Interview guides · ABS Fujitsu General
ABS Fujitsu General Software Engineer Interview Questions & Guide 2026
ABS Fujitsu General software engineer prep on operations: decide what you would need to see to know a release is going wrong.
The 60-second brief
The Software Engineer role at ABS Fujitsu General is a critical function that bridges the gap between sophisticated engineering principles and high-performance industrial production. As a member of the technical team, you are responsible for ensuring that the software and systems driving ABS Fujitsu General's manufacturing and production environments operate with precision, reliability, and efficiency.
Prepare in one language you know well enough to debug in rather than the one you think reads best. Under a clock an unfamiliar language costs you standard-library lookups and iteration mechanics, and that time comes out of your thinking budget, not your typing budget.
Focus areas
- Make every write idempotent under retry
- Detect concurrent edits instead of losing writes
- Trace a symptom to a mechanism under load
Overview
This position is vital to the company's commitment to quality and innovation. You will contribute to projects that directly affect the scale and complexity of the company's operations, ranging from production planning and control to quality assurance systems. Success in this role requires a blend of core technical knowledge, analytical rigor, and the ability to thrive within an environment that values structured, process-driven development.
Where to focus your preparation
Treat the sections below as preparation areas and confirm the format with your recruiter.
Preparation focus
No round sequence has been reported for this company, so work the categories below and confirm the format with your recruiter.
What to demonstrate
- Breadth across SQL, experimentation and product reasoning
- Ability to state assumptions before choosing a method
How to prepare
- Drill the practice exercises below and time yourself
- Prepare three quantified stories about decisions you drove
Where candidates lose points
Paginating with LIMIT/OFFSET over a set that changes while the client is reading it
OFFSET n makes the database produce and discard n rows before returning anything, so the cost of a page grows with its depth rather than with its size and page 500 costs five hundred pages of work. The correctness problem is worse than the cost: if a row is inserted or reordered between two page fetches, rows shift across the offset boundary and are either skipped entirely or returned twice, and neither outcome leaves any trace in the response for the client to detect. Keyset pagination - WHERE (sort_key, id) < ($last_sort_key, $last_id) ORDER BY sort_key DESC, id DESC LIMIT n, backed by an index in exactly that order - reads only the rows it returns and is stable against concurrent inserts. It requires the tie-break column: a timestamp is not unique, and duplicate sort keys straddling a page boundary reintroduce the skip it was adopted to remove.
Choosing an index from the columns a query mentions rather than from how it filters and orders
A composite B-tree index on (a, b, c) can be seeked only as a left prefix: equality on a, then equality on b, then a range or an ordering on c. A query that filters on b alone cannot seek into it at all and at best gets a full scan of the index; a query that filters a and ranges on b gets no benefit from c, because the index is only sorted by c within a fixed (a, b) pair. The practical consequence is that one index per column is close to useless for multi-predicate queries while a single correctly ordered composite index turns a scan into a lookup. The ordering half is what gets missed: if the index cannot satisfy the ORDER BY, the database must read every matching row and sort before the limit can apply, so a LIMIT 20 over a million matching rows still reads a million rows.
Choosing a schema before the access patterns are known
Write the queries first, with their filters, sort orders, cardinalities and which ones sit on the latency-critical path, then design tables and indexes to serve them. An index nothing queries still costs write throughput and storage, and a hot query with no supporting index becomes a full scan that only hurts once the table is big.
Finishing a solution without stating its complexity
Give time and space in the same breath as the code, and define n explicitly when there are two sizes, since n nodes and m edges are not interchangeable. Space is the half that gets skipped: count the auxiliary structures you allocate and the recursion stack at its deepest, not only the answer you hand back.
Questions & practice
Identify the heaviest tenants in a five-minute window under memory pressure
Medium · top-k · heavy hitters · streaming
The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.
Approach
- Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
- Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
- State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
- Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.
- Choose and defend it: at 50,000 tenants the exact rings cost under 100 MB in a process that already holds more, so ship exact. Keep the sketch for the case that actually motivates it, a per-principal or per-IP key where cardinality runs to millions and is not bounded by anything you control.
- Raise the fleet problem before it is asked: each of 20 to 40 instances sees only its share, and the top 50 of one shard is not the top 50 of the fleet. Either aggregate counts centrally or accept that a per-instance threshold multiplied by instance count is the limit you are really enforcing.
Follow-up
- The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
- Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?
- You switch to per-principal keys and cardinality goes to 10 million. Walk through what changes.
Archive a resource graph without breaking live references or recursing
Medium · graph traversal · topological order · tenant isolation
Resources reference other resources within a tenant; for the largest tenant the reference table holds up to 2,000,000 nodes and 8,000,000 edges. Archiving a resource must archive everything reachable from it that nothing outside the set still references, refuse when a live external referrer exists, and terminate when references form cycles, which they legitimately do. Produce the archive order and the refusal list, targeting O(V+E). Say what stops the traversal crossing a tenant boundary, and why recursion is the wrong control structure at this size.
Approach
- Load the subgraph with the tenant predicate on both endpoints of the edge, not only on the side you started from. Scoping the left table alone is the classic cross-tenant leak: one mis-entered edge then pulls another tenant's resources into the traversal and, worse, into the archive.
- Traverse iteratively with an explicit stack. A 2,000,000-node graph can hold a chain deep enough to exhaust a native stack in the low tens of thousands of frames, and that failure is a process crash rather than an error you can return.
- Treat cycles as data rather than corruption: compute strongly connected components with Tarjan in O(V+E) using its own explicit stack, then condense. The condensation is a DAG, so a topological order over it gives the archive order, and every member of a component archives in one transaction because no order within a cycle is valid.
- Decide refusals with reverse edges. A candidate is archivable only if every in-edge originates inside the candidate set, so build the transpose or count in-degrees restricted to the visited set, and emit each blocked resource with the id of the external referrer, which is the only part of the answer an operator can act on.
- Store the graph as CSR rather than a map of lists: an offsets array of V+1 8-byte entries plus E 8-byte targets is about 80 MB at this size, where boxed adjacency lists cost several times that and lose cache locality on every hop.
- Run Kahn over the condensation for the order in O(V+E). If the emitted count is short of the component count the condensation step itself is wrong, since a condensation cannot contain a cycle, which makes the check free.
Follow-up
- The graph is read in one query and the archive writes a minute later. What can change in between, and how do you make the write safe?
- The candidate set is 400,000 resources. Is that one transaction, and if not, what does a half-finished archive look like to a reader?
- An edge points at a resource in another tenant. Is that a refusal, an error, or an alert?
Find overlapping job attempts and peak concurrency from lease records
Medium · sweep line · intervals · leases
A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.
Approach
- Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
- For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
- For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
- Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
- State the clock caveat: started_at and finished_at are written by different workers, so under skew of a few hundred milliseconds an apparent overlap shorter than that bound is not evidence. Filter reported overlaps by a minimum duration, or prefer timestamps written by whichever component heartbeats the lease.
- Scale the sort rather than assuming it fits: the sweep emits two endpoints per attempt, so 50,000,000 records become 100,000,000 endpoints, and at roughly 24 bytes each, an 8-byte timestamp plus a 4-byte job_type plus a kind flag padded to alignment, that is about 2.4 GB of sort keys before any scratch space. Either push the ordering into the database behind an index on (job_type, started_at) or run an external merge sort in chunks; the overlap pass sorts n records rather than 2n, so it is the cheaper of the two.
Worked solution (30 min)
- Write the interval derivation with the COALESCE and state in one line which of the two end sources is observed and which is assumed.
- Write the concurrency sweep: the endpoint tuples, the sort key including the end-before-start tie-break, and the per-job_type counter.
- Hand-trace four attempts of one job, two disjoint and two overlapping by three seconds, and confirm the overlap detector fires exactly once.
- Add the skew filter as a minimum overlap duration, state the value you chose, and justify it from how the timestamps are written.
Expected result: One global sort by (job_run_id, started_at) driving a running-maximum-end check for overlaps, plus a sweep over 2n endpoints with ends ordered before starts for per-job_type peak concurrency, both O(n log n), with half-open intervals, NULL finished_at falling back to lease_expires_at, and overlaps shorter than the clock-skew bound excluded.
Verify it yourself
- Two attempts touching at exactly the same instant report concurrency 1, not 2.
- A job with a single attempt never appears in the overlap output regardless of its lease.
- The reported peak timestamp for a job_type lies inside at least one of that type's intervals.
Follow-up
- A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
- Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
- How would you compute both answers incrementally as records arrive rather than in a daily batch?
Denormalise tenant onto revisions and backfill it live
Hard · denormalisation · online migration · backfill
resource_revision (revision_id, resource_id, version, actor_user_id, change_kind, patch, request_id, created_at) has 400M rows and no tenant column; tenant_id lives only on resource. Two reads need it: a tenant-scoped audit feed ordered by created_at DESC, and an offboarding purge. Both join back to resource today. Justify adding tenant_id to resource_revision against those two reads, name the anomaly the copy introduces and the constraint that prevents it, then give the ordered migration for a live table taking 1.2k writes/second — the lock each step takes, how the backfill is batched, and where each step stops being reversible. PostgreSQL 16.
Approach
- Justify from the access path rather than from taste. Without the column, the audit feed either scans resource_revision by created_at and discards other tenants' rows, or resolves the tenant's resource_ids first and probes with them — both proportional to the tenant's whole history rather than to one page. With (tenant_id, created_at DESC, revision_id DESC) it is a seek that stops at 50 rows, and the purge becomes a ranged delete instead of a join.
- Name the cost exactly: a second copy of a fact can disagree with the first. Make the disagreement unwritable rather than documented — add UNIQUE (resource_id, tenant_id) on resource so it can serve as a foreign-key target, then FOREIGN KEY (resource_id, tenant_id) REFERENCES resource (resource_id, tenant_id) on the revision table. A revision can then only ever carry its parent's tenant.
- Step one, expand: ALTER TABLE resource_revision ADD COLUMN tenant_id BIGINT NULL, with no default, so it is a catalogue change and no rewrite. It still needs ACCESS EXCLUSIVE for an instant, and that instant queues behind the longest open transaction on the table while every later query queues behind it — set lock_timeout to 2s and retry rather than wait.
- Step two, dual-write: deploy the writer that populates tenant_id on every new revision while reads still use the join. Reversible by redeploying the previous build, because nothing reads the column yet.
- Step three, backfill: batch by primary key rather than by created_at so the cursor is dense and resumable — UPDATE resource_revision rr SET tenant_id = r.tenant_id FROM resource r WHERE r.resource_id = rr.resource_id AND rr.revision_id > $1 AND rr.revision_id <= $1 + 5000 AND rr.tenant_id IS NULL — committing per batch and persisting the cursor. Throttle on replica replay lag and on dead-tuple count, since each batch writes 5,000 new row versions. Run the backfill before the index exists so those updates can stay HOT.
- Step four, index then enforce then contract: CREATE INDEX CONCURRENTLY (cannot run inside a transaction block, scans the table twice, waits on open transactions, and leaves an INVALID index to drop concurrently if it fails); ADD CONSTRAINT ... CHECK (tenant_id IS NOT NULL) NOT VALID, then VALIDATE CONSTRAINT, which takes only SHARE UPDATE EXCLUSIVE, after which SET NOT NULL uses the validated check instead of re-scanning on PostgreSQL 12 and later. Only then move the audit reads onto the column and, in a later deploy, delete the join path.
Follow-up
- The backfill is half finished and a rollback is required. What state is the table in, and what does the previous build do with a half-populated column?
- How do you verify the backfill actually finished, given rows are still being inserted while it runs?
- A resource must now be movable between tenants. What does that do to the composite foreign key and to the revisions already written?
Hold a per-tenant active cap against concurrent creates
Hard · write skew · isolation levels · constraints
A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.
Approach
- Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
- Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
- Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
- State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.
- For the job case the invariant is expressible per row, so let the database hold it: a partial unique index on job_run (tenant_id, job_type) WHERE status IN ('queued','running') makes a second running export unwritable and the loser takes 23505, mapped to 409. That is strictly better than a counter — no drift, no reconciliation — and it is available only because the cap is one rather than fifty.
- Add the retry discipline each route demands: under SERIALIZABLE both 40001 and deadlock 40P01 are retryable and the retry must re-execute the read, while under READ COMMITTED with the counter nothing retries, because the conflict is reported to the caller rather than raised as an error.
Worked solution (35 min)
- Reproduce with two sessions that both count 49, both insert and both commit, at READ COMMITTED and then at REPEATABLE READ; record the final active count for each.
- Repeat both sessions at SERIALIZABLE and record which SQLSTATE the loser receives and at which statement it is raised.
- Implement the counter form and run a 20-way concurrent create against a tenant sitting at 45 active resources.
- Implement the partial unique index for the job case and race 20 enqueues of the same export.
Expected result: READ COMMITTED and REPEATABLE READ both finish at 51. SERIALIZABLE finishes at 50 with one transaction aborted at 40001 — usually at commit, though SSI may raise it at an earlier statement. The counter form finishes at exactly 50: of the twenty creates, the five that take the tenant from 45 to 50 return 201 and the remaining fifteen match zero rows and return 409, with no error raised. The job index admits one running export and rejects the rest with 23505.
Verify it yourself
- count(*) WHERE status='active' never exceeds the cap across 50 randomised concurrent runs.
- Remove the active_resource_count < 50 predicate and the same test must start failing; if it still passes, the race is not being exercised.
- At SERIALIZABLE, confirm every participating session is SERIALIZABLE — one session at a lower level and the guarantee is gone.
- After each run, the counter equals the real count of active rows.
Follow-up
- A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
- The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?
- How do you detect after the fact that the counter drifted, without locking the table?
When both the length and cross-sectional area of a resistor (conductor) increase, what is the effect on total resistance?
Medium
Approach
- Say what you would check first and why it is the highest-information step.
- Clarify what is being asked and what a complete answer contains.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Describe your understanding of control systems and their application in manufacturing.
Medium
Approach
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
How do you approach troubleshooting a failure in a production-related system?
Medium
Approach
- Work from the requirement backwards to the design.
- Say what you would check first and why it is the highest-information step.
- State your assumptions explicitly before working the problem.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Explain the core principles of your primary programming language or technical domain.
Medium
Approach
- Work from the requirement backwards to the design.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Give the resource write endpoints a failure taxonomy clients can act on
Easy · error taxonomy · status codes · retries
Two callers use POST and PATCH /v1/resources: a server-side SDK that retries automatically, and a browser app that shows the user a message. Today every failure is a 500 carrying prose. Define the error contract for a malformed body, a field that fails validation, an expired token, a token whose auth_version no longer matches, a resource_id owned by another tenant, a version mismatch on update, an idempotency key reused with a different body, an exceeded tenant quota, and a read replica that has not caught up. Deliverable: the envelope, the status per case, and what each caller does.
Approach
- Split the envelope by audience: a stable
codeenum for programs, amessagedocumented as human-only and free to change wording, arequest_idthat joins to resource_revision.request_id and the trace, and adetailsarray of field paths for validation failures. Publish the negative rules too - clients never branch onmessage, and an unrecognisedcodefalls back to the status class. - Assign status by who has to change something. 400 for bytes that do not parse, 422 for a body that parses and violates a rule, 401 for a token that no longer authenticates - expiry and an auth_version mismatch are the same instruction, re-authenticate - 403 for a scope the principal lacks, 404 rather than 403 for another tenant's resource_id because 403 confirms the id exists, 412 for a failed If-Match (409 if the version travels in the body instead), 422 for a key reused with a different fingerprint, 429 for quota.
- Derive retryability from whether the outcome is unknown, not from the status number. A timeout or a 5xx on a write is unknown - the transaction may have committed and the response lost - so the only safe retry is one carrying the same idempotency key. Every 4xx except 429 is deterministic, and retrying it only spends the caller's remaining deadline.
- Refuse to model replica lag as an error. Read-after-write is held by pinning the session to the primary for a short window, not by a 404 the SDK retries into a loop; if staleness must be visible, expose it as a watermark on a 200, because a failure code invites a retry that cannot fix it.
- Write both caller behaviours into the published contract: the SDK retries only 429, 503 and timeouts, with capped backoff and full jitter bounded by the deadline it was given; the browser stops and shows
message, except on 412, where it must re-read the resource and rebase the edit rather than resubmit.
Worked solution (20 min)
- Write the envelope as four named fields and state which are present on every error response without exception.
- Fill a nine-row table: condition, status, code string, retryable yes/no, and the schedule or the reason a retry cannot help.
- For each retryable row, name what makes the retry safe - HTTP method semantics, or an idempotency key.
- Write the two caller policies as pseudocode: which codes the SDK retries, and what the browser does on 412 and on 429.
Expected result: An envelope with a code enum, a human message, a request_id and per-field details; nine conditions mapped to distinct statuses; retry advice attached to the outcome rather than to the status class; replica lag handled as consistency, not as an error.
Verify it yourself
- Every row marked retryable names the mechanism that makes repeating it safe.
- A resource_id from another tenant and a resource_id that does not exist are indistinguishable from outside.
- Adding a new code does not change any existing code's meaning or any status already published.
Follow-up
- A customer reports two resources created from one click. Which of your status codes could have produced that, and what in the contract permitted the client's reading?
- You need a tenth error code next quarter without a version bump. What must v1 already have said for that to be non-breaking?
Read latency spikes on a sixty-second sawtooth
Medium · cache stampede · single-flight · ttl · tail latency
The cached listing read path serves about 14k reads/second at an 85% hit rate. p99 sits at 35 ms for 57 seconds, jumps to 900 ms for 3, and repeats. During each spike the primary shows several hundred identical listing queries starting within the same millisecond, all carrying one large tenant's id. Cache entries use a 60-second TTL. Give the mechanism, the ordered checks, the fix, and the correctness hazard your fix must not introduce.
Approach
- Match the period to a configured number before theorising about load. A spike every 60 seconds against a 60-second TTL is an entry expiring, and you confirm it by correlating spike timestamps with the entry's write time rather than with the traffic curve. If the period had matched a cron or a GC interval instead, this is a different investigation.
- Establish the concurrency of the miss. Several hundred identical queries in one millisecond means the miss path has no coalescing: every request that arrives between expiry and repopulation recomputes. The herd size is that key's arrival rate times its recompute time, so at 1.2k reads/second for the hot key and a 250 ms recompute you expect about 300 concurrent misses, which matches what is observed.
- Add single-flight on the miss path so one caller per key recomputes under a short-lived lock while the rest wait for its result. Prefer stale-while-revalidate where the read tolerates it: return the expired value immediately and refresh asynchronously, which removes the latency spike rather than serialising it into a queue of waiters.
- De-synchronise the keys. Write TTLs with jitter, for example 60 seconds plus or minus 10%, so a deploy or a mass invalidation does not align every key on the same second and turn a per-key herd into a fleet-wide one.
- Name the hazard the fix must not introduce. Serving a stale listing is acceptable only because the API reports the projection watermark, and a reader that loaded the old value before a write can repopulate the entry after the invalidation, so the bounded TTL is what actually caps staleness rather than the delete. Keep read-after-write pinned to the primary for the writing session regardless.
- Verify on miss concurrency, not hit rate. The hit rate barely moves, because the herd is one miss multiplied; the number that must change is distinct origin queries per key per minute.
Follow-up
- The same sawtooth appears on a key that is invalidated on write rather than expired. Is that the same bug?
- How does your answer change if the recompute takes 4 seconds instead of 250 ms?
- What exactly does a client see during a stale-while-revalidate window, and how does the watermark let them tell?
Suggested practice checklist
For someone who has spent the last few years shipping features and reading other people's code, and who has not solved a timed problem from a blank file in a long time. Five days rebuild the primitives and the patterns that sit on them, working from invariants rather than remembered solutions, and the last two attach that back to the rest of the loop.
Day 1 — Rebuild the primitives by implementing them
- Implement a dynamic array with doubling growth and an operation counter, then change the growth rule to add a fixed sixteen slots instead, and time both for n of ten thousand, a hundred thousand and a million. The fixed-increment version resizes n/16 times at O(n) each, so its total work is quadratic; doubling is what makes append amortised constant.
- Implement a hash map with separate chaining and a load-factor resize, then insert ten thousand keys engineered to land in one bucket and record what happens to lookup time, so that average-case O(1) becomes a claim with a stated precondition rather than a reflex.
- For dynamic-array append and hash-map insert, write down which cost is amortised rather than worst-case, which single operation pays the whole bill, and what a system with a hard per-operation deadline would have to do instead.
Deliverable: Two working implementations plus a timing table showing the input at which each structure's advertised complexity stops holding.
Day 2 — Arrays under an invariant: two pointers, sliding window, binary search
- Solve longest-subarray-with-sum-at-most-K using a sliding window, then run it on an input containing negative numbers and watch it return the wrong answer: extending the window only moves the sum monotonically when every element is non-negative, and that precondition is the whole reason the technique works.
- Write the binary search that finds the first index satisfying a predicate rather than an exact value, put the loop invariant above the loop in a comment, and verify termination on the two inputs that break careless versions: the empty range, and a range where every element satisfies the predicate.
- Compute the midpoint as lo + (hi - lo) / 2 and write one line on why the obvious (lo + hi) / 2 is a genuine defect in a fixed-width integer type and a non-issue in a language with arbitrary-precision integers.
Deliverable: Three solved problems, each with its invariant written above the loop, plus one recorded input on which the sliding window is provably wrong.
Day 3 — Sorting, heaps, and the greedy argument that has to be proved
- Solve one top-k problem three ways, by full sort, by a size-k heap, and by quickselect, then write the values of n and k at which each becomes the right choice, along with quickselect's quadratic worst case and why a randomised pivot makes that unlikely rather than impossible.
- Implement bottom-up heapify and count sift-down steps to confirm it does linear work rather than n log n, because most nodes sit near the bottom of the tree and therefore move only a short distance.
- Take interval scheduling by earliest finishing time and write the exchange argument out in full: given any optimal schedule, swapping in the earliest-finishing interval keeps it feasible and no smaller. Then construct the weighted variant where that same greedy fails and name what has to replace it.
Deliverable: A three-way top-k comparison with measured crossover points, one written exchange argument, and one counterexample to a greedy rule that looks almost identical.
Day 4 — Recursion, memoisation, and the step to a table
- Take one problem with overlapping subproblems, such as edit distance or coin change, instrument the plain recursion with a call counter to show the blow-up, then add memoisation and re-count.
- Convert the memoised version to a bottom-up table and state the two properties you relied on: each subproblem's result depends only on its arguments, and the dependencies form a DAG you can enumerate in order.
- Rewrite one deep recursion with an explicit stack, then find the input length at which the original hits the interpreter's frame limit, which defaults to about a thousand frames in CPython, so you know when the rewrite is required rather than decorative.
Deliverable: One problem in three forms, naive, memoised and tabulated, with call counts for each and the input length at which recursion depth becomes the binding constraint.
Day 5 — Graphs, where most of the work is choosing the traversal
- Implement BFS and DFS over one adjacency list, then answer for each which finds a shortest path in an unweighted graph and which you would use to detect a cycle in a directed graph, including why the in-progress versus finished distinction matters for the second.
- Implement topological sort by in-degree, feed it a graph containing a cycle, and confirm the failure signature is that fewer than V nodes come out rather than an exception, then note that the order it produces is one of several valid ones.
- Run a shortest-path search on a graph with a single negative edge weight and show the wrong answer, then write the precondition Dijkstra actually needs, non-negative weights, because it finalises a node's distance the first time that node is popped, and name the algorithm you would switch to and its own limit.
Deliverable: A small graph library with BFS, DFS and topological sort, plus two inputs that produce documented wrong answers under the wrong algorithm choice.
Day 6 — One day for everything that is not an algorithm
- Sketch one system only to the depth a coding-heavy loop tends to reach: the endpoints, what the service stores, and the single query pattern that decides the schema. Stop at twenty-five minutes.
- Prepare the project answer for an interviewer who codes, which means rehearsing the two levels they push to: the specific thing you built, and why you chose that approach over the alternative they will name. Open with a number and be ready to say what it excludes.
- Prepare the answer to what you would do differently, choosing a real technical mistake with a specific fix rather than a complaint about process or staffing.
Deliverable: One design sketch at endpoint-and-schema depth, plus a project answer rehearsed to two levels of follow-up.
Day 7 — Solve out loud, under time
- Do three timed problems at twenty-five minutes each in a plain editor with no autocomplete and no execution until the end, then tally separately the failures that were syntax and the ones that were approach, because those two numbers call for different fixes.
- Narrate one solution from the first sentence, stating the approach and its complexity before writing any code, and rehearse the sentence you will use when you realise mid-solution that the approach is wrong.
- Re-solve from blank the two problems you were slowest on this week and compare the times against the day they first appeared.
Deliverable: A recording of one fully narrated solution and a tally that separates syntax failures from approach failures.
The estimate and the day you knew
A slipped date is only a bad story if you sat on it. What matters is what you believed when you gave the number, the signal that told you it was wrong, how many days passed before you said so, and what you cut rather than asking for more time. Scope you defended counts as much as scope you dropped.
Narrate an outage you owned from page to postmortem
Hard · incident response · blast radius · postmortems
Pick an incident you personally drove, ideally one where writes were affected rather than reads. In six to eight minutes: state the symptom as it first appeared on a dashboard, the blast radius you established before you knew the cause, the mitigation you applied and when, the mechanism you eventually proved, and the follow-up that would prevent a repeat. Bring numbers: error rate, tenants affected, minutes to mitigate, minutes to resolve. If you cannot name what you measured, choose a different incident.
Approach
- Open on the signal rather than the cause: which metric at which percentile moved, on which service, at what time, so the listener follows the same evidence you had rather than a conclusion you already reached.
- Separate mitigation from diagnosis out loud. State what you did to stop the bleeding (flag off, shed traffic, drain a lease, roll back a deploy) and say plainly that you did it before the mechanism was known, because those are two jobs with different deadlines.
- Establish blast radius in countable terms: how many tenants, how many writes, and crucially whether the effect was loss or only delay. An append-only revision table or a pending outbox row means the change survived and the projection was merely behind, which is a repair rather than a data-loss incident.
- Prove the mechanism instead of asserting it. Name the trace span that grew, the plan that flipped to a sequential scan, the lease that expired, plus one alternative you ruled out and the signal that stayed flat while you ruled it out.
- Close on the durable fix and its cost, distinguishing what landed that week from what needed an expand-and-contract migration across several deploys, and say which of the two you actually finished.
Follow-up
- What would you do differently in the first five minutes, given the same dashboard and no more information?
- Which follow-up action did you deliberately not take, and why was dropping it the right call?
- How did you convince yourself the mitigation was safe to apply while the cause was still unknown?
Estimate work you have never done and defend the range
Hard · estimation · backfills · expand-contract
You are asked to estimate a change you have never attempted: add a column to a 100-million-row table, populate it, move reads across, and drop the old shape. Give a range with the assumptions that generate it, including batch size, the signal your backfill throttles on, and wall-clock hours, and name the three unknowns that would move the number most. Then describe a real estimate you gave under comparable ignorance: how you expressed its uncertainty, what you committed to, and how wrong you turned out to be.
Approach
- Decompose into independently deployable steps before estimating anything: add the column nullable, write both shapes, backfill in batches, verify, move reads, stop writing the old shape, drop it. That is four deploys spread over days, and the calendar estimate is dominated by them rather than by the loop's runtime.
- Do the arithmetic aloud for the part that has arithmetic in it: batch size times number of batches times per-batch duration, at a write rate the primary can absorb alongside roughly 1.2k writes per second of production traffic. The loop is throttled by replication lag and lock waits, not by how fast it can issue statements.
- Price the schema step by its lock rather than its statement duration. In PostgreSQL an ALTER TABLE taking ACCESS EXCLUSIVE waits for every open transaction on that table while later queries queue behind it, so a millisecond change issued during a thirty-second analytics query stalls that table for thirty seconds. Adding a nullable column with a non-volatile default avoids a rewrite from version 11; a new index wants CREATE INDEX CONCURRENTLY, which cannot run inside a transaction block and leaves an invalid index behind if it fails.
- Express the answer as a range whose endpoints each trace to a stated assumption, then name the cheapest experiment that collapses it, which is almost always running one real batch against the real table and multiplying.
- Commit to a checkpoint rather than a completion date: the day you report a measured number from that first batch. That is a promise you can keep under uncertainty, and it is what the asker actually needs in order to plan.
Follow-up
- How do you verify the backfill genuinely finished, given rows written by production traffic while it ran?
- Where does the backfill resume from after a worker is killed mid-batch, and what makes that resume point trustworthy?
- Your first batch comes back ten times slower than assumed. What do you tell the person waiting on the estimate, and when?
Argue against a design, lose, and commit anyway
Medium · disagreement · service boundaries · decision records
Describe a design you argued against and lost. State the failure you predicted as a named mechanism, not a feeling about complexity: two services that would need one transaction, a projection with no rebuild path, a write path with no idempotency key. Say what evidence you brought, what the decision maker weighed instead, and what you did after the decision was made: what you instrumented, what you wrote down, and whether the prediction came true. Five minutes.
Approach
- State the prediction in falsifiable form up front: the mechanism, the condition that triggers it, and the observable outcome. A prediction that cannot be checked also cannot be credited to you later.
- Show the evidence you had at the time and label each piece honestly as measured, analogous, or intuition. Keeping the intuition is fine; disguising it as data is the thing that erodes your standing in the next argument.
- Represent the opposing case at full strength, including the constraint you did not control: a fixed date, a team boundary, or the fact that the decision was cheap to reverse and yours was not.
- Make disagree-and-commit concrete. Name the artefact you left behind so the prediction could be settled without you: the alert and its threshold, the counter on the dashboard, the decision note that recorded the trade-off and the condition that would revisit it.
- Report the outcome without editing it. If the design held and your predicted mechanism never fired, say so and say what you had mis-weighted, which is more persuasive than a vindication story.
Follow-up
- What threshold on that alert would have proved you right, and did anyone ever look at it?
- If the same proposal arrived tomorrow with the same deadline, would you argue it the same way?
- How did you behave toward the design once it shipped and started failing in a different way than you predicted?