Implement a Dependency-Aware Task Scheduler
This question evaluates skills in dependency management, deadline-driven scheduling and algorithmic data-structure design, focusing on handling directed acyclic graphs and ordering constraints.
Implement a TaskManager class with two methods:
AddTasks(tasks): add one or more tasks into the system.ConsumeTask(): return and remove the executable task with the earliest deadline.
Each task has the following fields:
id: unique task identifierddl: integer deadline, where a smaller value means an earlier deadlinesubTasks: a list of prerequisite task IDs that must be completed before this task can be consumed
Requirements:
- Support multiple calls to
AddTasks. ConsumeTask()should return the pending task with the smallest deadline among all currently executable tasks.- A task is executable only if all of its prerequisite tasks have already been consumed.
- If no executable task exists, return
NO_TASK. - For this coding problem, assume task IDs are unique and the dependency graph is valid and acyclic.
Explain the data structures you would use and implement both methods efficiently.
Implement a Dependency-Aware Task Scheduler
Design a dependency-aware task scheduler. Each task has an integer id, an integer deadline ddl, and a list subTasks containing prerequisite task IDs. A task can be consumed only after all of its prerequisite tasks have already been consumed.
The original interface is a TaskManager class with:
AddTasks(tasks): add one or more new tasksConsumeTask(): return and remove the currently executable task with the earliest deadline
For this judge, implement a function solution(operations) that simulates the class.
Each operation is one of:
('add', tasks)wheretasksis a list of task dictionaries('consume',)
For every ('consume',) operation, append the returned value to the answer list.
Rules:
- Multiple add operations are allowed.
- A task is executable only if every ID in
subTaskshas already been consumed. - Among executable tasks, consume the one with the smallest
ddl. - If several executable tasks have the same
ddl, consume the one with the smallerid. - If no executable task exists, return
'NO_TASK'. - Task IDs are unique, and the dependency graph is valid and acyclic.
Return a list containing the result of every consume operation in order.
Constraints
- 1 <= total number of tasks across all add operations <= 200000
- 0 <= total number of dependency links across all tasks <= 200000
- 0 <= ddl <= 10^9
- Task IDs are unique integers
- The dependency graph is acyclic and all prerequisite IDs are valid task IDs that may appear in earlier or later add operations
Examples
Example 1
Input: [('add', [{'id': 1, 'ddl': 5, 'subTasks': []}, {'id': 2, 'ddl': 3, 'subTasks': []}]), ('consume',), ('consume',), ('consume',)]
Output: [2, 1, 'NO_TASK']
Explanation: Tasks 1 and 2 are immediately executable. Task 2 has the earlier deadline, then task 1, then nothing remains.
Example 2
Input: [('add', [{'id': 1, 'ddl': 5, 'subTasks': []}, {'id': 2, 'ddl': 1, 'subTasks': [1]}, {'id': 3, 'ddl': 4, 'subTasks': []}]), ('consume',), ('consume',), ('consume',), ('consume',)]
Output: [3, 1, 2, 'NO_TASK']
Explanation: Task 2 has the smallest deadline but is blocked by task 1. So task 3 is consumed first, then 1, which unlocks 2.
Hints
- You need one structure to quickly get the executable task with the smallest deadline, and another structure to update tasks that become executable after a prerequisite is consumed.
- Track, for each task, how many prerequisites are still unfinished, and keep reverse edges from each prerequisite to the tasks that depend on it.
Approach
This is Kahn's topological-sort algorithm fused with a min-heap so that, among all currently-executable tasks, we always pick the one with the smallest deadline.
State maintained
tasks:id → {ddl, remaining, consumed}whereremainingis the count of not-yet-consumed prerequisites.dependents:prereqId → [tasks waiting on it](a reverse adjacency list).consumed: set of already-finished task ids.ready: a min-heap of(ddl, id)holding tasks whose prerequisites are all satisfied.
add_tasks — For each new task it scans subTasks. A prerequisite already in consumed is ignored; otherwise it bumps remaining and records this task under that prereq in dependents. This handles out-of-order adds (a task may be added before or after its prerequisite). If remaining == 0, the task is immediately pushed to ready.
consume_task — Pop the smallest (ddl, id). Because the heap key is the tuple (ddl, id), ties on deadline break to the smaller id automatically (rules 3–4). Stale heap entries — already consumed, or whose remaining is no longer 0 — are skipped (lazy deletion). The chosen task is marked consumed; then every dependent's remaining is decremented, and any that reaches 0 is pushed to ready. If the heap empties without a valid task, it returns 'NO_TASK'.
Correctness: A task enters ready exactly when its last outstanding prerequisite is consumed, so rule 2 (all prerequisites done) holds; the heap guarantees the earliest-deadline / smallest-id choice (rules 3–4). Lazy deletion keeps stale tuples harmless.
- Time complexity: O(N log N + E)
- Space complexity: O(N + E)