Interview guides · ADIT
ADIT Software Engineer Interview Questions & Guide 2026
Concurrency drills for ADIT software engineer prep: races, lock ordering, and what a check-then-act sequence assumes.
The 60-second brief
A Software Engineer at ADIT serves as a core contributor to the company’s technological infrastructure and product delivery. This role is pivotal in translating technical requirements into efficient, scalable solutions that drive the business forward. You will be expected to balance high-level architectural thinking with the practical, day-to-day demands of writing clean, maintainable code.
If the loop includes an asynchronous take-home, treat it as a code review of you rather than as a puzzle: structure, what you chose to test, and what you wrote down about the constraint you were working under. Hold the stated time box and say what you would have done with more of it.
Focus areas
- Bound every outbound call with a timeout
- Trace a symptom to a mechanism under load
- Detect concurrent edits instead of losing writes
Overview
The work environment at ADIT is characterized by a focus on fundamental engineering principles and core language proficiency. As a Software Engineer, you will contribute to the stability and performance of internal products, requiring a strong grasp of object-oriented programming and database management. It is a role that rewards engineers who can articulate their thought processes clearly and demonstrate a solid understanding of how software components interact within a larger system.
Where to focus your preparation
Treat the sections below as preparation areas and confirm the format with your recruiter.
Preparation focus
No round sequence has been reported for this company, so work the categories below and confirm the format with your recruiter.
What to demonstrate
- Breadth across SQL, experimentation and product reasoning
- Ability to state assumptions before choosing a method
How to prepare
- Drill the practice exercises below and time yourself
- Prepare three quantified stories about decisions you drove
Where candidates lose points
Choosing an index from the columns a query mentions rather than from how it filters and orders
A composite B-tree index on (a, b, c) can be seeked only as a left prefix: equality on a, then equality on b, then a range or an ordering on c. A query that filters on b alone cannot seek into it at all and at best gets a full scan of the index; a query that filters a and ranges on b gets no benefit from c, because the index is only sorted by c within a fixed (a, b) pair. The practical consequence is that one index per column is close to useless for multi-predicate queries while a single correctly ordered composite index turns a scan into a lookup. The ordering half is what gets missed: if the index cannot satisfy the ORDER BY, the database must read every matching row and sort before the limit can apply, so a LIMIT 20 over a million matching rows still reads a million rows.
Running a schema change as though the lock lasts as long as the statement
In PostgreSQL an ALTER TABLE that needs an ACCESS EXCLUSIVE lock must first wait for every open transaction touching that table, and while it waits, later queries needing a conflicting lock queue behind it rather than overtaking it. A DDL statement that would execute in milliseconds, issued while a thirty-second analytics query is open, therefore stalls all traffic on that table for thirty seconds: the outage length is set by the longest open transaction, not by the change. The defences are specific and worth knowing by name - set lock_timeout low and retry rather than queue, add columns without a volatile default so no table rewrite occurs (from version 11 a non-volatile default is a metadata-only change), build indexes with CREATE INDEX CONCURRENTLY while accepting that it cannot run inside a transaction block and leaves an invalid index behind if it fails, and add constraints as NOT VALID followed by a separate VALIDATE CONSTRAINT, which takes a weaker lock.
Reading the constraints as preamble rather than as part of the problem
The bounds are usually there to eliminate the obvious approach: n up to 10^5 makes an O(n^2) scan roughly 10^10 operations, far outside any per-test time budget, and an input larger than memory rules out loading it at all. When a bound is not given, ask for it, then say out loud which approach it kills.
A queue or buffer with no bound
Every producer-consumer boundary needs a capacity and a policy for reaching it: block the producer, shed load, or drop the oldest entry. Unbounded buffering converts a temporary slowdown into memory exhaustion and hides the backpressure signal that would have revealed the consumer was falling behind.
Questions & practice
Track a rolling failure rate per destination for circuit decisions
Easy · sliding window · ring buffer · circuit breaker
The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.
Approach
- Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
- Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
- State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
- Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
- Expire idle destinations, or memory grows with every destination ever seen rather than with the live set. Hold the rings in a bounded LRU keyed on destination_id and treat a miss as no history, which is the correct default for an endpoint that has been silent for a minute.
- Keep the half-open probe out of the window arithmetic. After the circuit opens, one probe per interval decides whether to close it, and folding that single success into a window that still holds a 100 percent failure history would reopen the destination on one data point.
Follow-up
- The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
- A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?
- How would you make the window survive a process restart, and is it worth the cost?
Diff a projection against the primary without per-row point reads
Hard · reconciliation · range hashing · throttling
The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.
Approach
- Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
- Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
- For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
- Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.
- Pin the comparison to a point in time or it reports lag as drift: consider only rows whose updated_at is older than now minus a lag margin, and re-check each candidate mismatch individually before repairing. At 1,200 writes per second a diff without this reports thousands of false positives, and an unattended repairer would then overwrite live rows with stale values.
- Make the run resumable and throttled: batch by range key, persist the last completed range, and watch a signal such as replica lag or primary CPU, pausing rather than pressing on. A reconciliation that cannot be stopped and resumed gets killed halfway and restarted from zero, which is how a repair becomes an incident.
Worked solution (35 min)
- Compute the naive cost explicitly at 40,000,000 reads and 0.5 ms each, then at 100 concurrent, and state what those connections do to a pool already carrying 1,200 writes per second.
- Write the merge-join version over (tenant_id, resource_id) and state its memory.
- Define the range aggregate: the range key, the per-row hash input, and the combining function, with one sentence excluding XOR.
- Work an example with 40,000,000 rows, branching factor 256 and 5 differing rows, and count the ranges examined.
- Add the watermark filter and the resume point, and name the throttle signal the loop watches.
Expected result: A rejection of per-row point reads backed by the time cost and the cache-eviction argument, a single ordered merge join as the dense-case answer at O(n) time and O(1) memory, a range-hash drill-down examining O(d log_B(n/d)) ranges using a sum or multiset hash rather than XOR, a watermark excluding recently written rows, and a resumable throttled run loop.
Verify it yourself
- Injecting one known stale row makes exactly one leaf range mismatch and the drill-down reaches it.
- Duplicating a row on one side is detected, which is precisely the case XOR would miss.
- Running the diff twice against an idle system reports zero mismatches both times.
Follow-up
- The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
- Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?
- How would you run this continuously at low cost instead of only as incident response?
Find overlapping job attempts and peak concurrency from lease records
Medium · sweep line · intervals · leases
A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.
Approach
- Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
- For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
- For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
- Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
- State the clock caveat: started_at and finished_at are written by different workers, so under skew of a few hundred milliseconds an apparent overlap shorter than that bound is not evidence. Filter reported overlaps by a minimum duration, or prefer timestamps written by whichever component heartbeats the lease.
- Scale the sort rather than assuming it fits: the sweep emits two endpoints per attempt, so 50,000,000 records become 100,000,000 endpoints, and at roughly 24 bytes each, an 8-byte timestamp plus a 4-byte job_type plus a kind flag padded to alignment, that is about 2.4 GB of sort keys before any scratch space. Either push the ordering into the database behind an index on (job_type, started_at) or run an external merge sort in chunks; the overlap pass sorts n records rather than 2n, so it is the cheaper of the two.
Follow-up
- A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
- Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
- How would you compute both answers incrementally as records arrive rather than in a daily batch?
Explain why the owner filter ignores the listing index
Medium · composite index · query plans · sort elimination
The only index on resource is (tenant_id, status, updated_at DESC, resource_id DESC). A new endpoint returns one user's resources across all statuses, newest created first: WHERE tenant_id = $1 AND owner_user_id = $2 ORDER BY created_at DESC LIMIT 20. On a tenant with 2M rows it takes 900 ms and EXPLAIN shows a sort above a large scan. Explain precisely why the existing index cannot serve it, give the index that can, and state which of these the new index still will not help: owner_user_id alone across tenants; the same query ordered by updated_at. PostgreSQL 16.
Approach
- Separate the two jobs an index does. For filtering, a composite btree is seekable only on a left prefix, so with no predicate on status the scan can at best range over tenant_id and test owner_user_id per row; PostgreSQL 16 has no btree skip scan to jump the unconstrained column.
- For ordering, the index is sorted by (status, updated_at) within a tenant and not by created_at, so the LIMIT cannot stop early: every matching row is read and then sorted. That is the 'Sort Method: top-N heapsort' line, and it is why the plan reads 2M rows to answer with 20.
- Derive the replacement from the access path — equality, equality, then the ordering column: CREATE INDEX CONCURRENTLY ON resource (tenant_id, owner_user_id, created_at DESC). The scan seeks to the (tenant, owner) range and walks 20 entries in order, so the Sort node disappears along with the row-read.
- Treat INCLUDE (title, status) as conditional, not free. An index-only scan still visits the heap for any row whose page is not marked all-visible, so on a table taking 1.2k writes/second the win depends on autovacuum keeping the visibility map current, and the wider index costs more on every insert.
- Answer the two negatives explicitly. owner_user_id alone is not a left prefix of the new index, so it degrades to a full scan of the index at best. Ordered by updated_at, the query still seeks on the (tenant, owner) pair but must sort, because only created_at is ordered within that pair.
- Measure both sides with EXPLAIN (ANALYZE, BUFFERS) and compare estimated against actual rows at the lowest node — a 2M-versus-200 misestimate there is usually what chose the plan, and adding an index will not fix a statistics problem.
Follow-up
- 90% of rows are status='active'. Would a partial index WHERE status = 'active' change your answer, and for which of the three queries?
- A dashboard runs this for 40 owners in one page load. What changes about the design?
- How do you roll this index out on a table taking 1.2k writes/second, and what does it cost on every insert from then on?
Denormalise tenant onto revisions and backfill it live
Hard · denormalisation · online migration · backfill
resource_revision (revision_id, resource_id, version, actor_user_id, change_kind, patch, request_id, created_at) has 400M rows and no tenant column; tenant_id lives only on resource. Two reads need it: a tenant-scoped audit feed ordered by created_at DESC, and an offboarding purge. Both join back to resource today. Justify adding tenant_id to resource_revision against those two reads, name the anomaly the copy introduces and the constraint that prevents it, then give the ordered migration for a live table taking 1.2k writes/second — the lock each step takes, how the backfill is batched, and where each step stops being reversible. PostgreSQL 16.
Approach
- Justify from the access path rather than from taste. Without the column, the audit feed either scans resource_revision by created_at and discards other tenants' rows, or resolves the tenant's resource_ids first and probes with them — both proportional to the tenant's whole history rather than to one page. With (tenant_id, created_at DESC, revision_id DESC) it is a seek that stops at 50 rows, and the purge becomes a ranged delete instead of a join.
- Name the cost exactly: a second copy of a fact can disagree with the first. Make the disagreement unwritable rather than documented — add UNIQUE (resource_id, tenant_id) on resource so it can serve as a foreign-key target, then FOREIGN KEY (resource_id, tenant_id) REFERENCES resource (resource_id, tenant_id) on the revision table. A revision can then only ever carry its parent's tenant.
- Step one, expand: ALTER TABLE resource_revision ADD COLUMN tenant_id BIGINT NULL, with no default, so it is a catalogue change and no rewrite. It still needs ACCESS EXCLUSIVE for an instant, and that instant queues behind the longest open transaction on the table while every later query queues behind it — set lock_timeout to 2s and retry rather than wait.
- Step two, dual-write: deploy the writer that populates tenant_id on every new revision while reads still use the join. Reversible by redeploying the previous build, because nothing reads the column yet.
- Step three, backfill: batch by primary key rather than by created_at so the cursor is dense and resumable — UPDATE resource_revision rr SET tenant_id = r.tenant_id FROM resource r WHERE r.resource_id = rr.resource_id AND rr.revision_id > $1 AND rr.revision_id <= $1 + 5000 AND rr.tenant_id IS NULL — committing per batch and persisting the cursor. Throttle on replica replay lag and on dead-tuple count, since each batch writes 5,000 new row versions. Run the backfill before the index exists so those updates can stay HOT.
- Step four, index then enforce then contract: CREATE INDEX CONCURRENTLY (cannot run inside a transaction block, scans the table twice, waits on open transactions, and leaves an INVALID index to drop concurrently if it fails); ADD CONSTRAINT ... CHECK (tenant_id IS NOT NULL) NOT VALID, then VALIDATE CONSTRAINT, which takes only SHARE UPDATE EXCLUSIVE, after which SET NOT NULL uses the validated check instead of re-scanning on PostgreSQL 12 and later. Only then move the audit reads onto the column and, in a later deploy, delete the join path.
Worked solution (40 min)
- Write the five steps as separate scripts and state, for each, the lock mode it acquires and the deploy it pairs with.
- On a 20M-row copy, run the ADD COLUMN while a 30-second transaction holds a lock on the table, and record how long unrelated queries queue behind it.
- Run the batched backfill at 5,000 rows, kill it mid-run, restart from the persisted cursor, and confirm no row is processed twice and none is skipped.
- Build the index concurrently under concurrent write load, then add the CHECK ... NOT VALID, VALIDATE it and SET NOT NULL, timing each.
- Compare the audit-feed plan before and after: join-and-filter versus an index seek with no Sort.
Expected result: ADD COLUMN completes in milliseconds once it holds the lock, but with a 30-second transaction open it stalls all traffic on that table for the full 30 seconds unless lock_timeout cuts it off. The backfill resumes exactly at the persisted revision_id. After VALIDATE, SET NOT NULL returns without a table scan. The audit feed drops from scanning the tenant's history to reading about 50 rows.
Verify it yourself
- SELECT count(*) FROM resource_revision WHERE tenant_id IS NULL returns 0, re-checked after the dual-writer has been live for a full deploy cycle.
- A sampled join confirms rr.tenant_id = r.tenant_id across 100k random revisions; the composite foreign key makes a mismatch unwritable from then on.
- pg_stat_activity shows no transaction older than one batch's duration while the backfill runs.
- EXPLAIN of the audit feed shows an Index Scan with no Sort node.
Follow-up
- The backfill is half finished and a rollback is required. What state is the table in, and what does the previous build do with a half-populated column?
- How do you verify the backfill actually finished, given rows are still being inserted while it runs?
- A resource must now be movable between tenants. What does that do to the composite foreign key and to the revisions already written?
What is the purpose of the static keyword in programming?
Medium
Approach
- Work from the requirement backwards to the design.
- Say what you would check first and why it is the highest-information step.
- Clarify what is being asked and what a complete answer contains.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
How does encapsulation improve the security and maintainability of an application?
Medium
Approach
- Clarify what is being asked and what a complete answer contains.
- Work from the requirement backwards to the design.
- State your assumptions explicitly before working the problem.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
Can you explain the difference between an abstract class and an interface?
Medium
Approach
- Work from the requirement backwards to the design.
- Clarify what is being asked and what a complete answer contains.
- Say what you would check first and why it is the highest-information step.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
How do you implement inheritance and polymorphism in your code?
Medium
Approach
- Work from the requirement backwards to the design.
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
Keep one tenant's bulk export from starving projection updates
Medium · backpressure · fair scheduling · head-of-line blocking · leases
The worker fleet runs about 600 jobs/second out of job_run, claimed under a lease and heartbeated while running. Most handlers finish under 200 ms; exports run for minutes. One tenant enqueues 50,000 exports. Design the scheduling so that tenant's exports slow down and nothing else does: the queue split, the concurrency caps and where they are enforced, the claim query, and the backpressure signal that stops accepting new work. State the in-flight worker count each class needs at its arrival rate, and what the cap costs the tenant that hits it.
Approach
- Do the concurrency arithmetic first, because it determines the pool shapes. Required in-flight work is arrival rate times service time: 600/second of 200 ms handlers needs about 120 workers, while one export per second at 180 seconds needs 180 on its own. The long tail dominates any pool it shares, so a single pool sized from the mean is consumed by exports while 50 ms projections queue behind them. That is head-of-line blocking, and adding capacity does not fix it because the ratio is what is wrong.
- Split by job class rather than by priority. Priority inside one pool still lets a running export hold its worker for the next four minutes - there is no preemption for a handler already executing. Separate queues and separate worker processes give each class a floor the other cannot take.
- Enforce the per-tenant cap inside the claim, not at enqueue. Claim with SELECT ... WHERE status='queued' AND run_after <= now() AND job_type=$1 ORDER BY run_after, job_run_id FOR UPDATE SKIP LOCKED LIMIT 1, restricted to tenants currently under their cap. Derive the running count from rows in status 'running' with a live lease rather than from a counter incremented at claim and decremented at completion: the derived count self-heals when a worker dies, and the counter leaks a slot every time one does.
- Make the ordering fair over tenants instead of over jobs. Strict FIFO with a cap still forces the claim to scan past 50,000 rows belonging to a capped tenant before it finds anyone else's work, so cost grows with backlog depth. Pick the tenant first from a small per-tenant queue-depth summary, then claim within that tenant, which makes the scan proportional to the number of active tenants instead.
- Close the loop with backpressure and deduplication. Reject or defer enqueues once a class's depth passes a bound, and rely on UNIQUE (job_type, dedupe_key) WHERE status IN ('queued','running') so a retrying producer collapses into one row instead of multiplying the backlog. Watch oldest-queued-age per class rather than depth: depth means nothing without a service rate, while age is the user-visible latency directly.
Worked solution (25 min)
- Compute required in-flight workers per class from arrival rate times service time, and show what one shared pool does when both classes contend.
- Write the claim statement with the per-tenant restriction, and state how the running count is derived so it survives a worker being killed.
- Trace what the claim scans when one tenant holds 50,000 queued rows, under FIFO and under tenant-first selection.
- Choose the backpressure threshold and the signal it watches, then state what the producer receives when it trips.
Expected result: Separate queues and worker pools per job class, sized from rate times service time (about 120 for 200 ms work, about 180 for exports). A per-(job_type, tenant) cap enforced inside the claim with FOR UPDATE SKIP LOCKED, with the running count derived from live leases so it self-heals. Tenant-first selection keeps claim cost proportional to active tenants rather than backlog depth. Enqueue is rejected on class depth, duplicates collapse on dedupe_key, and the alarm is oldest-queued-age per class.
Verify it yourself
- A tenant with 50,000 queued exports never occupies more than its cap's worth of workers.
- Claim cost does not grow as that tenant's backlog grows.
- Killing a worker mid-job returns its cap slot within the lease interval with no manual step.
- Projection p99 is unchanged while the export backlog drains.
Follow-up
- An export outruns its lease, so two copies run. What must the handler do to make the second copy harmless, and what does it write to guarantee that?
- With a cap of 4, the tenant's 50,000 exports now take hours. What do you tell them, and does the answer change if they are the largest tenant on the platform?
- Queue depth is flat but oldest-queued-age is climbing. Name the mechanisms that produce that exact pair of signals.
Listing latency scales with page size, not with filters
Easy · n+1 · latency · query batching
The tenant listing endpoint reads resource filtered by tenant_id and status, ordered by updated_at DESC, and returns each row plus the owner's display name from app_user and the actor of that resource's latest resource_revision. p99 is 55 ms at 10 rows per page and 1.4 s at 200. Database telemetry shows 401 statements per request, each under 1 ms, and nothing in the slow-query log. Diagnose the cause and give the fix, stating the statement count per request and the p99 you expect afterwards.
Approach
- Read the counters before forming a theory. 401 statements for 200 rows is one driver query plus two per row, and sub-millisecond execution with an empty slow-query log rules out a bad plan. The time is round trips, which is why it is invisible in every per-query metric and scales with rows returned rather than with filter selectivity.
- Name the two per-row statements from their normalised text: a single-row app_user lookup by user_id, and a resource_revision lookup by resource_id ordered by version DESC LIMIT 1. Confirm by dropping those two response fields and watching the statement count fall to one. That locates the calls in the serialisation layer, not the repository.
- Check that the arithmetic accounts for the whole gap. Measure one round trip to the replica in isolation; 400 trips at roughly 3 ms of network plus 0.2 ms of execution is about 1.3 s on top of a 55 ms baseline, which matches. If the multiplication had fallen short, the N+1 would only be part of the story and you would keep looking.
- Batch both lookups. Collect owner_user_ids and resource_ids from the driver query, then issue WHERE tenant_id = $1 AND user_id = ANY($2) for the users, and PostgreSQL's SELECT DISTINCT ON (resource_id) ... WHERE resource_id = ANY($2) ORDER BY resource_id, version DESC for the latest revision, which the UNIQUE (resource_id, version) index serves directly. On an engine without DISTINCT ON, use a lateral join or a row_number window. Three statements per request at any page size.
- Keep the tenant predicate in the batched query. The per-row version was implicitly scoped because its ids came from tenant-scoped rows; a batched user_id = ANY(...) with no tenant_id is an unscoped read that behaves correctly only as long as the id list is trustworthy.
- Re-measure at 10, 50 and 200 rows and confirm the statement count is constant. Latency should now track bytes returned.
Follow-up
- The page size is capped at 200 today. What breaks first if it is raised to 2,000, and is it still this bug?
- How do you stop the next N+1 from reaching production, given that no individual query is slow and the endpoint's tests pass?
- The latest-revision actor is only used to render an avatar. Make the case for denormalising it onto resource, and name the write anomaly that introduces.
Suggested practice checklist
Four days sample coding, design, fundamentals and the practical rounds at deliberately shallow depth, which is enough to surface the topics you did not know were in scope. That map, rather than a guess made on day one, decides where the last three days go.
Day 1 — Coding, one pass at shallow depth
- Solve one problem from each of six families, an array with two pointers, hash counting, binary search, a tree traversal, a graph traversal and one dynamic program, under a hard twenty-minute cap with no extensions, marking each finished, late, or stalled.
- For every stall, write the exact move you could not make rather than the subject, so the note reads could not turn the recurrence into a loop rather than bad at dynamic programming.
- Fix nothing today. The value of the pass is the unfixed record.
Deliverable: Six timed attempts marked finished, late or stalled, each stall carrying a named blocking move.
Day 2 — Design, one pass at shallow depth
- Spend twenty minutes each on three different shapes, a read-heavy feed, a write-heavy ingest path, and something needing a transaction across two entities, stopping each at requirements, interface and data model.
- After each, write the first question you could not answer, which is usually a number you could not estimate or a failure mode you had no vocabulary for.
- Mark which of the three you would be most relieved not to be asked, and treat that as data rather than as a preference.
Deliverable: Three shallow designs, each with the first unanswerable question written at the bottom.
Day 3 — Fundamentals and the practical rounds
- Answer eight short questions in writing at four minutes each, covering the material that fills the gaps between the big rounds: what happens between a URL and a rendered page, what an index costs on write, when a process is preferable to a thread, and what conditions a deadlock requires.
- Do one thirty-minute practical task of the kind a take-home compresses: read an unfamiliar two-hundred-line file and write what it does, what you would change, and the one thing you remain unsure of.
- Score every answer fluent, correct but slow, or absent, and keep the absent ones visible.
Deliverable: Eight scored short answers and one written reading of unfamiliar code.
Day 4 — The rounds that are about you, and the map
- Deliver three behavioural answers aloud against a timer, a conflict, a failure you owned, and a decision made without enough information, marking any that ran past three minutes or contained no number.
- Assemble the map: every marked item from days one to three on a single page, sorted by how likely it is to appear in your loop rather than by how uncomfortable it felt.
- Choose exactly two areas for the remaining three days and write down what you are deliberately abandoning.
Deliverable: A one-page scored map of the whole surface area with two areas chosen and the rest explicitly abandoned.
Day 5 — First chosen area, to the depth you skipped
- Work the higher-ranked area in four focused blocks, choosing items one level above where you stalled rather than repeating what already works.
- After each block write the rule you extracted in one sentence with its precondition attached, since a rule carrying no precondition is exactly what fails under a variation.
- Re-attempt the day-one or day-two item that exposed this area and compare against the original timing.
Deliverable: Four worked blocks, a timed re-attempt against the original, and three one-sentence rules with preconditions.
Day 6 — Second chosen area, where the gap is coverage rather than speed
- Treat the second area differently from the first. Day five drilled something you could already half-do; this one is usually a topic you had simply never met, so build one worked reference example end to end and keep it, rather than attempting six problems badly.
- Write down the vocabulary you were missing on day two or three, five terms at most, each with the one sentence that makes it usable in an answer rather than the textbook definition.
- Redo the shallow attempt that exposed this area and note whether you now fail later in the problem, because moving the failure point is the realistic gain from a single day and is worth more than a score that did not change.
Deliverable: One worked reference example for the newly covered area, a five-term vocabulary list, and a note on where the failure point moved.
Day 7 — Reassemble the loop
- Sit two rounds back to back with no gap, ordering them so the area you chose second comes last, because the map was built from rested, isolated attempts and the loop will reach your weaker area when you are already spent.
- Write where the second round suffered from the first, which is normally the point at which structure collapses into narration.
- Reduce the week to one page holding only the rules you can state without reading them.
Deliverable: Mock notes on cross-round carryover plus a one-page card of rules you can recite from memory.
What the behavioural round is actually measuring
Every story you tell gets read for blast radius and judgement: what could have broken, who else it touched, what you knew at the moment you decided. Nobody can audit your code in an hour, so they audit your reasoning instead. Pick work where the call was genuinely yours and the consequences were real enough to remember.
Estimate work you have never done and defend the range
Hard · estimation · backfills · expand-contract
You are asked to estimate a change you have never attempted: add a column to a 100-million-row table, populate it, move reads across, and drop the old shape. Give a range with the assumptions that generate it, including batch size, the signal your backfill throttles on, and wall-clock hours, and name the three unknowns that would move the number most. Then describe a real estimate you gave under comparable ignorance: how you expressed its uncertainty, what you committed to, and how wrong you turned out to be.
Approach
- Decompose into independently deployable steps before estimating anything: add the column nullable, write both shapes, backfill in batches, verify, move reads, stop writing the old shape, drop it. That is four deploys spread over days, and the calendar estimate is dominated by them rather than by the loop's runtime.
- Do the arithmetic aloud for the part that has arithmetic in it: batch size times number of batches times per-batch duration, at a write rate the primary can absorb alongside roughly 1.2k writes per second of production traffic. The loop is throttled by replication lag and lock waits, not by how fast it can issue statements.
- Price the schema step by its lock rather than its statement duration. In PostgreSQL an ALTER TABLE taking ACCESS EXCLUSIVE waits for every open transaction on that table while later queries queue behind it, so a millisecond change issued during a thirty-second analytics query stalls that table for thirty seconds. Adding a nullable column with a non-volatile default avoids a rewrite from version 11; a new index wants CREATE INDEX CONCURRENTLY, which cannot run inside a transaction block and leaves an invalid index behind if it fails.
- Express the answer as a range whose endpoints each trace to a stated assumption, then name the cheapest experiment that collapses it, which is almost always running one real batch against the real table and multiplying.
- Commit to a checkpoint rather than a completion date: the day you report a measured number from that first batch. That is a promise you can keep under uncertainty, and it is what the asker actually needs in order to plan.
Follow-up
- How do you verify the backfill genuinely finished, given rows written by production traffic while it ran?
- Where does the backfill resume from after a worker is killed mid-batch, and what makes that resume point trustworthy?
- Your first batch comes back ten times slower than assumed. What do you tell the person waiting on the estimate, and when?
Unblock an engineer without taking the keyboard
Easy · mentoring · leases · at-least-once
A teammate has spent two days on a job handler that occasionally writes duplicate rows. They are certain the queue is delivering twice by mistake. You suspect a lease expiring under a slow handler, so the job is running concurrently with itself. Describe how you have unblocked someone in this position: what you asked before offering a hypothesis, what you showed them rather than told them, and what you left them owning. Then say what you would do if their theory turned out to be the right one.
Approach
- Ask before diagnosing, and ask for things answerable from data they already have: the attempt count on the job rows that produced duplicates, the handler's observed duration against its lease expiry, and whether the duplicate rows share a natural key that a unique constraint could have caught.
- Teach the shape rather than the answer. A lease cannot distinguish a dead worker from a slow one, so a handler that outruns its lease is running twice by design, and deploys deliver the other half by killing handlers mid-run on every rollout. Both of their candidate theories produce identical duplicate rows, which is why the evidence has to come from timings rather than from argument.
- Hand over a checklist they execute: a natural key on every write the handler performs so the second copy collides rather than appends, the record of intent written before any external effect, a lease heartbeat while running, and the metric that shows it working.
- Keep ownership with them deliberately. Pair on the first write, then step back; if you finish it yourself you have closed one ticket and left the same person stuck on the next redelivery.
- Close on the systemic gap that let two days pass, which is usually a missing dashboard for attempt counts or an undocumented at-least-once contract, and fix that rather than only the bug.
Follow-up
- How would you distinguish a genuine double-delivery from a lease expiry using only the data already stored?
- Their handler calls an external endpoint before recording that it did. What do you tell them to change first?
- What do you do the third time the same person brings you the same class of bug?
Argue against a design, lose, and commit anyway
Medium · disagreement · service boundaries · decision records
Describe a design you argued against and lost. State the failure you predicted as a named mechanism, not a feeling about complexity: two services that would need one transaction, a projection with no rebuild path, a write path with no idempotency key. Say what evidence you brought, what the decision maker weighed instead, and what you did after the decision was made: what you instrumented, what you wrote down, and whether the prediction came true. Five minutes.
Approach
- State the prediction in falsifiable form up front: the mechanism, the condition that triggers it, and the observable outcome. A prediction that cannot be checked also cannot be credited to you later.
- Show the evidence you had at the time and label each piece honestly as measured, analogous, or intuition. Keeping the intuition is fine; disguising it as data is the thing that erodes your standing in the next argument.
- Represent the opposing case at full strength, including the constraint you did not control: a fixed date, a team boundary, or the fact that the decision was cheap to reverse and yours was not.
- Make disagree-and-commit concrete. Name the artefact you left behind so the prediction could be settled without you: the alert and its threshold, the counter on the dashboard, the decision note that recorded the trade-off and the condition that would revisit it.
- Report the outcome without editing it. If the design held and your predicted mechanism never fired, say so and say what you had mis-weighted, which is more persuasive than a vindication story.
Follow-up
- What threshold on that alert would have proved you right, and did anyone ever look at it?
- If the same proposal arrived tomorrow with the same deadline, would you argue it the same way?
- How did you behave toward the design once it shipped and started failing in a different way than you predicted?