cswork / libraryOpen practice workspace

Interview guides · Aeron

Aeron Software Engineer Interview Questions & Guide 2026

Testing practice for Aeron software engineer candidates: the boundaries worth covering, and why flakiness is a real defect.

The 60-second brief

A Software Engineer at Aeron is at the heart of the company’s mission to push the boundaries of navigation and systems technology. This role is not merely about writing code; it is about architecting high-performance solutions that operate at the intersection of complex hardware and sophisticated software. You will be instrumental in building systems that require extreme precision, reliability, and efficiency.

Most rounds test how you handle an under-specified problem more than what you recall. A wrong first approach you correct out loud is recoverable; a constraint you assumed silently and were never given is the expensive mistake.

Focus areas

  • Trace a symptom to a mechanism under load
  • Make every write idempotent under retry
  • Bound every outbound call with a timeout

Overview

The impact of your work is direct and tangible. Whether you are developing low-level drivers, optimizing communication protocols, or verifying critical navigation systems, your contributions ensure that Aeron products meet the highest standards of safety and performance. You will work in an environment that values deep technical expertise, requiring you to bridge the gap between abstract software concepts and the physical constraints of embedded hardware.

This position is ideal for engineers who thrive on technical depth and enjoy solving "close-to-the-metal" challenges. You will collaborate with cross-functional teams to tackle complex system-level problems, making this a high-stakes, high-reward role for those passionate about engineering excellence.

Where to focus your preparation

Treat the sections below as preparation areas and confirm the format with your recruiter.

Preparation focus

No round sequence has been reported for this company, so work the categories below and confirm the format with your recruiter.

What to demonstrate

  • Breadth across SQL, experimentation and product reasoning
  • Ability to state assumptions before choosing a method

How to prepare

  • Drill the practice exercises below and time yourself
  • Prepare three quantified stories about decisions you drove

Where candidates lose points

Shipping a migration and the code that depends on it as a single change

During any rolling deploy, and for as long as a rollback remains possible, old and new code execute against the same schema at the same time. A migration that drops or renames a column breaks every instance that has not restarted yet, and code that requires a column the migration has not applied breaks every instance that restarted early. The discipline is expand then contract: add the new column nullable, write both shapes, backfill in batches, move reads across once the backfill is verified, and only then stop writing the old shape and drop it - four deploys, usually spread over days. It feels disproportionate until the first rollback, at which point it is the only reason the previous version still runs.

Letting a slow dependency consume unbounded concurrency

The failure that takes a service down is usually not an error but a delay. A dependency answering in thirty seconds instead of fifty milliseconds holds each request's worker or connection six hundred times longer, and since required concurrency is arrival rate times latency, a fleet sized for sixty in-flight requests now needs thirty-six thousand to sustain the same rate - so it queues, and requests whose clients have already abandoned them still occupy resources. Retries make it precisely worse: a policy of three attempts triples the load on a dependency at the exact moment it is least able to serve, which is how one slow dependency becomes an outage of everything sharing that pool. Containment is four specific things - a timeout on every outbound call shorter than the caller's remaining budget, a bounded pool per dependency so one cannot starve the others, backoff with full jitter rather than a fixed delay so retries do not resynchronise, and a circuit that stops sending once the failure rate makes an attempt pointless.

Abandoning working code to chase the optimal solution

Get the straightforward version correct, state its complexity, and only then optimise, keeping the working version until the faster one passes the same cases. A correct quadratic solution with a stated path to linear beats a half-written optimal one that never ran.

Choosing a schema before the access patterns are known

Write the queries first, with their filters, sort orders, cardinalities and which ones sit on the latency-critical path, then design tables and indexes to serve them. An index nothing queries still costs write throughput and storage, and a hot query with no supporting index becomes a full scan that only hurts once the table is big.

Questions & practice

Collapse a redelivered event batch into per-aggregate high-water marks

Easy · hashing · at-least-once · aggregation

You drain a batch of up to 5,000,000 events, each (aggregate_id BIGINT, aggregate_version INT, event_type, payload). The log guarantees order within one aggregate only; the batch merges 64 partitions, and a relay failover has redelivered a range, so an older version for an aggregate can appear after a newer one. Given a map of last_applied_version per aggregate, produce the events worth applying, at most one per (aggregate_id, version), plus the count discarded. Target O(n) time. State the memory for 2,000,000 distinct aggregates and what you do when it does not fit.

Approach

  1. One pass, one hash map from aggregate_id to the highest version kept, and a discard counter. An event whose version is at or below last_applied_version for its aggregate is dropped without further work, which is the whole reason the event carries its version rather than a delta. O(n) expected time, O(d) space in distinct aggregates.
  2. Keep the maximum, never the last occurrence. The redelivered range means the final appearance of an aggregate in the batch can be an older version than one seen earlier in the same batch, so last-wins applies stale state over newer state and the projection regresses with no error anywhere.
  3. Cost the memory instead of calling it large: an 8-byte key plus a 4-byte version is 12 bytes of payload, and an open-addressed table held at a 0.7 load factor costs roughly 17 bytes per entry before per-slot metadata, so 2,000,000 aggregates is tens of megabytes in a native layout and several times that in a runtime that boxes both key and value.
  4. If the distinct set exceeds memory, partition on hash(aggregate_id) mod P and reduce each partition independently. Every event for one aggregate hashes to the same partition, so the per-partition result is exact and the merge is concatenation rather than a second reduction.
  5. Reject sorting the batch by (aggregate_id, version) as the default. It is O(n log n) and buys nothing, because max is associative and commutative and needs no ordering; sorting earns its cost only when the downstream consumer must receive the events in order rather than a per-aggregate winner.
  6. Separate the two mechanisms out loud: in-batch deduplication does not make the consumer idempotent, because the same event redelivered tomorrow arrives in a different batch entirely. The projection write itself still has to be keyed on (aggregate_id, version).

Follow-up

  • The payload is a patch rather than a snapshot, so applying only the highest version loses the intermediate changes. What changes in your reduction?
  • How do you detect that version 7 arrived while version 6 was never delivered, and what should the consumer do about the gap?
  • Two events for one aggregate carry the same version with different payloads. Which one is wrong, and how would you find out?

Find overlapping job attempts and peak concurrency from lease records

Medium · sweep line · intervals · leases

A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.

Approach

  1. Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
  2. For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
  3. For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
  4. Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
  5. State the clock caveat: started_at and finished_at are written by different workers, so under skew of a few hundred milliseconds an apparent overlap shorter than that bound is not evidence. Filter reported overlaps by a minimum duration, or prefer timestamps written by whichever component heartbeats the lease.
  6. Scale the sort rather than assuming it fits: the sweep emits two endpoints per attempt, so 50,000,000 records become 100,000,000 endpoints, and at roughly 24 bytes each, an 8-byte timestamp plus a 4-byte job_type plus a kind flag padded to alignment, that is about 2.4 GB of sort keys before any scratch space. Either push the ordering into the database behind an index on (job_type, started_at) or run an external merge sort in chunks; the overlap pass sorts n records rather than 2n, so it is the cheaper of the two.

Worked solution (30 min)

  1. Write the interval derivation with the COALESCE and state in one line which of the two end sources is observed and which is assumed.
  2. Write the concurrency sweep: the endpoint tuples, the sort key including the end-before-start tie-break, and the per-job_type counter.
  3. Hand-trace four attempts of one job, two disjoint and two overlapping by three seconds, and confirm the overlap detector fires exactly once.
  4. Add the skew filter as a minimum overlap duration, state the value you chose, and justify it from how the timestamps are written.

Expected result: One global sort by (job_run_id, started_at) driving a running-maximum-end check for overlaps, plus a sweep over 2n endpoints with ends ordered before starts for per-job_type peak concurrency, both O(n log n), with half-open intervals, NULL finished_at falling back to lease_expires_at, and overlaps shorter than the clock-skew bound excluded.

Verify it yourself

  • Two attempts touching at exactly the same instant report concurrency 1, not 2.
  • A job with a single attempt never appears in the overlap output regardless of its lease.
  • The reported peak timestamp for a job_type lies inside at least one of that type's intervals.

Follow-up

  • A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
  • Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
  • How would you compute both answers incrementally as records arrive rather than in a daily batch?

Diff a projection against the primary without per-row point reads

Hard · reconciliation · range hashing · throttling

The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.

Approach

  1. Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
  2. Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
  3. For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
  4. Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.
  5. Pin the comparison to a point in time or it reports lag as drift: consider only rows whose updated_at is older than now minus a lag margin, and re-check each candidate mismatch individually before repairing. At 1,200 writes per second a diff without this reports thousands of false positives, and an unattended repairer would then overwrite live rows with stale values.
  6. Make the run resumable and throttled: batch by range key, persist the last completed range, and watch a signal such as replica lag or primary CPU, pausing rather than pressing on. A reconciliation that cannot be stopped and resumed gets killed halfway and restarted from zero, which is how a repair becomes an incident.

Follow-up

  • The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
  • Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?
  • How would you run this continuously at low cost instead of only as incident response?

Hold a per-tenant active cap against concurrent creates

Hard · write skew · isolation levels · constraints

A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.

Approach

  1. Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
  2. Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
  3. Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
  4. State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.
  5. For the job case the invariant is expressible per row, so let the database hold it: a partial unique index on job_run (tenant_id, job_type) WHERE status IN ('queued','running') makes a second running export unwritable and the loser takes 23505, mapped to 409. That is strictly better than a counter — no drift, no reconciliation — and it is available only because the cap is one rather than fifty.
  6. Add the retry discipline each route demands: under SERIALIZABLE both 40001 and deadlock 40P01 are retryable and the retry must re-execute the read, while under READ COMMITTED with the counter nothing retries, because the conflict is reported to the caller rather than raised as an error.

Worked solution (35 min)

  1. Reproduce with two sessions that both count 49, both insert and both commit, at READ COMMITTED and then at REPEATABLE READ; record the final active count for each.
  2. Repeat both sessions at SERIALIZABLE and record which SQLSTATE the loser receives and at which statement it is raised.
  3. Implement the counter form and run a 20-way concurrent create against a tenant sitting at 45 active resources.
  4. Implement the partial unique index for the job case and race 20 enqueues of the same export.

Expected result: READ COMMITTED and REPEATABLE READ both finish at 51. SERIALIZABLE finishes at 50 with one transaction aborted at 40001 — usually at commit, though SSI may raise it at an earlier statement. The counter form finishes at exactly 50: of the twenty creates, the five that take the tenant from 45 to 50 return 201 and the remaining fifteen match zero rows and return 409, with no error raised. The job index admits one running export and rejects the rest with 23505.

Verify it yourself

  • count(*) WHERE status='active' never exceeds the cap across 50 randomised concurrent runs.
  • Remove the active_resource_count < 50 predicate and the same test must start failing; if it still passes, the race is not being exercised.
  • At SERIALIZABLE, confirm every participating session is SERIALIZABLE — one session at a lower level and the guarantee is gone.
  • After each run, the counter equals the real count of active rows.

Follow-up

  • A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
  • The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?
  • How do you detect after the fact that the counter drifted, without locking the table?

Explain why the owner filter ignores the listing index

Medium · composite index · query plans · sort elimination

The only index on resource is (tenant_id, status, updated_at DESC, resource_id DESC). A new endpoint returns one user's resources across all statuses, newest created first: WHERE tenant_id = $1 AND owner_user_id = $2 ORDER BY created_at DESC LIMIT 20. On a tenant with 2M rows it takes 900 ms and EXPLAIN shows a sort above a large scan. Explain precisely why the existing index cannot serve it, give the index that can, and state which of these the new index still will not help: owner_user_id alone across tenants; the same query ordered by updated_at. PostgreSQL 16.

Approach

  1. Separate the two jobs an index does. For filtering, a composite btree is seekable only on a left prefix, so with no predicate on status the scan can at best range over tenant_id and test owner_user_id per row; PostgreSQL 16 has no btree skip scan to jump the unconstrained column.
  2. For ordering, the index is sorted by (status, updated_at) within a tenant and not by created_at, so the LIMIT cannot stop early: every matching row is read and then sorted. That is the 'Sort Method: top-N heapsort' line, and it is why the plan reads 2M rows to answer with 20.
  3. Derive the replacement from the access path — equality, equality, then the ordering column: CREATE INDEX CONCURRENTLY ON resource (tenant_id, owner_user_id, created_at DESC). The scan seeks to the (tenant, owner) range and walks 20 entries in order, so the Sort node disappears along with the row-read.
  4. Treat INCLUDE (title, status) as conditional, not free. An index-only scan still visits the heap for any row whose page is not marked all-visible, so on a table taking 1.2k writes/second the win depends on autovacuum keeping the visibility map current, and the wider index costs more on every insert.
  5. Answer the two negatives explicitly. owner_user_id alone is not a left prefix of the new index, so it degrades to a full scan of the index at best. Ordered by updated_at, the query still seeks on the (tenant, owner) pair but must sort, because only created_at is ordered within that pair.
  6. Measure both sides with EXPLAIN (ANALYZE, BUFFERS) and compare estimated against actual rows at the lowest node — a 2M-versus-200 misestimate there is usually what chose the plan, and adding an index will not fix a statistics problem.

Follow-up

  • 90% of rows are status='active'. Would a partial index WHERE status = 'active' change your answer, and for which of the three queries?
  • A dashboard runs this for 40 owners in one page load. What changes about the design?
  • How do you roll this index out on a table taking 1.2k writes/second, and what does it cost on every insert from then on?

How can you interface SPI with multiple devices? Provide a practical example.

Medium

Approach

  1. Say what you would check first and why it is the highest-information step.
  2. State your assumptions explicitly before working the problem.
  3. Work from the requirement backwards to the design.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

How are commands passed to the kernel, and how is device initialization handled?

Medium

Approach

  1. Clarify what is being asked and what a complete answer contains.
  2. Work from the requirement backwards to the design.
  3. State your assumptions explicitly before working the problem.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

How do device drivers work internally? Explain with a block diagram and code implementation for Ioctl operations.

Medium

Approach

  1. Work from the requirement backwards to the design.
  2. State your assumptions explicitly before working the problem.
  3. Clarify what is being asked and what a complete answer contains.

Follow-up

  • What assumption would you test first?
  • How would you know your answer was wrong?

In a constrained embedded device, how would you implement a driver outside of an OS environment?

Medium

Approach

  1. State your assumptions explicitly before working the problem.
  2. Say what you would check first and why it is the highest-information step.
  3. Work from the requirement backwards to the design.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

Shard by tenant when one tenant outgrows a single shard

Hard · sharding · hot partition · routing · online migration

One primary holds resource, resource_revision, outbox_event and idempotency_key for every tenant and is at its write ceiling at 1.2k writes/second. tenant_id leads every index. Shard across eight primaries. One tenant holds 22% of all rows and by itself exceeds a single shard's write capacity. Design the routing, the split of that tenant, and the online move of a tenant between shards with writes continuing. State what breaks for queries that are tenant-scoped today, and exactly what a write must do when it arrives at the old shard after the cutover.

Approach

  1. Route on a unit smaller than a tenant from the start. Make the routing key (tenant_id, bucket) with a fixed bucket count - 64 over eight shards - and keep a directory mapping each (tenant_id, bucket) to a shard, carrying a version and cached in every service. An ordinary tenant has all 64 buckets pointing at one shard and behaves exactly as it does today; only the hot tenant has its buckets spread. Hashing tenant_id alone spreads tenants evenly, gives you no way to move one, and has no answer at all for a tenant larger than a node. The bucket count is the part you cannot change later without rehashing rows, so pick it well above the shard count and rebalance by moving buckets, not by re-bucketing.
  2. For the tenant that exceeds one node, its buckets must land on different shards - that is the whole point of bucketing it, and buckets confined to its own shard would rename the rows while leaving every write on the node whose ceiling it already exceeds. Size it from measured numbers rather than from its row share: 22% of rows says nothing about write rate. The current primary tops out near 1.2k writes/second on this hardware and workload, so a tenant peaking at W writes/second needs its buckets spread over at least ceil(W / headroom-per-shard) shards, where the divisor is the share of each shard's ceiling you are willing to give it while that shard still serves other tenants - not the full 1.2k. Size on its peak, not its mean.
  3. Fix the co-location invariant at the right grain. What must commit in one transaction is a resource, its resource_revision row and its outbox_event row, so the bucket is a property of the resource: derive it once at creation and stamp it into resource_id, and every later revision and event routes with its parent for free. Per-tenant co-location was never the requirement, and mistaking it for one is what makes a tenant look unsplittable. What genuinely breaks is an invariant spanning two resources of one tenant - a per-tenant counter, uniqueness across its resources - which now needs either a home-shard table or two-phase commit, and 2PC at this write rate is not a serious option.
  4. Keep the idempotency constraint arbitrating, because it is now enforced per shard. PRIMARY KEY (tenant_id, idempotency_key) only continues to reject a retry if the same key always lands on the same shard, so derive the create-path bucket from hash(tenant_id, idempotency_key) and mint the new resource_id inside that bucket, which also puts the key row and the resource it guards in one transaction. A bucket chosen from anything that differs between a request and its retry - a timestamp, the worker id, a client-supplied resource id - splits one key across two shards, both inserts succeed, and the write endpoint's retry safety is silently gone.
  5. State what the split costs the hot tenant's reads. Its listing, one 21-entry index scan today, becomes a scatter-gather: every bucket-shard returns 21 rows, a coordinator merges and discards the surplus, latency becomes the slowest shard's rather than the median's, and the keyset cursor has to carry a position per bucket instead of one (updated_at, resource_id) pair. Counts over that tenant fan out the same way. The relay becomes one leader per shard; consumers are unaffected because their ordering guarantee was always per aggregate and a resource's events never leave its bucket.
  6. Move one bucket at a time, reversibly, and fence the straggler at the shard rather than at the caller. Copy from a snapshot while the bucket stays read-write, tail changes until the remaining delta is a few seconds of writes, fence writes for that (tenant_id, bucket) alone with a retryable status, apply the final delta, bump the routing version. Scoping the fence to a bucket is what makes a seconds-long freeze affordable. Then have each shard store the routing epoch it believes it holds for each (tenant_id, bucket) and reject any write carrying an older one: without that token, a service on a stale map commits successfully to a database nothing will ever read again, and the loss stays invisible for days. Outside the data path, anything that aggregated across tenants in one query - admin reporting, the A-Z index, global counters - becomes a fan-out across eight shards with a merge, and per-tenant uniqueness survives only on tables that stay whole on the tenant's home shard.

Worked solution (40 min)

  1. Write the routing lookup keyed by (tenant_id, bucket), its version field, where it is cached and invalidated, and the request-path cost.
  2. From the tenant's measured peak write rate and the per-shard headroom you will grant it, compute how many shards its buckets must span, assign them, and show no single shard carries its whole write rate.
  3. Trace one create end to end: which value picks the bucket, where resource_id gets it stamped, and why the revision, outbox and idempotency rows land on the same shard.
  4. Write the move steps for one bucket, then the epoch check the shard performs on every write, and trace a stale-map write through it.

Expected result: A versioned (tenant_id, bucket) to shard directory cached in every service, with ordinary tenants pointing all their buckets at one shard. The hot tenant's buckets are deliberately assigned to different shards, enough of them that its peak write rate divided across them fits the headroom granted on each, because no single node can carry it. The bucket is derived once and stamped into resource_id, so a resource, its revisions and its outbox rows commit together on one shard while the tenant spans several; only cross-resource invariants within the tenant lose their single-shard transaction. The create-path bucket comes from hash(tenant_id, idempotency_key) so the per-shard unique constraint still arbitrates retries. The tenant's listing becomes a scatter-gather with a per-bucket cursor. Migration moves one bucket at a time - snapshot copy, tail, seconds-long fence for that bucket, final delta, routing-version bump - and a routing epoch per (tenant_id, bucket) is checked by the shard so a stale caller's write is rejected rather than committed where nothing will read it.

Verify it yourself

  • The hot tenant's buckets resolve to more than one shard, and its peak write rate split across them is inside the headroom each shard has after its other tenants.
  • A resource's rows, its revisions, its outbox rows and its idempotency key row always resolve to a single shard, so no one write spans two.
  • The same (tenant_id, idempotency_key) routes to the same bucket on every retry, so the per-shard unique constraint still rejects the duplicate.
  • A write carrying an old routing epoch is rejected by the shard rather than merely misrouted by the caller.

Follow-up

  • The fence lasts 90 seconds instead of 4 because the final delta keeps growing. What is happening, and what do you do while the tenant is fenced?
  • Two tenants must merge into one account. What does that cost under this scheme, and which step is not reversible?
  • A shard is lost entirely. Which tenants are affected, and what is the source of truth for rebuilding them?

Exports duplicate a row range about once a week

Hard · leases · clock skew · idempotency · fencing

Roughly once a week an export writes a file containing a duplicated range of rows. The affected job_run rows show attempt = 1, status = succeeded, one started_at, and a lease_owner naming a different host from the one whose logs show the job starting. Leases last 30 seconds and are heartbeated every 10 from inside the handler; lease_expires_at is computed on the worker and compared against the database's now(). Find the mechanism, and give a fix that holds even if you cannot fix the clocks.

Approach

  1. Start from the fact that eliminates the obvious answer. attempt = 1 means no retry was recorded, so this is not a re-run after failure; two workers ran the same row concurrently and the takeover path never touched the counter. lease_owner naming a host other than the one that started the job is the same statement from the other side.
  2. Enumerate the mechanisms that cause a premature takeover, then find the signal that separates them. Either the lease genuinely expired because the heartbeat did not fire, which is what happens when the heartbeat runs on the handler's own thread and the handler makes a long blocking call, or it only appeared expired because two clocks disagree, since lease_expires_at is written from the worker's clock and evaluated against the database's. The discriminator is the distribution: incidents clustered on the longest exports indict the heartbeat, incidents clustered on one host indict skew. Measure both, and measure each host's offset against the database directly.
  3. Read the reclaim query precisely. In PostgreSQL now() is transaction start time, not statement time, so a reclaimer holding a long transaction compares against an older timestamp than expected; clock_timestamp() is the statement-time function. This is worth ruling in or out before you redesign anything, because it changes which rows look expired.
  4. Remove the second clock rather than trying to synchronise it. Issue and extend the lease in the database, with lease_expires_at = now() + interval '30 seconds' in both the claim and the heartbeat, so exactly one clock is ever compared and worker skew stops mattering to this predicate.
  5. Accept that a lease can still expire under a slow worker, because a lease cannot distinguish slow from dead, and fence the work. Carry a monotonically increasing lease generation and make every write the handler performs conditional on still holding it, as UPDATE ... WHERE job_run_id = $1 AND lease_owner = $2 AND lease_generation = $3, so a displaced worker's writes affect zero rows and it aborts instead of duplicating.
  6. Make the handler's writes idempotent independently of all that: give each exported chunk a natural key of (job_run_id, batch_start) with a unique constraint so a second copy conflicts rather than appends, move the heartbeat off the handler's thread, and increment attempt on takeover so the event is visible in a metric.

Follow-up

  • The displaced worker has already streamed half the file to object storage. What makes that side effect safe to repeat?
  • You now count takeovers. What alert fires on that counter, and at what threshold?
  • What breaks if you simply raise the lease to five minutes?

Suggested practice checklist

For a candidate senior enough that the loop turns on design and judgement rather than on whether the coding round gets finished. Five days build one system properly and then stress it; coding gets a single maintenance day, on the assumption that the risk at this level is an unexamined tradeoff rather than a missed algorithm.

Day 1 — Numbers before diagrams

  • Build your own reference card of the figures you will re-derive all week: bytes for a realistic record, requests per second implied by a given daily active count, and the storage that a year at a given write rate produces. Derive each one rather than copying it, because the derivation is what survives a follow-up.
  • Turn one product statement into capacity requirements. From ten million daily users at four writes and forty reads each, state the peak-to-average factor you are assuming and why, then produce peak write QPS, peak read QPS and a year of storage.
  • Write the two numbers whose order of magnitude changes the design, the read-to-write ratio and the working-set size against memory per node, and state the threshold at which each one flips your answer.

Deliverable: A one-page numbers card and one worked capacity estimate with every assumption written down.

Day 2 — One system, from requirements to schema

  • Spend the first ten minutes producing only functional requirements, non-functional targets with numbers attached, a p99 latency, a durability expectation, a consistency requirement, and an explicit out-of-scope list.
  • Define the interface before the boxes: the three or four endpoints, their parameters, what each returns, and which of them are idempotent.
  • Write the data model, then write the single access pattern that justifies it, and state what the schema would have to become if the dominant access pattern were the other one.

Deliverable: One design carried to endpoint-and-schema depth, with non-functional targets expressed as numbers and a written out-of-scope list.

Day 3 — The consistency you are actually buying

  • Write out what a client sees under asynchronous replication when its write commits on the leader and its next read is served by a lagging follower, then write the two fixes, pinning that session's reads to the leader for a bounded window or carrying a version token the replica must reach, and the cost of each.
  • Work the quorum arithmetic on paper for N of three with W and R of two, and separate what R + W > N does guarantee, that any read set intersects any write set, from what it does not: on its own it is not linearizability, and a sloppy quorum that accepts writes on nodes outside the preference list breaks even the intersection.
  • Take two storage choices with different defaults, a single-leader relational store committing synchronously and a quorum-replicated store that converges eventually, and write the specific product behaviour that would be wrong under each, rather than a general statement about which is stronger.

Deliverable: A page separating what quorum overlap guarantees from what it does not, with one concrete product misbehaviour attached to each gap.

Day 4 — Failure is the design

  • For one write path, work through the case where the client times out after the server has already committed, then design the idempotency key: who generates it, how long it is retained, and what the duplicate request returns.
  • Express the retry policy as parameters rather than as a word: maximum attempts, base delay, backoff factor, jitter, and which error classes are retried at all. Then state why retrying a non-idempotent write without a key is a correctness bug and not merely waste.
  • Compute the fan-out effect on tail latency. If a request waits on ten backends and each independently exceeds its p99 one percent of the time, the chance at least one is slow is 1 - 0.99^10, about ten percent. Then write why independence is the optimistic assumption and what correlates them in practice.
  • Name the backpressure mechanism for one queue or one dependency in the design, a bounded queue with shedding or a concurrency limit, and write what the caller is told when it engages.

Deliverable: One write path with an idempotency design, a parameterised retry policy, and a written tail-latency calculation with its assumption named.

Day 5 — Scaling the hot path

  • Choose cache-aside or write-through for one read path and write the staleness window each produces, then name the invalidation event and what the system does when that event is lost.
  • Design against the stampede: either coalesce requests so only one recomputes a missing key, or refresh early with jittered expiry, and write why identical TTLs on keys populated in the same moment produce a synchronised expiry and a thundering herd.
  • Shard one table by a key you choose, then answer the two questions that break the choice: which queries now require a scatter-gather, and what happens to the distribution when one tenant is a hundred times larger than the median.
  • Write the cost of adding a node under plain modulo placement, where nearly every key moves, against consistent hashing, where roughly one key in n+1 moves, and state what virtual nodes are for.

Deliverable: A caching and sharding decision for one path, each with its failure mode and its rebalancing cost written beside it.

Day 6 — Keep the coding hand in, at the bar that applies to you

  • Solve one medium problem in thirty minutes, then spend twenty more making it production-shaped: named invariants, validation at the boundary, and errors that distinguish a caller mistake from an internal fault.
  • Write the tests you would require of a colleague's version of that function: one for empty input, one for the boundary, and one for the case the implementation is most likely to get wrong.
  • Read a piece of your own code from six months ago and write the change you would ask for, phrased as you would actually phrase it in review.

Deliverable: One problem hardened to review standard, with its test list and one written review comment.

Day 7 — Defend it while being interrupted

  • Run a forty-five-minute design mock with an interviewer briefed to change a requirement halfway, a tenfold traffic increase or a new strict consistency requirement, and to push on one number you estimated.
  • Rehearse the two sentences a senior loop is listening for: naming the tradeoff you are choosing against and why, and saying what you would measure to learn that the choice was wrong.
  • Prepare the design you regret: a real decision, the constraint that produced it, what it cost, and what you changed afterwards.

Deliverable: Mock notes recording how the design changed under the new requirement, plus a written account of one regretted decision.

Disagreement needs an outcome you did not choose

Conflict answers where you were right and everyone came round are the weakest ones. Stronger: the evidence you went and collected, what would have changed your mind, and what you did in the weeks after the call went against you. Implementing a design you argued against, properly, is a specific and checkable behaviour.

Estimate work you have never done and defend the range

Hard · estimation · backfills · expand-contract

You are asked to estimate a change you have never attempted: add a column to a 100-million-row table, populate it, move reads across, and drop the old shape. Give a range with the assumptions that generate it, including batch size, the signal your backfill throttles on, and wall-clock hours, and name the three unknowns that would move the number most. Then describe a real estimate you gave under comparable ignorance: how you expressed its uncertainty, what you committed to, and how wrong you turned out to be.

Approach

  1. Decompose into independently deployable steps before estimating anything: add the column nullable, write both shapes, backfill in batches, verify, move reads, stop writing the old shape, drop it. That is four deploys spread over days, and the calendar estimate is dominated by them rather than by the loop's runtime.
  2. Do the arithmetic aloud for the part that has arithmetic in it: batch size times number of batches times per-batch duration, at a write rate the primary can absorb alongside roughly 1.2k writes per second of production traffic. The loop is throttled by replication lag and lock waits, not by how fast it can issue statements.
  3. Price the schema step by its lock rather than its statement duration. In PostgreSQL an ALTER TABLE taking ACCESS EXCLUSIVE waits for every open transaction on that table while later queries queue behind it, so a millisecond change issued during a thirty-second analytics query stalls that table for thirty seconds. Adding a nullable column with a non-volatile default avoids a rewrite from version 11; a new index wants CREATE INDEX CONCURRENTLY, which cannot run inside a transaction block and leaves an invalid index behind if it fails.
  4. Express the answer as a range whose endpoints each trace to a stated assumption, then name the cheapest experiment that collapses it, which is almost always running one real batch against the real table and multiplying.
  5. Commit to a checkpoint rather than a completion date: the day you report a measured number from that first batch. That is a promise you can keep under uncertainty, and it is what the asker actually needs in order to plan.

Follow-up

  • How do you verify the backfill genuinely finished, given rows written by production traffic while it ran?
  • Where does the backfill resume from after a worker is killed mid-batch, and what makes that resume point trustworthy?
  • Your first batch comes back ten times slower than assumed. What do you tell the person waiting on the estimate, and when?

Turn a code review disagreement into a decision

Easy · code review · optimistic concurrency · communication

A colleague's change updates a row with UPDATE resource SET version = version + 1 WHERE resource_id = $1 AND version = $2 and treats an affected-row count of zero as a successful no-op. You read that as a silently lost update; they think returning 200 is friendlier to clients than returning a conflict. Describe how you have handled a review disagreement of this shape: what goes in the comment, when you leave the thread, and who decides. Then write the comment you would leave here, in under 80 words.

Approach

  1. Sort the disagreement before writing anything. A silently discarded write is a correctness claim about data; the choice between 409 and 412 is taste. Only the first justifies blocking a merge, and saying which one you are doing is most of the value of the comment.
  2. Make the claim reproducible in the comment itself with an interleaving rather than a principle: A reads version 7, B reads version 7, B commits version 8, A's predicate matches zero rows, A is told it succeeded and A's edit is gone.
  3. Offer the alternative with its cost attached: return 409 carrying the current version and the revision that won, so the client can re-read and re-apply. Note that automatic retry is not the fix, because a retry re-reads the winner's state and reapplies an intent formed against data that no longer exists.
  4. Apply an escalation rule you can state: two round trips on the thread, then a call, and the service's owner decides rather than the reviewer. A reviewer who cannot be overruled is a bottleneck with extra steps.
  5. Close in writing wherever the decision lands, so the next reader finds the reasoning in the code or the ticket instead of in a collapsed review thread.

Follow-up

  • Where would you put the test that fails if someone reintroduces the swallowed zero rowcount?
  • The author says clients cannot handle a 409. How do you check whether that is true?
  • How do you handle the same review comment when the author is more senior than you and in a hurry?

Narrate an outage you owned from page to postmortem

Hard · incident response · blast radius · postmortems

Pick an incident you personally drove, ideally one where writes were affected rather than reads. In six to eight minutes: state the symptom as it first appeared on a dashboard, the blast radius you established before you knew the cause, the mitigation you applied and when, the mechanism you eventually proved, and the follow-up that would prevent a repeat. Bring numbers: error rate, tenants affected, minutes to mitigate, minutes to resolve. If you cannot name what you measured, choose a different incident.

Approach

  1. Open on the signal rather than the cause: which metric at which percentile moved, on which service, at what time, so the listener follows the same evidence you had rather than a conclusion you already reached.
  2. Separate mitigation from diagnosis out loud. State what you did to stop the bleeding (flag off, shed traffic, drain a lease, roll back a deploy) and say plainly that you did it before the mechanism was known, because those are two jobs with different deadlines.
  3. Establish blast radius in countable terms: how many tenants, how many writes, and crucially whether the effect was loss or only delay. An append-only revision table or a pending outbox row means the change survived and the projection was merely behind, which is a repair rather than a data-loss incident.
  4. Prove the mechanism instead of asserting it. Name the trace span that grew, the plan that flipped to a sequential scan, the lease that expired, plus one alternative you ruled out and the signal that stayed flat while you ruled it out.
  5. Close on the durable fix and its cost, distinguishing what landed that week from what needed an expand-and-contract migration across several deploys, and say which of the two you actually finished.

Follow-up

  • What would you do differently in the first five minutes, given the same dashboard and no more information?
  • Which follow-up action did you deliberately not take, and why was dropping it the right call?
  • How did you convince yourself the mitigation was safe to apply while the cause was still unknown?