cswork / libraryOpen practice workspace

Interview guides · Aditya Birla Group

Aditya Birla Group Software Engineer Interview Questions & Guide 2026

Take-home style practice for Aditya Birla Group software engineer candidates: a small service, a fixed budget, a written tradeoff.

The 60-second brief

As a Software Engineer at Aditya Birla Group, you are a pivotal contributor to the digital transformation of one of the world’s most diversified conglomerates. Your work spans multiple business divisions—including metals, cement, retail, and chemicals—where you translate complex industrial and consumer-facing requirements into robust, scalable software solutions. You are not just writing code; you are building the digital backbone that powers supply chains, optimizes manufacturing processes, and enhances customer experiences across a massive, multi-sector footprint.

The behavioural round is a technical round in narrative form. Prepare it by collecting specifics you actually owned, such as a design you argued against, an incident you diagnosed, or a decision you later reversed, rather than by rehearsing phrasing.

Focus areas

  • Bound blast radius with per-tenant concurrency limits
  • Scope every query and cache key by tenant
  • Build at-least-once pipelines with explicit deduplication horizons

Overview

This role is intellectually demanding and strategically significant. You will often operate at the intersection of traditional engineering disciplines and modern software architecture, requiring you to bridge the gap between legacy industrial systems and cutting-edge technologies like Cloud, AI/ML, and Blockchain. Whether you are optimizing internal logistics or developing consumer-facing applications, your impact is measured by your ability to deliver efficient, high-availability systems that drive business value at scale.

The Aditya Birla Group interview process

Aditya Birla Group candidates report 6 rounds · ≈ 4-6 weeks. The stages below are what candidates describe, not a published process.

Initial Screening

The person on this call usually cannot evaluate your code and does not need to. They write a short paragraph, and that paragraph is what a hiring manager skims when deciding who to put on your loop. So the test is not whether your work was hard, it is whether a non-engineer can repeat it correctly. Name systems by what they did rather than by their internal codename, give each project a shape (what was breaking, what you changed, what happened after), and keep the whole walkthrough near ninety seconds. Depth that cannot survive a paraphrase reads as vagueness.

What to demonstrate

  • Whether a non-engineer can restate your projects without distorting them, since their paraphrase is what travels to the hiring manager, not your sentences
  • Whether each project has a shape rather than a stack list: the failure or constraint, the change you made, the result and how it was measured
  • Whether you can say what was yours inside a team project without either inflating it or disappearing into the plural

How to prepare

  • Rewrite each headline project as two sentences with no internal system names and no acronyms outside your company, then say them to someone outside engineering and have them repeat them back. Fix whatever came back wrong
  • Attach one measured number to each project: the baseline, the change, and the window it was measured over. Where nothing was ever measured, say that plainly rather than reaching for a plausible percentage
  • Time the background walkthrough against a clock. If it runs past two minutes, compress the earliest role to a single clause and spend the recovered time on the most recent one

Aptitude Testing

Input bounds are the part of the prompt most often skimmed, and they usually contain the answer. They tell you which complexity class is admissible, which narrows the search before you have thought about the problem itself. As a rough planning figure, a compiled language does on the order of 10^8 simple operations per second and an interpreted one roughly an order of magnitude less. So n up to about twenty admits enumerating subsets, a few thousand admits a quadratic pass, and a million admits neither: you need near-linear, or linear with a log factor. If the bounds are missing, ask for them.

What to demonstrate

  • Whether the approach is justified by the stated input size rather than by whichever pattern you recognised first
  • Whether you ask about the properties that change the algorithm: whether the input arrives sorted, whether duplicates occur, whether values are bounded integers, whether it all fits in memory
  • Whether you can name the bottleneck in your own solution and what would remove it, even when you deliberately leave it in place
  • Whether a claimed speedup is real, since memoising a recursion only helps when subproblems genuinely overlap and the state can be keyed cheaply

How to prepare

  • For each algorithm you rely on, write down the largest n it handles in roughly a second, then check two of those figures by timing them in the language you will actually type in
  • For two weeks, write one line naming your target complexity and the bound that justifies it before you write any code, then compare that line with what you ended up submitting
  • Practise the conversion backwards: given a required O(n log n), list the mechanisms that get you there (sorting, a heap, an ordered map, divide and conquer) and choose by what the problem needs to query, not by what you used last

Group Discussion

You cannot drill a format you do not know, so put the preparation into material that travels. Three pieces of your own work, each rehearsed until you can take a follow-up you did not anticipate, will carry a conversation or a code walkthrough equally well. Specificity is what separates that from filler. A number needs its definition before it means anything: a p99 is over some window and measured at some hop, and a server-side figure excludes the queueing and network time a client would see. The number you cannot qualify is the one to leave out.

What to demonstrate

  • Whether your examples carry detail only someone who did the work would hold, such as what the binding constraint actually was, which alternative you rejected and why it was worse, and what you measured on each side of the change
  • Whether a number survives one follow-up, meaning you can say what it was measured over and whether it moved because of your change or merely alongside it
  • Whether a failure is described with the specific change that followed it, rather than a lesson stated in general terms
  • Whether your part in a team effort is stated accurately, including what other people did

How to prepare

  • Write a page on each of three projects covering the constraint, the option you rejected, the measurement before and after, and what went wrong. Cut any line you cannot take a follow-up on, since you are writing the parts you will be pressed on rather than a summary.
  • Recover the real figures while you still have access: request volume, data size, latency with its percentile and window, team size, timeline. Note where each came from, whether a dashboard, a design document or memory, and mark the estimates so you can say which they are out loud.
  • Take your weakest project story to someone who works in a different area and have them ask why four times in succession. The point where you run out of answer is the part to go and re-read before the round.

Technical Interviews

Most of the time lost in this format is not lost to thinking. It goes to a standard-library call you half-remember, an off-by-one in a loop bound, and a debugging loop that mutates code at random until something passes. When output is wrong, stop re-reading the whole function: take the smallest input that reproduces it and walk the state through by hand, printing intermediates if the environment allows. Guessing at a fix without a failing case you understand is how a five-minute bug becomes twenty, and the clock does not pause while you do it.

What to demonstrate

  • Whether you reach the right structure without a detour, and can write it from memory rather than only recall that one exists
  • Whether overflow is considered where the language has fixed-width integers, since a signed 32-bit value stops at 2,147,483,647 and then wraps in Java, is undefined behaviour in C++, and does not arise in Python, whose integers grow instead
  • Whether recursion depth is treated as a constraint on large inputs, given that CPython's default limit is 1000 frames and a deep recursion can exhaust the stack in any language where an iterative version would not
  • Whether a failing case is isolated and explained before any edit is made to the code

How to prepare

  • From an empty file and with no references open, implement the pieces you lean on most: a heap push and pop, an iterative DFS with an explicit stack, and a binary search whose midpoint is written lo + (hi - lo) / 2, which avoids the overflow that (lo + hi) / 2 can hit in a fixed-width integer type
  • Time yourself on the ten library calls you look up most, such as sorting with a custom comparator, splitting and joining strings, and finding the next key at or above a value in an ordered map, until the lookup is gone
  • Take a solution you know is broken and, before touching it, write one sentence naming the input, the expected value and the actual value. Repeat until you do it without deciding to.

HR Interview

When a round has no standard shape, it is often there because something is still open: an area no earlier conversation reached, a round where the signal came out mixed, or a decision someone is not ready to make alone. Work out which by going back over what each earlier round actually covered rather than how it felt, and arrive able to give evidence on that point without being asked twice. Weak answers replay the loop's earlier material at the same depth. Strong ones go a level deeper and stay consistent with what you already said.

What to demonstrate

  • Whether your account of a project matches the one you gave earlier in the loop, since what you said before may be available to whoever runs this round
  • Whether you can go a level deeper on something already covered, reaching the decision and its alternatives rather than repeating the summary
  • Whether you state your own uncertainty accurately, including parts of a system you did not build and decisions you inherited, instead of claiming even ownership across all of it
  • Whether you can answer a question you handled poorly earlier by naming what you missed, rather than delivering a polished second version as if the first had not happened

How to prepare

  • Reconstruct the loop on one page: for each round, the questions you were asked and the answer you actually gave, not the better one you thought of afterwards. The gaps on that page are your best available guess at why this round exists.
  • Take the two claims you made earlier that carry the most weight and assemble the backing for each: the measurement, the date, what broke, the decision you would make differently now.
  • Write down the three facts about your work that must not drift between tellings, such as team size, timeline and your own role, and check your stories against that list rather than trusting recall under pressure

Final Offer

Where the day includes a partner from product, design or data, that conversation is weighted like the technical ones and prepared for least. They are deciding one thing: whether having you in the room makes their decisions cheaper. That means options with costs attached, not implementation detail and not "it depends". An estimate someone can plan against — a range, the assumption that would push it to the high end, and what you would drop to hit the low one — is worth more than a confident single number, which everyone present already knows is wrong.

What to demonstrate

  • Whether an estimate comes as a range with the assumption most likely to break it, and states what a specific scope cut would actually buy
  • Whether a technical constraint is handed over as a choice with consequences on their side, rather than as a verdict they have no standing to argue with
  • Whether you establish what decision is on the table before proposing anything
  • Whether risk is raised while it can still change the plan, with the trigger that would confirm it, instead of reported afterwards as a slip

How to prepare

  • Take a project that shipped late and write the two-sentence warning you could have given three weeks earlier, naming what you would have needed decided at that point
  • Rehearse one estimate out loud until it arrives in three parts: the range, the single assumption that would blow it, and the smallest thing you would cut to protect the date
  • Rewrite an objection you have actually made — the "we can't do that" version — as two options with their costs, so the choice ends up with the person who owns it

Where candidates lose points

Serialising a tenant's writes through select ... for update on a single counter row

It is the first change that makes a counter correct, and it caps that tenant's write throughput at roughly one divided by the lock hold time. A transaction that takes the lock, makes a network call and then commits holds it for the entire round trip: at 2 ms that is about 500 writes per second for the whole tenant, and the largest tenants are exactly the ones that exceed it. The damage then spreads, because every waiter holds a database connection while it queues, so one hot tenant drains the shared pool and the symptom presents as a site-wide latency incident rather than as a lock problem. The repairs are to shrink the critical section to a single statement, to shard the counter into per-(tenant, hour) or per-(tenant, bucket) rows and sum on read, or to batch in memory and flush periodically while accepting the bounded loss that batching implies.

Holding money in a floating-point type, or rounding it more than once

Binary floating point cannot represent 0.01 or 0.1 exactly, so sums drift and two code paths that should agree disagree by cents nobody can trace back. The fix is integer minor units or an exact decimal type end to end, with sub-cent rates expressed as scaled integers such as micro-units, because a per-request price genuinely is smaller than a cent. The second half of the trap is rounding position: rounding each line and then summing gives a different total from summing and rounding once, and half-up and half-even diverge systematically across many lines, so rounding must happen at one named place and every downstream reader must carry the rounded value rather than recompute it from quantity and rate.

Sharing mutable state with no stated owner

Say which thread, request or task owns each mutable structure, and what protects it when the answer is more than one: a lock, a queue that hands ownership across, or an immutable copy per reader. A structure documented as safe for concurrent reads is usually not safe for a concurrent write alongside those reads.

Finishing a solution without stating its complexity

Give time and space in the same breath as the code, and define n explicitly when there are two sizes, since n nodes and m edges are not interchangeable. Space is the half that gets skipped: count the auxiliary structures you allocate and the recursion stack at its deepest, not only the answer you hand back.

Questions & practice

Find peak concurrent sandbox usage from run intervals

Medium · sweep-line · intervals · concurrency-caps · null-semantics

Given up to 5 million job_run rows for one tenant over one day, with run_id, started_at, finished_at, status and wall_clock_limit_seconds, report the maximum number of sandboxes running at once, the earliest instant that maximum is reached, and the first run_id that would breach a per-tenant cap of C. started_at is null while a run is queued; finished_at is null both for runs still executing and for runs in status lost. Treat a run as occupying [started_at, finished_at). Give the complexity and state how you handle each null.

Approach

  1. Turn each run into two sweep events, (started_at, +1) and (end, -1), then sort the 2n events by timestamp with -1 ordered before +1 at equal timestamps. That tie-break is what makes the interval half-open, so a run finishing at 10:00:00 and one starting at 10:00:00 never overlap.
  2. Decide each null out loud before sweeping, because each choice moves the answer. A null started_at means queued and contributes nothing. A null finished_at with status running or leased is clipped to the window end. Status lost has no observed end at all, so clip it at started_at + wall_clock_limit_seconds on the grounds that the supervisor owns the timeout, and record that you did. The table's check (finished_at is null or started_at is not null) guarantees you never see an end without a start.
  3. Sweep once, maintaining a running counter, the maximum, and the timestamp at which the maximum was first attained (update peak_at only on a strict increase, or you will report the last such instant instead of the earliest). Capture the first run_id whose +1 takes the counter to C+1 during the same sweep rather than in a second pass.
  4. Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by started_at, a min-heap of end times gives O(n log k) time and O(k) space with k the peak concurrency, which is the better shape when the rows come from an index scan on (tenant_id, started_at).
  5. If second resolution is acceptable, counting-sort the endpoints into an 86,400-slot delta array and prefix-sum it: O(n + T) time and O(T) space, which beats the comparison sort at 5 million rows. It answers only at second granularity, so state which resolution the cap is defined in.

Follow-up

  • Now report peak concurrency per tenant for 10,000 tenants from one globally sorted stream. What changes about memory and about the sort?
  • The cap has to be enforced at dispatch rather than reported afterwards. What does the admission check look like, and where does it race?
  • How would you answer 'peak concurrency within any 5-minute window' without re-sorting?

Fold a deduplicated usage stream into hourly rollups

Easy · aggregation · deduplication · watermarks · exact-arithmetic

You are given one day of usage_event rows, up to 250 million, each carrying event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at and ingested_at. Produce usage_rollup_hourly cells keyed (tenant_id, workspace_id, sku, hour_start) with quantity_sum, event_count and source_max_ingested_at. An event counts once per (tenant_id, idempotency_key). The rollup grain has no environment column, so state your filter. One pass. Give your time and space bounds, and say what the deduplication actually costs in memory.

Approach

  1. Bucket on occurred_at, never ingested_at: hour_start = date_trunc('hour', occurred_at at time zone 'UTC'). The two columns answer different questions. occurred_at says which hour the customer is billed for; ingested_at says how current the fold is. Using the second for the first makes late data invisible instead of correctable.
  2. The fold is trivial and the deduplication is the entire cost, so price it before designing anything clever. An exact set over (tenant_id, idempotency_key) at 250M entries, stored as a 16-byte 128-bit hash in an open-addressed table at 0.7 load factor, needs about 357M slots at 16 bytes each, roughly 5.7 GB. The fix is partitioning by hash(tenant_id) % P so each shard holds 1/P of the set and no tenant's keys straddle shards.
  3. Rule out a Bloom filter as a replacement, in the right direction: a false positive reports 'already seen' for an event never seen, so you drop a real event and lose revenue with no error raised. It is usable only as a negative pre-filter in front of the exact set, where a miss is conclusive and a hit must fall through to the real lookup.
  4. Accumulate in scaled integers, not binary floating point. numeric(20,6) admits values below 10^14, so one event scaled to micro-units can reach 10^20, past int64's 9.22 x 10^18; use a 128-bit or arbitrary-precision accumulator unless you first bound the per-event maximum. binary64 represents integers exactly only to 2^53, about 9.01 x 10^15, and cannot represent 0.1 at all, so two runs that sum in different orders disagree.
  5. Carry source_max_ingested_at = max(ingested_at) over the events folded into each cell, and count event_count over accepted, post-dedup events. Without that watermark there is no way to prove later what a number did and did not include, which is the first question any reconciliation asks.
  6. State the environment filter explicitly, because the rollup grain cannot record it. A fold that quietly includes staging bills non-production traffic; one that quietly excludes it loses a cost signal. Production-only is the billing answer, and either way it belongs in the job name and the output metadata. Complexity: O(n) time, O(distinct dedup keys) space, dominated by the dedup set rather than by the cells.

Follow-up

  • A producer retries at 23:59:59 and the retry lands at 00:00:01. The unique index on the daily-partitioned table must include the partition key. What gets double-counted, and what is the smallest change that fixes it?
  • The consumer acknowledges its batch before committing the fold. Which failure loses revenue now, and which arrangement duplicates instead?
  • What makes a re-run over the same day produce byte-identical rollups?

Order a job dependency graph and find its critical path

Medium · topological-sort · dag-longest-path · cycle-detection · critical-path

A workspace defines up to 50,000 jobs with up to 200,000 dependency edges and an estimated duration_seconds per job. Given the edge list, reject the graph if it contains a cycle and name one cycle's nodes; otherwise return a valid execution order, the earliest possible completion time with unlimited workers, and the set of jobs whose slack is zero. Then say which single job to shorten in order to cut the completion time, and by exactly how much. State the complexity of each part.

Approach

  1. Kahn's algorithm for the order: compute indegrees, seed a queue with zero-indegree nodes, emit and decrement. O(V + E), which at 50,000 and 200,000 is milliseconds. If fewer than V nodes are emitted, the graph contains a cycle.
  2. Kahn detects a cycle but cannot name one. The nodes left with indegree above zero contain every cycle, so run one DFS restricted to that residual subgraph with three-colour marking and report the stack slice from the grey node the back edge points at. That is the difference between a usable error message and 'dependency cycle detected'.
  3. Earliest completion with unlimited workers is the longest path, which is NP-hard on a general graph and linear on a DAG. State the precondition, then relax in topological order: earliest_finish[v] = duration[v] + max(earliest_finish[u] for u in preds(v)), taking the max over an empty predecessor set as zero. The makespan T is the maximum over all nodes. O(V + E).
  4. Second pass in reverse topological order for latest_finish, then slack[v] = latest_finish[v] - earliest_finish[v]. Zero-slack nodes form the critical path, and there can be several disjoint critical paths, so return the set rather than one chain. slack[v] = 0 is exactly the statement that some longest path runs through v; equivalently, the longest path through v has length T - slack[v].
  5. The speed-up bound is the point of the question, and the obvious form of it is wrong. Shortening a zero-slack job v by d, with 0 <= d <= duration[v], cuts the makespan by min(d, T - L_avoid(v)), where L_avoid(v) is the longest path in the graph with v deleted: the longest path that avoids v, not the second-longest path overall. The two coincide only when the runner-up path misses v. Counterexample: A of 10 s feeds both B of 5 s and C of 4 s, so T = 15 s and the second-longest path is 14 s, yet shortening A by 10 s leaves a makespan of 5 s. The realised gain is the full 10 s, because both paths ran through A and shrank together, while min(10, 15 - 14) predicts 1 s. The reason is structural: shortening v reduces every path through v by d and leaves every other path alone, so the new makespan is max(T - d, L_avoid(v)).
  6. Compute L_avoid(v) the direct way: delete v and re-run the same forward relaxation, O(V + E) per candidate. The cheaper equivalent skips the deletion, since L_avoid(v) only ever matters through that max: set duration[v] := 0, recompute the makespan as T0(v) = max(T - duration[v], L_avoid(v)), and the gain is min(d, T - T0(v)), which is identical for every d <= duration[v]. Only zero-slack jobs are candidates, because shortening a job with positive slack changes the completion time not at all. One relaxation is milliseconds at this size, so ranking a critical set in the hundreds costs O(k(V + E)) and is worth doing exactly; a critical set in the tens of thousands is not, and there you evaluate a shortlist, longest jobs first, and say that the answer is the best of that shortlist rather than the optimum.

Worked solution (30 min)

  1. Build four fixtures. A: 12 jobs, two branches of 100 s and 95 s that share no job. B: fixture A plus one back edge. C: two disjoint paths tied at 100 s. D: the shared-prefix case, one job of 10 s feeding a 5 s job and a 4 s job, so the longest path is 15 s and the runner-up is 14 s.
  2. Run Kahn; on fixture B confirm it emits fewer than V nodes, then run the residual-subgraph DFS and print the actual cycle.
  3. Compute earliest_finish forward and latest_finish backward, and list the zero-slack set for each fixture.
  4. For each zero-slack job v, recompute the makespan with duration[v] := 0 to get T0(v), and record both the correct bound T - T0(v) and the wrong one, T - second_longest_path, side by side.
  5. Apply the shortening for real (20 s off the critical branch of A, 10 s off the shared prefix of D) and diff the recomputed makespan against each prediction.

Expected result: Fixture A: makespan 100 s, and shortening by 20 s leaves 95 s, a gain of 5 s. Both formulas agree here, because the 95 s branch avoids the shortened job. Fixture D: makespan 15 s, and shortening by 10 s leaves 5 s, a gain of the full 10 s, which T - T0(v) = 15 - 5 = 10 predicts and T - second_longest = 1 does not. Fixture C: the zero-slack set covers both tied paths, and shortening a job on one of them alone gains nothing, since the other path still runs 100 s.

Verify it yourself

  • The cycle printed by the DFS is a real cycle: every consecutive pair is an edge present in the input.
  • Summing durations along any zero-slack path equals the makespan exactly.
  • For every candidate, the predicted gain equals the makespan recomputed from scratch with the shortened duration. Assert the equality; do not eyeball it.
  • Fixture D is the regression test for the bound, and a fixture whose branches are disjoint is not: it passes under either formula and proves nothing.

Follow-up

  • Only m workers are available. What happens to your answer, and what can you still promise about the schedule you produce?
  • Edges arrive incrementally as the customer edits the pipeline. How do you detect a cycle at insert time without re-running Kahn over 250,000 elements?
  • Durations are estimates. How would you express completion time as a distribution, and what breaks about the critical path once you do?

Enforce a concurrent-run quota that survives simultaneous requests

Medium · isolation levels · write skew · quotas · lock contention

A plan allows at most 20 concurrently running rows in job_run per tenant. The table holds run_id, tenant_id, workspace_id, status (queued, leased, running, succeeded, failed, timed_out, cancelled, lost), lease_token, leased_until, started_at and finished_at. Today the service runs select count(*) from job_run where tenant_id = $1 and status = 'running', compares the result to 20, then inserts. Under load a tenant exceeds the cap by exactly the number of concurrent requests. Name the anomaly, say which isolation levels do and do not prevent it, and give a version that holds, as SQL.

Approach

  1. Name it: write skew. Each transaction reads a predicate (the count of running rows), neither modifies what the other read, and both then insert rows that jointly violate an invariant no single row expresses. Read committed permits it. So does repeatable read, because snapshot isolation's first-updater-wins check fires only on conflicting row updates, and these are inserts touching disjoint rows.
  2. Enumerate the fixes with their real costs. SERIALIZABLE works: PostgreSQL's SSI tracks the predicate read and aborts one transaction with SQLSTATE 40001, which obliges the caller to retry and makes the abort rate rise with contention on a hot tenant. Folding the predicate into the write as insert ... select ... where (select count(*) ...) < 20 narrows the race to the statement's snapshot but does not close it under read committed.
  3. Give the version that holds at read committed: serialise on a row both transactions must touch. update tenant_concurrency set running = running + 1 where tenant_id = $1 and running < 20 returning running updates zero rows when the cap is reached, and zero rows is the rejection. This works because at read committed a blocked UPDATE re-evaluates its WHERE clause against the newly committed row; at repeatable read the same statement raises a serialisation error instead, so the isolation level changes the calling contract.
  4. State the cost you just bought. That row is now a per-tenant serialisation point, so admission throughput for the tenant is bounded by one divided by the lock hold time; at a 2 ms hold that is roughly 500 admissions/second. Keep the critical section to the single UPDATE, with no network call or scheduling decision inside the transaction, and decrement in the same transaction that writes the terminal status.
  5. Close the leak the status enum implies: a run can end as lost, so a crashed worker otherwise consumes a slot forever. Reconcile on a schedule against status = 'running' and leased_until < now(), and treat the counter as a fast path over job_run, which stays the system of record.

Worked solution (25 min)

  1. Seed a tenant with 19 running rows, then fire 8 concurrent sessions each running the select-then-insert, and count the resulting running rows.
  2. Repeat at REPEATABLE READ and confirm the count still exceeds 20.
  3. Repeat at SERIALIZABLE, count the 40001 aborts, and note that without a retry loop those requests fail rather than queue.
  4. Implement the atomic counter UPDATE, re-run the 8-way test, and confirm exactly 20 running rows with zero over-admissions.
  5. Kill a worker mid-run, let the lease expire, and check whether the slot comes back without intervention.

Expected result: Write skew identified; read committed and repeatable read both permit it; serialisable prevents it at the price of 40001 retries; the working read-committed version is update tenant_concurrency set running = running + 1 where tenant_id = $1 and running < 20 returning running, whose zero-row result is the rejection, plus a reconciliation path for runs that terminate as 'lost'.

Verify it yourself

  • At 8x concurrency against a cap of 20, running rows never exceed 20.
  • The rejection returns zero rows rather than raising, so it is distinguishable from an error in the caller.
  • Killing a worker does not permanently consume a slot.
  • The counter and select count(*) from job_run where status = 'running' agree after reconciliation.

Follow-up

  • Write the retry loop for the SERIALIZABLE version. What does the caller see when it keeps aborting, and what bounds the retries?
  • Two regions each keep a counter. What is the effective cap, and what does admission do when the counter store is unreachable?
  • The cap changes mid-flight on a plan upgrade. Do running jobs get killed, and what does the counter row look like during the change?

Paginate a tenant's delivery export without skipping rows

Easy · keyset pagination · indexing · multi-tenancy

A customer exports webhook_delivery: delivery_id (bigint identity), subscription_id, tenant_id, event_id, status, attempt_count, next_attempt_at, created_at, delivered_at, updated_at. The endpoint runs select ... where tenant_id = $1 order by created_at desc limit 100 offset $2, and customers report rows missing from exports taken while new deliveries are being inserted. Write the replacement query and the index that supports it, paging a tenant's deliveries newest first at constant cost per page. State why updated_at cannot be the cursor column.

Approach

  1. Name the defect precisely. OFFSET is a position in a result set that is recomputed on every request, so a row inserted ahead of the window shifts everything back by one and the next page starts after a row the client never received. Nothing errors and no identifier gap appears, so the loss is silent.
  2. Replace the position with a value predicate over a stable, unique, indexed ordering: where tenant_id = $1 and (created_at, delivery_id) < ($2, $3) order by created_at desc, delivery_id desc limit 100. The row comparison is load-bearing: created_at alone is not unique, so ties straddling a page boundary are dropped or repeated, which is the same bug in a smaller window.
  3. Index (tenant_id, created_at, delivery_id). PostgreSQL scans a btree in either direction, so an all-DESC ORDER BY is served by an ASC index read backwards and no DESC modifiers are needed; they only matter when the ORDER BY mixes directions. Confirm the plan has no Sort node above the index scan, or the LIMIT stops being an early exit.
  4. Price both forms: keyset is one index descent plus 100 adjacent leaf entries per page, constant regardless of depth, while OFFSET still produces and discards every skipped row, so page N costs time proportional to N times the page size and a deep page on a large table goes from milliseconds to seconds.
  5. Rule out updated_at as the cursor from the precondition, not from taste: a cursor column must never change value for a row already paged past. updated_at moves on every delivery attempt, so a row the client already emitted re-enters a later page and is exported twice. created_at and delivery_id are immutable, which is the whole qualification.

Follow-up

  • The client wants a snapshot as of one instant rather than a live tail. Compare a repeatable-read transaction held open, an added created_at <= $snapshot bound, and a materialised export table.
  • A retention job deletes deliveries older than 90 days. What does a client mid-walk see, and does keyset pagination help at all?
  • The customer wants to resume an export from yesterday's last cursor. What must be true of the cursor for that to be safe?

Can you apply binary search in a linked list? Why or why not?

Medium

Approach

  1. Work from the requirement backwards to the design.
  2. Say what you would check first and why it is the highest-information step.
  3. State your assumptions explicitly before working the problem.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

How would you design a scalable system to handle millions of user requests per minute?

Medium

Approach

  1. State your assumptions explicitly before working the problem.
  2. Say what you would check first and why it is the highest-information step.
  3. Clarify what is being asked and what a complete answer contains.

Follow-up

  • How would you know your answer was wrong?
  • What assumption would you test first?

Sealing a billing period against late-arriving usage

Medium · idempotency · immutable ledger · rounding · conditional writes

billing seals a tenant's period once the metering watermark passes the period end, prices the sealed rollups against the plan (included allowance, tier boundaries, negotiated discount) and writes invoice_line_item rows: quantity numeric(28,6), unit_price_micros bigint, amount_minor bigint, currency char(3), source_rollup_watermark timestamptz. The job is re-run after failures and two workers may attempt the same tenant. Events legitimately arrive with occurred_at inside the period and ingested_at after it. Specify the seal transition, the idempotency key for every write including the payment-processor call, the rounding position and mode, and the fate of a post-seal event.

Approach

  1. Make sealing a conditional write rather than a read followed by a write: UPDATE usage_rollup_hourly SET status = 'sealed', sealed_at = now() WHERE tenant_id = $1 AND hour_start >= $2 AND hour_start < $3 AND status = 'open' RETURNING rollup_id. Two concurrent sealers cannot both win because the loser's predicate no longer matches, and the loser learns it lost from an empty result rather than from a lock timeout.
  2. Gate the seal on the watermark, not on the clock - the period closes when the fold is trustworthy past period_end - but cap the wait, because an unsealed period blocks the whole billing run. Seal anyway after a stated maximum (six hours past period end is a reasonable default) and let whatever arrives afterwards become an adjustment. The trade-off is named in one line: adjustments are cheap, a missed billing cycle is not.
  3. Make every write converge under re-run. Line items are idempotent on (invoice_id, sku, rate_tier) with ON CONFLICT DO UPDATE permitted only while the invoice is draft; the payment-processor call carries (tenant_id, billing_period_start) as its idempotency key, because a timeout there is an unknown outcome, not a failed one, and a plain retry is how a customer gets charged twice.
  4. Keep the arithmetic exact and round exactly once. quantity stays numeric, the rate is an integer unit_price_micros in millionths of a minor unit because per-request prices are genuinely below a cent, and amount_minor = round_half_even(quantity x unit_price_micros / 1,000,000) is computed once per line and stored. Tiering walks the boundaries in order emitting one line per (sku, rate_tier) with tier 0 as the included allowance at price zero; the invoice total is the sum of stored amount_minor values and is never recomputed downstream from quantity and rate.
  5. Handle the post-seal event as a forward-only correction. The sealed rollup is frozen, so the difference between the sealed value and the restated value becomes a new invoice_line_item with kind = 'adjustment' and voided_by_line_id pointing at the line it reverses, carrying its own source_rollup_watermark. Nothing is edited in place, because the original line is the only evidence of what the customer was actually charged and is precisely what a dispute, a refund or an audit asks to see.

Worked solution (35 min)

  1. Write the seal as a single conditional UPDATE ... WHERE status = 'open' RETURNING and state exactly what the losing worker sees.
  2. Price one line by hand: quantity 4,318,904.250000 at unit_price_micros 1200 gives 5,182.6851 minor units and 5,183 after a single half-even rounding. Then do quantity 2,500,000.000000 at unit_price_micros 1, which lands exactly on 2.5 and rounds to 2 under half-even but 3 under half-up.
  3. Take four hundred synthetic lines with fractional minor units and compute the total two ways - sum of per-line rounded amounts, and a single rounding of the summed exact amounts - then record the gap.
  4. Trace one event with occurred_at inside the period and ingested_at two days after the seal all the way to the row that eventually reflects it.

Expected result: Seal as a conditional UPDATE from status = 'open' gated on the metering watermark with a bounded maximum wait; line writes idempotent on (invoice_id, sku, rate_tier) and the processor call idempotent on (tenant_id, billing_period_start); amount_minor rounded once per line with half-even; late data becoming an adjustment line that points at the line it reverses and records its own watermark, with no in-place edit anywhere.

Verify it yourself

  • Re-running the entire billing job on an already-invoiced period must produce identical line rows and must not call the payment processor a second time. If it charges again, the idempotency key was on the retry rather than on the business fact.
  • Over four hundred lines with uniformly distributed fractional parts the two totals should differ by a handful of minor units - standard deviation around sqrt(400/12), about 5.8, with a worst case of 200. If your two totals match exactly, the test data has no fractional parts and has not exercised the trap.
  • Every line carries a source_rollup_watermark, and two lines for the same SKU with different watermarks should explain their difference without opening any other table.

Follow-up

  • Two workers start the same tenant's seal a millisecond apart and the winner crashes after sealing but before writing any line. What does the second worker observe, and is the resulting invoice correct?
  • Show the divergence between rounding each line and rounding the total once over four hundred lines, and say which direction it goes.
  • A customer disputes a charge from two quarters ago. Which rows answer it, and which single design decision made that answer possible?

Invoice detail latency triples after an ORM relationship refactor

Easy · n+1 query · orm · latency regression

An invoice detail endpoint returned in 40 ms at p99 last week. After a refactor replaced a hand-written join with ORM relationship access it returns in 1.4 s, and the regression grows with the number of invoice_line_item rows on the invoice. Database CPU rose, but no statement in the slow-query log exceeds 3 ms. You have request traces with per-span SQL, the ORM statement log, and a staging copy of the data. Produce an ordered diagnostic checklist, the measurement that confirms the cause before any code change, and the fix.

Approach

  1. Count statements per request before reading any statement duration. A slow-query log hides this class by construction, because every individual query is fast and only their number is wrong; take one trace and count SQL spans.
  2. Establish proportionality rather than asserting it: sample invoices with 5, 20, 60 and 200 line items and plot statements per request against line count. A straight line of slope 1 through an intercept of one or two identifies a lazy relationship load, and no index or cache would move that line.
  3. Locate the emitting attribute access in the refactored code and check whether the same shape repeats one level deeper, for instance a tax or adjustment collection hanging off each line, which turns the cost quadratic.
  4. Fix with a bounded statement count: either one join that fetches invoice and lines together, or two statements where the second is WHERE invoice_id = $1 AND tenant_id = $2. Keep tenant_id in the predicate so the read stays tenant-scoped even though invoice_id already implies it.
  5. Choose between the two deliberately: the join duplicates the wide parent row across N children on the wire, the two-statement form avoids that for one extra round trip. Prefer the join for narrow parents and the split for wide ones.
  6. Pin it with a per-request statement-count assertion in a test that varies line count, because a latency assertion passes on a small fixture and would not have caught this.

Follow-up

  • The endpoint now also needs per-line tax rows. Show the shape that keeps statement count constant instead of reintroducing the same defect one level down.
  • How does this change if a transaction-pooling proxy sits between the service and the database, so each statement may land on a different backend session?
  • The same page paginates invoices with LIMIT and OFFSET. Why is that a second, independent defect, and what replaces it?

Suggested practice checklist

For someone who has spent the last few years shipping features and reading other people's code, and who has not solved a timed problem from a blank file in a long time. Five days rebuild the primitives and the patterns that sit on them, working from invariants rather than remembered solutions, and the last two attach that back to the rest of the loop.

Day 1 — Rebuild the primitives by implementing them

  • Implement a dynamic array with doubling growth and an operation counter, then change the growth rule to add a fixed sixteen slots instead, and time both for n of ten thousand, a hundred thousand and a million. The fixed-increment version resizes n/16 times at O(n) each, so its total work is quadratic; doubling is what makes append amortised constant.
  • Implement a hash map with separate chaining and a load-factor resize, then insert ten thousand keys engineered to land in one bucket and record what happens to lookup time, so that average-case O(1) becomes a claim with a stated precondition rather than a reflex.
  • For dynamic-array append and hash-map insert, write down which cost is amortised rather than worst-case, which single operation pays the whole bill, and what a system with a hard per-operation deadline would have to do instead.

Deliverable: Two working implementations plus a timing table showing the input at which each structure's advertised complexity stops holding.

Day 2 — Arrays under an invariant: two pointers, sliding window, binary search

  • Solve longest-subarray-with-sum-at-most-K using a sliding window, then run it on an input containing negative numbers and watch it return the wrong answer: extending the window only moves the sum monotonically when every element is non-negative, and that precondition is the whole reason the technique works.
  • Write the binary search that finds the first index satisfying a predicate rather than an exact value, put the loop invariant above the loop in a comment, and verify termination on the two inputs that break careless versions: the empty range, and a range where every element satisfies the predicate.
  • Compute the midpoint as lo + (hi - lo) / 2 and write one line on why the obvious (lo + hi) / 2 is a genuine defect in a fixed-width integer type and a non-issue in a language with arbitrary-precision integers.

Deliverable: Three solved problems, each with its invariant written above the loop, plus one recorded input on which the sliding window is provably wrong.

Day 3 — Sorting, heaps, and the greedy argument that has to be proved

  • Solve one top-k problem three ways, by full sort, by a size-k heap, and by quickselect, then write the values of n and k at which each becomes the right choice, along with quickselect's quadratic worst case and why a randomised pivot makes that unlikely rather than impossible.
  • Implement bottom-up heapify and count sift-down steps to confirm it does linear work rather than n log n, because most nodes sit near the bottom of the tree and therefore move only a short distance.
  • Take interval scheduling by earliest finishing time and write the exchange argument out in full: given any optimal schedule, swapping in the earliest-finishing interval keeps it feasible and no smaller. Then construct the weighted variant where that same greedy fails and name what has to replace it.

Deliverable: A three-way top-k comparison with measured crossover points, one written exchange argument, and one counterexample to a greedy rule that looks almost identical.

Day 4 — Recursion, memoisation, and the step to a table

  • Take one problem with overlapping subproblems, such as edit distance or coin change, instrument the plain recursion with a call counter to show the blow-up, then add memoisation and re-count.
  • Convert the memoised version to a bottom-up table and state the two properties you relied on: each subproblem's result depends only on its arguments, and the dependencies form a DAG you can enumerate in order.
  • Rewrite one deep recursion with an explicit stack, then find the input length at which the original hits the interpreter's frame limit, which defaults to about a thousand frames in CPython, so you know when the rewrite is required rather than decorative.

Deliverable: One problem in three forms, naive, memoised and tabulated, with call counts for each and the input length at which recursion depth becomes the binding constraint.

Day 5 — Graphs, where most of the work is choosing the traversal

  • Implement BFS and DFS over one adjacency list, then answer for each which finds a shortest path in an unweighted graph and which you would use to detect a cycle in a directed graph, including why the in-progress versus finished distinction matters for the second.
  • Implement topological sort by in-degree, feed it a graph containing a cycle, and confirm the failure signature is that fewer than V nodes come out rather than an exception, then note that the order it produces is one of several valid ones.
  • Run a shortest-path search on a graph with a single negative edge weight and show the wrong answer, then write the precondition Dijkstra actually needs, non-negative weights, because it finalises a node's distance the first time that node is popped, and name the algorithm you would switch to and its own limit.

Deliverable: A small graph library with BFS, DFS and topological sort, plus two inputs that produce documented wrong answers under the wrong algorithm choice.

Day 6 — One day for everything that is not an algorithm

  • Sketch one system only to the depth a coding-heavy loop tends to reach: the endpoints, what the service stores, and the single query pattern that decides the schema. Stop at twenty-five minutes.
  • Prepare the project answer for an interviewer who codes, which means rehearsing the two levels they push to: the specific thing you built, and why you chose that approach over the alternative they will name. Open with a number and be ready to say what it excludes.
  • Prepare the answer to what you would do differently, choosing a real technical mistake with a specific fix rather than a complaint about process or staffing.

Deliverable: One design sketch at endpoint-and-schema depth, plus a project answer rehearsed to two levels of follow-up.

Day 7 — Solve out loud, under time

  • Do three timed problems at twenty-five minutes each in a plain editor with no autocomplete and no execution until the end, then tally separately the failures that were syntax and the ones that were approach, because those two numbers call for different fixes.
  • Narrate one solution from the first sentence, stating the approach and its complexity before writing any code, and rehearse the sentence you will use when you realise mid-solution that the approach is wrong.
  • Re-solve from blank the two problems you were slowest on this week and compare the times against the day they first appeared.

Deliverable: A recording of one fully narrated solution and a tally that separates syntax failures from approach failures.

The bug you decided not to fix

Engineers over-index on what they repaired. A stronger answer covers something you knowingly left broken: the alert you tuned down, the data inconsistency you documented instead of chasing, the cleanup you deferred past two quarters. Give the reasoning and the condition that would have reopened it, so it reads as a decision and not as neglect.

How do you motivate team members to achieve maximum efficiency in a high-pressure environment?

Medium · behavioural and engineering judgement

Approach

  1. Pick a story where you made the decision, not one where you watched it.
  2. Close with what you would do differently, concretely.
  3. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What would you do differently if you ran that again?
  • What did you decide not to do, and why?

Where do you see yourself in five years, and how does this role align with those goals?

Medium · behavioural and engineering judgement

Approach

  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Give the blast radius: what could have broken, and what you measured.
  3. Name the disagreement and how you resolved it with evidence.

Follow-up

  • What did you decide not to do, and why?
  • What would you do differently if you ran that again?

Describe a real-life instance where you went out of your way to help a friend or colleague.

Medium · behavioural and engineering judgement

Approach

  1. Close with what you would do differently, concretely.
  2. Name the disagreement and how you resolved it with evidence.
  3. State the situation in two sentences and spend the rest on the reasoning.

Follow-up

  • What did you decide not to do, and why?
  • How did you know your change caused the improvement?

How do you handle situations where you need to integrate new, unfamiliar technologies into an existing codebase?

Medium · behavioural and engineering judgement

Approach

  1. Give the blast radius: what could have broken, and what you measured.
  2. Pick a story where you made the decision, not one where you watched it.
  3. Close with what you would do differently, concretely.

Follow-up

  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?