cswork / libraryOpen practice workspace

Interview guides · AGI

AGI Software Engineer Interview Questions & Guide 2026

API design practice for AGI software engineer candidates: compatibility, versioning, and changes you cannot take back.

The 60-second brief

A Software Engineer at AGI plays a pivotal role in bridging the gap between complex engineering challenges and scalable, real-world solutions. You are not just writing code; you are contributing to the foundational architecture that drives the company’s technical output. This role requires a balance of rigorous analytical thinking and the ability to translate high-level design requirements into efficient, maintainable software systems.

Seniority moves the scope further than the words in the title do. An earlier-career loop mostly checks that you implement something correctly and can reason about its cost, while a senior loop checks that you can pick between two defensible designs and say what you gave up.

Focus areas

  • Choose indexes from the query's access path
  • Bound every outbound call with a timeout
  • Paginate large result sets with keyset cursors

Overview

In this position, you will be expected to operate at the intersection of product development and core engineering. Whether you are working on electrical design integration or broader software system architecture, your impact is measured by the stability, scalability, and efficiency of your contributions. The environment is one that values deep technical proficiency and an ability to articulate the "why" behind your technical decisions, making it an ideal space for engineers who thrive on complex, high-stakes problem-solving.

The AGI interview process

AGI candidates report 5 rounds · ≈ 4-6 weeks. The stages below are what candidates describe, not a published process.

Initial Contact

An unlabelled round is first an information problem, and the cheapest information is free. Whoever schedules it can usually tell you how long it runs, who will be in the room and what they work on, whether you will be writing code and in what environment, and whether anything is being sent beforehand. Ask in writing so the answer is on record, then prepare for the two or three formats those answers still leave open instead of betting on one. What separates a strong candidate is not guessing right; it is having an opening that works whichever one it turns out to be.

What to demonstrate

  • Whether you can start work from an ambiguous brief, since tolerating a vague scope without stalling is the same thing the job asks for
  • Whether the questions you asked beforehand were ones that change your preparation, such as duration, medium and who is joining, rather than ones whose answers you could not have acted on
  • Whether you adapt when the round turns out to be something other than what you were told, instead of spending the first ten minutes visibly recalibrating

How to prepare

  • Send one short scheduling message asking four things: how long, who is joining and what they work on, whether you will be writing code and where, and whether to prepare anything in advance. Treat a vague reply as real information, since it means the round is loosely structured and you will be shaping it yourself.
  • Write one opening that works in any of the formats still open: restate in your own words what you have been asked to do, then ask which of two directions is more useful to them. Say it aloud until it stops sounding recited.
  • Set up for the two most likely formats before the call starts, with a blank editor in the language you would choose and a shared document you can type into, so a format surprise costs you nothing in the first minutes

Recruiter Screen

Before anything technical happens, someone has to decide which rung of the ladder your loop is calibrated to, and that decision sets the bar for every round after it. It comes from how you describe scope, not from your title, because titles do not convert cleanly between companies. The weak version of the answer is team size and years. The strong version names the largest change you shipped where nobody reviewed the design, what would have broken if you had been wrong, and what you were paged for. Get the level said out loud on this call, because the range and the loop both follow from it.

What to demonstrate

  • Whether the scope in your own account maps onto a level the team actually has an opening at, so a mismatch ends the process cheaply rather than after four interviewers have spent a day
  • Whether your title needs re-mapping: the same word describes very different amounts of independent decision-making at a twenty-person company and a ten-thousand-person one
  • Whether your compensation expectation can be filled at that level in the structure the role pays in, which is why the number gets asked for before any engineer is scheduled

How to prepare

  • Write down two changes from the last two years: the largest one you designed with nobody reviewing the design, and the largest one where someone more senior did. Lead with the first when scope comes up, and be ready to say which parts of the second were yours
  • Ask which level the loop is calibrated to and what changes at the level above it, then plan your weeks from that answer rather than from the posting
  • Settle a total-compensation range beforehand with the split named, base against bonus against equity and its vesting period, so a question about numbers gets a number instead of the word market

Technical Discussion

What this round decides is narrow: whether you can produce code that runs and is correct on inputs nobody showed you. An elegant solution that does not compile scores below a plain one that does, so write a correct brute force first, say out loud that you know its cost, and improve it with the working version still on screen. What separates strong answers is who finds the broken case. Trace your own code against an empty input, a single element, and duplicate keys before you say you are finished, because being told is far more expensive than noticing.

What to demonstrate

  • Whether degenerate inputs get checked without being asked for: an empty collection, one element, every element equal, and the extreme value the input type allows
  • Whether the complexity you state matches the code you actually wrote, including a sort or a copy sitting inside a loop
  • Whether the finished answer is verified against the worked examples before you call it done, rather than assumed correct because the code reads correctly

How to prepare

  • Take five problems you have already solved and, without running anything, write down what each returns for empty input, a single element, and all-duplicates. Then run them and count how many you predicted wrong.
  • Drill the brute force as its own skill: on ten problems, write only the obviously-correct slow version and time how long it takes to get it passing. If that is more than a few minutes, that is what to practise, not the optimal version.
  • Add a fixed last step before you submit anything, reading only the loop bounds and the initial value of each accumulator, which is where most off-by-one errors live

Behavioral Discussion

Your first answer is not really what is scored. It buys the follow-up questions, and those decide the round. An interviewer with fifteen minutes takes one thread and pushes on it four or five times, so a story you can only tell at a single level of detail collapses under the third why. That is an argument for fewer stories known deeply rather than one prepared per prompt. Four or five pieces of work you can still explain down to the code you changed and the argument you had about it will cover nearly anything asked in this round.

What to demonstrate

  • Whether a story holds as the questioning moves from what you did to why that instead of the alternative, and then to what you would change knowing what you know now
  • Whether you can re-cut a project to answer the question actually asked rather than delivering a rehearsed block that answers an adjacent one
  • Whether your level of detail is chosen rather than habitual: going down to the schema when the question is about the data model, staying out of it when the question is about the person who disagreed with you

How to prepare

  • Pick four projects and write the chain out four levels deep for each: what you did, why that, why not the alternative, and what would have to be true for the alternative to have won. Where you cannot reach the fourth level, you have a placeholder rather than a story
  • Have someone ask why three times in a row on a single thread with nothing else added, and mark the point where you start repeating a sentence you already said. That point is where the interviewer stops learning anything
  • Build a one-page index instead of an answer bank: the common prompts in this round (disagreement, a failure that was yours, thin requirements, a deadline you missed, work you inherited) mapped to which of your four projects you would use for each, so the choosing is done now rather than while an interviewer waits

Final Decision

Where the day includes a partner from product, design or data, that conversation is weighted like the technical ones and prepared for least. They are deciding one thing: whether having you in the room makes their decisions cheaper. That means options with costs attached, not implementation detail and not "it depends". An estimate someone can plan against — a range, the assumption that would push it to the high end, and what you would drop to hit the low one — is worth more than a confident single number, which everyone present already knows is wrong.

What to demonstrate

  • Whether an estimate comes as a range with the assumption most likely to break it, and states what a specific scope cut would actually buy
  • Whether a technical constraint is handed over as a choice with consequences on their side, rather than as a verdict they have no standing to argue with
  • Whether you establish what decision is on the table before proposing anything
  • Whether risk is raised while it can still change the plan, with the trigger that would confirm it, instead of reported afterwards as a slip

How to prepare

  • Take a project that shipped late and write the two-sentence warning you could have given three weeks earlier, naming what you would have needed decided at that point
  • Rehearse one estimate out loud until it arrives in three parts: the range, the single assumption that would blow it, and the smallest thing you would cut to protect the date
  • Rewrite an objection you have actually made — the "we can't do that" version — as two options with their costs, so the choice ends up with the person who owns it

Where candidates lose points

Running a schema change as though the lock lasts as long as the statement

In PostgreSQL an ALTER TABLE that needs an ACCESS EXCLUSIVE lock must first wait for every open transaction touching that table, and while it waits, later queries needing a conflicting lock queue behind it rather than overtaking it. A DDL statement that would execute in milliseconds, issued while a thirty-second analytics query is open, therefore stalls all traffic on that table for thirty seconds: the outage length is set by the longest open transaction, not by the change. The defences are specific and worth knowing by name - set lock_timeout low and retry rather than queue, add columns without a volatile default so no table rewrite occurs (from version 11 a non-volatile default is a metadata-only change), build indexes with CREATE INDEX CONCURRENTLY while accepting that it cannot run inside a transaction block and leaves an invalid index behind if it fails, and add constraints as NOT VALID followed by a separate VALIDATE CONSTRAINT, which takes a weaker lock.

Paginating with LIMIT/OFFSET over a set that changes while the client is reading it

OFFSET n makes the database produce and discard n rows before returning anything, so the cost of a page grows with its depth rather than with its size and page 500 costs five hundred pages of work. The correctness problem is worse than the cost: if a row is inserted or reordered between two page fetches, rows shift across the offset boundary and are either skipped entirely or returned twice, and neither outcome leaves any trace in the response for the client to detect. Keyset pagination - WHERE (sort_key, id) < ($last_sort_key, $last_id) ORDER BY sort_key DESC, id DESC LIMIT n, backed by an index in exactly that order - reads only the rows it returns and is stable against concurrent inserts. It requires the tie-break column: a timestamp is not unique, and duplicate sort keys straddling a page boundary reintroduce the skip it was adopted to remove.

Retrying a write that is not safe to repeat

A timeout tells you nothing about whether the server applied the write, so a blind retry of a create or a charge can duplicate it. Either make the operation idempotent, with a caller-supplied key the server deduplicates on or a conditional update, or do not retry it; and use exponential backoff with jitter so the retries of many clients do not synchronise into a second outage.

Never running a concrete value through the code

Trace one small input and one edge input by hand, index by index, out loud. Re-reading your own code catches design mistakes; walking a real value through it catches the off-by-one, the uninitialised accumulator and the loop that never advances.

Questions & practice

Diff a projection against the primary without per-row point reads

Hard · reconciliation · range hashing · throttling

The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.

Approach

  1. Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
  2. Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
  3. For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
  4. Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.
  5. Pin the comparison to a point in time or it reports lag as drift: consider only rows whose updated_at is older than now minus a lag margin, and re-check each candidate mismatch individually before repairing. At 1,200 writes per second a diff without this reports thousands of false positives, and an unattended repairer would then overwrite live rows with stale values.
  6. Make the run resumable and throttled: batch by range key, persist the last completed range, and watch a signal such as replica lag or primary CPU, pausing rather than pressing on. A reconciliation that cannot be stopped and resumed gets killed halfway and restarted from zero, which is how a repair becomes an incident.

Worked solution (35 min)

  1. Compute the naive cost explicitly at 40,000,000 reads and 0.5 ms each, then at 100 concurrent, and state what those connections do to a pool already carrying 1,200 writes per second.
  2. Write the merge-join version over (tenant_id, resource_id) and state its memory.
  3. Define the range aggregate: the range key, the per-row hash input, and the combining function, with one sentence excluding XOR.
  4. Work an example with 40,000,000 rows, branching factor 256 and 5 differing rows, and count the ranges examined.
  5. Add the watermark filter and the resume point, and name the throttle signal the loop watches.

Expected result: A rejection of per-row point reads backed by the time cost and the cache-eviction argument, a single ordered merge join as the dense-case answer at O(n) time and O(1) memory, a range-hash drill-down examining O(d log_B(n/d)) ranges using a sum or multiset hash rather than XOR, a watermark excluding recently written rows, and a resumable throttled run loop.

Verify it yourself

  • Injecting one known stale row makes exactly one leaf range mismatch and the drill-down reaches it.
  • Duplicating a row on one side is detected, which is precisely the case XOR would miss.
  • Running the diff twice against an idle system reports zero mismatches both times.

Follow-up

  • The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
  • Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?
  • How would you run this continuously at low cost instead of only as incident response?

Canonicalise a request body into a stable idempotency fingerprint

Medium · parsing · canonicalisation · hashing

idempotency_key.request_fingerprint is a SHA-256 over the method, path and canonicalised body, and a retry whose fingerprint differs must be rejected with 422 rather than served the stored response. Write the canonicaliser. Bodies are JSON up to 256 KB nested at most 32 levels; clients vary key order, whitespace and unicode escaping, and some send 64-bit ids as JSON numbers. Produce a deterministic byte string such that semantically identical bodies match and any semantic difference does not. State your complexity and name two normalisations you refuse to perform.

Approach

  1. Parse once into a tree, then re-serialise under fixed rules: object keys sorted, array order preserved, one escaping convention, no insignificant whitespace. Parsing is O(n) and sorting keys is O(k log k) per object, so O(n log n) overall with O(depth) stack, and the 32-level cap is enforced during parsing because hostile nesting is how a canonicaliser becomes a stack overflow.
  2. Sort keys by their UTF-8 bytes and say why the obvious implementation is wrong in some runtimes: a default string comparison that orders by UTF-16 code units places surrogate pairs, meaning code points from U+10000 up, below U+E000 to U+FFFF, which is not UTF-8 byte order, so two services written in different languages disagree on the same document.
  3. Do not re-encode numbers through a double. IEEE-754 binary64 represents integers exactly only up to 2^53, so normalising a 19-digit id through a float changes it, and 1 against 1.0 cannot be reconciled without deciding whether they are the same value. Preserve the literal token, and require ids as strings at the API boundary if you want them comparable.
  4. Reject duplicate keys rather than picking one. JSON permits them and parsers disagree, most keeping the last, so any choice you make ties the fingerprint to a parser detail that the code handling the request does not necessarily share.
  5. Frame the hash preimage so concatenation cannot collide: delimit or length-prefix the method, path and body, otherwise one request's fields can be rearranged into another request with the same byte stream and the same fingerprint.
  6. Name the refusals and their consequence: no case folding, no dropping of null-valued keys, no Unicode normalisation. Each makes two different requests fingerprint alike, and the resulting failure is the worst one this table has, since the second request is answered with the first one's stored response and its effect never happens.

Follow-up

  • A client sends the same logical request with an extra field your API ignores. Same key, different fingerprint, so you return 422. Is that the right answer?
  • Where does the fingerprint get computed relative to request decompression and the body-size limit?
  • The endpoint takes 1,000 requests per second with 256 KB bodies. What does hashing cost, and does it belong at the edge or in the core service?

Merge partitioned event streams into one ordered feed with bounded lateness

Hard · k-way merge · watermarks · out-of-order streams

The read-model service consumes 64 log partitions carrying about 4,000 events per second in total. Each partition is ordered within itself, but partitions drift by up to 30 seconds, and the activity feed must present a tenant's events in occurred_at order. Produce the merge. State its complexity, the buffer it requires in events and in bytes, what happens when one partition is idle, and what you do with an event that arrives after you have already emitted its position. Payloads average 1 KB.

Approach

  1. Merge with a min-heap over the 64 partition heads keyed on (occurred_at, event_id): O(log P) per event and O(n log P) overall. The tie-break on event_id is what makes the output deterministic when two partitions carry the same millisecond, which matters because the feed is paginated and a non-deterministic order reorders pages under the reader.
  2. Emitting the heap head is only correct once every partition has produced everything up to that timestamp, so the emit condition is a watermark: the minimum across partitions of the highest occurred_at seen, less the allowed lateness. Events are held until the watermark passes them, which is what turns individually ordered streams into a jointly ordered one.
  3. Size the buffer from the lateness rather than guessing: 4,000 events per second times 30 seconds is 120,000 buffered events, and at 1 KB each about 120 MB of heap. That number is the real price of the ordering guarantee and belongs in front of whoever asked for it.
  4. Handle the idle partition explicitly, because it fails the feed rather than corrupting it: a partition with no traffic never advances its own maximum, so the watermark freezes and output stops entirely. Either every partition emits a periodic idle marker carrying the broker's current time, or the watermark falls back to wall clock for a partition silent beyond a threshold.
  5. Choose the late-event policy from what the projection is keyed on. The projection upserts on (aggregate_id, aggregate_version) and discards a version it has already applied, so a late event is safe to apply out of order and correctness never depended on the merge at all. Apply it, recompute the affected feed page, and count lateness so the 30-second budget can be re-derived from data rather than folklore.
  6. Say what the merge does not buy: ordering is guaranteed within one aggregate by the log's partitioning, and no watermark makes the cross-aggregate order authoritative. Two events from different aggregates in the same millisecond have no true order, so the feed's order is a presentation choice that must be stable rather than correct.

Follow-up

  • The lateness budget is raised to five minutes. What is the new buffer, and what besides memory changes?
  • The consumer restarts. Where does it resume from, and what does the feed look like for the first 30 seconds?
  • One partition is ten minutes behind because its producer is slow. Do you stall the feed or emit without it?

Find version gaps and relay lag with window functions

Medium · window functions · event tables · frame semantics

outbox_event holds event_id, aggregate_type, aggregate_id, aggregate_version, event_type, payload, status ('pending','published','dead'), attempts, created_at, published_at. A projection is missing rows and you must decide whether the relay skipped events or the consumer dropped them. Write three queries over the last seven days: one listing every aggregate_id whose published aggregate_version sequence has a hole, one giving per-day counts with a running total, and one returning the newest published event per aggregate. For each, say where the window function is evaluated relative to WHERE and LIMIT. PostgreSQL 16.

Approach

  1. Gaps: compute lead(aggregate_version) OVER (PARTITION BY aggregate_id ORDER BY aggregate_version) in a subquery, then filter next_version <> aggregate_version + 1 in the outer query. Window functions are evaluated after WHERE, GROUP BY and HAVING and before the outer ORDER BY and LIMIT, so the predicate cannot sit in the same WHERE clause and PostgreSQL 16 has no QUALIFY.
  2. Say what the seven-day filter does to the answer: it truncates every partition, so the first row per aggregate has no predecessor inside the window and a hole spanning the boundary is invisible. Widen the window, or join to resource.version as the authority for the true maximum.
  3. Running total: SELECT date_trunc('day', created_at) AS d, count() AS n, sum(count()) OVER (ORDER BY date_trunc('day', created_at) ROWS UNBOUNDED PRECEDING). An aggregate inside a window call is legal because grouping runs before windowing. The grouping key is unique per row here so ROWS and RANGE agree, but write the frame anyway — over ungrouped rows with tied timestamps the default RANGE frame pulls in every peer row and the total jumps.
  4. Newest per aggregate: DISTINCT ON (aggregate_id) ... ORDER BY aggregate_id, aggregate_version DESC is the cheap PostgreSQL-only form when an index matches that order; row_number() OVER (PARTITION BY aggregate_id ORDER BY aggregate_version DESC) = 1 is the portable form and needs a subquery for the same evaluation-order reason as the gap query.
  5. Interpret rather than report: no gaps plus a normal p95 of published_at - created_at points at the consumer; gaps or a fat lag tail point at the relay; rows still 'pending' with attempts > 0 point at neither, because they never left the database.
  6. Be explicit that the partial index on (created_at, event_id) WHERE status = 'pending' does not serve any of these — they read published rows. Name the index a recurring monitor would need, and say why a query run twice a year may not deserve one.

Follow-up

  • Relay failover redelivers events. Does a duplicate break the gap query, and how would you detect one from this table alone?
  • Turn the gap check into a continuous monitor rather than a query someone runs after an incident. What does it watch?
  • The consumer claims it never received event 4,812,006. What do you look at, in what order?

Hold a per-tenant active cap against concurrent creates

Hard · write skew · isolation levels · constraints

A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.

Approach

  1. Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
  2. Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
  3. Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
  4. State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.
  5. For the job case the invariant is expressible per row, so let the database hold it: a partial unique index on job_run (tenant_id, job_type) WHERE status IN ('queued','running') makes a second running export unwritable and the loser takes 23505, mapped to 409. That is strictly better than a counter — no drift, no reconciliation — and it is available only because the cap is one rather than fifty.
  6. Add the retry discipline each route demands: under SERIALIZABLE both 40001 and deadlock 40P01 are retryable and the retry must re-execute the read, while under READ COMMITTED with the counter nothing retries, because the conflict is reported to the caller rather than raised as an error.

Worked solution (35 min)

  1. Reproduce with two sessions that both count 49, both insert and both commit, at READ COMMITTED and then at REPEATABLE READ; record the final active count for each.
  2. Repeat both sessions at SERIALIZABLE and record which SQLSTATE the loser receives and at which statement it is raised.
  3. Implement the counter form and run a 20-way concurrent create against a tenant sitting at 45 active resources.
  4. Implement the partial unique index for the job case and race 20 enqueues of the same export.

Expected result: READ COMMITTED and REPEATABLE READ both finish at 51. SERIALIZABLE finishes at 50 with one transaction aborted at 40001 — usually at commit, though SSI may raise it at an earlier statement. The counter form finishes at exactly 50: of the twenty creates, the five that take the tenant from 45 to 50 return 201 and the remaining fifteen match zero rows and return 409, with no error raised. The job index admits one running export and rejects the rest with 23505.

Verify it yourself

  • count(*) WHERE status='active' never exceeds the cap across 50 randomised concurrent runs.
  • Remove the active_resource_count < 50 predicate and the same test must start failing; if it still passes, the race is not being exercised.
  • At SERIALIZABLE, confirm every participating session is SERIALIZABLE — one session at a lower level and the guarantee is gone.
  • After each run, the counter equals the real count of active rows.

Follow-up

  • A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
  • The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?
  • How do you detect after the fact that the counter drifted, without locking the table?

How many gas stations do you think are in the United States and explain the logic you would use to discover how many?

Medium

Approach

  1. Say what you would check first and why it is the highest-information step.
  2. State your assumptions explicitly before working the problem.
  3. Clarify what is being asked and what a complete answer contains.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

If you were tasked with optimizing a legacy system, where would you start?

Medium

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. Say what you would check first and why it is the highest-information step.
  3. Work from the requirement backwards to the design.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

Evolve the resource contract without breaking integrations you cannot upgrade

Hard · versioning · backward compatibility · deprecation

GET /v1/resources/{id} returns status from a four-value enum ('draft','active','archived','deleted'), a numeric version, and the body inline. Consumers are a browser app you deploy and roughly 300 server-side integrations, some untouched for two years, that switch exhaustively on status and parse ids as JSON numbers. You must add a 'pending_review' status, move bodies over 256 KB to a body_ref pointer, and expose per-field change history from resource_revision. Specify the compatibility policy, the wire changes, how both generations are served, and the evidence that lets you remove the old shape.

Approach

  1. Write the policy first and date it: fields are added, never retyped or repurposed; consumers ignore unknown fields; an unknown enum value maps to a documented fallback; nothing is removed until telemetry shows no caller reads it. Then say the uncomfortable part out loud - v1 shipped without the unknown-value rule, so 300 running integrations have no fallback, and no server change can install one into code that is already deployed.
  2. That single fact forces per-request negotiation rather than a server-side default. Keep one internal model and select a serialiser from an explicit version in the request, and default a caller that sends nothing to the oldest supported version. Defaulting to the newest is the change that breaks every integration that never asked for anything, on the day you ship.
  3. Downgrade 'pending_review' for old callers to the nearest state they already handle, 'draft', and state the loss explicitly: those integrations cannot see review state and will treat the resource as editable. If that is unacceptable for one integration, the remedy is moving it to the new version, not a cleverer projection - there is no mapping that invents a state the client has no code for.
  4. Make the body change additive. Old callers keep body inline; the new shape adds body_ref and a size field, and resources over the limit are served to old callers by resolving the pointer server-side or by refusing with a documented code, chosen once and published. Never repurpose body to carry the pointer: a client that renders it shows a storage key to a user, and that failure is silent, where a missing field would have been loud. While you are here, serialise BIGINT ids as strings in the new shape - a browser parsing JSON numbers gets IEEE-754 doubles, exact only to 2^53 - and treat that as its own breaking change requiring the same negotiation, not a quiet fix.
  5. Add change history as a separate sub-resource, GET /v1/resources/{id}/revisions, keyset-paginated over (resource_id, version) rather than as an array inside the resource. A field added to a hot response is paid for by every caller including those that never read it, and an unbounded array inside a cached object destroys the size assumptions the cache was configured with.
  6. Retire on evidence rather than on a date alone: count requests per negotiated version per credential, publish a Sunset header (RFC 8594) with the removal date and a link to the migration, contact the credentials still on the old version, then answer 410 Gone once it is removed. Keep each version's serialiser under snapshot tests so a refactor cannot change v1's bytes by accident.

Worked solution (40 min)

  1. Write and date the compatibility policy as five rules, then mark which of them v1 callers cannot honour.
  2. Choose the negotiation mechanism and the default for an unversioned request, and justify the default in one sentence.
  3. Write the downgrade table: new state to old state, new body shape to old body shape, and what is lost in each direction.
  4. Specify the revisions sub-resource: its URL, its cursor, and why it is not a field on the resource.
  5. Write the sunset plan: the per-version per-credential metric, the header, the lead time, and the terminal status code.

Expected result: A dated additive policy, version negotiation over one internal model with the oldest version as the default, a downgrade table with its losses named, history as a paginated sub-resource, and a removal gated on per-credential version telemetry rather than a calendar entry.

Verify it yourself

  • A two-year-old integration receives a resource that is really in 'pending_review' and neither crashes nor renders a blank state.
  • Deleting the legacy body field from the internal model breaks exactly one serialiser and no business logic.
  • Every v1 response is byte-stable under snapshot tests after an unrelated refactor.

Follow-up

  • An old integration submits a status transition while the resource is really in 'pending_review'. What does the write path accept, and what does it reject?
  • Two years on you want to delete the v1 serialiser. What evidence makes that safe, and who must be contacted before it happens?
  • How would you test against a two-year-old integration rather than against today's source?

One log partition stops advancing while the others drain

Easy · poison message · head-of-line blocking · consumer lag · projections

Search results for a subset of tenants are hours stale; the rest are current. The projection consumer reports lag of zero on 15 of 16 partitions and 400,000 on one. Its error rate is flat and its CPU is idle. outbox_event has no pending rows older than a second, so the relay has published everything it holds. Identify the mechanism, give the ordered checks, and state what you do in the first ten minutes versus what you change permanently.

Approach

  1. Read the lag distribution first. A slow consumer lags everywhere; zero on fifteen partitions and 400,000 on one is not throughput. Idle CPU on the stuck partition means the consumer is not advancing its offset at all, which points at one message it cannot get past rather than at a rate problem.
  2. Exonerate the producer before touching the consumer. No pending outbox rows older than a second means the relay published, so the event exists in the log. This separates never sent from sent and never applied, which are different code paths and usually different owners.
  3. Read the message at the stuck offset and the handler's log lines for its event_id. A flat error rate with no progress has two explanations and you must distinguish them: the handler is throwing and the retry loop is swallowing it, or the handler is blocking on something and never returning. Idle CPU with no error lines favours the second.
  4. Mitigate before diagnosing further. Move the offending event to a dead-letter store and commit the offset past it. Adding consumers does nothing here, because a partition is consumed by exactly one member of the group, and the blast radius is every aggregate hashed to that partition, not only the aggregate that produced the bad event.
  5. Fix permanently by bounding handler attempts and dead-lettering on exhaustion, so no single message can stop a partition. Then replay the dead-lettered event once the handler is fixed: it carries aggregate_id and aggregate_version, so a consumer that discards versions it has already applied can absorb the replay, and resource_revision is the fallback if the event itself is unusable.

Follow-up

  • The dead-lettered event carried aggregate_version 7 and the projection had applied 6. What must the replay do differently if 8 and 9 landed in the meantime?
  • How do you show staleness to the user while the partition is behind, given the API already returns the projection's watermark?
  • What changes if the message is poison because a previous deploy wrote a payload shape the current code cannot parse?

Suggested practice checklist

Four days sample coding, design, fundamentals and the practical rounds at deliberately shallow depth, which is enough to surface the topics you did not know were in scope. That map, rather than a guess made on day one, decides where the last three days go.

Day 1 — Coding, one pass at shallow depth

  • Solve one problem from each of six families, an array with two pointers, hash counting, binary search, a tree traversal, a graph traversal and one dynamic program, under a hard twenty-minute cap with no extensions, marking each finished, late, or stalled.
  • For every stall, write the exact move you could not make rather than the subject, so the note reads could not turn the recurrence into a loop rather than bad at dynamic programming.
  • Fix nothing today. The value of the pass is the unfixed record.

Deliverable: Six timed attempts marked finished, late or stalled, each stall carrying a named blocking move.

Day 2 — Design, one pass at shallow depth

  • Spend twenty minutes each on three different shapes, a read-heavy feed, a write-heavy ingest path, and something needing a transaction across two entities, stopping each at requirements, interface and data model.
  • After each, write the first question you could not answer, which is usually a number you could not estimate or a failure mode you had no vocabulary for.
  • Mark which of the three you would be most relieved not to be asked, and treat that as data rather than as a preference.

Deliverable: Three shallow designs, each with the first unanswerable question written at the bottom.

Day 3 — Fundamentals and the practical rounds

  • Answer eight short questions in writing at four minutes each, covering the material that fills the gaps between the big rounds: what happens between a URL and a rendered page, what an index costs on write, when a process is preferable to a thread, and what conditions a deadlock requires.
  • Do one thirty-minute practical task of the kind a take-home compresses: read an unfamiliar two-hundred-line file and write what it does, what you would change, and the one thing you remain unsure of.
  • Score every answer fluent, correct but slow, or absent, and keep the absent ones visible.

Deliverable: Eight scored short answers and one written reading of unfamiliar code.

Day 4 — The rounds that are about you, and the map

  • Deliver three behavioural answers aloud against a timer, a conflict, a failure you owned, and a decision made without enough information, marking any that ran past three minutes or contained no number.
  • Assemble the map: every marked item from days one to three on a single page, sorted by how likely it is to appear in your loop rather than by how uncomfortable it felt.
  • Choose exactly two areas for the remaining three days and write down what you are deliberately abandoning.

Deliverable: A one-page scored map of the whole surface area with two areas chosen and the rest explicitly abandoned.

Day 5 — First chosen area, to the depth you skipped

  • Work the higher-ranked area in four focused blocks, choosing items one level above where you stalled rather than repeating what already works.
  • After each block write the rule you extracted in one sentence with its precondition attached, since a rule carrying no precondition is exactly what fails under a variation.
  • Re-attempt the day-one or day-two item that exposed this area and compare against the original timing.

Deliverable: Four worked blocks, a timed re-attempt against the original, and three one-sentence rules with preconditions.

Day 6 — Second chosen area, where the gap is coverage rather than speed

  • Treat the second area differently from the first. Day five drilled something you could already half-do; this one is usually a topic you had simply never met, so build one worked reference example end to end and keep it, rather than attempting six problems badly.
  • Write down the vocabulary you were missing on day two or three, five terms at most, each with the one sentence that makes it usable in an answer rather than the textbook definition.
  • Redo the shallow attempt that exposed this area and note whether you now fail later in the problem, because moving the failure point is the realistic gain from a single day and is worth more than a score that did not change.

Deliverable: One worked reference example for the newly covered area, a five-term vocabulary list, and a note on where the failure point moved.

Day 7 — Reassemble the loop

  • Sit two rounds back to back with no gap, ordering them so the area you chose second comes last, because the map was built from rested, isolated attempts and the loop will reach your weaker area when you are already spent.
  • Write where the second round suffered from the first, which is normally the point at which structure collapses into narration.
  • Reduce the week to one page holding only the rules you can state without reading them.

Deliverable: Mock notes on cross-round carryover plus a one-page card of rules you can recite from memory.

Review and mentoring: what you let through

Counting review comments or mentees proves nothing. The useful version is a specific change you approved with a reservation you stated, or one you blocked and the delay that cost. Say which standard you were holding and why it was worth the friction. A mentoring story needs the thing the other person can now do without you.

Tell us about a time you had to resolve a technical disagreement with a teammate.

Medium · behavioural and engineering judgement

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. Give the blast radius: what could have broken, and what you measured.
  3. Close with what you would do differently, concretely.

Follow-up

  • What did you decide not to do, and why?
  • What would you do differently if you ran that again?

Why do you want to work at AGI?

Medium · behavioural and engineering judgement

Approach

  1. Give the blast radius: what could have broken, and what you measured.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Close with what you would do differently, concretely.

Follow-up

  • How did you know your change caused the improvement?
  • What did you decide not to do, and why?

Can you walk us through a complex project you previously led?

Medium · behavioural and engineering judgement

Approach

  1. Give the blast radius: what could have broken, and what you measured.
  2. Close with what you would do differently, concretely.
  3. Pick a story where you made the decision, not one where you watched it.

Follow-up

  • What did you decide not to do, and why?
  • How did you know your change caused the improvement?

How do you handle ambiguity when project requirements change mid-cycle?

Medium · behavioural and engineering judgement

Approach

  1. Close with what you would do differently, concretely.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.

Follow-up

  • What would you do differently if you ran that again?
  • What did you decide not to do, and why?