Interview guides · Agile5 Technologies
Agile5 Technologies Software Engineer Interview Questions & Guide 2026
Testing practice for Agile5 Technologies software engineer candidates: the boundaries worth covering, and why flakiness is a real defect.
The 60-second brief
As a Software Engineer at Agile5 Technologies, you are joining a mission-driven team dedicated to delivering high-performance, secure, and scalable solutions. This role bridges complex client requirements and technical execution, ensuring that Agile5 Technologies' software products meet the rigorous standards of its partners. You will be expected to translate high-level needs into functional code, contributing directly to the stability and innovation of projects that often operate in sensitive or high-stakes environments.
The loop does not sample the job evenly, and arguing about that in the room costs you. Daily work is mostly incremental change inside code someone else wrote, while the loop samples narrow slices of it; prepare for the slices and save the realism argument for your questions at the end.
Focus areas
- Keep money in integer minor units
- Bound blast radius with per-tenant concurrency limits
- Make every write idempotent under client retries
Overview
This position offers a unique vantage point into the full software development lifecycle. You will not only be writing code but also working within the Agile methodologies that define the company's workflow, collaborating with cross-functional teams to solve real-world problems. Whether you are working on cyber capabilities or custom enterprise applications, your work will affect the efficacy of the systems Agile5 Technologies deploys. Success here requires a blend of technical proficiency, clear communication, and an ability to thrive in a structured, iterative environment.
The Agile5 Technologies interview process
Agile5 Technologies candidates report 2 rounds · ≈ 2-4 weeks. The stages below are what candidates describe, not a published process.
Online Screening
Input bounds are the part of the prompt most often skimmed, and they usually contain the answer. They tell you which complexity class is admissible, which narrows the search before you have thought about the problem itself. As a rough planning figure, a compiled language does on the order of 10^8 simple operations per second and an interpreted one roughly an order of magnitude less. So n up to about twenty admits enumerating subsets, a few thousand admits a quadratic pass, and a million admits neither: you need near-linear, or linear with a log factor. If the bounds are missing, ask for them.
What to demonstrate
- Whether the approach is justified by the stated input size rather than by whichever pattern you recognised first
- Whether you ask about the properties that change the algorithm: whether the input arrives sorted, whether duplicates occur, whether values are bounded integers, whether it all fits in memory
- Whether you can name the bottleneck in your own solution and what would remove it, even when you deliberately leave it in place
- Whether a claimed speedup is real, since memoising a recursion only helps when subproblems genuinely overlap and the state can be keyed cheaply
How to prepare
- For each algorithm you rely on, write down the largest n it handles in roughly a second, then check two of those figures by timing them in the language you will actually type in
- For two weeks, write one line naming your target complexity and the bound that justifies it before you write any code, then compare that line with what you ended up submitting
- Practise the conversion backwards: given a required O(n log n), list the mechanisms that get you there (sorting, a heap, an ordered map, divide and conquer) and choose by what the problem needs to query, not by what you used last
In-Person/Video Interview
Because the format is not fixed, the first job in the room is classification. Listen to the opening question and decide what it is: a probe into work you have already described, a fresh problem to solve now, or a conversation about how you operate. Each wants a different register, and the common failure is forcing a rehearsed structure onto a question that did not ask for it. Running a full design ritual on a ten-minute debugging question reads as not listening. When you cannot tell which it is, ask how long they want to spend and answer at that depth.
What to demonstrate
- Whether the shape of your answer matches the question, so a yes-or-no gets answered before it is justified and an open prompt gets a direction before a detour
- Whether you check how much depth is wanted instead of deciding for them, and whether you stop when the answer is complete rather than continuing until someone interrupts
- Whether you can be redirected in the middle of an answer without restarting it from the beginning
- Whether a question outside your experience gets an honest boundary followed by reasoning from what you do know, instead of a confident answer with nothing behind it
How to prepare
- Rehearse one project at three lengths, roughly thirty seconds, three minutes, and a full walkthrough at the depth of a design review, and practise switching between them when someone interrupts mid-telling
- Have someone ask you five questions of deliberately mixed type in one sitting without telling you the types, and score only whether you identified each one correctly before you started answering
- Draft the sentence you will use to check depth, along the lines of asking whether the short version is useful here or they want the detail, and use it in a real conversation this week so the day of the round is not its first outing
Where candidates lose points
One shared connection pool for every tenant and every query class
A single tenant with a large table and a missing index can occupy every connection with slow queries, and every other tenant then waits in connection acquisition -- a queue invisible in database metrics, because the database itself looks healthy while the application starves. Containment is bulkheads: separate pools or per-tenant concurrency caps for interactive requests, background jobs and exports, a statement timeout low enough that a pathological query dies before it accumulates, and an idle-in-transaction timeout so a stuck client cannot pin a connection and its locks indefinitely. One caveat worth knowing in advance: if a transaction-pooling proxy sits in front of the database, session-scoped behaviour changes, so session-level advisory locks and settings applied outside a transaction do not survive the way they do on a direct connection.
Checking a quota with a select and then writing
Under read-committed isolation, two concurrent transactions both observe a count below the limit and both insert, so the limit is exceeded by exactly the concurrency. Repeatable read does not rescue it either: it provides a stable snapshot, and this is write skew, which snapshot isolation permits by design. The options are serialisable isolation, which detects the conflict and aborts one transaction with a serialisation failure and therefore obliges the caller to retry; a single statement with the predicate inside the write; or a constraint that makes the surplus insert fail outright. The reason this pattern survives review is that it is correct in every test that runs one request at a time.
Choosing a schema before the access patterns are known
Write the queries first, with their filters, sort orders, cardinalities and which ones sit on the latency-critical path, then design tables and indexes to serve them. An index nothing queries still costs write throughput and storage, and a hot query with no supporting index becomes a full scan that only hurts once the table is big.
A cache with no invalidation story
Say how an entry goes stale, how long you can serve it stale, and what happens when many requests miss the same key at the same instant. One popular key expiring under load sends every concurrent request to the origin together; single-flight coalescing, jittered expiry, or serving stale while revalidating are the standard answers.
Questions & practice
Locate a billing reconciliation gap without rescanning ninety million events
Hard · reconciliation · dimensional-bisection · watermarks · hypothesis-testing
A tenant's sealed invoice total is 0.4% below the sum of its raw usage_event rows for the period. That tenant has 90 million events over 30 days in a table partitioned daily on ingested_at, and its rollups carry source_max_ingested_at, revision and sealed_at. Recomputing all 30 days from raw is correct, and you are not going to do it. Give the procedure that locates the divergent (workspace, sku, hour) cell, the cost of each probe, and the one query you run before any of it.
Approach
- Run the free query first. Sum raw quantity for the period restricted to
ingested_at <= source_max_ingested_atof the sealed rollups, and compare that against the unrestricted sum. The rollup stores the watermark precisely so this can be answered without a scan. If the whole 0.4% sits above the watermark, nothing is broken: it is late data, it becomes an adjustment line, and the investigation ends in one query. - Only if the gap survives that test do you bisect, and you bisect by dimension rather than by rows. Compare 30 per-day totals, then inside the offending day compare the 6 SKUs, then the workspaces, then the 24 hours. That is roughly 30 + 6 + W + 24 grouped probes, each an indexed range scan over one daily partition for one tenant, against O(N) per attempt for the naive re-fold.
- Quantify why naive is not merely slow but unusable mid-incident: at a generous 200,000 rows/second sequential, 90 million rows is about 7.5 minutes per attempt, you will want ten attempts, and every one competes for I/O on the same partitions live ingest is writing. The diagnostic worsens the backlog it is diagnosing.
- Before fetching each comparison, state what it would look like under each hypothesis. Two adjacent hours off by equal and opposite amounts is
occurred_atversusingested_atbucketing. A whole day offset by exactly N hours is a timezone applied at the wrong layer. A gap confined to one SKU in one workspace is an environment filter. The same(tenant_id, idempotency_key)present in twoingested_daypartitions is the dedup horizon losing a retry that crossed midnight. - Make the next bisection cheap by storing the aggregate you keep recomputing. A per-
(tenant_id, ingested_day)count and quantity checksum turns step two from thirty probes into one read, and it is the same number the reconciliation job already produces. - Whatever you find, the sealed period does not change value. The correction is an adjustment line pointing at the line it reverses, carrying its own
source_rollup_watermark, because the original invoice is the evidence of what the customer was charged.
Follow-up
- The gap is 0.4% in one direction on one day and 0.4% the other way the next day. What does that shape rule in, and what does it rule out?
- How do you distinguish a duplicate from a restatement, given
revisionandrecomputed_aton the rollup? - Ingest is still running while you investigate. What makes your two numbers comparable at all?
Seal an hour under late data with bounded memory
Hard · watermarks · late-data · quantile-sketch · conditional-write
Metering ingest reads 256 partitions at 10,000 to 40,000 events/second. Events carry occurred_at and ingested_at, and during a producer replay the gap between them is hours. Seal each UTC hour once no more than 50 parts per million of that hour's eventual quantity can still arrive, using memory that does not grow with the size of the replay. Define the watermark, the lateness parameter and how you measure it, the structure holding open hours, and the write that performs the seal. State what an idle partition does to your watermark.
Approach
- Two clocks, two jobs. Bucket by
occurred_at, because that is the hour the customer is billed for, and advance the watermark oningested_at, because that is what the fold has consumed and whatsource_max_ingested_atrecords. Conflating them is what makes late data invisible. - The global watermark is the min over partitions of each partition's committed
ingested_at, not the max: the fold is trustworthy only as far as the slowest partition. The consequence is that one idle partition pins the watermark forever and nothing seals, so an idle partition must promote its watermark to wall clock after a stated idle timeout, and that timeout becomes a correctness parameter, because a partition that is slow rather than idle gets sealed past. - Choose the lateness L from the measured distribution of
ingested_at - occurred_at, weighted by quantity rather than by event count. The target is 50 ppm of the hour's quantity, and a replay is rare in events while carrying disproportionate mass, so an event-weighted quantile picks an L that is comfortably wrong at exactly the moment it matters. - Measure that quantile in bounded memory. A Greenwald-Khanna summary gives epsilon-approximate quantiles in O((1/epsilon) log(epsilon n)) space; a t-digest costs more per merge but has relative error that tightens at the tails, which is the half of the distribution you are reading at p99.99. Keep a separate summary per tenant class, because one tenant's batch importer is not the population.
- Hold open hours in a min-heap keyed by
hour_start. When the watermark advances, pop every hour withhour_end + L < Wand seal it: O(log H_open) per advance and O(1) amortised per event to touch its bucket. Memory is open hours multiplied by distinct(tenant, workspace, sku)keys, so cap the number of simultaneously open hours and spill the oldest intousage_rollup_hourlyasstatus='open'with arevisionbump. While an hour is open the row is upsertable, so the store is your overflow. - The seal itself is a conditional write:
update ... set status='sealed', sealed_at=now() where status='open' returning .... Two sealers race on every restart, and the loser must see zero rows and stop rather than write a second value. After the seal, an event for that hour is not an upsert but an adjustment, andsource_max_ingested_atis what proves it arrived afterwards.
Follow-up
- A replay starts during the sealing window for a period you are about to close. What do you do, and what is the customer-visible consequence of each option?
- Your measured quantity-weighted p99.99 lateness is six hours and the invoice must be issued at 02:00 UTC on the first. How do you reconcile those two numbers?
- How would you detect that L has drifted before it costs you an hour's quantity?
Fold a deduplicated usage stream into hourly rollups
Easy · aggregation · deduplication · watermarks · exact-arithmetic
You are given one day of usage_event rows, up to 250 million, each carrying event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at and ingested_at. Produce usage_rollup_hourly cells keyed (tenant_id, workspace_id, sku, hour_start) with quantity_sum, event_count and source_max_ingested_at. An event counts once per (tenant_id, idempotency_key). The rollup grain has no environment column, so state your filter. One pass. Give your time and space bounds, and say what the deduplication actually costs in memory.
Approach
- Bucket on
occurred_at, neveringested_at:hour_start = date_trunc('hour', occurred_at at time zone 'UTC'). The two columns answer different questions.occurred_atsays which hour the customer is billed for;ingested_atsays how current the fold is. Using the second for the first makes late data invisible instead of correctable. - The fold is trivial and the deduplication is the entire cost, so price it before designing anything clever. An exact set over
(tenant_id, idempotency_key)at 250M entries, stored as a 16-byte 128-bit hash in an open-addressed table at 0.7 load factor, needs about 357M slots at 16 bytes each, roughly 5.7 GB. The fix is partitioning byhash(tenant_id) % Pso each shard holds 1/P of the set and no tenant's keys straddle shards. - Rule out a Bloom filter as a replacement, in the right direction: a false positive reports 'already seen' for an event never seen, so you drop a real event and lose revenue with no error raised. It is usable only as a negative pre-filter in front of the exact set, where a miss is conclusive and a hit must fall through to the real lookup.
- Accumulate in scaled integers, not binary floating point.
numeric(20,6)admits values below 10^14, so one event scaled to micro-units can reach 10^20, past int64's 9.22 x 10^18; use a 128-bit or arbitrary-precision accumulator unless you first bound the per-event maximum. binary64 represents integers exactly only to 2^53, about 9.01 x 10^15, and cannot represent 0.1 at all, so two runs that sum in different orders disagree. - Carry
source_max_ingested_at = max(ingested_at)over the events folded into each cell, and countevent_countover accepted, post-dedup events. Without that watermark there is no way to prove later what a number did and did not include, which is the first question any reconciliation asks. - State the environment filter explicitly, because the rollup grain cannot record it. A fold that quietly includes
stagingbills non-production traffic; one that quietly excludes it loses a cost signal. Production-only is the billing answer, and either way it belongs in the job name and the output metadata. Complexity: O(n) time, O(distinct dedup keys) space, dominated by the dedup set rather than by the cells.
Worked solution (25 min)
- Write both key tuples down before any code: dedup key
(tenant_id, idempotency_key), cell key(tenant_id, workspace_id, sku, hour_start), withhour_startderived fromoccurred_atin UTC. - Build a 10,000-row fixture containing one event duplicated three times under the same
idempotency_key, two events sharing anidempotency_keyacross differenttenant_idvalues, one event whoseoccurred_atis two hours before itsingested_at, and onestagingevent inside an otherwise production cell. - Fold it and assert each of those four expectations separately rather than eyeballing a grand total.
- Re-run with the input shuffled and diff the output files.
- Size the dedup set for 250M keys using the load-factor arithmetic and write the number down next to the fixture.
Expected result: The triplicate contributes one event and its quantity once. The two same-key, different-tenant events both count, because the dedup key is the pair. The late event lands in the hour of its occurred_at while that cell's source_max_ingested_at advances to the later timestamp. The staging event is included or excluded per the stated filter and never silently.
Verify it yourself
- Shuffled input produces byte-identical cells, including
event_countandsource_max_ingested_at. - The sum of
quantity_sumacross all cells equals the sum of quantity over the distinct dedup keys, computed independently. - Swapping the accumulator to binary64 makes a fixture of 0.1-valued quantities disagree with the exact sum. That is a failing test, not a rounding note.
Follow-up
- A producer retries at 23:59:59 and the retry lands at 00:00:01. The unique index on the daily-partitioned table must include the partition key. What gets double-counted, and what is the smallest change that fixes it?
- The consumer acknowledges its batch before committing the fold. Which failure loses revenue now, and which arrangement duplicates instead?
- What makes a re-run over the same day produce byte-identical rollups?
Migrate a live partitioned event table without blocking ingest
Hard · online migration · ddl locks · expand and contract · partitioning
usage_event is range-partitioned daily on ingested_at, holds roughly 250M rows per day across 400 live partitions, and is written at 10-40k rows/second. Two changes are required: quantity must move from double precision to numeric(20,6), and a new environment column must become NOT NULL with a default of 'production'. Ingest cannot stop. Give the ordered plan, naming for each step the lock it takes, what that lock blocks, and roughly how long it is held. Identify the one step that cannot be rolled back cleanly once traffic depends on it.
Approach
- Classify the two changes before planning anything. Adding a column with a non-volatile default has been metadata-only since PostgreSQL 11, so it is cheap. Changing double precision to numeric is not binary-coercible, so
alter column ... typerewrites every partition under ACCESS EXCLUSIVE and rebuilds its indexes; on this volume that is hours of blocked ingest and is simply not an option, which is why the plan is expand-and-contract rather than one statement. - Expand: add
quantity_numeric numeric(20,6)andenvironmentwith its default on the parent. Both are catalogue-only but both take a brief ACCESS EXCLUSIVE that cascades to partitions, so run each withlock_timeoutset to a second or two and retry on failure. A queued ACCESS EXCLUSIVE request blocks every reader behind it, which is how a metadata-only change turns into an outage. - Dual-write: deploy producer code that populates both columns on every insert, and leave it running before anything reads the new column. This is the step that cannot be reverted cleanly. Once readers depend on quantity_numeric, reverting the writer leaves rows with a null there, and the gap is only discoverable by re-reading the old column, which the readers have stopped doing.
- Backfill older partitions in batches keyed on the primary key, oldest first, committing every few thousand rows with a pause between batches, and skipping the partition still receiving writes until it rotates. Each batch is an ordinary UPDATE taking row locks only. The cost is bloat and WAL rather than blocking, so watch dead tuples and let autovacuum keep pace instead of wrapping 400 partitions in one transaction.
- Make NOT NULL cheap with the three-step form:
add constraint ... check (environment is not null) not valid(brief ACCESS EXCLUSIVE, no scan), thenvalidate constraint(SHARE UPDATE EXCLUSIVE, scans while reads and writes continue), thenset not null, which from PostgreSQL 12 uses the validated check and skips its own full scan. Do this per partition, then on the parent. - Switch and contract: move reads to the new column behind a flag, verify over a full period that both columns agree on freshly written rows, drop the old column (metadata-only), and only then remove the dual-write. Any index on the new column goes on with CREATE INDEX CONCURRENTLY per partition, since CIC is not supported on a partitioned parent: create the parent index with ONLY, build each child concurrently, then ALTER INDEX ... ATTACH PARTITION until the parent index becomes valid.
Follow-up
- A CREATE INDEX CONCURRENTLY fails halfway through the partition list. What state is the table in, how do you detect it, and what do you run?
- The producer computes quantity itself. What happens to a request already in flight when the dual-write deploy lands, and does it matter?
- Give two queries that prove the backfill is complete: one cheap enough to run every minute, one authoritative.
Enforce a concurrent-run quota that survives simultaneous requests
Medium · isolation levels · write skew · quotas · lock contention
A plan allows at most 20 concurrently running rows in job_run per tenant. The table holds run_id, tenant_id, workspace_id, status (queued, leased, running, succeeded, failed, timed_out, cancelled, lost), lease_token, leased_until, started_at and finished_at. Today the service runs select count(*) from job_run where tenant_id = $1 and status = 'running', compares the result to 20, then inserts. Under load a tenant exceeds the cap by exactly the number of concurrent requests. Name the anomaly, say which isolation levels do and do not prevent it, and give a version that holds, as SQL.
Approach
- Name it: write skew. Each transaction reads a predicate (the count of running rows), neither modifies what the other read, and both then insert rows that jointly violate an invariant no single row expresses. Read committed permits it. So does repeatable read, because snapshot isolation's first-updater-wins check fires only on conflicting row updates, and these are inserts touching disjoint rows.
- Enumerate the fixes with their real costs. SERIALIZABLE works: PostgreSQL's SSI tracks the predicate read and aborts one transaction with SQLSTATE 40001, which obliges the caller to retry and makes the abort rate rise with contention on a hot tenant. Folding the predicate into the write as
insert ... select ... where (select count(*) ...) < 20narrows the race to the statement's snapshot but does not close it under read committed. - Give the version that holds at read committed: serialise on a row both transactions must touch.
update tenant_concurrency set running = running + 1 where tenant_id = $1 and running < 20 returning runningupdates zero rows when the cap is reached, and zero rows is the rejection. This works because at read committed a blocked UPDATE re-evaluates its WHERE clause against the newly committed row; at repeatable read the same statement raises a serialisation error instead, so the isolation level changes the calling contract. - State the cost you just bought. That row is now a per-tenant serialisation point, so admission throughput for the tenant is bounded by one divided by the lock hold time; at a 2 ms hold that is roughly 500 admissions/second. Keep the critical section to the single UPDATE, with no network call or scheduling decision inside the transaction, and decrement in the same transaction that writes the terminal status.
- Close the leak the status enum implies: a run can end as
lost, so a crashed worker otherwise consumes a slot forever. Reconcile on a schedule againststatus = 'running' and leased_until < now(), and treat the counter as a fast path overjob_run, which stays the system of record.
Worked solution (25 min)
- Seed a tenant with 19 running rows, then fire 8 concurrent sessions each running the select-then-insert, and count the resulting running rows.
- Repeat at REPEATABLE READ and confirm the count still exceeds 20.
- Repeat at SERIALIZABLE, count the 40001 aborts, and note that without a retry loop those requests fail rather than queue.
- Implement the atomic counter UPDATE, re-run the 8-way test, and confirm exactly 20 running rows with zero over-admissions.
- Kill a worker mid-run, let the lease expire, and check whether the slot comes back without intervention.
Expected result: Write skew identified; read committed and repeatable read both permit it; serialisable prevents it at the price of 40001 retries; the working read-committed version is update tenant_concurrency set running = running + 1 where tenant_id = $1 and running < 20 returning running, whose zero-row result is the rejection, plus a reconciliation path for runs that terminate as 'lost'.
Verify it yourself
- At 8x concurrency against a cap of 20, running rows never exceed 20.
- The rejection returns zero rows rather than raising, so it is distinguishable from an error in the caller.
- Killing a worker does not permanently consume a slot.
- The counter and
select count(*) from job_run where status = 'running'agree after reconciliation.
Follow-up
- Write the retry loop for the SERIALIZABLE version. What does the caller see when it keeps aborting, and what bounds the retries?
- Two regions each keep a counter. What is the effective cap, and what does admission do when the counter store is unreachable?
- The cap changes mid-flight on a plan upgrade. Do running jobs get killed, and what does the counter row look like during the change?
Any previous experience with the Agile development process?
Medium
Approach
- State your assumptions explicitly before working the problem.
- Work from the requirement backwards to the design.
- Say what you would check first and why it is the highest-information step.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
What is your process for testing and deploying code in a team environment?
Medium
Approach
- Work from the requirement backwards to the design.
- Clarify what is being asked and what a complete answer contains.
- Say what you would check first and why it is the highest-information step.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Sealing a billing period against late-arriving usage
Medium · idempotency · immutable ledger · rounding · conditional writes
billing seals a tenant's period once the metering watermark passes the period end, prices the sealed rollups against the plan (included allowance, tier boundaries, negotiated discount) and writes invoice_line_item rows: quantity numeric(28,6), unit_price_micros bigint, amount_minor bigint, currency char(3), source_rollup_watermark timestamptz. The job is re-run after failures and two workers may attempt the same tenant. Events legitimately arrive with occurred_at inside the period and ingested_at after it. Specify the seal transition, the idempotency key for every write including the payment-processor call, the rounding position and mode, and the fate of a post-seal event.
Approach
- Make sealing a conditional write rather than a read followed by a write: UPDATE usage_rollup_hourly SET status = 'sealed', sealed_at = now() WHERE tenant_id = $1 AND hour_start >= $2 AND hour_start < $3 AND status = 'open' RETURNING rollup_id. Two concurrent sealers cannot both win because the loser's predicate no longer matches, and the loser learns it lost from an empty result rather than from a lock timeout.
- Gate the seal on the watermark, not on the clock - the period closes when the fold is trustworthy past period_end - but cap the wait, because an unsealed period blocks the whole billing run. Seal anyway after a stated maximum (six hours past period end is a reasonable default) and let whatever arrives afterwards become an adjustment. The trade-off is named in one line: adjustments are cheap, a missed billing cycle is not.
- Make every write converge under re-run. Line items are idempotent on (invoice_id, sku, rate_tier) with ON CONFLICT DO UPDATE permitted only while the invoice is draft; the payment-processor call carries (tenant_id, billing_period_start) as its idempotency key, because a timeout there is an unknown outcome, not a failed one, and a plain retry is how a customer gets charged twice.
- Keep the arithmetic exact and round exactly once. quantity stays numeric, the rate is an integer unit_price_micros in millionths of a minor unit because per-request prices are genuinely below a cent, and amount_minor = round_half_even(quantity x unit_price_micros / 1,000,000) is computed once per line and stored. Tiering walks the boundaries in order emitting one line per (sku, rate_tier) with tier 0 as the included allowance at price zero; the invoice total is the sum of stored amount_minor values and is never recomputed downstream from quantity and rate.
- Handle the post-seal event as a forward-only correction. The sealed rollup is frozen, so the difference between the sealed value and the restated value becomes a new invoice_line_item with kind = 'adjustment' and voided_by_line_id pointing at the line it reverses, carrying its own source_rollup_watermark. Nothing is edited in place, because the original line is the only evidence of what the customer was actually charged and is precisely what a dispute, a refund or an audit asks to see.
Worked solution (35 min)
- Write the seal as a single conditional UPDATE ... WHERE status = 'open' RETURNING and state exactly what the losing worker sees.
- Price one line by hand: quantity 4,318,904.250000 at unit_price_micros 1200 gives 5,182.6851 minor units and 5,183 after a single half-even rounding. Then do quantity 2,500,000.000000 at unit_price_micros 1, which lands exactly on 2.5 and rounds to 2 under half-even but 3 under half-up.
- Take four hundred synthetic lines with fractional minor units and compute the total two ways - sum of per-line rounded amounts, and a single rounding of the summed exact amounts - then record the gap.
- Trace one event with occurred_at inside the period and ingested_at two days after the seal all the way to the row that eventually reflects it.
Expected result: Seal as a conditional UPDATE from status = 'open' gated on the metering watermark with a bounded maximum wait; line writes idempotent on (invoice_id, sku, rate_tier) and the processor call idempotent on (tenant_id, billing_period_start); amount_minor rounded once per line with half-even; late data becoming an adjustment line that points at the line it reverses and records its own watermark, with no in-place edit anywhere.
Verify it yourself
- Re-running the entire billing job on an already-invoiced period must produce identical line rows and must not call the payment processor a second time. If it charges again, the idempotency key was on the retry rather than on the business fact.
- Over four hundred lines with uniformly distributed fractional parts the two totals should differ by a handful of minor units - standard deviation around sqrt(400/12), about 5.8, with a worst case of 200. If your two totals match exactly, the test data has no fractional parts and has not exercised the trap.
- Every line carries a source_rollup_watermark, and two lines for the same SKU with different watermarks should explain their difference without opening any other table.
Follow-up
- Two workers start the same tenant's seal a millisecond apart and the winner crashes after sealing but before writing any line. What does the second worker observe, and is the resulting invoice correct?
- Show the divergence between rounding each line and rounding the total once over four hundred lines, and say which direction it goes.
- A customer disputes a charge from two quarters ago. Which rows answer it, and which single design decision made that answer possible?
A rare job-run overwrite that logging makes disappear
Hard · fencing tokens · leases · concurrency
About one job run in fifty thousand records billable_seconds matching no observed sandbox lifetime, and a few rows show worker_id changing after finished_at was already set. It does not reproduce: debug logging around the terminal write made it vanish for two weeks before it returned. Runs last from 200 ms to 30 minutes, the lease is 60 seconds and is renewed while a run executes. Give an ordered checklist, the mechanism, and a fix that makes the illegal write impossible rather than merely rarer.
Approach
- Mine the evidence instead of chasing a repro: select rows where updated_at is later than finished_at, or where a terminal status was written twice, and join them to attempt history to recover both writer identities. The defect has already happened tens of times and the rows are the recording.
- State the signature before measuring it. If the cause is a lease that expired while the original worker was stalled, affected runs should cluster where the gap between the last renewal and the terminal write exceeds the lease, and should correlate with worker pause metrics rather than with workload shape.
- Read the disappearance honestly. Logging inside the window changed the timing and lowered the probability; it is evidence about how narrow the window is, not a fix. Reproduce by widening the window on purpose, shortening the lease and injecting a pause between sandbox exit and the terminal write, rather than by adding more instrumentation.
- Name the mechanism precisely: the lease expires during a stall such as a long garbage-collection pause or a brief partition, the run is re-dispatched, and the original worker then wakes and writes its terminal state over the new attempt's row. A lease alone cannot stop this, because the check and the write are separated by the stall.
- Fix by fencing the write itself: UPDATE job_run SET status = $2, finished_at = $3, billable_seconds = $4 WHERE run_id = $1 AND status = 'running' AND lease_token = $5, with zero rows affected interpreted as having been fenced rather than as success. The token lives on the row so the store arbitrates, not the worker's memory.
- Keep the state machine honest: a retry inserts a new row pointing at parent_run_id rather than resetting the old one, and a run whose worker vanished terminates as lost with billable_seconds null, because recording failure asserts an outcome nobody observed and then bills and retries on that assertion.
Follow-up
- The supervisor also emits a usage event on completion. What does the fenced worker do about the event it already emitted, and how does metering absorb it?
- Lease renewal is itself a network call. What happens when a renewal times out, and how does the worker decide whether it still holds the lease?
- Why is lengthening the lease past the longest legitimate run the wrong lever, and what breaks if you do it anyway?
Suggested practice checklist
Four days sample coding, design, fundamentals and the practical rounds at deliberately shallow depth, which is enough to surface the topics you did not know were in scope. That map, rather than a guess made on day one, decides where the last three days go.
Day 1 — Coding, one pass at shallow depth
- Solve one problem from each of six families, an array with two pointers, hash counting, binary search, a tree traversal, a graph traversal and one dynamic program, under a hard twenty-minute cap with no extensions, marking each finished, late, or stalled.
- For every stall, write the exact move you could not make rather than the subject, so the note reads could not turn the recurrence into a loop rather than bad at dynamic programming.
- Fix nothing today. The value of the pass is the unfixed record.
Deliverable: Six timed attempts marked finished, late or stalled, each stall carrying a named blocking move.
Day 2 — Design, one pass at shallow depth
- Spend twenty minutes each on three different shapes, a read-heavy feed, a write-heavy ingest path, and something needing a transaction across two entities, stopping each at requirements, interface and data model.
- After each, write the first question you could not answer, which is usually a number you could not estimate or a failure mode you had no vocabulary for.
- Mark which of the three you would be most relieved not to be asked, and treat that as data rather than as a preference.
Deliverable: Three shallow designs, each with the first unanswerable question written at the bottom.
Day 3 — Fundamentals and the practical rounds
- Answer eight short questions in writing at four minutes each, covering the material that fills the gaps between the big rounds: what happens between a URL and a rendered page, what an index costs on write, when a process is preferable to a thread, and what conditions a deadlock requires.
- Do one thirty-minute practical task of the kind a take-home compresses: read an unfamiliar two-hundred-line file and write what it does, what you would change, and the one thing you remain unsure of.
- Score every answer fluent, correct but slow, or absent, and keep the absent ones visible.
Deliverable: Eight scored short answers and one written reading of unfamiliar code.
Day 4 — The rounds that are about you, and the map
- Deliver three behavioural answers aloud against a timer, a conflict, a failure you owned, and a decision made without enough information, marking any that ran past three minutes or contained no number.
- Assemble the map: every marked item from days one to three on a single page, sorted by how likely it is to appear in your loop rather than by how uncomfortable it felt.
- Choose exactly two areas for the remaining three days and write down what you are deliberately abandoning.
Deliverable: A one-page scored map of the whole surface area with two areas chosen and the rest explicitly abandoned.
Day 5 — First chosen area, to the depth you skipped
- Work the higher-ranked area in four focused blocks, choosing items one level above where you stalled rather than repeating what already works.
- After each block write the rule you extracted in one sentence with its precondition attached, since a rule carrying no precondition is exactly what fails under a variation.
- Re-attempt the day-one or day-two item that exposed this area and compare against the original timing.
Deliverable: Four worked blocks, a timed re-attempt against the original, and three one-sentence rules with preconditions.
Day 6 — Second chosen area, where the gap is coverage rather than speed
- Treat the second area differently from the first. Day five drilled something you could already half-do; this one is usually a topic you had simply never met, so build one worked reference example end to end and keep it, rather than attempting six problems badly.
- Write down the vocabulary you were missing on day two or three, five terms at most, each with the one sentence that makes it usable in an answer rather than the textbook definition.
- Redo the shallow attempt that exposed this area and note whether you now fail later in the problem, because moving the failure point is the realistic gain from a single day and is worth more than a score that did not change.
Deliverable: One worked reference example for the newly covered area, a five-term vocabulary list, and a note on where the failure point moved.
Day 7 — Reassemble the loop
- Sit two rounds back to back with no gap, ordering them so the area you chose second comes last, because the map was built from rested, isolated attempts and the loop will reach your weaker area when you are already spent.
- Write where the second round suffered from the first, which is normally the point at which structure collapses into narration.
- Reduce the week to one page holding only the rules you can state without reading them.
Deliverable: Mock notes on cross-round carryover plus a one-page card of rules you can recite from memory.
Review and mentoring: what you let through
Counting review comments or mentees proves nothing. The useful version is a specific change you approved with a reservation you stated, or one you blocked and the delay that cost. Say which standard you were holding and why it was worth the friction. A mentoring story needs the thing the other person can now do without you.
How have you dealt with a difficult customer or stakeholder in the past?
Medium · behavioural and engineering judgement
Approach
- Close with what you would do differently, concretely.
- Pick a story where you made the decision, not one where you watched it.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- What did you decide not to do, and why?
Describe a project you worked on; what was your specific contribution?
Medium · behavioural and engineering judgement
Approach
- Give the blast radius: what could have broken, and what you measured.
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
Follow-up
- How did you know your change caused the improvement?
- What did you decide not to do, and why?
Can you describe a time you had to explain a complex technical concept to a non-technical team member?
Medium · behavioural and engineering judgement
Approach
- State the situation in two sentences and spend the rest on the reasoning.
- Name the disagreement and how you resolved it with evidence.
- Give the blast radius: what could have broken, and what you measured.
Follow-up
- How did you know your change caused the improvement?
- What did you decide not to do, and why?
How do you handle debugging or technical roadblocks during a project?
Medium · behavioural and engineering judgement
Approach
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Close with what you would do differently, concretely.
Follow-up
- What did you decide not to do, and why?
- How did you know your change caused the improvement?