Interview guides · Acma Computers
Acma Computers Software Engineer Interview Questions & Guide 2026
Concurrency drills for Acma Computers software engineer prep: races, lock ordering, and what a check-then-act sequence assumes.
The 60-second brief
At Acma Computers, the Software Engineer role is central to the company's technical operations, connecting complex infrastructure with user-facing solutions. Whether you work as a Server Engineer, Out System Developer, or Network Engineer, your contributions affect the stability and efficiency of Acma Computers' digital systems. You will build, maintain, and optimize systems that support Acma Computers' internal and external clients.
Browser-facing seats are not covered by algorithm practice. Scope in state ownership, what the page does on a slow or failed request, and how you would diagnose something that renders correctly but feels slow.
Focus areas
- Keep money in integer minor units
- Make every write idempotent under client retries
- Build at-least-once pipelines with explicit deduplication horizons
Overview
This role is critical because it demands a balance of high-level architectural thinking and hands-on technical execution. You will work in a varied environment where technical precision is required to support Acma Computers' growing product suite. If you are passionate about solving intricate engineering puzzles and thrive in a fast-paced environment where your work has immediate, tangible results, you will find this position both challenging and rewarding.
The Acma Computers interview process
Acma Computers candidates report 3 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.
Initial Screening
Before anything technical happens, someone has to decide which rung of the ladder your loop is calibrated to, and that decision sets the bar for every round after it. It comes from how you describe scope, not from your title, because titles do not convert cleanly between companies. The weak version of the answer is team size and years. The strong version names the largest change you shipped where nobody reviewed the design, what would have broken if you had been wrong, and what you were paged for. Get the level said out loud on this call, because the range and the loop both follow from it.
What to demonstrate
- Whether the scope in your own account maps onto a level the team actually has an opening at, so a mismatch ends the process cheaply rather than after four interviewers have spent a day
- Whether your title needs re-mapping: the same word describes very different amounts of independent decision-making at a twenty-person company and a ten-thousand-person one
- Whether your compensation expectation can be filled at that level in the structure the role pays in, which is why the number gets asked for before any engineer is scheduled
How to prepare
- Write down two changes from the last two years: the largest one you designed with nobody reviewing the design, and the largest one where someone more senior did. Lead with the first when scope comes up, and be ready to say which parts of the second were yours
- Ask which level the loop is calibrated to and what changes at the level above it, then plan your weeks from that answer rather than from the posting
- Settle a total-compensation range beforehand with the split named, base against bonus against equity and its vesting period, so a question about numbers gets a number instead of the word market
Technical Assessments
The same problem is scored by two different mechanisms depending on the format, and preparing for one does not cover the other. With a person watching, partial progress is visible and a hint is a correction you can absorb; silence is the expensive failure, because nobody can read a half-written function. With an automated grader there is no partial credit for what you were about to do, nobody to ask, and the worked examples in the prompt are the entire specification. Read them as a contract, down to whether an empty result should be an empty list or no output at all.
What to demonstrate
- In a live session, whether your commentary tracks what your hands are doing, and whether a hint redirects you or gets defended against
- In an automated one, whether you cover the cases the examples do not show, since the hidden cases are where the score moves
- Whether you manage the clock on purpose: abandoning an approach that is not converging while there is still time to write something simpler that finishes
How to prepare
- Have someone hand you a problem and feed you one deliberately wrong hint. Practise testing it against a concrete case instead of accepting or rejecting it on authority.
- Do one timed run a week in a plain browser editor with autocomplete, linting and your own snippets switched off, which is closer to what these environments give you
- For the automated format, write the harness before the solution: a main that feeds the worked examples plus an empty and a single-element case and prints expected against actual, so a wrong submission is caught by you first
Collaborative Interviews
When a round has no standard shape, it is often there because something is still open: an area no earlier conversation reached, a round where the signal came out mixed, or a decision someone is not ready to make alone. Work out which by going back over what each earlier round actually covered rather than how it felt, and arrive able to give evidence on that point without being asked twice. Weak answers replay the loop's earlier material at the same depth. Strong ones go a level deeper and stay consistent with what you already said.
What to demonstrate
- Whether your account of a project matches the one you gave earlier in the loop, since what you said before may be available to whoever runs this round
- Whether you can go a level deeper on something already covered, reaching the decision and its alternatives rather than repeating the summary
- Whether you state your own uncertainty accurately, including parts of a system you did not build and decisions you inherited, instead of claiming even ownership across all of it
- Whether you can answer a question you handled poorly earlier by naming what you missed, rather than delivering a polished second version as if the first had not happened
How to prepare
- Reconstruct the loop on one page: for each round, the questions you were asked and the answer you actually gave, not the better one you thought of afterwards. The gaps on that page are your best available guess at why this round exists.
- Take the two claims you made earlier that carry the most weight and assemble the backing for each: the measurement, the date, what broke, the decision you would make differently now.
- Write down the three facts about your work that must not drift between tellings, such as team size, timeline and your own role, and check your stories against that list rather than trusting recall under pressure
Where candidates lose points
Holding money in a floating-point type, or rounding it more than once
Binary floating point cannot represent 0.01 or 0.1 exactly, so sums drift and two code paths that should agree disagree by cents nobody can trace back. The fix is integer minor units or an exact decimal type end to end, with sub-cent rates expressed as scaled integers such as micro-units, because a per-request price genuinely is smaller than a cent. The second half of the trap is rounding position: rounding each line and then summing gives a different total from summing and rounding once, and half-up and half-even diverge systematically across many lines, so rounding must happen at one named place and every downstream reader must carry the rounded value rather than recompute it from quantity and rate.
Checking a quota with a select and then writing
Under read-committed isolation, two concurrent transactions both observe a count below the limit and both insert, so the limit is exceeded by exactly the concurrency. Repeatable read does not rescue it either: it provides a stable snapshot, and this is write skew, which snapshot isolation permits by design. The options are serialisable isolation, which detects the conflict and aborts one transaction with a serialisation failure and therefore obliges the caller to retry; a single statement with the predicate inside the write; or a constraint that makes the surplus insert fail outright. The reason this pattern survives review is that it is correct in every test that runs one request at a time.
Comparing floating-point values for equality, or holding money in them
Binary floating point cannot represent 0.1 exactly, so repeated addition drifts and an equality check fails on values that are mathematically equal. Store currency as integer minor units or a decimal type, and compare floats against a tolerance you chose for a stated reason.
Abandoning working code to chase the optimal solution
Get the straightforward version correct, state its complexity, and only then optimise, keeping the working version until the faster one passes the same cases. A correct quadratic solution with a stated path to linear beats a half-written optimal one that never ran.
Questions & practice
Locate a billing reconciliation gap without rescanning ninety million events
Hard · reconciliation · dimensional-bisection · watermarks · hypothesis-testing
A tenant's sealed invoice total is 0.4% below the sum of its raw usage_event rows for the period. That tenant has 90 million events over 30 days in a table partitioned daily on ingested_at, and its rollups carry source_max_ingested_at, revision and sealed_at. Recomputing all 30 days from raw is correct, and you are not going to do it. Give the procedure that locates the divergent (workspace, sku, hour) cell, the cost of each probe, and the one query you run before any of it.
Approach
- Run the free query first. Sum raw quantity for the period restricted to
ingested_at <= source_max_ingested_atof the sealed rollups, and compare that against the unrestricted sum. The rollup stores the watermark precisely so this can be answered without a scan. If the whole 0.4% sits above the watermark, nothing is broken: it is late data, it becomes an adjustment line, and the investigation ends in one query. - Only if the gap survives that test do you bisect, and you bisect by dimension rather than by rows. Compare 30 per-day totals, then inside the offending day compare the 6 SKUs, then the workspaces, then the 24 hours. That is roughly 30 + 6 + W + 24 grouped probes, each an indexed range scan over one daily partition for one tenant, against O(N) per attempt for the naive re-fold.
- Quantify why naive is not merely slow but unusable mid-incident: at a generous 200,000 rows/second sequential, 90 million rows is about 7.5 minutes per attempt, you will want ten attempts, and every one competes for I/O on the same partitions live ingest is writing. The diagnostic worsens the backlog it is diagnosing.
- Before fetching each comparison, state what it would look like under each hypothesis. Two adjacent hours off by equal and opposite amounts is
occurred_atversusingested_atbucketing. A whole day offset by exactly N hours is a timezone applied at the wrong layer. A gap confined to one SKU in one workspace is an environment filter. The same(tenant_id, idempotency_key)present in twoingested_daypartitions is the dedup horizon losing a retry that crossed midnight. - Make the next bisection cheap by storing the aggregate you keep recomputing. A per-
(tenant_id, ingested_day)count and quantity checksum turns step two from thirty probes into one read, and it is the same number the reconciliation job already produces. - Whatever you find, the sealed period does not change value. The correction is an adjustment line pointing at the line it reverses, carrying its own
source_rollup_watermark, because the original invoice is the evidence of what the customer was charged.
Follow-up
- The gap is 0.4% in one direction on one day and 0.4% the other way the next day. What does that shape rule in, and what does it rule out?
- How do you distinguish a duplicate from a restatement, given
revisionandrecomputed_aton the rollup? - Ingest is still running while you investigate. What makes your two numbers comparable at all?
Order a job dependency graph and find its critical path
Medium · topological-sort · dag-longest-path · cycle-detection · critical-path
A workspace defines up to 50,000 jobs with up to 200,000 dependency edges and an estimated duration_seconds per job. Given the edge list, reject the graph if it contains a cycle and name one cycle's nodes; otherwise return a valid execution order, the earliest possible completion time with unlimited workers, and the set of jobs whose slack is zero. Then say which single job to shorten in order to cut the completion time, and by exactly how much. State the complexity of each part.
Approach
- Kahn's algorithm for the order: compute indegrees, seed a queue with zero-indegree nodes, emit and decrement. O(V + E), which at 50,000 and 200,000 is milliseconds. If fewer than V nodes are emitted, the graph contains a cycle.
- Kahn detects a cycle but cannot name one. The nodes left with indegree above zero contain every cycle, so run one DFS restricted to that residual subgraph with three-colour marking and report the stack slice from the grey node the back edge points at. That is the difference between a usable error message and 'dependency cycle detected'.
- Earliest completion with unlimited workers is the longest path, which is NP-hard on a general graph and linear on a DAG. State the precondition, then relax in topological order:
earliest_finish[v] = duration[v] + max(earliest_finish[u] for u in preds(v)), taking the max over an empty predecessor set as zero. The makespan T is the maximum over all nodes. O(V + E). - Second pass in reverse topological order for
latest_finish, thenslack[v] = latest_finish[v] - earliest_finish[v]. Zero-slack nodes form the critical path, and there can be several disjoint critical paths, so return the set rather than one chain.slack[v] = 0is exactly the statement that some longest path runs through v; equivalently, the longest path through v has lengthT - slack[v]. - The speed-up bound is the point of the question, and the obvious form of it is wrong. Shortening a zero-slack job v by d, with 0 <= d <= duration[v], cuts the makespan by
min(d, T - L_avoid(v)), whereL_avoid(v)is the longest path in the graph with v deleted: the longest path that avoids v, not the second-longest path overall. The two coincide only when the runner-up path misses v. Counterexample: A of 10 s feeds both B of 5 s and C of 4 s, so T = 15 s and the second-longest path is 14 s, yet shortening A by 10 s leaves a makespan of 5 s. The realised gain is the full 10 s, because both paths ran through A and shrank together, whilemin(10, 15 - 14)predicts 1 s. The reason is structural: shortening v reduces every path through v by d and leaves every other path alone, so the new makespan ismax(T - d, L_avoid(v)). - Compute
L_avoid(v)the direct way: delete v and re-run the same forward relaxation, O(V + E) per candidate. The cheaper equivalent skips the deletion, sinceL_avoid(v)only ever matters through that max: setduration[v] := 0, recompute the makespan asT0(v) = max(T - duration[v], L_avoid(v)), and the gain ismin(d, T - T0(v)), which is identical for every d <= duration[v]. Only zero-slack jobs are candidates, because shortening a job with positive slack changes the completion time not at all. One relaxation is milliseconds at this size, so ranking a critical set in the hundreds costs O(k(V + E)) and is worth doing exactly; a critical set in the tens of thousands is not, and there you evaluate a shortlist, longest jobs first, and say that the answer is the best of that shortlist rather than the optimum.
Follow-up
- Only m workers are available. What happens to your answer, and what can you still promise about the schedule you produce?
- Edges arrive incrementally as the customer edits the pipeline. How do you detect a cycle at insert time without re-running Kahn over 250,000 elements?
- Durations are estimates. How would you express completion time as a distribution, and what breaks about the critical path once you do?
Hold a tenant to a trailing sixty-second request limit
Medium · sliding-window · two-pointer · rate-limiting · tenant-skew
The gateway must hold each tenant to R requests in any trailing 60 seconds, in aggregate across three regions and every pod, within a budget of under 10 ms added p99. Peak is 30,000 requests/second across 200,000 active tenants, and traffic is heavily skewed toward a handful of them. Give an exact single-process algorithm with its amortised per-request cost and its memory per tenant, then a bounded-memory approximation and the worst-case overshoot it actually admits. Say what the distributed version does when the counter store is unreachable.
Approach
- Exact, single process: a per-tenant deque of request timestamps. On arrival, pop from the front while
front <= now - 60s, then admit if the remaining length is below R and push. Each timestamp is pushed once and popped once, so the cost is O(1) amortised. The O(R) version is the one that re-filters the whole deque on every request. - Quote the memory. R = 1,000 across 200,000 active tenants is up to 2 x 10^8 timestamps at 8 bytes, about 1.6 GB, and that is the worst case rather than the mean, because the long tail of small tenants holds almost nothing. Skew helps you here and hurts you in the sharding decision.
- Bounded alternative, with its real bound stated: a fixed 60-second counter is O(1) memory but admits close to 2R across a 60-second span straddling a boundary. The weighted two-bucket estimate,
prev * (60 - elapsed)/60 + cur, is better on smooth traffic but assumes the previous window's arrivals were uniform; an adversary packing them at the end of that window is undercounted and can still approach 2R. Say that rather than calling it exact. - Token bucket is the usual gateway answer and a different contract: O(1) state per tenant (
tokens,last_refill), a sustained rate, and a deliberate burst allowance equal to the bucket size. Choose it when a burst is acceptable and the log when the limit is contractual. - Distributed: the limit is per tenant in aggregate, so a local bucket of R/N per pod is wrong in both directions under skew. A tenant landing on one pod is throttled at R/N, and a tenant spread evenly across pods exceeds R. The shared check must be a single atomic round trip, one script or one increment-and-compare, never read-then-write, and it must fit inside the 10 ms p99 budget.
- Decide the unavailable case in advance and write it down. Failing open keeps the product up and lets a tenant exceed its limit for the duration; failing closed converts a counter-store outage into a full outage. Most gateways fail open on rate limits and closed on authorisation, and those are two separate decisions made separately.
Worked solution (25 min)
- Implement the deque version and instrument the per-request pop count, then confirm total pops equal total pushes over a run.
- Generate a burst that places R requests in the last 100 ms of one minute and R more in the first 100 ms of the next.
- Run that burst through the exact deque, a fixed 60-second counter, and the weighted two-bucket estimate, recording admissions in the trailing 60 seconds at every instant.
- Size the memory as R x active tenants x 8 bytes at R = 1,000 and 200,000 tenants, and compare it against what a token bucket would need.
Expected result: The exact deque never admits more than R in any trailing 60-second window. The fixed counter admits close to 2R across the boundary. The weighted estimate lands between the two on this burst and approaches 2R once the previous window's requests are packed at its end.
Verify it yourself
- Total pops equal total pushes, which is what makes the amortised O(1) claim true rather than merely asserted.
- Sliding the whole burst by 30 seconds changes the fixed counter's result and leaves the deque's unchanged.
- Running two processes each limiting to R/2, against a tenant that sends everything to one of them, shows that tenant throttled at half its contractual limit.
Follow-up
- One tenant sends 40% of all traffic. What does that do to a single counter key, and what do you shard on instead?
- Quotas rather than rate limits: the check is
select used; if used < limit then insert. Name the isolation level that still permits the overshoot, and the two fixes. - How do you return an accurate
Retry-Afterfrom the exact algorithm without a second scan?
Migrate a live partitioned event table without blocking ingest
Hard · online migration · ddl locks · expand and contract · partitioning
usage_event is range-partitioned daily on ingested_at, holds roughly 250M rows per day across 400 live partitions, and is written at 10-40k rows/second. Two changes are required: quantity must move from double precision to numeric(20,6), and a new environment column must become NOT NULL with a default of 'production'. Ingest cannot stop. Give the ordered plan, naming for each step the lock it takes, what that lock blocks, and roughly how long it is held. Identify the one step that cannot be rolled back cleanly once traffic depends on it.
Approach
- Classify the two changes before planning anything. Adding a column with a non-volatile default has been metadata-only since PostgreSQL 11, so it is cheap. Changing double precision to numeric is not binary-coercible, so
alter column ... typerewrites every partition under ACCESS EXCLUSIVE and rebuilds its indexes; on this volume that is hours of blocked ingest and is simply not an option, which is why the plan is expand-and-contract rather than one statement. - Expand: add
quantity_numeric numeric(20,6)andenvironmentwith its default on the parent. Both are catalogue-only but both take a brief ACCESS EXCLUSIVE that cascades to partitions, so run each withlock_timeoutset to a second or two and retry on failure. A queued ACCESS EXCLUSIVE request blocks every reader behind it, which is how a metadata-only change turns into an outage. - Dual-write: deploy producer code that populates both columns on every insert, and leave it running before anything reads the new column. This is the step that cannot be reverted cleanly. Once readers depend on quantity_numeric, reverting the writer leaves rows with a null there, and the gap is only discoverable by re-reading the old column, which the readers have stopped doing.
- Backfill older partitions in batches keyed on the primary key, oldest first, committing every few thousand rows with a pause between batches, and skipping the partition still receiving writes until it rotates. Each batch is an ordinary UPDATE taking row locks only. The cost is bloat and WAL rather than blocking, so watch dead tuples and let autovacuum keep pace instead of wrapping 400 partitions in one transaction.
- Make NOT NULL cheap with the three-step form:
add constraint ... check (environment is not null) not valid(brief ACCESS EXCLUSIVE, no scan), thenvalidate constraint(SHARE UPDATE EXCLUSIVE, scans while reads and writes continue), thenset not null, which from PostgreSQL 12 uses the validated check and skips its own full scan. Do this per partition, then on the parent. - Switch and contract: move reads to the new column behind a flag, verify over a full period that both columns agree on freshly written rows, drop the old column (metadata-only), and only then remove the dual-write. Any index on the new column goes on with CREATE INDEX CONCURRENTLY per partition, since CIC is not supported on a partitioned parent: create the parent index with ONLY, build each child concurrently, then ALTER INDEX ... ATTACH PARTITION until the parent index becomes valid.
Worked solution (45 min)
- On a scratch cluster, build 10 partitions of 2M rows each and run a writer at a few thousand inserts/second.
- Run the naive type change and measure how long writes stall and how far ingest lag grows before killing it.
- Run the expand step with
lock_timeout = '2s'while the writer runs, and observe a clean lock timeout and retry instead of a pile-up of blocked readers. - Backfill in 5k-row batches and chart dead tuples and WAL generated per batch.
- Run the not-valid, validate, set-not-null sequence and confirm from
pg_stat_activityand timings that nothing held an exclusive lock through a full scan. - Add an index with CIC per partition plus ATTACH PARTITION and confirm the parent index reports valid only after the last attach.
Expected result: An ordered expand, dual-write, backfill, switch, contract plan with the lock named per step: metadata-only ADD COLUMN under a brief ACCESS EXCLUSIVE taken with lock_timeout; batched UPDATE backfill under row locks; CHECK NOT VALID, then VALIDATE under SHARE UPDATE EXCLUSIVE, then SET NOT NULL; CREATE INDEX CONCURRENTLY per partition with ATTACH PARTITION; and the dual-write-to-read switch identified as the step that cannot be reverted cleanly.
Verify it yourself
- No step in the plan holds ACCESS EXCLUSIVE for longer than the configured lock_timeout.
- The writer's error rate stays at zero through the rehearsal apart from the deliberate lock timeout.
- After VALIDATE, SET NOT NULL completes in milliseconds on a table where the naive form scanned every row.
- Freshly written rows agree on both columns for a full verification period before the old column is dropped.
Follow-up
- A CREATE INDEX CONCURRENTLY fails halfway through the partition list. What state is the table in, how do you detect it, and what do you run?
- The producer computes quantity itself. What happens to a request already in flight when the dual-write deploy lands, and does it matter?
- Give two queries that prove the backfill is complete: one cheap enough to run every minute, one authoritative.
Rebuild an hourly rollup with deduplication and late-arrival accounting
Hard · window functions · deduplication · event time vs ingest time · watermarks
From usage_event (event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at, ingested_at), produce the values usage_rollup_hourly should hold for one tenant over one day: per (workspace_id, sku, hour_start) the deduplicated quantity_sum, event_count and source_max_ingested_at, bucketed by occurred_at. Duplicates share (tenant_id, idempotency_key). Also report, per hour, the running total across the day and the share of quantity that arrived more than two hours after the hour began. Write the query, and state which duplicates a daily unique index cannot catch.
Approach
- Deduplicate in its own CTE before any aggregation, because a SUM cannot be un-summed:
row_number() over (partition by tenant_id, idempotency_key order by ingested_at, event_id) = 1. Include the tiebreaker. Without it the surviving row is non-deterministic when two duplicates share an ingested_at, and a rollup described as deterministically recomputable then disagrees with itself between runs. - Bucket on occurred_at and nothing else, and pin the timezone explicitly.
date_trunc('hour', timestamptz)truncates in the session's TimeZone setting, so the same query run by a session set to a non-UTC zone buckets differently; use the three-argumentdate_trunc('hour', occurred_at, 'UTC')on PostgreSQL 16 or later, ordate_trunc('hour', occurred_at at time zone 'UTC') at time zone 'UTC'before that. Filterenvironment = 'production'explicitly, since metering covers three environments and billing covers one. - Aggregate to the grain with
sum(quantity),count(*)andmax(ingested_at). The last is not decoration: it is the watermark the row consumed up to, and without it there is no way to prove afterwards what a number did and did not include. - Compute the late share inside the dedup-and-aggregate step as a conditional aggregate,
sum(quantity) filter (where ingested_at > hour_start + interval '2 hours'), then divide by the hour's total. Compute the running total as a window over the already aggregated rows:sum(quantity_sum) over (partition by workspace_id, sku order by hour_start rows between unbounded preceding and current row). Running either over raw rows puts the duplicates back. - Answer the index question exactly. The unique constraint is on (ingested_day, tenant_id, idempotency_key), because a unique index on a partitioned table must contain the partition key. It therefore deduplicates only within one ingest day and admits a duplicate whose retry crosses midnight or whose replay runs a week later. That is why this CTE dedups across the whole window being recomputed, and why the dedup horizon is a correctness parameter rather than a retention cost.
- Keep the numeric type all the way through. quantity is numeric so the sums are exact; a cast to double precision anywhere in this pipeline reintroduces drift that surfaces only as a few unreconcilable cents per tenant per month, long after the query is out of anyone's mind.
Follow-up
- A dispute forces the same recompute over 40 days for one tenant. What changes about the dedup CTE's memory use and the chosen plan, and what would you do about it?
- Two runs a minute apart return different quantity_sum values for an hour that is already closed. Give two mechanisms that produce that, and the single query that distinguishes them.
- Express the same rollup incrementally so it does not re-scan the day each time the watermark advances. What does the incremental version stop being able to answer?
How do you document network configurations to ensure team-wide consistency?
Medium · system design and architecture
Approach
- State the consistency you need, and where you are willing to be stale.
- Fix the scope first: who calls this, how often, and what they do when it fails.
- Name the read and write paths separately; they rarely have the same bottleneck.
Follow-up
- How does this behave when that dependency is down for an hour?
- What breaks first when traffic grows ten times?
What steps do you take to ensure high availability for critical server deployments?
Medium · system design and architecture
Approach
- Choose a partition key and say what query it makes expensive.
- Fix the scope first: who calls this, how often, and what they do when it fails.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- What would you drop to keep the system up under load?
- What breaks first when traffic grows ten times?
Explain the difference between L1 and L2 support in a network environment.
Medium · system design and architecture
Approach
- State the consistency you need, and where you are willing to be stale.
- Name the read and write paths separately; they rarely have the same bottleneck.
- Name the failure you are designing for, then the recovery path.
Follow-up
- What breaks first when traffic grows ten times?
- How does this behave when that dependency is down for an hour?
How do you approach troubleshooting a server connectivity issue?
Medium · system design and architecture
Approach
- Fix the scope first: who calls this, how often, and what they do when it fails.
- Name the read and write paths separately; they rarely have the same bottleneck.
- Name the failure you are designing for, then the recovery path.
Follow-up
- What would you drop to keep the system up under load?
- How does this behave when that dependency is down for an hour?
Sealing a billing period against late-arriving usage
Medium · idempotency · immutable ledger · rounding · conditional writes
billing seals a tenant's period once the metering watermark passes the period end, prices the sealed rollups against the plan (included allowance, tier boundaries, negotiated discount) and writes invoice_line_item rows: quantity numeric(28,6), unit_price_micros bigint, amount_minor bigint, currency char(3), source_rollup_watermark timestamptz. The job is re-run after failures and two workers may attempt the same tenant. Events legitimately arrive with occurred_at inside the period and ingested_at after it. Specify the seal transition, the idempotency key for every write including the payment-processor call, the rounding position and mode, and the fate of a post-seal event.
Approach
- Make sealing a conditional write rather than a read followed by a write: UPDATE usage_rollup_hourly SET status = 'sealed', sealed_at = now() WHERE tenant_id = $1 AND hour_start >= $2 AND hour_start < $3 AND status = 'open' RETURNING rollup_id. Two concurrent sealers cannot both win because the loser's predicate no longer matches, and the loser learns it lost from an empty result rather than from a lock timeout.
- Gate the seal on the watermark, not on the clock - the period closes when the fold is trustworthy past period_end - but cap the wait, because an unsealed period blocks the whole billing run. Seal anyway after a stated maximum (six hours past period end is a reasonable default) and let whatever arrives afterwards become an adjustment. The trade-off is named in one line: adjustments are cheap, a missed billing cycle is not.
- Make every write converge under re-run. Line items are idempotent on (invoice_id, sku, rate_tier) with ON CONFLICT DO UPDATE permitted only while the invoice is draft; the payment-processor call carries (tenant_id, billing_period_start) as its idempotency key, because a timeout there is an unknown outcome, not a failed one, and a plain retry is how a customer gets charged twice.
- Keep the arithmetic exact and round exactly once. quantity stays numeric, the rate is an integer unit_price_micros in millionths of a minor unit because per-request prices are genuinely below a cent, and amount_minor = round_half_even(quantity x unit_price_micros / 1,000,000) is computed once per line and stored. Tiering walks the boundaries in order emitting one line per (sku, rate_tier) with tier 0 as the included allowance at price zero; the invoice total is the sum of stored amount_minor values and is never recomputed downstream from quantity and rate.
- Handle the post-seal event as a forward-only correction. The sealed rollup is frozen, so the difference between the sealed value and the restated value becomes a new invoice_line_item with kind = 'adjustment' and voided_by_line_id pointing at the line it reverses, carrying its own source_rollup_watermark. Nothing is edited in place, because the original line is the only evidence of what the customer was actually charged and is precisely what a dispute, a refund or an audit asks to see.
Worked solution (35 min)
- Write the seal as a single conditional UPDATE ... WHERE status = 'open' RETURNING and state exactly what the losing worker sees.
- Price one line by hand: quantity 4,318,904.250000 at unit_price_micros 1200 gives 5,182.6851 minor units and 5,183 after a single half-even rounding. Then do quantity 2,500,000.000000 at unit_price_micros 1, which lands exactly on 2.5 and rounds to 2 under half-even but 3 under half-up.
- Take four hundred synthetic lines with fractional minor units and compute the total two ways - sum of per-line rounded amounts, and a single rounding of the summed exact amounts - then record the gap.
- Trace one event with occurred_at inside the period and ingested_at two days after the seal all the way to the row that eventually reflects it.
Expected result: Seal as a conditional UPDATE from status = 'open' gated on the metering watermark with a bounded maximum wait; line writes idempotent on (invoice_id, sku, rate_tier) and the processor call idempotent on (tenant_id, billing_period_start); amount_minor rounded once per line with half-even; late data becoming an adjustment line that points at the line it reverses and records its own watermark, with no in-place edit anywhere.
Verify it yourself
- Re-running the entire billing job on an already-invoiced period must produce identical line rows and must not call the payment processor a second time. If it charges again, the idempotency key was on the retry rather than on the business fact.
- Over four hundred lines with uniformly distributed fractional parts the two totals should differ by a handful of minor units - standard deviation around sqrt(400/12), about 5.8, with a worst case of 200. If your two totals match exactly, the test data has no fractional parts and has not exercised the trap.
- Every line carries a source_rollup_watermark, and two lines for the same SKU with different watermarks should explain their difference without opening any other table.
Follow-up
- Two workers start the same tenant's seal a millisecond apart and the winner crashes after sealing but before writing any line. What does the second worker observe, and is the resulting invoice correct?
- Show the divergence between rounding each line and rounding the total once over four hundred lines, and say which direction it goes.
- A customer disputes a charge from two quarters ago. Which rows answer it, and which single design decision made that answer possible?
Describe a situation where you had to learn a new technology quickly to solve a production issue.
Medium · debugging and production issues
Approach
- Check the instrumentation before believing the symptom.
- Establish what changed and when, before forming any theory.
- Pick a bisection that eliminates candidates whichever way it turns out.
Follow-up
- What would you add now so this is faster to diagnose next time?
- What would you look at first, and what would it rule out?
Suggested practice checklist
For someone who has spent the last few years shipping features and reading other people's code, and who has not solved a timed problem from a blank file in a long time. Five days rebuild the primitives and the patterns that sit on them, working from invariants rather than remembered solutions, and the last two attach that back to the rest of the loop.
Day 1 — Rebuild the primitives by implementing them
- Implement a dynamic array with doubling growth and an operation counter, then change the growth rule to add a fixed sixteen slots instead, and time both for n of ten thousand, a hundred thousand and a million. The fixed-increment version resizes n/16 times at O(n) each, so its total work is quadratic; doubling is what makes append amortised constant.
- Implement a hash map with separate chaining and a load-factor resize, then insert ten thousand keys engineered to land in one bucket and record what happens to lookup time, so that average-case O(1) becomes a claim with a stated precondition rather than a reflex.
- For dynamic-array append and hash-map insert, write down which cost is amortised rather than worst-case, which single operation pays the whole bill, and what a system with a hard per-operation deadline would have to do instead.
Deliverable: Two working implementations plus a timing table showing the input at which each structure's advertised complexity stops holding.
Day 2 — Arrays under an invariant: two pointers, sliding window, binary search
- Solve longest-subarray-with-sum-at-most-K using a sliding window, then run it on an input containing negative numbers and watch it return the wrong answer: extending the window only moves the sum monotonically when every element is non-negative, and that precondition is the whole reason the technique works.
- Write the binary search that finds the first index satisfying a predicate rather than an exact value, put the loop invariant above the loop in a comment, and verify termination on the two inputs that break careless versions: the empty range, and a range where every element satisfies the predicate.
- Compute the midpoint as lo + (hi - lo) / 2 and write one line on why the obvious (lo + hi) / 2 is a genuine defect in a fixed-width integer type and a non-issue in a language with arbitrary-precision integers.
Deliverable: Three solved problems, each with its invariant written above the loop, plus one recorded input on which the sliding window is provably wrong.
Day 3 — Sorting, heaps, and the greedy argument that has to be proved
- Solve one top-k problem three ways, by full sort, by a size-k heap, and by quickselect, then write the values of n and k at which each becomes the right choice, along with quickselect's quadratic worst case and why a randomised pivot makes that unlikely rather than impossible.
- Implement bottom-up heapify and count sift-down steps to confirm it does linear work rather than n log n, because most nodes sit near the bottom of the tree and therefore move only a short distance.
- Take interval scheduling by earliest finishing time and write the exchange argument out in full: given any optimal schedule, swapping in the earliest-finishing interval keeps it feasible and no smaller. Then construct the weighted variant where that same greedy fails and name what has to replace it.
Deliverable: A three-way top-k comparison with measured crossover points, one written exchange argument, and one counterexample to a greedy rule that looks almost identical.
Day 4 — Recursion, memoisation, and the step to a table
- Take one problem with overlapping subproblems, such as edit distance or coin change, instrument the plain recursion with a call counter to show the blow-up, then add memoisation and re-count.
- Convert the memoised version to a bottom-up table and state the two properties you relied on: each subproblem's result depends only on its arguments, and the dependencies form a DAG you can enumerate in order.
- Rewrite one deep recursion with an explicit stack, then find the input length at which the original hits the interpreter's frame limit, which defaults to about a thousand frames in CPython, so you know when the rewrite is required rather than decorative.
Deliverable: One problem in three forms, naive, memoised and tabulated, with call counts for each and the input length at which recursion depth becomes the binding constraint.
Day 5 — Graphs, where most of the work is choosing the traversal
- Implement BFS and DFS over one adjacency list, then answer for each which finds a shortest path in an unweighted graph and which you would use to detect a cycle in a directed graph, including why the in-progress versus finished distinction matters for the second.
- Implement topological sort by in-degree, feed it a graph containing a cycle, and confirm the failure signature is that fewer than V nodes come out rather than an exception, then note that the order it produces is one of several valid ones.
- Run a shortest-path search on a graph with a single negative edge weight and show the wrong answer, then write the precondition Dijkstra actually needs, non-negative weights, because it finalises a node's distance the first time that node is popped, and name the algorithm you would switch to and its own limit.
Deliverable: A small graph library with BFS, DFS and topological sort, plus two inputs that produce documented wrong answers under the wrong algorithm choice.
Day 6 — One day for everything that is not an algorithm
- Sketch one system only to the depth a coding-heavy loop tends to reach: the endpoints, what the service stores, and the single query pattern that decides the schema. Stop at twenty-five minutes.
- Prepare the project answer for an interviewer who codes, which means rehearsing the two levels they push to: the specific thing you built, and why you chose that approach over the alternative they will name. Open with a number and be ready to say what it excludes.
- Prepare the answer to what you would do differently, choosing a real technical mistake with a specific fix rather than a complaint about process or staffing.
Deliverable: One design sketch at endpoint-and-schema depth, plus a project answer rehearsed to two levels of follow-up.
Day 7 — Solve out loud, under time
- Do three timed problems at twenty-five minutes each in a plain editor with no autocomplete and no execution until the end, then tally separately the failures that were syntax and the ones that were approach, because those two numbers call for different fixes.
- Narrate one solution from the first sentence, stating the approach and its complexity before writing any code, and rehearse the sentence you will use when you realise mid-solution that the approach is wrong.
- Re-solve from blank the two problems you were slowest on this week and compare the times against the day they first appeared.
Deliverable: A recording of one fully narrated solution and a tally that separates syntax failures from approach failures.
Know where your numbers came from
Bring the two or three numbers the story rests on and know how they were collected. A p99 whose timer starts inside your handler excludes the time a request spent queued, so it can sit flat while users wait longer. Give the window, the percentile and what the measurement left out, or drop the number.
If you have two conflicting system requirements, how do you decide on a priority?
Medium · behavioural and engineering judgement
Approach
- State the situation in two sentences and spend the rest on the reasoning.
- Name the disagreement and how you resolved it with evidence.
- Close with what you would do differently, concretely.
Follow-up
- What did you decide not to do, and why?
- What would you do differently if you ran that again?
Walk me through a time you identified a root cause for a recurring system failure.
Medium · behavioural and engineering judgement
Approach
- Give the blast radius: what could have broken, and what you measured.
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
Follow-up
- What did you decide not to do, and why?
- What would you do differently if you ran that again?
Reverse a webhook ordering decision after measuring its cost
Medium · reversing decisions · head-of-line blocking · at-least-once · api contracts
You argued for strict per-subscription ordering in webhook-delivery, which means one in-flight attempt per subscription. It shipped. Three months later a single unresponsive endpoint holds one subscription's queue at a six-hour backlog, and two customers report events arriving out of order anyway once their own retries are counted. Describe a decision you reversed: what you originally optimised for, the measurement that changed your mind, what the reversal cost in engineering time and customer change, and how you told the people who had already built on the original guarantee.
Approach
- State the original decision as a trade you made knowingly. Ordering across a network requires a single in-flight attempt per subscription, and its price is head-of-line blocking whenever one endpoint is slow. 'We priced it wrong' is a much stronger opening than 'we did not realise', and it is usually the true one.
- Bring the measurement that flipped it, not the anecdote: backlog age at the ninety-ninth percentile per subscription, the share of subscriptions where one slow endpoint gated an otherwise healthy queue, and the delivery throughput lost to serialisation. A reversal justified by complaints is indistinguishable from a reversal justified by fatigue.
- Name what you learned about the guarantee itself, which is the engineering content of this story. At-least-once delivery means a retried event already arrives after newer ones and the consumer already must be idempotent, so a guarantee the customer has to defend against anyway was never worth what it cost to provide.
- Describe the migration, because reversing a published contract is the hard half and the part candidates skip. Parallel attempts behind a per-subscription flag, a monotonically increasing sequence number added to the envelope so order-sensitive consumers can sort or discard, documentation that states at-least-once and unordered in those words, and a deprecation measured in quarters because the client is a pinned SDK inside a build pipeline you cannot see or redeploy.
- Give the cost in the two currencies that matter: engineer-weeks, and how many customers had to change code. Then say who you told before it shipped rather than in a changelog afterwards, and which large customer you left on the old behaviour and for how long.
- Close with the signal you now weight differently, stated as something you would do earlier next time: measuring the blocking cost on the slowest decile of endpoints before committing to the guarantee, rather than after a customer noticed.
Follow-up
- A customer insists they need ordering. What do you offer them that is not global serialisation?
- How did you choose the deprecation window given that you cannot see or redeploy the clients?
- What would have to be true for you to reverse back?