the same export twice while the first is running produces one job_run row and one operation id.
  • Killing a worker mid-export and letting the lease expire yields one output file, not two, and one terminal transition.
  • A client that receives the completion webhook and then polls sees the same terminal state and the same result location.

Follow-up

  • An operation has said 'running' for 40 minutes and the worker is gone. What does the client see, and which columns in job_run decide that?
  • Two tenants each submit 50 exports at once. What in this contract stops one of them delaying the other?
  • The customer wants the export emailed instead. What changes, and what becomes harder to make exactly-once?

Exports duplicate a row range about once a week

Hard · leases · clock skew · idempotency · fencing

Roughly once a week an export writes a file containing a duplicated range of rows. The affected job_run rows show attempt = 1, status = succeeded, one started_at, and a lease_owner naming a different host from the one whose logs show the job starting. Leases last 30 seconds and are heartbeated every 10 from inside the handler; lease_expires_at is computed on the worker and compared against the database's now(). Find the mechanism, and give a fix that holds even if you cannot fix the clocks.

Approach

  1. Start from the fact that eliminates the obvious answer. attempt = 1 means no retry was recorded, so this is not a re-run after failure; two workers ran the same row concurrently and the takeover path never touched the counter. lease_owner naming a host other than the one that started the job is the same statement from the other side.
  2. Enumerate the mechanisms that cause a premature takeover, then find the signal that separates them. Either the lease genuinely expired because the heartbeat did not fire, which is what happens when the heartbeat runs on the handler's own thread and the handler makes a long blocking call, or it only appeared expired because two clocks disagree, since lease_expires_at is written from the worker's clock and evaluated against the database's. The discriminator is the distribution: incidents clustered on the longest exports indict the heartbeat, incidents clustered on one host indict skew. Measure both, and measure each host's offset against the database directly.
  3. Read the reclaim query precisely. In PostgreSQL now() is transaction start time, not statement time, so a reclaimer holding a long transaction compares against an older timestamp than expected; clock_timestamp() is the statement-time function. This is worth ruling in or out before you redesign anything, because it changes which rows look expired.
  4. Remove the second clock rather than trying to synchronise it. Issue and extend the lease in the database, with lease_expires_at = now() + interval '30 seconds' in both the claim and the heartbeat, so exactly one clock is ever compared and worker skew stops mattering to this predicate.
  5. Accept that a lease can still expire under a slow worker, because a lease cannot distinguish slow from dead, and fence the work. Carry a monotonically increasing lease generation and make every write the handler performs conditional on still holding it, as UPDATE ... WHERE job_run_id = $1 AND lease_owner = $2 AND lease_generation = $3, so a displaced worker's writes affect zero rows and it aborts instead of duplicating.
  6. Make the handler's writes idempotent independently of all that: give each exported chunk a natural key of (job_run_id, batch_start) with a unique constraint so a second copy conflicts rather than appends, move the heartbeat off the handler's thread, and increment attempt on takeover so the event is visible in a metric.

Follow-up

  • The displaced worker has already streamed half the file to object storage. What makes that side effect safe to repeat?
  • You now count takeovers. What alert fires on that counter, and at what threshold?
  • What breaks if you simply raise the lease to five minutes?

Suggested practice checklist

Roughly ninety minutes on weeknights with one longer weekend block. The plan cuts scope rather than compressing everything, on the assumption that one thing finished per night beats four half-started.

Day 1 — Fix the scope and take a cold baseline

  • Read the role description and write the three things the loop will almost certainly test, then write an explicit not-doing list and keep it visible all week.
  • Take one twenty-five-minute coding problem and one fifteen-minute design prompt cold, and write the single sentence naming what blocked each, because those two sentences decide where the remaining evenings go.
  • Set the week's rule: one thing finished every night, including the night you only have forty minutes.

Deliverable: A one-page scope with a not-doing list and two cold attempts, each carrying one sentence on what blocked it.

Day 2 — One pattern, written three times from blank

  • Choose the single pattern most likely to appear in your loop and write it three times from an empty file rather than editing the previous attempt.
  • On the third pass, write the invariant as a comment before the loop body and the complexity before the first line of code.
  • Stop at ninety minutes even if the third version is imperfect, and write the one thing you would fix given another hour.

Deliverable: Three independent implementations of the same pattern plus a note on what changed between them.

Day 3 — One design, only to the depth you can defend

  • Take one system shape and go only as far as requirements, interface and data model, refusing to draw a box you could not survive a follow-up about.
  • Attach one number to each non-functional requirement, deriving it rather than asserting it, and write the assumption the number rests on.
  • Write the one tradeoff you are choosing against and the observation that would make you reverse it.

Deliverable: One design at interface-and-schema depth with derived numbers and one written reversible tradeoff.

Day 4 — Only the fundamentals you will have to defend

  • Write, in under two hundred words each, the answers to the two questions that follow almost any implementation: why this structure and not the obvious alternative, and what happens to this code at a hundred times the input.
  • Write what an index actually costs: faster lookups on the indexed columns against a write that now maintains a second structure, plus the cases where the planner declines to use it anyway, low selectivity, or a predicate wrapping the column in a function.
  • Delete any answer you cannot deliver aloud in under a minute, since an answer that needs reading is not an answer you have.

Deliverable: Three written answers, each under two hundred words and each timed aloud.

Day 5 — Your own work, timed

  • Write a ninety-second and a four-minute version of your main project and time both aloud rather than reading them.
  • Prepare the two follow-ups that always come: what you would do differently, and how you knew it worked.
  • Put one number in the first sentence and be ready to say exactly where it came from and what it excludes.

Deliverable: Two timed narratives with one defensible number in the opening line.

Day 6 — The one full rehearsal, in the weekend block

  • Run a sixty-minute mock covering a coding round and a design round in one sitting with no break, because sustained attention is the thing evenings have not trained.
  • Immediately afterwards, and before hearing any feedback, write the three moments you lost the thread.
  • Spend the rest of the block only on those three moments, and on nothing you merely feel shaky about.

Deliverable: Mock notes naming three failure moments with a specific fix written under each.

Day 7 — Taper

  • Write the twenty-minute warm-up you will actually do on the morning: one problem you can already solve from a blank file, one design you can narrate, and nothing you have never seen.
  • Re-read only your own notes from this week and open no new material.
  • Write the logistics down: the editor or shared document you will be working in, whether execution and lookups are permitted, and the sentence you will use when you do not know something.

Deliverable: A one-page card holding the design structure, the project numbers, and the logistics.

Disagreement needs an outcome you did not choose

Conflict answers where you were right and everyone came round are the weakest ones. Stronger: the evidence you went and collected, what would have changed your mind, and what you did in the weeks after the call went against you. Implementing a design you argued against, properly, is a specific and checkable behaviour.

Tell me about a time you had to explain a technical issue to a non-technical stakeholder.

Medium · behavioural and engineering judgement

Approach

  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Pick a story where you made the decision, not one where you watched it.
  3. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What did you decide not to do, and why?
  • What would you do differently if you ran that again?

How do you handle conflicting priorities between product requirements and technical limitations?

Medium · behavioural and engineering judgement

Approach

  1. Name the disagreement and how you resolved it with evidence.
  2. Pick a story where you made the decision, not one where you watched it.
  3. Close with what you would do differently, concretely.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

Describe your experience working in an Agile or cross-functional team environment.

Medium · behavioural and engineering judgement

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. Name the disagreement and how you resolved it with evidence.
  3. State the situation in two sentences and spend the rest on the reasoning.

Follow-up

  • What did you decide not to do, and why?
  • How did you know your change caused the improvement?